CN106556722B CN201611022636.1A CN201611022636A CN106556722B CN 106556722 B CN106556722 B CN 106556722B CN 201611022636 A CN201611022636 A CN 201611022636A CN 106556722 B CN106556722 B CN 106556722B
Authority
CN
China
Prior art keywords
ammeter
phase
isolation switch
replacing
secondary connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611022636.1A
Other languages
Chinese (zh)
Other versions
CN106556722A (en
Inventor
郑宏
崔山林
姜川
李政年
陈东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611022636.1A priority Critical patent/CN106556722B/en
Publication of CN106556722A publication Critical patent/CN106556722A/en
Application granted granted Critical
Publication of CN106556722B publication Critical patent/CN106556722B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • G01R11/02Constructional details
    • G01R11/04Housings; Supporting racks; Arrangements of terminals

Abstract

A method of do not have a power failure and replaces the area Zhu Biantai metering device, battalion when replacement CT or ammeter is avoided to match personnel while arriving field operation, the labor intensity for alleviating staff also ensures power supply reliability, its step are as follows: the isolation switch and on-load switch of corresponding prepped side CT are first closed when needing replacing secondary connection side CT, make one group of CT paired running, then disconnects the on-load switch and isolation switch of the secondary connection side CT needed replacing;The on-load switch of secondary connection side CT and isolation switch are closed after replacement, then disconnect the on-load switch and isolation switch of corresponding prepped side CT;When replacing ammeter, external insulation is combed in insertion fixing pluge socket, comb teeth passes through the electrical contact end of each pair of electroconductive elastic sheet, disconnects the current terminal of ammeter, realizes CT closed loop with connection conductive sheet by the lower conductive sheet on comb teeth, replaces ammeter;After having changed ammeter, external insulation comb is transferred to, it can normal power supply.

