CN106555565A - A kind of low pressure and easy leaking loses the cementing method that well positive injection is instead squeezed - Google Patents

A kind of low pressure and easy leaking loses the cementing method that well positive injection is instead squeezed Download PDF

Info

Publication number
CN106555565A
CN106555565A CN201611083144.3A CN201611083144A CN106555565A CN 106555565 A CN106555565 A CN 106555565A CN 201611083144 A CN201611083144 A CN 201611083144A CN 106555565 A CN106555565 A CN 106555565A
Authority
CN
China
Prior art keywords
well
drilling fluid
positive injection
pressure
cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611083144.3A
Other languages
Chinese (zh)
Other versions
CN106555565B (en
Inventor
李明忠
李正国
毕明清
谢海涛
赵毅博
魏钊
何斌斌
蒋记伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinopec Oilfield Service Corp
Sinopec North China Petroleum Engineering Corp
Original Assignee
Sinopec Oilfield Service Corp
Sinopec North China Petroleum Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinopec Oilfield Service Corp, Sinopec North China Petroleum Engineering Corp filed Critical Sinopec Oilfield Service Corp
Priority to CN201611083144.3A priority Critical patent/CN106555565B/en
Publication of CN106555565A publication Critical patent/CN106555565A/en
Application granted granted Critical
Publication of CN106555565B publication Critical patent/CN106555565B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices, or the like

Abstract

The present invention relates to a kind of low pressure and easy leaking loses the cementing method that well positive injection is instead squeezed, including:1) drilling fluid stages cycle is carried out during setting of casing;2) carry out top under after complete sleeve pipe to drilling fluid in well logical;If setting up normal circulation, fixed displacement circulated at least two cycles;Circulation, positive injection drilling fluid cannot such as be set up;Ensure that annular space is unobstructed;3) positive cement injection sealing returns height to the cement ensured by drop ply bottom position or stratum pressure-bearing;4) small displacement carries out trying to squeeze, and drop ply is squeezed logical;Such as try to squeeze well head pressure more than PClose, then stop construction;Such as try to squeeze well head pressure less than PClose, anti-crowded construction is carried out with slurry rod structure according to anti-squeeze cementing amount is designed.It is low that the cementing method efficiently solves the problems, such as that the cement that well cementation leakage is caused returns high not enough and interval isolation displacement efficiency, reduce the cement mortar caused by leakage to waste, it is to avoid because the cost brought using ultralow density cement slurries is dramatically increased and the poorly sealed production hidden danger for causing of sizing collar.

