CN106546446A - The assembled method of independent sampling tiling sampled based on large area undisturbed soil - Google Patents

The assembled method of independent sampling tiling sampled based on large area undisturbed soil Download PDF

Info

Publication number
CN106546446A
CN106546446A CN201610904168.4A CN201610904168A CN106546446A CN 106546446 A CN106546446 A CN 106546446A CN 201610904168 A CN201610904168 A CN 201610904168A CN 106546446 A CN106546446 A CN 106546446A
Authority
CN
China
Prior art keywords
sampling
earth
soil
block
piecemeal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610904168.4A
Other languages
Chinese (zh)
Inventor
王发信
王振宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Province (ministry Of Water Resources Huaihe Water Conservancy Committee) Water Conservancy Science Research Institute (anhui Water Conservancy Project Quality Inspection Center Station)
Original Assignee
Anhui Province (ministry Of Water Resources Huaihe Water Conservancy Committee) Water Conservancy Science Research Institute (anhui Water Conservancy Project Quality Inspection Center Station)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Province (ministry Of Water Resources Huaihe Water Conservancy Committee) Water Conservancy Science Research Institute (anhui Water Conservancy Project Quality Inspection Center Station) filed Critical Anhui Province (ministry Of Water Resources Huaihe Water Conservancy Committee) Water Conservancy Science Research Institute (anhui Water Conservancy Project Quality Inspection Center Station)
Priority to CN201610904168.4A priority Critical patent/CN106546446A/en
Publication of CN106546446A publication Critical patent/CN106546446A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/02Devices for withdrawing samples
    • G01N1/04Devices for withdrawing samples in the solid state, e.g. by cutting
    • G01N1/08Devices for withdrawing samples in the solid state, e.g. by cutting involving an extracting tool, e.g. core bit
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/28Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

The present invention discloses the assembled method of independent sampling tiling sampled based on large area undisturbed soil, comprises the following steps:S1, in flat field of fetching earth, by lowering of watertable equipment, controlling groundwater level is all the time in fetching earth 1~below 1.5m of depth;S2, control soil body soil relative water content are between 20%~25%;S3, field of fetching earth are divided into the block that fetches earth of M × N number of comparable size, and the block order according to longitudinal direction from south to north, laterally from east to west that will fetch earth carries out dyadic ordering, and the numbering of the block that fetches earth is(M、N);When M is odd number with N, the block that fetches earth of the numbering is used as sampling piecemeal;S4, the square plate sleeve of use, gather each sampling piecemeal successively;After the soil body is separated, experimental site is transported to;S5, each sampling piecemeal that will be transported to experimental site, according to longitudinal direction order from south to north, laterally from east to west, carry out assembled restructuring according to the numbering for sampling piecemeal, obtain meeting the undisturbed soil of sampling requirement after the completion of assembly.

Description

The assembled method of independent sampling tiling sampled based on large area undisturbed soil
Technical field
The present invention relates to water conservancy soil sample technical field, specifically a kind of independently to be taken based on what large area undisturbed soil was sampled The assembled method of sample tiling.
Background technology
Undisturbed soil for disturbed soil, backfill, be the earth surface soil granule Jing hundreds of thousands years so that it is longer when Between air slaking, the result of motion such as degrade, corrode, migrating, depositing, define distinctive layer reason construction and constitute with hole, have The physical features such as hydrogeological parameter and dry density such as specific specific yield, feed coefficient of precipitation infiltration.Undisturbed soil is to carry out water The basic important document of the scientific researches such as literature, hydrogeology, agrology, agronomy, environmental science.
So for undisturbed soil sampling is to carry out the science such as hydrology, hydrogeology, agrology, agronomy, environmental science The problem that must solve of research, concerning the studies above achievement precision still to reliability.At present, soil basketing method generally has following several Kind:
First, destructive sampling is carried out in farmland, this method is difficult to the control of the conditions such as water, fertilizer, and is difficult to weight It is multiple to test;
2nd, the back-filling in layers compacting soil in soil filling device, and each layer soil dry bulk density is connect with representative nature soil body dry density Closely, so as to reach the purpose of simulation undisturbed soil, but this soil basketing method is destroyed soil stratification construction and is constituted with hole, makes experiment Research effect is had a greatly reduced quality;
3rd, general soil sampler fetches earth method, and this mode is due to lacking critical index control, or soil sample overdrying is overstocked, real When testing, after soil body water-swellable, by the counteracting force of barrel, make original state soil layer reason construction that extruding destruction occur with hole, from And substantially reduce the feedwater of soil and permeability, or earth pillar is excessively loose, during experiment, tube wall rapid osmotic passage is formed, made Soil moisture monitoring is greatly improved, so as to affect the precision of related experiment achievement still to reliability.
The content of the invention
It is an object of the invention to provide the assembled method of independent sampling tiling sampled based on large area undisturbed soil, the method energy Enough make sampling soil be close to undisturbed soil, improve the precision and reliability of soil water experiment.
The technical solution adopted for the present invention to solve the technical problems is:
The assembled method of independent sampling tiling sampled based on large area undisturbed soil, is comprised the following steps:
S1, in flat field of fetching earth, by lowering of watertable equipment, controlling groundwater level all the time in the depth 1 of fetching earth~ 1.5m it is following;
S2, control soil body soil relative water content are between 20%~25%;
S3, field of fetching earth are divided into the block that fetches earth of M × N number of comparable size, will fetch earth block according to longitudinal direction from south to north, laterally by east orientation The order in west carries out dyadic ordering, and the numbering of the block that fetches earth is(M、N);When M is odd number with N, the block conduct of fetching earth of the numbering Sampling piecemeal;
S4, the square plate sleeve of use, gather each sampling piecemeal successively;After the soil body is separated, experimental site is transported to;
S5, each sampling piecemeal that experimental site will be transported to, according to longitudinal order from south to north, laterally from east to west, root Assembled restructuring is carried out according to the numbering of sampling piecemeal, obtains meeting the undisturbed soil of sampling requirement after the completion of assembly.
The invention has the beneficial effects as follows, method is simple, simple operation, and sampling soil can be made to be close to undisturbed soil, soil is improved The precision and reliability of experiment, and have without the need for Special soil sampler, low cost.
Description of the drawings
The present invention is further described with reference to the accompanying drawings and examples:
Fig. 1 is the schematic diagram of the present invention.
Specific embodiment
The present invention provides the assembled method of independent sampling tiling sampled based on large area undisturbed soil, comprises the following steps:
S1, in flat field of fetching earth, by lowering of watertable equipment, controlling groundwater level all the time in the depth 1 of fetching earth~ 1.5m it is following;
S2, control soil body soil relative water content are between 20%~25%;
S3, field of fetching earth are divided into the block that fetches earth of M × N number of comparable size, will fetch earth block according to longitudinal direction from south to north, laterally by east orientation The order in west carries out dyadic ordering, and the numbering of the block that fetches earth is(M、N);When M is odd number with N, the block conduct of fetching earth of the numbering Sampling piecemeal;
To large-scale runoff field experiment, it is to reduce marginal condition to affect, soil filling device area is usually 4m × 6m or 4m × 8m, just at present For equipment and the technology of fetching earth, it is difficult to once overall to sample, as shown in figure 1, the present embodiment will fetch earth field be divided into 4 × 4 1m × The block that fetches earth of 1m, according to longitudinal direction order number consecutively from south to north, be laterally from east to west(1,1)、(1,2)、(1,3)、(1, 4);(2,1)、(2,2)、(2,3)、(2,4);(3,1)、(3,2)、(3,3)、(3,4);(4,1)、(4,2)、(4,3)、(4,4);Its Middle numbering is(1,1)、(1,3)、(3,1)With(3,3)Fetch earth block as sampling piecemeal;
S4, using 1m × 1m square plate sleeve, gather successively each sampling piecemeal;Sampling piecemeal is ensured, completely there is something special Under, the piecemeal soil body is carefully disassembled, the outer soil bodys of all around stems 5cm are cut out using conventional method, and within the 5cm of sleeve outside, the soil body is adopted Removed with the method cut, cut, by cutting, make earth pillar external diameter in sleeve be less than 2~5mm of sleeve diameter, to ensure that sleeve can be partly Freely press;
When undisturbed soil fetch earth depth reach projected depth when, can be using wire saw from the sawed-off soil body in cylinder base opening edge, then level Enough distances are removed, top cylinder bottom tray is refilled, is lifted to experimental site;
S5, each sampling piecemeal that experimental site will be transported to, according to order laterally from south to north, longitudinally from east to west, root Assembled restructuring is carried out according to the numbering of sampling piecemeal, obtains meeting the undisturbed soil of sampling requirement after the completion of assembly.
The above, is only presently preferred embodiments of the present invention, not makees any pro forma restriction to the present invention;Appoint What those of ordinary skill in the art, under without departing from technical solution of the present invention ambit, all using the side of the disclosure above Method and technology contents make many possible variations and modification, or the equivalent reality for being revised as equivalent variations to technical solution of the present invention Apply example.Therefore, every content without departing from technical solution of the present invention, is done to above example according to the technical spirit of the present invention Any simple modification, equivalent, equivalence changes and modification, still fall within the range of technical solution of the present invention protection.

Claims (1)

1. the assembled method of independent sampling tiling for being sampled based on large area undisturbed soil, it is characterised in that comprise the following steps:
S1, in flat field of fetching earth, by lowering of watertable equipment, controlling groundwater level all the time in the depth 1 of fetching earth~ 1.5m it is following;
S2, control soil body soil relative water content are between 20%~25%;
S3, field of fetching earth are divided into the block that fetches earth of M × N number of comparable size, will fetch earth block according to longitudinal direction from south to north, laterally by east orientation The order in west carries out dyadic ordering, and the numbering of the block that fetches earth is(M、N);When M is odd number with N, the block conduct of fetching earth of the numbering Sampling piecemeal;
S4, the square plate sleeve of use, gather each sampling piecemeal successively;After the soil body is separated, experimental site is transported to;
S5, each sampling piecemeal that experimental site will be transported to, according to longitudinal order from south to north, laterally from east to west, root Assembled restructuring is carried out according to the numbering of sampling piecemeal, obtains meeting the undisturbed soil of sampling requirement after the completion of assembly.
CN201610904168.4A 2016-10-18 2016-10-18 The assembled method of independent sampling tiling sampled based on large area undisturbed soil Pending CN106546446A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610904168.4A CN106546446A (en) 2016-10-18 2016-10-18 The assembled method of independent sampling tiling sampled based on large area undisturbed soil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610904168.4A CN106546446A (en) 2016-10-18 2016-10-18 The assembled method of independent sampling tiling sampled based on large area undisturbed soil

Publications (1)

Publication Number Publication Date
CN106546446A true CN106546446A (en) 2017-03-29

Family

ID=58368946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610904168.4A Pending CN106546446A (en) 2016-10-18 2016-10-18 The assembled method of independent sampling tiling sampled based on large area undisturbed soil

Country Status (1)

Country Link
CN (1) CN106546446A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108764401A (en) * 2018-05-28 2018-11-06 孔令根 It is a kind of to be easy to debate the two-dimensional marker scheme to addressing

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56160634A (en) * 1980-05-15 1981-12-10 Kawasaki Steel Corp Collecting method for sample of furnace content after blowing out blast furnace
DE19625125C1 (en) * 1996-06-13 1997-06-05 Lla Umwelttechnische Analytik Soil sample extraction method
WO2001042760A1 (en) * 1999-12-10 2001-06-14 Rutgers, The State University Of New Jersey Powder sampling method and apparatus
CN101936823A (en) * 2010-09-26 2011-01-05 西安建筑科技大学 Method for sampling large-sized unsaturated structural undisturbed soil samples
CN201716211U (en) * 2010-07-26 2011-01-19 四川农业大学 Undisturbed soil sampling device
CN102607883A (en) * 2012-03-09 2012-07-25 安徽省(水利部淮河水利委员会)水利科学研究院 Method for sampling undisturbed soil pillar for hydrogeological parameter experiment
CN104614198A (en) * 2015-01-16 2015-05-13 长安大学 Quartering based automatic sampler for engineering aggregate and sampling method of engineering aggregate

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56160634A (en) * 1980-05-15 1981-12-10 Kawasaki Steel Corp Collecting method for sample of furnace content after blowing out blast furnace
DE19625125C1 (en) * 1996-06-13 1997-06-05 Lla Umwelttechnische Analytik Soil sample extraction method
WO2001042760A1 (en) * 1999-12-10 2001-06-14 Rutgers, The State University Of New Jersey Powder sampling method and apparatus
CN201716211U (en) * 2010-07-26 2011-01-19 四川农业大学 Undisturbed soil sampling device
CN101936823A (en) * 2010-09-26 2011-01-05 西安建筑科技大学 Method for sampling large-sized unsaturated structural undisturbed soil samples
CN102607883A (en) * 2012-03-09 2012-07-25 安徽省(水利部淮河水利委员会)水利科学研究院 Method for sampling undisturbed soil pillar for hydrogeological parameter experiment
CN104614198A (en) * 2015-01-16 2015-05-13 长安大学 Quartering based automatic sampler for engineering aggregate and sampling method of engineering aggregate

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李满亮: "带状留茬间作防风蚀效果的风洞试验研究", 《中国优秀硕士学位论文全文数据库 农业科技辑》 *
浙江省质量技术监督局: "浙江省地方标准DB 33/T 895—2013:耕地质量评定与地力分等定级技术规范", 《浙江省地方标准》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108764401A (en) * 2018-05-28 2018-11-06 孔令根 It is a kind of to be easy to debate the two-dimensional marker scheme to addressing

Similar Documents

Publication Publication Date Title
Jeong et al. Analysis of rainfall-induced landslide on unsaturated soil slopes
Wolfe et al. North American nonmarine climates and vegetation during the Late Cretaceous
Malaya et al. Critical review on the parameters influencing soil-water characteristic curve
Hardie et al. Effect of antecedent soil moisture on preferential flow in a texture-contrast soil
Ng et al. Gas breakthrough and emission through unsaturated compacted clay in landfill final cover
CN103134745B (en) High water capacity soil and bentonite clay material permeability test cylinder, device and testing method
CN206556909U (en) Segmented soil sample collector
Heilweil et al. Variably saturated groundwater modelling for optimizing managed aquifer recharge using trench infiltration
Cannavo et al. Prediction of long‐term sustainability of constructed urban soil: impact of high amounts of organic matter on soil physical properties and water transfer
Onyelowe et al. Innovative overview of SWRC application in modeling geotechnical engineering problems
CN102607883B (en) Method for sampling undisturbed soil pillar for hydrogeological parameter experiment
CN103454403A (en) Soil erosion and nutrient migration simulating device applicable to Karst regions
Sołtysiak et al. A multi-method approach to groundwater risk assessment: A case study of a landfill in southern Poland
CN109100481A (en) Characteristics of fracture development integrated experiment device under a kind of closed soil body drying and watering cycle
Francischini et al. A middle Permian (Roadian) lungfish aestivation burrow from the Rio do Rasto Formation (Paraná Basin, Brazil) and associated U-Pb dating
CN206346168U (en) It is a kind of quickly to take multilayer water installations by what static cone penetration equipment was pressed into
CN109086519A (en) The strengthening motoring calculation method and system of adaptive construction environment
CN106546446A (en) The assembled method of independent sampling tiling sampled based on large area undisturbed soil
Gwenzi et al. Transpiration and plant water relations of evergreen woody vegetation on a recently constructed artificial ecosystem under seasonally dry conditions in Western Australia
Kidron et al. Why dew and fog measurements carried out by microlysimeters do not adequately reflect the intact soil? The role of temperature
CN103630420A (en) Undisturbed soil collecting device and collection method thereof
Ferreira et al. Analysis of changes in volume and propagation of cracks in expansive soil due to changes in water content
Wan et al. The role of roots in the stability of landfill clay covers under the effect of dry–wet cycles
CN206369639U (en) A kind of sampler for easily loose original state coarse-grained soil permeability test
Kördel et al. Prediction of leaching and groundwater contamination by pesticides

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170329