Description

Do not have a power failure the method for replacing the area Zhu Biantai metering device
Technical field
The present invention relates to a kind of methods for replacing the area Zhu Biantai metering device that do not have a power failure.
Background technique
Currently, needing platform area to stop when column becomes the secondary connection side CT in (time variant voltage on column) platform area or ammeter breaks down Electricity, power supply department battalion arrive field operation simultaneously with personnel, step on bar replacement CT by distribution personnel or replace the ammeter calculated in electricity box, Operating personnel's large labor intensity, causes damages after power failure to manufacturing enterprise.
Summary of the invention
The present invention is to propose a kind of method for replacing the area Zhu Biantai metering device that do not have a power failure, when avoiding replacement CT or ammeter Battalion arrives field operation simultaneously with personnel, and the labor intensity for alleviating staff also ensures power supply reliability, prevents because having a power failure Unnecessary economic loss is caused to manufacturing enterprise.
To solve the above problems, the technical solution adopted by the present invention is as follows:
1, former pole type transformer secondary connection side CT is moved on in counter box, every phase secondary connection side CT is corresponded in electricity box One prepped side CT is set and constitutes one group of CT, installs isolation switch respectively in every group of CT source side and load side and load is opened It closes, the isolation switch and on-load switch of secondary connection side CT be in closed state, the isolation switch of corresponding prepped side CT and bears Lotus switch is in an off state;
2, fixing pluge is set in counter box, the fixing pluge be located at secondary connection side CT leading-out terminal and ammeter into Between line end, three groups of electroconductive elastic sheets of corresponding A, B, C phase built in fixing pluge, every group of electroconductive elastic sheet is by two pairs of electroconductive elastic sheet structures At, the resilient electrical contact of opposite end up and down of each pair of electroconductive elastic sheet and it is connected to A phase end of incoming cables, A phase leading-out terminal and B phase end of incoming cables, B Phase leading-out terminal and C phase end of incoming cables, C phase leading-out terminal, fixing pluge set there are six socket and are located on batch meter panel, and market people Member combs equipped with six tooth external insulations, and six comb teeth of the external insulation comb are corresponding with the electrical contact end of six pairs of electroconductive elastic sheets respectively, and Upper conductive sheet and lower conductive sheet is respectively set in the upper and lower surfaces of six comb teeth, the lower conductive sheet is by being located in comb handle It connects conductive sheet and realizes electrical connection;
3, the isolation switch and on-load switch that corresponding prepped side CT is first closed when needing replacing secondary connection side CT, make One group of CT paired running, then disconnect the on-load switch and isolation switch of the secondary connection side CT needed replacing;
4, the on-load switch of secondary connection side CT and isolation switch are closed after replacing, then disconnect corresponding prepped side CT's On-load switch and isolation switch;
5, when replacing ammeter, external insulation is combed in insertion fixing pluge socket, comb teeth passes through the electricity of each pair of electroconductive elastic sheet Contact jaw, by A phase end of incoming cables and A phase leading-out terminal, B phase end of incoming cables and B phase leading-out terminal and C phase end of incoming cables and C phase leading-out terminal it It is separated, that is, the current terminal of ammeter is disconnected, the lower conductive sheet and connection conductive sheet realization CT closed loop on comb teeth, replacement electricity are passed through Table;
6, after having changed ammeter, external insulation comb is transferred to, it can normal power supply.
Further, it is located at beside each pair of electroconductive elastic sheet in fixing pluge and is also equipped with another pair electroconductive elastic sheet side by side, with Make to be inserted into more stable when external insulation comb.
It is calculated in electricity box the beneficial effects of the present invention are: former pole type transformer secondary connection side CT is moved on to, and every phase One group of CT is set, and fixing pluge and external insulation comb are set, is not had a power failure under conditions of ensuring personal safety and replaces CT Or ammeter, battalion with personnel while arriving field operation when avoiding replacement CT or ammeter, and it is easy to operate, alleviate the labor of staff Fatigue resistance also ensures power supply reliability, prevents from causing unnecessary economic loss to manufacturing enterprise.
Detailed description of the invention
Fig. 1 is the arrangement schematic diagram of pole type transformer of the invention;
Fig. 2 is the electrical schematic diagram in the area Zhu Biantai of the invention;
Fig. 3 is fixing pluge outline drawing;
Fig. 4 is terminal schematic diagram behind fixing pluge;
Fig. 5 is fixing pluge schematic diagram of internal structure;
Fig. 6 is external insulation comb front schematic view;
Fig. 7 is the schematic rear view of external insulation comb.
Specific embodiment
Do not have a power failure the method for replacing the area Zhu Biantai metering device, and its step are as follows:
1, as shown in Figure 1 and Figure 2, former pole type transformer secondary connection side CT is moved on in counter box, it is corresponding every in electricity box Phase secondary connection side CT is arranged a prepped side CT and constitutes one group of CT, installs isolation respectively in every group of CT source side and load side Disconnecting link and on-load switch, the isolation switch and on-load switch of secondary connection side CT are in closed state, corresponding prepped side CT's Isolation switch and on-load switch are in an off state;
2, as shown in Fig. 2, Fig. 3, Fig. 4 and Fig. 5, fixing pluge 1 is set in counter box, the fixing pluge 1 is located at Between secondary connection side CT leading-out terminal and ammeter end of incoming cables, three groups of electroconductive elastic sheets of corresponding A, B, C phase built in fixing pluge 1, often Group electroconductive elastic sheet is made of two pairs of electroconductive elastic sheets, the resilient electrical contact of opposite end up and down of each pair of electroconductive elastic sheet 102,103 and company It connects in A phase end of incoming cables, A phase leading-out terminal and B phase end of incoming cables, B phase leading-out terminal and C phase end of incoming cables, C phase leading-out terminal, fixing pluge 1 If there are six socket 101 and being located on batch meter panel;As shown in Figure 6 and Figure 7, marketing personnel are equipped with six tooth external insulations comb 2, institute Six comb teeth 201 for stating external insulation comb 2 are corresponding with the electrical contact end of six pairs of electroconductive elastic sheets respectively, and six comb teeth 201 it is upper, Conductive sheet 203 and lower conductive sheet 204 is respectively set in lower surface, and the lower conductive sheet 204 passes through the connection in comb handle 202 Conductive sheet 205 realizes electrical connection;
3, the isolation switch and on-load switch that corresponding prepped side CT is first closed when needing replacing secondary connection side CT, make One group of CT paired running, then disconnect the on-load switch and isolation switch of the secondary connection side CT needed replacing;
4, the on-load switch of secondary connection side CT and isolation switch are closed after replacing, then disconnect corresponding prepped side CT's On-load switch and isolation switch;
5, when replacing ammeter, by 2 insertion fixing pluge socket 101 of external insulation comb, comb teeth 201 passes through each pair of conductive bullet The electrical contact end of piece 102,103, by A phase end of incoming cables and A phase leading-out terminal, B phase end of incoming cables and B phase leading-out terminal and C phase end of incoming cables It is separated with C phase leading-out terminal, that is, the current terminal of ammeter is disconnected, lower conductive sheet 204 and connection conductive sheet on comb teeth 202 are passed through 205 realize CT closed loop, replace ammeter;
6, after having changed ammeter, external insulation comb 2 is transferred to, it can normal power supply.
It is located at each pair of 102,103 side of electroconductive elastic sheet in fixing pluge 1 and is also equipped with another pair electroconductive elastic sheet side by side, so that It is inserted into more stable when external insulation comb.
The above is only specific embodiments of the present invention, are not intended to restrict the invention, for those skilled in the art For member, the invention may be variously modified and varied.All within the spirits and principles of the present invention, it is made it is any modification, Equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (2)

1. do not have a power failure the method for replacing the area Zhu Biantai metering device, it is characterized in that:
1), former pole type transformer secondary connection side CT is moved on in counter box, every phase secondary connection side CT is corresponded in electricity box and is set It sets a prepped side CT and constitutes one group of CT, install isolation switch respectively in every group of CT source side, distinguish in every group of CT load side Another isolation switch and breaker are installed, the isolation switch and breaker of secondary connection side CT is in closed state, corresponding The isolation switch and on-load switch of prepped side CT is in an off state;
2), fixing pluge is set in counter box, the fixing pluge is located at secondary connection side CT leading-out terminal and ammeter inlet wire Between end, three groups of electroconductive elastic sheets of corresponding A, B, C phase built in fixing pluge, every group of electroconductive elastic sheet is by two pairs of electroconductive elastic sheet structures At, the resilient electrical contact of opposite end up and down of each pair of electroconductive elastic sheet and it is connected to A phase end of incoming cables, A phase leading-out terminal and B phase end of incoming cables, B Phase leading-out terminal and C phase end of incoming cables, C phase leading-out terminal, fixing pluge set there are six socket and are located on batch meter panel, and market people Member combs equipped with six tooth external insulations, and six comb teeth of the external insulation comb are corresponding with the electrical contact end of six pairs of electroconductive elastic sheets respectively, and Upper conductive sheet and lower conductive sheet is respectively set in the upper and lower surfaces of six comb teeth, the lower conductive sheet is by being located in comb handle It connects conductive sheet and realizes electrical connection;
3) isolation switch and breaker that corresponding prepped side CT, is first closed when needing replacing secondary connection side CT, make one group CT paired running, then disconnect the breaker and isolation switch of the secondary connection side CT needed replacing;
4) breaker of secondary connection side CT and isolation switch are closed after, replacing, then disconnect the load of corresponding prepped side CT Switch and isolation switch;
5), when replacing ammeter, external insulation is combed in insertion fixing pluge socket, comb teeth passes through the electrical contact of each pair of electroconductive elastic sheet End, by A phase end of incoming cables and A phase leading-out terminal, B phase end of incoming cables and B phase leading-out terminal and the interruption of C phase end of incoming cables and C phase leading-out terminal It opens, that is, disconnects the current terminal of ammeter, by the lower conductive sheet and connection conductive sheet realization CT closed loop on comb teeth, replace ammeter;
6) after, having changed ammeter, external insulation comb is transferred to, it can normal power supply.
2. the method according to claim 1 that replace the area Zhu Biantai metering device that do not have a power failure, it is characterized in that: in fixing pluge It is interior to be located at beside each pair of electroconductive elastic sheet side by side equipped with another pair electroconductive elastic sheet.
CN201611022636.1A 2016-11-18 2016-11-18 Do not have a power failure the method for replacing the area Zhu Biantai metering device Active CN106556722B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611022636.1A CN106556722B (en) 2016-11-18 2016-11-18 Do not have a power failure the method for replacing the area Zhu Biantai metering device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611022636.1A CN106556722B (en) 2016-11-18 2016-11-18 Do not have a power failure the method for replacing the area Zhu Biantai metering device

Publications (2)

Publication Number Publication Date
CN106556722A CN106556722A (en) 2017-04-05
CN106556722B true CN106556722B (en) 2019-05-07

Family

ID=58444445

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611022636.1A Active CN106556722B (en) 2016-11-18 2016-11-18 Do not have a power failure the method for replacing the area Zhu Biantai metering device

Country Status (1)

Country Link
CN (1) CN106556722B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107765056B (en) * 2017-09-22 2020-05-01 国家电网公司 Direct current CT replacing device
CN113625010B (en) * 2021-07-29 2023-08-22 国网重庆市电力公司营销服务中心 Wiring device

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202210109U (en) * 2011-08-16 2012-05-02 广平县供电公司 Metering box capable of electrically replacing electric meter and current transformer
CN103245809A (en) * 2013-06-03 2013-08-14 国家电网公司 Portable electric quantity remedying device and electric energy meter replacing method for accurate metering
CN203707525U (en) * 2014-03-10 2014-07-09 国家电网公司 Short circuit apparatus for replacement of electric energy meter without power failure
CN103913613A (en) * 2014-04-03 2014-07-09 云南电力试验研究院(集团)有限公司电力研究院 Device allowing electric energy meter to be plugged and unplugged without outage
CN204044202U (en) * 2014-07-25 2014-12-24 国家电网公司 A kind of power failure changes the Apparatus and system of electric energy meter
JP2015129707A (en) * 2014-01-08 2015-07-16 関西電力株式会社 Uninterruptible bypass tool for watthour meter
CN105527476A (en) * 2015-12-23 2016-04-27 华威博奥电力设备有限公司 Device and method for plugging and unplugging electric energy meter without power-off
CN205450050U (en) * 2016-03-28 2016-08-10 万沙电气有限公司 Do not cut off power supply and change instrument of electric energy meter
CN106093502A (en) * 2016-07-19 2016-11-09 国网上海市电力公司 A kind of power failure changes the device of single-phase intelligent electric energy meter

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202210109U (en) * 2011-08-16 2012-05-02 广平县供电公司 Metering box capable of electrically replacing electric meter and current transformer
CN103245809A (en) * 2013-06-03 2013-08-14 国家电网公司 Portable electric quantity remedying device and electric energy meter replacing method for accurate metering
JP2015129707A (en) * 2014-01-08 2015-07-16 関西電力株式会社 Uninterruptible bypass tool for watthour meter
CN203707525U (en) * 2014-03-10 2014-07-09 国家电网公司 Short circuit apparatus for replacement of electric energy meter without power failure
CN103913613A (en) * 2014-04-03 2014-07-09 云南电力试验研究院(集团)有限公司电力研究院 Device allowing electric energy meter to be plugged and unplugged without outage
CN204044202U (en) * 2014-07-25 2014-12-24 国家电网公司 A kind of power failure changes the Apparatus and system of electric energy meter
CN105527476A (en) * 2015-12-23 2016-04-27 华威博奥电力设备有限公司 Device and method for plugging and unplugging electric energy meter without power-off
CN205450050U (en) * 2016-03-28 2016-08-10 万沙电气有限公司 Do not cut off power supply and change instrument of electric energy meter
CN106093502A (en) * 2016-07-19 2016-11-09 国网上海市电力公司 A kind of power failure changes the device of single-phase intelligent electric energy meter

Also Published As

Publication number Publication date
CN106556722A (en) 2017-04-05

Similar Documents

Publication Publication Date Title
CN106556722B (en) Do not have a power failure the method for replacing the area Zhu Biantai metering device
CN203367955U (en) Low voltage power cable isolation device
CA2800420C (en) Externally fused enclosure for a solar power system
CN203205870U (en) Single phase grounding protection switch cabinet
CN209417121U (en) Do not have a power failure rotation single-phase electricity electricity box
CN208209544U (en) A kind of novel circuit configuration of electric main power connection in power plant
CN207925382U (en) A kind of disconnecting switch static contact
CN105375480B (en) A kind of maintenance pedestal and air switch
CN106505415A (en) A kind of power supply row cabinet
CN207782141U (en) A kind of secondary voltage circuit and high-tension switch cabinet of PT
CN108808729A (en) A kind of novel circuit configuration of electric main power connection in power plant
CN204118031U (en) Indoor high-voltage vacuum on-load switch fuse combined electric apparatus
CN210577360U (en) Metal armored switch equipment with maintenance uninterrupted power supply function
CN201503970U (en) Protective socket
CN202206133U (en) Lightning protection isolator for direct-to-home signal line and power socket with same
CN207800395U (en) Box type transformer low pressure universal switch automatic switching-on device
CN104362519A (en) Medium-voltage power distribution system
CN205194892U (en) Device for connecting components and parts
CN202059180U (en) Low-voltage reactive power compensation drawer module
CN110445049A (en) It is a kind of not have a power failure the metal armoured switchgear of function with maintenance
CN106602409A (en) Unit power distribution cabinet buscouple linkage system
CN202616126U (en) Novel outdoor AC high-voltage isolation switch
CN209001447U (en) A kind of power distribution cabinet earthing or grounding means
CN205429435U (en) High tension switchgear's electrification shows ground structure
CN204129085U (en) Loaded termination control system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant