CN106555590A - The efficient fully-mechanized mining working method for designing in intensive fault zone - Google Patents

The efficient fully-mechanized mining working method for designing in intensive fault zone Download PDF

Info

Publication number
CN106555590A
CN106555590A CN201510613499.8A CN201510613499A CN106555590A CN 106555590 A CN106555590 A CN 106555590A CN 201510613499 A CN201510613499 A CN 201510613499A CN 106555590 A CN106555590 A CN 106555590A
Authority
CN
China
Prior art keywords
coal
face
tomography
mining
work surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510613499.8A
Other languages
Chinese (zh)
Inventor
崔树彬
郑永胜
刘学麟
赵庆祥
卢鑫
高德波
高坤
梁光录
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINWEN MINING GROUP ZHAI TOWN COAL MINE CO Ltd
Original Assignee
XINWEN MINING GROUP ZHAI TOWN COAL MINE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINWEN MINING GROUP ZHAI TOWN COAL MINE CO Ltd filed Critical XINWEN MINING GROUP ZHAI TOWN COAL MINE CO Ltd
Priority to CN201510613499.8A priority Critical patent/CN106555590A/en
Publication of CN106555590A publication Critical patent/CN106555590A/en
Pending legal-status Critical Current

Links

Abstract

The efficient fully-mechanized mining working method for designing in the intensive fault zone of the present invention, concrete grammar is:(1) Mining block design is coal seam group combined layout, and a point Multi sectional arrangement moves towards coal wall or incline longwall face, retreats.(2) optimizing design scheme of 3-d seismic exploration technology for exploiting field Exploitation Status, is introduced, the tomography of drop 3-10m in exploiting field can be found out, energy Optimization Work face recovery scheme arranges stope along tomography.(3) it is larger for special Adjacent Working Face fault throw, and when nearer with unitized production coal seam spacing, make same gate road also cross upper and lower two coal seams, work surface and adjustment mining sequence are arranged by reasonable selection heading layer position, the merging exploitation of different coal work surface is realized.

Description

The efficient fully-mechanized mining working method for designing in intensive fault zone
Technical field
The present invention relates to mining technique field, more particularly to intensive fault zone working face under complex geological condition Face method for designing.
Background technology
Usually because ocurrence of coal seam is uncertain, geological structure is complicated in tomography intensive exploiting field, and craven fault is relatively more, The unfavorable geological conditions such as coal seam thickness is unstable, causes to exploit difficulty increase, it is impossible to arrange high-yield and high-efficiency work Make face, economic benefit is poor.Cause exploiting field entirety roadway engineering amount many, ten thousand tons of exploiting field drivage ratio height, work Face is frequently moved passing fault, and coal resources loss is serious.In particular cases, because fault throw affects to cause phase Adjacent work surface different coal layer position is close to and is even docking together, if continuing according to tradition exploitation same coal seam Method, passing fault continually look for same layer coal, cause the increase of roadway construction total rock quantities and Coal Loss, Cause whole exploiting field realize that economical and efficient is exploited.
Need to provide a kind of intensive tomography area working face method for designing, further find out tomography distribution, realize disconnected The safe and efficient production in layer compact district.
The content of the invention
The invention provides a kind of efficient fully-mechanized mining working method for designing in the intensive fault zone in colliery, introduces dimensionally Seismic exploration technology, finds out exploiting field tomography distribution situation, optimizes coal-mining method, reduces geologic risk to greatest extent, And realize that special Adjacent Working Face different coal merges exploitation, create good economic benefit.
The efficient fully-mechanized mining working method for designing in the intensive fault zone of the present invention, concrete grammar is:
(1) Mining block design is coal seam group combined layout, and a point Multi sectional arrangement moves towards coal wall or inclined longwall Work surface, retreats.
(2) optimizing design scheme of 3-d seismic exploration technology for exploiting field Exploitation Status, is introduced, can be found out and be adopted The tomography of drop 3-10m in area, energy Optimization Work face recovery scheme, arranges stope along tomography.
(3) it is larger for special Adjacent Working Face fault throw, and when nearer with unitized production coal seam spacing, Make same gate road also cross upper and lower two coal seams, work is arranged by reasonable selection heading layer position Face and adjustment mining sequence, realize the merging exploitation of different coal work surface.
The invention has the beneficial effects as follows:In the intensive exploiting field of tomography, realize that work surface connection and reasonable arrangement evades tomography, create Highly efficient and productive work surface is found.Additionally, design interrupting layer in innovation conventional operation face continues along same when larger The idea of coal seam driving, by using fault throw, two coal seams of rational exploitation, considerably reduces tomography The cost of winning of compact district.
Description of the drawings
Example is designed below in conjunction with the accompanying drawings, and the specific embodiment of the present invention is described in further detail.
Fig. 1 two layers of coal designs of original;
Fig. 2 introduces the optimizing design scheme after 3-d seismic exploration;
Fig. 3 is that special Adjacent Working Face fault throw is big and when being close to unitized production coal seam spacing, using same Gate road exploits the design instance graph of different coal.
Specific embodiment
According to Fig. 1-Fig. 3:The efficient fully-mechanized mining working method for designing in the intensive fault zone of the present invention, concrete side Method is:
(1) Mining block design is coal seam group combined layout, and a point Multi sectional arrangement moves towards coal wall or inclined longwall Work surface, retreats.
(2) optimizing design scheme of 3-d seismic exploration technology for exploiting field Exploitation Status, is introduced, can be found out and be adopted The tomography of drop 3-10m in area, energy Optimization Work face recovery scheme, arranges stope along tomography.
(3) it is larger for special Adjacent Working Face fault throw, and when nearer with unitized production coal seam spacing, Make same gate road also cross upper and lower two coal seams, work is arranged by reasonable selection heading layer position Face and adjustment mining sequence, realize the merging exploitation of different coal work surface, effectively reduce simple exploitation same The passing fault total rock quantities that one coal seam is brought.
Embodiment 1:According to Fig. 1:The optimizing design scheme of former two layers of coal, four sections of the program point, Back production is carried out using strike long wall method.
Embodiment 2:According to Fig. 2:The optimizing design scheme after 3-d seismic exploration is introduced, exploiting field is adjusted Arrangement based on being in tilted layout is divided into 3 main exploitation block sections, compares original and move towards longwell arrangement, reduce complete Rock gangway road 1300m, whole enzymatic method 337m, reduce removal of home and remove 6 times, 200,000 tons of multi-party coal output, it is contemplated that 13,000,000 yuan of input can be saved.
Embodiment 3:According to Fig. 3:It is big for special Adjacent Working Face fault throw and be close between unitized production coal seam Away from when, using same gate road exploitation different coal design instance graph;WF7 in Fig. 3 between work surface 1,2 Tomography fault throw about 19m, close to interlamellar spacing 24m of two, four layers of coal, in work surface design process, lane Road is first tunneled wait disclosing after WF7 tomographies, along two layers of coal driving of work surface 2 along four layers of coal of work surface 1, Realize that Adjacent Working Face two-layer coal merges exploitation, realize the exploitation of work surface economical and efficient.

Claims (1)

1. the efficient fully-mechanized mining working method for designing in intensive fault zone, concrete grammar is:
(1) Mining block design is coal seam group combined layout, and a point Multi sectional arrangement moves towards coal wall or inclination Coal wall, retreats;
(2) optimizing design scheme of 3-d seismic exploration technology for exploiting field Exploitation Status, is introduced, can be looked into The tomography of drop 3-10m in bright exploiting field, energy Optimization Work face recovery scheme, arranges back production work along tomography Make face;
(3) it is larger for special Adjacent Working Face fault throw, and when nearer with unitized production coal seam spacing, Make same gate road also cross upper and lower two coal seams, arranged by reasonable selection heading layer position Work surface and adjustment mining sequence, realize the merging exploitation of different coal work surface.
CN201510613499.8A 2015-09-24 2015-09-24 The efficient fully-mechanized mining working method for designing in intensive fault zone Pending CN106555590A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510613499.8A CN106555590A (en) 2015-09-24 2015-09-24 The efficient fully-mechanized mining working method for designing in intensive fault zone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510613499.8A CN106555590A (en) 2015-09-24 2015-09-24 The efficient fully-mechanized mining working method for designing in intensive fault zone

Publications (1)

Publication Number Publication Date
CN106555590A true CN106555590A (en) 2017-04-05

Family

ID=58413444

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510613499.8A Pending CN106555590A (en) 2015-09-24 2015-09-24 The efficient fully-mechanized mining working method for designing in intensive fault zone

Country Status (1)

Country Link
CN (1) CN106555590A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107816353A (en) * 2017-11-06 2018-03-20 山东科技大学 A kind of excessive drop tomography new method of fully-mechanized mining working

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1567771A1 (en) * 1988-05-27 1990-05-30 Всесоюзный научно-исследовательский институт горной геомеханики и маркшейдерского дела Method of winning mineral reserves under guarded objects in areas under influence of steep tectonic disturbances
CN102808628A (en) * 2012-08-18 2012-12-05 山东新阳能源有限公司 Construction method of passage of large-section tunnel by water diversion fault
CN103775084A (en) * 2014-01-26 2014-05-07 四川川煤华荣能源股份有限公司花山煤矿 Construction technology of large-inclined-angle and large-mining-height fully-mechanized coal mining equipment passing through geological-structured fracture zone
CN104088642A (en) * 2014-06-30 2014-10-08 山东科技大学 Super-short-wall coal mining method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1567771A1 (en) * 1988-05-27 1990-05-30 Всесоюзный научно-исследовательский институт горной геомеханики и маркшейдерского дела Method of winning mineral reserves under guarded objects in areas under influence of steep tectonic disturbances
CN102808628A (en) * 2012-08-18 2012-12-05 山东新阳能源有限公司 Construction method of passage of large-section tunnel by water diversion fault
CN103775084A (en) * 2014-01-26 2014-05-07 四川川煤华荣能源股份有限公司花山煤矿 Construction technology of large-inclined-angle and large-mining-height fully-mechanized coal mining equipment passing through geological-structured fracture zone
CN104088642A (en) * 2014-06-30 2014-10-08 山东科技大学 Super-short-wall coal mining method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
侯留月: "近距离煤层过断层方法探索与研究", 《中国新技术新产品》 *
闫勇: "复杂条件下的三维地震勘探", 《煤田地质与勘探》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107816353A (en) * 2017-11-06 2018-03-20 山东科技大学 A kind of excessive drop tomography new method of fully-mechanized mining working
CN107816353B (en) * 2017-11-06 2019-04-19 山东科技大学 A kind of excessive drop tomography new method of fully-mechanized mining working

Similar Documents

Publication Publication Date Title
CN103628877B (en) A kind of multilayer gentle dip is thin-in thick mineral deposit filling mining method
CN103089266B (en) Drift-pillar-free sublevel barnyard caving mining method of open pit transferred underground transitional period
KR102369397B1 (en) Cooperative discharge method of upper layer separation water and narrow coal bed gas
CN103016053B (en) Method of local filling to control surface subsidence in gob
CN104533416B (en) Pole big thick ore body massive mechanical non-pillar sublevel caving mining methods
CN103821515B (en) A kind of double face filling coal mining technique
CN103362510B (en) Sublevel-drilling bench-combination ore-removal sublevel-room mining method
CN103216236A (en) Method for reducing subsidence of stope overburden bed separation by grouting
CN102080526A (en) Method for extracting gas from bedding level fractured well of ground coal seam roof
CN102352769A (en) Integrated mining method for commonly mining coal and gas of high mine
CN102493838A (en) Method for fully mechanized continuously-filling coal mining of steeply pitching coal seam
US20180195386A1 (en) Parallel digging, mining and filling operation coal mining method for controlling overlaying strata fracture and surface subsidence
CN102587960A (en) Arrangement method of high gas coal seam extraction working face roadway
AU2021106168A4 (en) High-gas Coal Seam Group Pressure Relief Mining Method Based on Gob-side Entry Retaining in the First Mining Whole Rock Pressure Relief Working Face
CN106761750B (en) Slot type recovery method is built in the longwell plane milling of half-edge coal seam longitudinal direction
CN109209474A (en) A kind of method that dual-lateral well extracts lower coal seam and top more goaf gas and ponding
CN103147759B (en) Prospecting and short-hole shrinkage mining method of small inclined ore body
CN101718209B (en) Processing method of passing sunk pillars on full-mechanized mining working face
CN110043309A (en) Close the method for arranging and well bore installation method of the gas drainage well of coal mine
CN103061732B (en) Hydraulic fracturing method of 2-3 meter hard medium sandstone stratum of roof of coal seam
CN205135632U (en) Lower leaf structure of coal seam group closely
CN110671148B (en) One-hole multi-open ground grouting filling method above coal pillar
CN103758521B (en) A kind of exploitation method of deep fractures
CN106555590A (en) The efficient fully-mechanized mining working method for designing in intensive fault zone
CN108343400B (en) Method for extracting coal seam group gas by directional drilling bedding

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170405

WD01 Invention patent application deemed withdrawn after publication