Description

A kind of low pressure and easy leaking loses the cementing method that well positive injection is instead squeezed
Technical field
The invention belongs to Oil/gas Well shaft building technical field of construction, and in particular to what a kind of low pressure and easy leaking mistake well positive injection was instead squeezed consolidates Well method.
Background technology
Well cementation is the key operation link during Oil/gas Well shaft building, realizes cement sheath in sleeve pipe and the constituted annular space of well Interior structure and the basic demand that sealing integrity is casing and cementing.But when well well cementation is lost to low pressure and easy leaking, due to stratum pressure-bearing Ability is relatively low, and under the effect of annular space hydrodynamic column pressure, cement mortar enters drop ply, causes cement to return high not enough, and sacrifices indirectly top Improve for efficiency, so as to cause cementing quality poor, affect Oil/gas Well normally production and service life.
The technology of anti-well cementation leakage mainly has low-density or Ultra-Low Density Cement Slurries and Stage collar casing.Use The materials such as foam, high strength glass microballon, floating bead and micro- silicon are used as palliative, the low-density or ultralow close of compatibility additive exploitation Degree mortar architecture, density can be down to 0.9g/cm3, meet well cementation needs.But as cement slurry density is reduced, while ensureing strong The performances such as degree, stability, dehydration meet well cementation needs, palliative intensity, additive performance requirement are greatly improved, is current state Not permitted in interior many block well cementation low cost operation present situations.In addition, the well cementation of twin-stage hoop is constrained by Formation bearing pressure, its peace Put position to determine with reference to well cementation slurry post, slurry performance, it is impossible to fundamentally realize well cementation leakproof;And if twin-stage hoop cuts out not Sternly (situation repeatedly may occur at the scene), then casing pressure test is unsatisfactory for producing needs, remedies task difficulty greatly, effect compared with Difference.
In prior art,《Positive injection instead squeezes application of the cementing technology in casing window sidetracking well》(Wang Zimin etc., natural gas Technology with it is economical, 2011) text describes conventional positive injection and instead squeezes cementing technology:It is to be applied to stratum that positive injection instead squeezes cementing technology Bearing capacity is too low, in drilling process severe leakage a kind of special oil gas well cementing operation technology.Conventional well positive injection instead squeezes well cementation Main technique technical characterstic is as follows:1. absorption well is necessarily used for, and has accurately grasped the characteristic of loss horizon;2. positive injection Cement mortar returns high design and is generally drop ply above 200m;3. instead squeezing construction must be carried out after positive injection neck slurry initial set;4. anti-squeezing is applied Before work injection cement mortar, bottom lost-circulation zone is first injected, is conducive to positive slip casting and the linking of anti-shove, is realized full well sealing.But should Article only to positive injection instead squeeze well cementation carry out qualitative design, be not yet related to regard to well prepare, slurry rod structure, well head pressure feature and The systematized engineering design methods such as control.
In sum, " positive injection is counter to squeeze " is as the remedial technology that cement returns high deficiency is solved after leakage of cementing the well, above-mentioned normal Rule positive injection is instead squeezed cementing technology and is generally used for surface pipe and intermediate casing cementing, but for low pressure and easy leaking loses the " positive injection of well Return crowded " cementing technology, still lack the method for designing and quality assurance measure of system at present, become in low cost well cementation operating situation The lower difficult problem for ensureing the type well cementing quality.
The content of the invention
It is an object of the invention to provide a kind of low pressure and easy leaking loses the cementing method that well positive injection is instead squeezed, effectively solving well cementation leakage The cement for causing returns the low problem of high not enough and interval isolation displacement efficiency, reduces because the cement mortar that leakage is caused is wasted.
In order to realize object above, the technical solution adopted in the present invention is:
A kind of low pressure and easy leaking loses the cementing method that well positive injection is instead squeezed, and comprises the following steps:
1) setting of casing:Drilling fluid stages cycle is carried out during setting of casing;
2) sleeve pipe enters well to designing after well depth, top is carried out to drilling fluid in well logical;
Normal circulation can be set up after leading to such as drilling fluid top, speed is returned with ring control and is not less than 1.2m/s, fixed displacement circulation at least two The individual cycle;
As in well, drilling fluid cannot set up circulation, positive injection drilling fluid controls slip casting discharge capacity, by sleeve pipe and the following annular space of leak source Interior closing slurry is pushed to stratum;Annular space drilling fluid more than leak source is pushed to stratum from annular space, to destroy drilling well in annular space Liquid structural capacity, it is ensured that annular space is unobstructed;
3) positive injection:Positive cement injection sealing returns height to the cement ensured by drop ply bottom position or stratum pressure-bearing;
4) it is anti-to squeeze:Examination is carried out with the discharge capacity for being not higher than 300L/min to squeeze, drop ply is squeezed logical, and record examination squeezing well head pressure;
Such as try to squeeze well head pressure more than PClose, then stop construction;
Such as try to squeeze well head pressure less than PClose, anti-crowded construction is carried out with slurry rod structure according to anti-squeeze cementing amount is designed;
PClose=min { the maximum closing well rated pressure allowed by ground preventer, formation fracture pressure at the casing shoe of upper strata }.
The low pressure and easy leaking of the present invention loses well positive injection, and anti-crowded cementing method is applied to:Formation bearing pressure is less than 1.30g/ cm3, and cost control is received, be not suitable for using consolidating that extremely-low density, high strength cement slurry system or foamed cement slurry system are carried out Well.
The low pressure and easy leaking of the present invention loses the cementing method that well positive injection is instead squeezed, and design principle is as follows:
1. the well of normal circulation can be set up before cementing the well, is cemented the well with normal slurry amount using normal procedure, be met with all strength and improve Displacement efficiency is required;Height is returned according to the cement can guarantee that by Formation bearing pressure in part wellblock, suitably adds 10%~15% body The design positive injection cement slurry volume of accumulated amount;
2. the well of normal circulation cannot be set up before cementing the well, using " positive injection " and " anti-to squeeze " well cementation;" positive injection " cement slurry volume is returned To drop ply position, do not add, " positive injection " section displacement efficiency is ensured using engineering measure;
3. there is leakage in normal well cementation but cement returns height not enough, or using " positive injection " and " anti-crowded " well cementation, to be sufficiently destroyed Drilling fluid structural capacity in the well section annular space of top, promote the borehole wall and casing wall mud cake to wash away, reduce drilling fluid and cement mortar blending is Purpose carries out " anti-to squeeze " design.
It is a systematic engineering of business to improve low pressure and easy leaking and lose well cementing quality, in scope (the setting of casing mistake of casing and cementing control Circulation and cementing operation process before journey, well cementation) take effective measure to be premise.First, before " positive injection is counter to squeeze " construction, need Property of drilling fluid in well is adjusted, viscosity and shear force is reduced.
As low pressure and easy leaking loses, well Formation bearing pressure is generally relatively low, and On Drilling Fluid Thixotropy is larger, should divide during setting of casing Duan Xunhuan, abolishes drilling fluid structural capacity, reduces the surge pressure that sleeve pipe enters well, while avoiding turn on pump from suppressing Lou stratum.Step 1 again) In, the stages cycle is referred to:Weak formation above well section is circulated per 500m;Into before weak formation, weak formation above well In Duan Jing, drilling fluid is all replaced;Into after weak formation, per the circulation of 200m well sections.During stages cycle, slow top is logical, pressure After stable, discharge capacity is gradually stepped up.
Under after complete sleeve pipe, the situation of normal circulation can be set up after drilling fluid top is logical:Sleeve pipe enters well to designing after well depth, first First to drilling fluid in well, slowly top is logical, and well inner sealing slurry is all recycled well by slush pump list valve small displacement;Returned according to well head Slurry situation, gradually steps up circulation discharge capacity;After annular space returns speed is not less than 1.2m/s, fixed displacement is circulated at least two weeks, is realized effective False filter cake on one, second interface is removed, the purpose of drilling fluid viscosity and shear force is reduced.Adjustment drilling fluid viscosity, shear force so as to meet Well cementation needs.Drilling fluid density is adjusted according to hole condition actual conditions;General, the Marsh funnel viscosity of drilling fluid is less than 45s.
Under after complete sleeve pipe, circulation cannot be set up in well, drilling fluid closing slurry can not recycle the situation of well:The complete set under There is the situation that High angle section and horizontal segment closing slurry in leakage, well cannot recycle well, positive injection drilling fluid, according to well head after pipe Pressure, controls slip casting discharge capacity, not only sleeve pipe can be pushed to stratum with the closing slurry in the following annular space of leak source, remove mud Cake, and ensure to deteriorate leakage situation.
Step 2) in, if circulation cannot be set up in well, slurry discharge capacity is replaced in control, by the closing in sleeve pipe and the following annular space of leak source When slurry is pushed to stratum, drilling fluid consumption is 1.5~2 times of this section of volume.From in annular space by annular space drilling fluid more than leak source It is appropriate to push to stratum, to destroy drilling fluid structural capacity in annular space, it is ensured that annular space is unimpeded.
" positive injection " cementing design:Positive cement injection sealing is returned to the cement ensured by drop ply bottom position or stratum pressure-bearing It is high.
Before positive injection construction, it is initially injected glue or newly with drilling fluid, is then implanted sequentially flushing liquor, cement mortar, in the borehole wall Under the premise of stable, flushing liquor segment length is improved.It is initially injected glue or newly matches somebody with somebody drilling fluid, it is therefore an objective to is sufficiently destroyed drilling fluid knot in well Structure power, effectively washes away wall cake.When injection flushing liquor, cement mortar, it is ensured that for slurry discharge capacity, but no more than circulation of drilling fluid Discharge capacity, to improve interval of interest cementing quality.
Such as cement the well the equal normal circulation of front drilling fluid, then the Formation bearing pressure of layer is lost as foundation with low pressure and easy leaking, positive injection Cement mortar sealing segment length L is determined according to vertical depth h on well depth track:
In formula (1), PHoldThe Formation bearing pressure of layer is lost for low pressure and easy leaking, has PHoldHoldgHL, wherein ρHoldFor stratum pressure-bearing energy Power equal yield density;PfFor this layer of position above annular space well section circulation frictional resistance;HLFor this layer of position place well vertical depth;ρmFor in annular space Drilling fluid density;ρcFor the equal yield density of this layer of position above cement mortar.Wherein, PfComputational methods may be referred to《SY-T5480– 1992 cementing rheological characteristics are designed》.
Such as during setting of casing or circulation of drilling fluid occurred leakage, step 3) in positive injection cement mortar sealing to drop ply Bottom, does not add, and retains anti-crowded passage;
As Jing after leak stopping cement the well before drilling well liquid energy set up normal circulation, then by one design procedure of scheme 3) in positive injection cement Slurry sealing segment length;
Scheme one:Cement mortar sealing segment length by easy lost-circulation zone above segment length L and easy lost-circulation zone to constitute down to bottom hole spacing, Cement slurry volume adds 10%~15% volume.
Cement mortar sealing segment length is considered as scheme one and drafts anti-crowded layer position position.
As drafted the cement mortar institute sealing that anti-crowded layer position is designed by scheme one, then the cement mortar interval isolation of positive injection is a length of drafts The annular space segment length of anti-crowded layer position to shaft bottom;
As drafted the cement mortar institute sealing that anti-crowded layer position is not designed by scheme one, then it is designed by scheme one.
Instead squeeze in cementing design, anti-final setting time of the time interval of crowded and positive injection not less than cement mortar at the top of positive injection.
Step 4) in, anti-squeeze cementing amount is designed according to the bruising pressure and wastage of positive injection, while additional 10%~ 15% volume.
Step 4) in, after examination was squeezed drop ply crowded leading to, injection flushing liquor consumption is improved, for destroying drilling fluid structural capacity in well And the mud cake washed away on the borehole wall, casing wall;Segment length insulating liquid not less than 200m is squeezed afterwards instead.The purpose of injection flushing liquor is abundant Destruction drilling fluid static the formed structural capacity of long-time, the mud cake effectively washed away on the borehole wall, casing wall in the well.
Before injection cement mortar, insulating liquid (or isolation slurry) of the segment length no less than 200m can be injected.
The anti-construction degree squeezed includes:
A) preventer is closed, the anti-crowded pipeline of connection, small displacement carry out examination and squeeze (cementing truck is not higher than 300L/min discharge capacities), note Well head pressure is squeezed in record examination;
Such as try to squeeze well head pressure more than PClose, then stop, no longer carrying out anti-squeezing and construct;
PClose=min { the maximum closing well rated pressure allowed by ground preventer, formation fracture pressure at the casing shoe of upper strata };
Such as try to squeeze well head pressure less than PClose, it is slow to improve anti-crowded discharge capacity, record well head pressure;It is slow again to reduce the anti-row of squeezing Amount, records well head pressure;Contrast investigates leakage and the closure situation of anti-crowded passage with the well head pressure twice under discharge capacity;Full Sufficient well head pressure is not more than PCloseAnti- crowded discharge capacity is improved as far as possible with the premise of the anti-crowded passage making capacity of reservation.
B) carry out anti-squeezing according to the anti-squeeze cementing amount of design and slurry rod structure to construct.Well head pressure is kept a close eye on during crowded operation instead Power changes;Anti- crowded well head pressure P0It is calculated as follows:
P0=PL-PFluid column+Pf (2)
In formula (2), PLTo return crowded passage leakage pressure, PFluid columnFor head of liquid in annular space, PfFor annular circulation frictional resistance.
The low pressure and easy leaking of the present invention loses the cementing method that well positive injection is instead squeezed, according to Formation bearing pressure and main lost-circulation zone Position, takes into account leakproof and improves displacement efficiency needs, optimize " positive injection is counter to squeeze " cementing method, it is ensured that construction quality, is to solve well cementation Low cost operation and ensure a kind of effective ways of contradiction between cementing quality, efficiently solve the well cementation cement that causes of leakage and return The low problem of high not enough and interval isolation displacement efficiency, reduce the cement mortar caused by leakage and waste, it is to avoid super because applying The cost that low-density cement mortar brings is dramatically increased and the poorly sealed production hidden danger for causing of sizing collar.
Compared with prior art, low pressure and easy leaking of the invention loses the cementing method that well positive injection is instead squeezed, with following beneficial effect Really:
(1) based on Formation bearing pressure and easy lost-circulation zone characteristic distributions, improvement and optimization " positive injection is counter to squeeze " well cementation side Method.Jing after the application of scene, the cement that effectively solving well cementation leakage is caused returns the low problem of high not enough and interval isolation displacement efficiency, Cementing quality significantly improves;And, technology Jing is promoted, and can be reduced because the cement mortar that leakage is caused is wasted, it is to avoid because making Dramatically increased with the cost that ultralow density cement slurries bring, it is to avoid the poorly sealed production hidden danger for causing of sizing collar.
(2) by systematized method for designing and quality assurance measure, become remedial measure and well well cementation is lost into low pressure and easy leaking Routinely method, it is adaptable to because in well cementation leakage cause cement return it is high not enough and under miss after complete sleeve pipe must cement the well by force Operating mode, be with a wide range of applications.
Description of the drawings
Well head pressure change schematic diagram when Fig. 1 is instead to squeeze;
When Fig. 2 is anti-crowded, slurry enters the schematic diagram of drop ply, wherein (a) is full of drilling fluid for drop ply, (b) exists for flushing liquor Drop ply fingering, (c) uniformly advances in drop ply for cement mortar;
Fig. 3 is JP-302 well cementing quality schematic diagrames, wherein (a) cements the well for well depth 0-800m, it is (b) attached for well depth 1200m Nearly 70m empty set pipes, (c) for the purpose of layer sealing;
Fig. 4 is JP-329 well cementing quality schematic diagrames, wherein (a) is top leak source above well section well cementation, it is (b) two leak sources Between cement the well, (c) be the well cementation of shaft bottom positive injection well section.
Specific embodiment
With reference to specific embodiment, the present invention is further illustrated.
Low pressure and easy leaking in specific embodiment loses the cementing method that well positive injection is instead squeezed, and applicable elements are:Stratum pressure-bearing energy Power is less than 1.30g/cm3, and cost control is received, be not suitable for using extremely-low density, high strength cement slurry system or foam slurry The well cementation that system is carried out.
The low pressure and easy leaking loses the cementing method that well positive injection is instead squeezed, and design principle is as follows:
1. the well of normal circulation can be set up before cementing the well, is cemented the well with normal slurry amount using normal procedure, be met with all strength and improve Displacement efficiency is required;Height is returned according to the cement can guarantee that by Formation bearing pressure in part wellblock, suitably adds 10%~15% body The design positive injection cement slurry volume of accumulated amount;
2. the well of normal circulation cannot be set up before cementing the well, using " positive injection " and " anti-to squeeze " well cementation;" positive injection " cement slurry volume is returned To drop ply position, do not add, " positive injection " section displacement efficiency is ensured using engineering measure;
3. there is leakage in normal well cementation but cement returns height not enough, or using " positive injection " and " anti-crowded " well cementation, to be sufficiently destroyed Drilling fluid structural capacity in the well section annular space of top, promote the borehole wall and casing wall mud cake to wash away, reduce drilling fluid and cement mortar blending is Purpose carries out " anti-to squeeze " design.
Low pressure and easy leaking in specific embodiment loses the cementing method that well positive injection is instead squeezed, and specifically includes following steps:
1) setting of casing:Drilling fluid stages cycle is carried out during setting of casing;
Stages cycle is required:Weak formation above well section is circulated per 500m;Into before weak formation, weak floor above well section In well, drilling fluid is all replaced;Into after weak formation, per the circulation of 200m well sections;During stages cycle, slow top is logical, and pressure is steady After fixed, discharge capacity is gradually stepped up.The purpose of stages cycle is to abolish drilling fluid structural capacity, reduces the exciting pressure that sleeve pipe enters well generation Power, while avoiding turn on pump from suppressing Lou stratum.
2) sleeve pipe enters well to designing after well depth, top is carried out to drilling fluid in well logical;
Under after complete sleeve pipe, the situation of normal circulation can be set up after drilling fluid top is logical:Sleeve pipe enters well to designing after well depth, first First to drilling fluid in well, slowly top is logical, and well inner sealing slurry is all recycled well by slush pump list valve small displacement;Returned according to well head Slurry situation, gradually steps up circulation discharge capacity;After annular space returns speed is not less than 1.2m/s, fixed displacement is circulated at least two weeks, is realized effective False filter cake on one, second interface is removed, the purpose of drilling fluid viscosity and shear force is reduced.Drilling fluid density is adjusted according to hole condition actual conditions Whole, Marsh funnel viscosity is less than 45s.
Under after complete sleeve pipe, circulation cannot be set up in well, drilling fluid closing slurry can not recycle the situation of well:The complete set under There is the situation that High angle section and horizontal segment closing slurry in leakage, well cannot recycle well, positive injection drilling fluid, according to well head after pipe Pressure, controls slip casting discharge capacity, not only sleeve pipe can be pushed to stratum with the closing slurry in the following annular space of leak source, remove mud Cake, and ensure to deteriorate leakage situation;Drilling fluid consumption is 1.5~2 times of this section of volume.From in annular space by more than leak source Annular space liquid is suitably pushed to stratum, to destroy drilling fluid structural capacity in annular space, it is ensured that annular space is unimpeded.
3) positive injection:Before " positive injection " construction, it is initially injected glue or newly with drilling fluid, is sufficiently destroyed drilling fluid structure in well Power, effectively washes away wall cake;Then flushing liquor, cement mortar are implanted sequentially;Ensure for slurry discharge capacity, but circulation of drilling fluid can not be surpassed Discharge capacity, improve interval of interest cementing quality.The water ensured to drop ply bottom position or stratum pressure-bearing by positive cement injection sealing Mud returns height.
Such as cement the well the equal normal circulation of front drilling fluid, then the Formation bearing pressure of layer is lost as foundation with low pressure and easy leaking, positive injection Cement mortar sealing segment length L is determined according to vertical depth h in well track:
In formula (1), PHoldThe Formation bearing pressure of layer is lost for low pressure and easy leaking, has PHoldHoldgHL, wherein ρHoldFor stratum pressure-bearing energy Power equal yield density;PfFrictional resistance is circulated for this layer of position above annular space well section, computational methods may be referred to《SY-T5480-1992 water fillings Mudflow denaturation is designed》;HLFor this layer of position place well vertical depth;ρmFor the drilling fluid density in annular space;ρcFor this layer of position above cement The equal yield density of slurry.
There is leakage such as during setting of casing or circulation of drilling fluid, cement slurry volume is determined according to well loss zone's location;Root Factually log well footpath data, the cement mortar sealing of positive injection do not added to drop ply bottom, retains anti-crowded passage;
Before as cemented the well Jing after leak stopping, well drilling well liquid energy sets up normal circulation, then the cement mortar envelope of positive injection is designed by scheme one Gu segment length;Scheme one:Cement mortar sealing segment length by easy lost-circulation zone above segment length L and easy lost-circulation zone to constitute down to bottom hole spacing, Cement slurry volume adds 10%~15% volume;
Cement mortar sealing segment length is considered as scheme one and drafts the position of anti-crowded layer position:
As drafted the cement mortar institute sealing that anti-crowded layer position is designed by scheme one, then the cement mortar interval isolation of positive injection is a length of drafts The annular space segment length of anti-crowded layer position to shaft bottom;
As drafted the cement mortar institute sealing that anti-crowded layer position is not designed by scheme one, then it is designed by scheme one.
4) it is anti-to squeeze:The anti-crowded time interval with positive injection is not less than the final setting time of cement mortar at the top of positive injection.
Anti- crowded construction degree is:
A) preventer is closed, the anti-crowded pipeline of connection carries out examination with cementing truck not higher than 300L/min discharge capacities and squeezes, and record examination is crowded Well head pressure;
Such as try to squeeze well head pressure more than PClose, then stop, no longer carrying out anti-squeezing and construct;
PClose=min { the maximum closing well rated pressure allowed by ground preventer, formation fracture pressure at the casing shoe of upper strata };
Such as try to squeeze well head pressure less than PClose, it is slow to improve anti-crowded discharge capacity, record well head pressure;It is slow again to reduce the anti-row of squeezing Amount, records well head pressure;Contrast investigates leakage and the closure situation of anti-crowded passage with the well head pressure twice under discharge capacity;Full Sufficient well head pressure is not more than PCloseAnti- crowded discharge capacity is improved as far as possible with the premise of the anti-crowded passage making capacity of reservation;
B) carry out anti-squeezing according to the anti-squeeze cementing amount of design and slurry rod structure to construct:Flushing liquor is first injected, its consumption is improved To be sufficiently destroyed drilling fluid static the formed structural capacity of long-time, the mud cake effectively washed away on the borehole wall, casing wall in the well;Afterwards Cement mortar is counter is squeezed for injection, designs anti-squeeze cementing amount according to the bruising pressure and wastage of positive injection, while additional 10%~ 15% volume.
Well head pressure change is kept a close eye on during crowded operation instead;Anti- crowded well head pressure P0It is calculated as follows:
P0=PL-PFluid column+Pf (2)
In formula (2), PLTo return crowded passage leakage pressure, PFluid columnFor head of liquid in annular space, PfFor annular circulation frictional resistance.
Pressure change is as shown in Figure 1:
1. closing well, small displacement examination are squeezed, and drop ply is squeezed logical, and well head pressure P is squeezed in examination1
2. flushing liquor being injected, injection discharge capacity being properly increased under conditions of pressure is allowed, now well head pressure is returned because of raising Crowded discharge capacity and increase;In flushing liquor injection process, annular space head of liquid is gradually lowered, and annular space global cycle frictional resistance is reduced, well head pressure Power is presented irregular fluctuation.
3. as cement mortar injects, annular space head of liquid gradually increases, and well head pressure declines;When flushing liquor enters drop ply Afterwards, as shown in Fig. 2 due to the differences in rheology between flushing liquor and drilling fluid substantially, flushing liquor is hindered along drop ply pore media The less path fingering of power (as shown in Fig. 2-(b)), the increase of well head pressure fall off rate;
4., after cement mortar reaches drop ply position, well head pressure still has certain decline;As cement paste rheological is worse than brill Well liquid, the fingering in drop ply pore media fade away, uniform to advance, and shown in such as Fig. 2-(c), well head pressure gradually rises.
In sum, well head pressure minimum can be entered the mark of drop ply as cement mortar, or according to well head pressure most Whether the corresponding cement mortar injection rate of little value used as returning the basis for estimation that is extruded onto specified drop ply.If well head pressure is not entered in cement mortar It is preferably minimized before entering specified drop ply and is worth and starts increase, cement mortar should now reduces returning crowded row then possibly into top drop ply Amount reduces top drop ply stretching degree, promotes cement mortar to continue traveling downwardly.
Embodiment 1
Well positive injection is lost using above-mentioned low pressure and easy leaking, and anti-crowded cementing method is cemented the well to JP-302 wells.JP-302 wells are normal There is leakage during well cementation, cement mortar returns high deficiency, counter to be squeezed.
There is leakage during JP-302 well protective casing setting of casings, drilling fluid sets up normal circulation before cementing the well Jing after leak stopping.Press Cementing design and construction are carried out according to the sealing of full well section, leakage occurs during for slurry process, according to pressure before wastage and bruising, Calculate that cement returns high 1500m;After waiting solidifying 12h, flushing liquor 10m is injected3, " returning crowded " cement mortar 30m3.As shown in figure 3, acoustic amplitude logging Show that annular space is not connected well section only 70m, below 1500m cementing quality high-quality, well head to well depth 800m " return crowded " well section high-quality, its In addition to 70m empty set pipes, low-density interval isolation quality reaches well remaining well section.
Embodiment 2
Well positive injection is lost using above-mentioned low pressure and easy leaking, and anti-crowded cementing method is cemented the well to JP-329 wells.JP-329 wells are cemented the well Front drilling fluid cannot set up normal circulation, be designed with " returning crowded " using " positive injection ".
After the complete sleeve pipe in JP-329 down-holes, as severe leakage can not set up circulation, in well, thick slurry cannot recycle well, the well Constructed using " positive injection back squeeze "." positive injection " sealing is not added to drop ply bottom, cement mortar;After positive injection 12h, crowded flushing is returned successively Liquid, isolation slurry and low-density cement mortar.Shown according to well head pressure, after returning crowded part of cement slurry, pressure be slowly dropped to it is minimum after Significantly rise, squeeze cementing is returned into top leak source.To avoid top drop ply leakage from being worse off, and under promoting cement mortar to continue OK, reduce returning crowded discharge capacity additional 15% volume to design flow.
Later stage also indicates that 2 points of leak sources of presence by acoustic amplitude logging curve.As shown in figure 4, top leak source is cemented the well with up to well head Quality high-quality;Between two leak sources there is certain slurry due to injection speed reduction in well section, and it is qualified that cementing quality reaches, part Well section reaches well;" positive injection " bottom well section cementing quality high-quality.

Claims (10)

1. a kind of low pressure and easy leaking loses the cementing method that well positive injection is instead squeezed, it is characterised in that:Comprise the following steps:
1) setting of casing:Drilling fluid stages cycle is carried out during setting of casing;
2) sleeve pipe enters well to designing after well depth, top is carried out to drilling fluid in well logical;
Normal circulation can be set up after leading to such as drilling fluid top, speed is returned with ring control and is not less than 1.2m/s, fixed displacement is circulated at least two weeks Phase;
As in well, drilling fluid cannot set up circulation, positive injection drilling fluid controls slip casting discharge capacity, by sleeve pipe and the following annular space of leak source Closing slurry is pushed to stratum;Annular space drilling fluid more than leak source is pushed to stratum from annular space, to destroy drilling fluid knot in annular space Structure power, it is ensured that annular space is unobstructed;
3) positive injection:Positive cement injection sealing returns height to the cement ensured by drop ply bottom position or stratum pressure-bearing;
4) it is anti-to squeeze:Examination is carried out with the discharge capacity for being not higher than 300L/min to squeeze, drop ply is squeezed logical, and record examination squeezing well head pressure;
Such as try to squeeze well head pressure more than PClose, then stop construction;
Such as try to squeeze well head pressure less than PClose, anti-crowded construction is carried out with slurry rod structure according to anti-squeeze cementing amount is designed;
PClose=min { the maximum closing well rated pressure allowed by ground preventer, formation fracture pressure at the casing shoe of upper strata }.
2. low pressure and easy leaking according to claim 1 loses the cementing method that well positive injection is instead squeezed, it is characterised in that:Step 1) in, The stages cycle is referred to:Weak formation above well section is circulated per 500m;Into before weak formation, weak formation above well section well Interior drilling fluid is all replaced;Into after weak formation, per the circulation of 200m well sections.
3. low pressure and easy leaking according to claim 1 loses the cementing method that well positive injection is instead squeezed, it is characterised in that:Step 2) in, If circulation cannot be set up in well, control, is bored when the closing slurry in sleeve pipe and the following annular space of leak source is pushed to stratum for slurry discharge capacity Well liquid consumption is 1.5~2 times of this section of volume.
4. low pressure and easy leaking according to claim 1 loses the cementing method that well positive injection is instead squeezed, it is characterised in that:Positive injection is constructed Before, it is initially injected glue or newly with drilling fluid, is then implanted sequentially flushing liquor, cement mortar, under the premise of wellbore stability, improves punching Washing lotion segment length.
5. the low pressure and easy leaking according to claim 1 or 4 loses the cementing method that well positive injection is instead squeezed, it is characterised in that:As cemented the well The equal normal circulation of front drilling fluid, then lose the Formation bearing pressure of layer as foundation with low pressure and easy leaking, the cement mortar sealing segment length L of positive injection Determined according to vertical depth h on well depth track:
In formula (1), PHoldThe Formation bearing pressure of layer is lost for low pressure and easy leaking, has PHoldHoldgHL, wherein ρHoldWork as Formation bearing pressure Metric density;PfFor this layer of position above annular space well section circulation frictional resistance;HLFor this layer of position place well vertical depth;ρmFor the drilling well in annular space Liquid-tight degree;ρcFor the equal yield density of this layer of position above cement mortar.
6. low pressure and easy leaking according to claim 5 loses the cementing method that well positive injection is instead squeezed, it is characterised in that:Such as in setting of casing Or there is leakage, step 3 during circulation of drilling fluid) in positive injection cement mortar sealing to drop ply bottom, do not add, retain anti- Crowded passage;
As Jing after leak stopping cement the well before drilling well liquid energy set up normal circulation, then by one design procedure of scheme 3) in positive injection cement mortar envelope Gu segment length;
Scheme one:Cement mortar sealing segment length by easy lost-circulation zone above segment length L and easy lost-circulation zone to constitute down to bottom hole spacing, cement Slurry amount adds 10%~15% volume.
7. low pressure and easy leaking according to claim 6 loses the cementing method that well positive injection is instead squeezed, it is characterised in that:
As drafted the cement mortar institute sealing that anti-crowded layer position is designed by scheme one, then the cement mortar interval isolation of positive injection is a length of drafts anti-squeezing The annular space segment length of layer position to shaft bottom;
As drafted the cement mortar institute sealing that anti-crowded layer position is not designed by scheme one, then it is designed by scheme one.
8. low pressure and easy leaking according to claim 1 loses the cementing method that well positive injection is instead squeezed, it is characterised in that:It is anti-to squeeze and positive injection Time interval not less than cement mortar at the top of positive injection final setting time.
9. low pressure and easy leaking according to claim 1 loses the cementing method that well positive injection is instead squeezed, it is characterised in that:Step 4) in, Anti- squeeze cementing amount is designed according to the bruising pressure and wastage of positive injection, while additional 10%~15% volume.
10. the low pressure and easy leaking according to claim 1 or 9 loses the cementing method that well positive injection is instead squeezed, it is characterised in that:Step 4) In, examination squeeze by drop ply squeeze it is logical after, improve injection flushing liquor consumption, for destroying in well drilling fluid structural capacity and washing away the borehole wall, set Mud cake on tube wall;Segment length insulating liquid not less than 200m is squeezed afterwards instead.
CN201611083144.3A 2016-11-30 2016-11-30 A kind of low pressure and easy leaking mistake anti-cementing method squeezed of well positive injection Active CN106555565B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611083144.3A CN106555565B (en) 2016-11-30 2016-11-30 A kind of low pressure and easy leaking mistake anti-cementing method squeezed of well positive injection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611083144.3A CN106555565B (en) 2016-11-30 2016-11-30 A kind of low pressure and easy leaking mistake anti-cementing method squeezed of well positive injection

Publications (2)

Publication Number Publication Date
CN106555565A true CN106555565A (en) 2017-04-05
CN106555565B CN106555565B (en) 2019-03-01

Family

ID=58445564

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611083144.3A Active CN106555565B (en) 2016-11-30 2016-11-30 A kind of low pressure and easy leaking mistake anti-cementing method squeezed of well positive injection

Country Status (1)

Country Link
CN (1) CN106555565B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107035338A (en) * 2017-05-12 2017-08-11 中国石油集团川庆钻探工程有限公司长庆钻井总公司 Annular space is counter notes backward extrusion blocking method for a kind of fine sand leak stopping slurry
CN107722954A (en) * 2017-11-01 2018-02-23 中石化石油工程技术服务有限公司 A kind of sealing agent, leak stopping slurries and leak-blocking construction method for borehole wall fractures leakage
CN108240196A (en) * 2017-12-15 2018-07-03 中国石油集团川庆钻探工程有限公司 The drilling liner cementing method of control pressure sensibility stratum annular equivalent density
CN109281637A (en) * 2018-10-17 2019-01-29 中石化石油工程技术服务有限公司 A kind of cementing method suitable for leakiness ultradeep well
CN109424320A (en) * 2017-08-31 2019-03-05 中国石油天然气股份有限公司 A kind of collecting well group portion well method
CN110905441A (en) * 2018-09-17 2020-03-24 中国石油化工股份有限公司 Well cementation method of low-pressure easy-to-leak well and casing string
CN111021982A (en) * 2018-10-09 2020-04-17 中国石油天然气股份有限公司 Well cementing method and well cementing device
CN111058796A (en) * 2019-11-25 2020-04-24 西南石油大学 Method for improving shale gas well oil layer casing well cementation quality
CN115324523A (en) * 2021-04-23 2022-11-11 中国石油天然气股份有限公司 Well shut-in control method, device, equipment and storage medium
CN115405254A (en) * 2022-08-09 2022-11-29 中石化石油工程技术服务有限公司 Foam cement leakage stopping method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0846839A2 (en) * 1996-11-12 1998-06-10 Halliburton Energy Services, Inc. Method and apparatus for placing and cementing casing in horizontal wells
CN1410650A (en) * 2002-06-04 2003-04-16 中海油田服务有限公司 Single stage double sealing well cementation method
CN103485771B (en) * 2013-09-26 2016-02-17 中国石油集团川庆钻探工程有限公司 A kind of cement the well before check the method for Formation bearing pressure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0846839A2 (en) * 1996-11-12 1998-06-10 Halliburton Energy Services, Inc. Method and apparatus for placing and cementing casing in horizontal wells
CN1410650A (en) * 2002-06-04 2003-04-16 中海油田服务有限公司 Single stage double sealing well cementation method
CN103485771B (en) * 2013-09-26 2016-02-17 中国石油集团川庆钻探工程有限公司 A kind of cement the well before check the method for Formation bearing pressure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
任文亮: "中原油田漏失井固井技术", 《中原油田漏失井固井技术 *
马勇: "非常规条件下超深漏失井尾管固井作业-以云安002-7井为例", 《钻井工程》 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107035338B (en) * 2017-05-12 2018-12-28 中国石油集团川庆钻探工程有限公司长庆钻井总公司 Annular space is counter infuses backward extrusion blocking method for a kind of fine sand leak stopping slurry
CN107035338A (en) * 2017-05-12 2017-08-11 中国石油集团川庆钻探工程有限公司长庆钻井总公司 Annular space is counter notes backward extrusion blocking method for a kind of fine sand leak stopping slurry
CN109424320A (en) * 2017-08-31 2019-03-05 中国石油天然气股份有限公司 A kind of collecting well group portion well method
CN107722954A (en) * 2017-11-01 2018-02-23 中石化石油工程技术服务有限公司 A kind of sealing agent, leak stopping slurries and leak-blocking construction method for borehole wall fractures leakage
CN107722954B (en) * 2017-11-01 2020-03-24 中石化石油工程技术服务有限公司 Plugging agent for fractured leakage of drilling well, plugging slurry and plugging construction method
CN108240196B (en) * 2017-12-15 2020-08-21 中国石油集团川庆钻探工程有限公司 Liner cementing method for controlling annular equivalent density of pressure sensitive stratum
CN108240196A (en) * 2017-12-15 2018-07-03 中国石油集团川庆钻探工程有限公司 The drilling liner cementing method of control pressure sensibility stratum annular equivalent density
CN110905441A (en) * 2018-09-17 2020-03-24 中国石油化工股份有限公司 Well cementation method of low-pressure easy-to-leak well and casing string
CN111021982B (en) * 2018-10-09 2022-03-29 中国石油天然气股份有限公司 Well cementing method and well cementing device
CN111021982A (en) * 2018-10-09 2020-04-17 中国石油天然气股份有限公司 Well cementing method and well cementing device
CN109281637A (en) * 2018-10-17 2019-01-29 中石化石油工程技术服务有限公司 A kind of cementing method suitable for leakiness ultradeep well
CN111058796A (en) * 2019-11-25 2020-04-24 西南石油大学 Method for improving shale gas well oil layer casing well cementation quality
CN111058796B (en) * 2019-11-25 2021-11-09 西南石油大学 Method for improving shale gas well oil layer casing well cementation quality
CN115324523A (en) * 2021-04-23 2022-11-11 中国石油天然气股份有限公司 Well shut-in control method, device, equipment and storage medium
CN115324523B (en) * 2021-04-23 2024-03-01 中国石油天然气股份有限公司 Well shut-in control method, device, equipment and storage medium
CN115405254A (en) * 2022-08-09 2022-11-29 中石化石油工程技术服务有限公司 Foam cement leakage stopping method

Also Published As

Publication number Publication date
CN106555565B (en) 2019-03-01

Similar Documents

Publication Publication Date Title
CN106555565B (en) A kind of low pressure and easy leaking mistake anti-cementing method squeezed of well positive injection
CN101532600B (en) Method for leak stoppage of solid expansion pipe
CN203257353U (en) Novel pressure control drilled well system
CN103867119B (en) Coal seam reservoirs completion remodeling method
CN105199685B (en) A kind of water-base drilling fluid of inductivity crack leak-proof leak-stopping
CN201705219U (en) Lateral drilling gravel pack completion string
CN107489411B (en) A kind of mechanical packing is the same as the temporarily stifled horizontal well refracturing method combined
CN103485345A (en) Construction method for covering layer closed porthole high-pressure curtain grouting
CN105986795B (en) Coal bed gas horizontal well coal seam remodeling method
CN106930713A (en) A kind of casing damage restorative procedure
CN104763394A (en) Segment transforming process for well-completion acid fracturing of open-hole horizontal well of oil gas well
CN117248857A (en) Method for dewatering and increasing oil by filling packing body particles in oil and gas well of fractured oil and gas reservoir
CN105370256A (en) Method for increasing wetting radius of high-pressure water injection of low-air-permeability coal seams through sectioned pre-splitting
CN102182421A (en) Segmented water plugging method of liquid bridge plug of horizontal well
CN104153738A (en) Blocking controlling and leaking stopping tool assembly and leaking stopping method applied to drilling engineering
CN107605425A (en) Stratum raising formation strength method is cohered in closure in coal bed gas suede capsule drilling fluid
CN110284853A (en) A kind of exhaustion carbonate gas reservoirs gas storage reconstruction abandoned well method for blocking
CN107489396A (en) A kind of towed cementing method of small borehole bushing window sidetracking well
CN101122220A (en) Swelling type screen pipe suspension method and swelling type screen pipe hanger
CN104265254A (en) Oil production technological method for multi-stage plug injection of oil-soluble viscosity reducer and liquid CO2 in deep super-heavy oil
CN109723403A (en) A kind of tail pipe pressure control well shaft fixing technology
CN204252934U (en) Test boring device for plugging
CN101230778B (en) Technique of gas drilling post-infusion cement slurry
CN106194076A (en) A kind of ultra-deep salt mine horizontally-butted wells replaces mud and expanding method
CN101338660B (en) Horizontal production-injection well completion structure possessing flow control function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant