CN106545022A - Cofferdam island foundation pit structure and method under the conditions of water delivery is not interrupted in canal lining reparation - Google Patents

Cofferdam island foundation pit structure and method under the conditions of water delivery is not interrupted in canal lining reparation Download PDF

Info

Publication number
CN106545022A
CN106545022A CN201610914651.0A CN201610914651A CN106545022A CN 106545022 A CN106545022 A CN 106545022A CN 201610914651 A CN201610914651 A CN 201610914651A CN 106545022 A CN106545022 A CN 106545022A
Authority
CN
China
Prior art keywords
cofferdam
water
foundation pit
interrupted
conditions
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610914651.0A
Other languages
Chinese (zh)
Other versions
CN106545022B (en
Inventor
吴德绪
谢向荣
倪锦初
刘百兴
李蘅
简兴昌
倪晖
徐唐锦
苏利军
周嵩
段寅
赵峰
石裕
杨谢芸
胡田清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changjiang Institute of Survey Planning Design and Research Co Ltd
Original Assignee
Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changjiang Institute of Survey Planning Design and Research Co Ltd filed Critical Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority to CN201610914651.0A priority Critical patent/CN106545022B/en
Publication of CN106545022A publication Critical patent/CN106545022A/en
Application granted granted Critical
Publication of CN106545022B publication Critical patent/CN106545022B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B5/00Artificial water canals, e.g. irrigation canals
    • E02B5/02Making or lining canals

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses cofferdam island foundation ditch and method under the conditions of water delivery is not interrupted in canal lining reparation, it is characterised in that:Water flowing channel (1) is included along the liner plate (2) of water delivery direction laying and along the described symmetrically arranged inclined canal slope (3) of liner plate (2);Cofferdam (4) is provided with water flowing channel (1), described cofferdam (4) is simultaneously fixed together with Qu Po (3) lower end positioned at the middle part of described water flowing channel (1);The bottom in described cofferdam (4) forms dry foundation pit (5) with the water flowing channel (1), described cofferdam (4) is modular buoyancy tank steel construction, aerofluxuss, discharge structure (4.1) are internally provided with the cofferdam (4) told, it overcomes the cofferdam of the prior art can be to the hurtful shortcoming of channel structure, with the head being greatly reduced in foundation ditch, the advantage of the uplift pressure that foundation ditch inside lining is born is effectively reduced.

Description

Cofferdam island foundation pit structure and method under the conditions of water delivery is not interrupted in canal lining reparation
Technical field
The present invention relates to Construction for Hydroelectric Project diversion technology field, is more specifically that canal lining is repaired not Interrupt cofferdam island foundation pit structure and method under the conditions of water delivery.
Background technology
To solve the imbalance of regional water, the water diversion project of China is more and more.It is with the operation of building up of engineering, defeated Water channel road is affected by many factors such as channel SEA LEVEL VARIATION, drainage system operation conditions, freeze thawing, construction qualities, may be gone out The damage of the forms such as existing concrete lining plate ftractures, subsides, anti-floating unstability, can cause channel local head to damage to a certain extent Lose increase, seepage prevention system destruction, it is serious when cause slope instability, have influence on the safe operation of channel.
Channel reparation at present is generally reparation of cutting off the water supply, but for large-sized water transfer project, the south water to north for such as having put into operation Work centerline, is responsible for Beijing, Tianjin and Hebei, Henan Province's Yan Qu lines large- and-medium size cities resident living and industrial confession Water task, once supply water interrupting, affects social influence that is wide, causing big.Accordingly, it would be desirable to not interrupt channel hydraulic pipeline condition Under, foundation ditch is formed using cofferdam, canal lining dry ground repairing construction is carried out under the protection in cofferdam, is continuously supplied to user as far as possible Water, improves water services quality.
Conventional bank material is generally native stone, concrete, stone-laying, steel sheet pile etc..Concrete, stone-laying cofferdam are difficult under water Construction;Earth rock cofferdam section is larger, and foundation ditch arrangement relative difficulty is formed in limited canal cross section, and soil erosion may cause Water delivery inverted-siphon along the line and canal silting, affect channel hydraulic pipeline ability;Steel sheet-pile cofferdam will typically insert weir base certain depth and protect It is fixed to keep steady, or basic casting concrete, and channel structure can be caused damage.After cofferdam forms foundation ditch, due to canal liner plate and The drainage blanket connection that impervious barrier bottom is typically provided, keeps at a certain distance away in bed course and is disposed with closed drain, in liner plate Water penetrative flexible pipe end be provided with the measures such as non-return valve, when the outer channel hydraulic pipeline water level of foundation ditch is higher, foundation ditch inside lining plate bottom Very high head can be born, uplift pressure destruction occurs.Canal for water conveyance is longer in addition, and position to be repaired is likely distributed in along the line multiple Different places, reparation need to meet the requirements such as construction is quick, convenient, can be recycled.
The content of the invention
The first object of the present invention is the weak point for overcoming above-mentioned background technology, and in proposing that canal lining is repaired not Island foundation pit structure in cofferdam under the conditions of disconnected water delivery.
The first object of the present invention is implemented by following scheme:Canal lining reparation is enclosed under the conditions of not interrupting water delivery Weir island foundation ditch, it is characterised in that:Water flowing channel includes the liner plate and symmetrical along described liner plate along the laying of water delivery direction The inclined canal slope for arranging;
Cofferdam is provided with water flowing channel, described cofferdam is located at middle part lower end and the Qu Po of described water flowing channel It is fixed together;
The bottom in described cofferdam forms dry foundation pit with the water flowing channel,
Described cofferdam is modular buoyancy tank steel construction, is internally provided with aerofluxuss, discharge structure in the cofferdam told, in institute The bottom in the cofferdam stated is provided with valve rubber, and described valve rubber is close on described liner plate;
It is made up of several casings in described cofferdam, by latching connection between each casing, and in adjacent casing Between be provided with water sealing structure;
Drainage blanket is provided with the bottom of described liner plate and impervious barrier, is equidistantly provided with described drainage blanket Water tube hose, the end of the Water penetrative flexible pipe described in each are provided with non-return valve, place remove outside described dry foundation pit Non-return valve on obturator is installed, be mounted on the non-return valve between the edge in described obturator and described cofferdam Immersible pump.
In above-mentioned technical proposal:Described cofferdam is in " mouth " font structure in canal for water conveyance.
In above-mentioned technical proposal:Described obturator is arranged on the second row of described dry foundation pit periphery or some On the non-return valve removed on row.
In above-mentioned technical proposal:The drainage blanket arranged between described dry foundation pit and described water flowing channel is protected all the time Hold connection.
In above-mentioned technical proposal:Described water flowing channel for inverted trapezoidal structure.
In above-mentioned technical proposal:The both sides of described dry foundation pit remain uninterrupted water flowing.
In above-mentioned technical proposal:The non-return valve in cofferdam described in keeping keeps opening-wide state.
In above-mentioned technical proposal:Immersible pump is installed in described dry foundation pit.
The second object of the present invention is to propose that a kind of construction method is under the conditions of canal lining reparation do not interrupt water delivery The method of cofferdam island foundation ditch.
Second purpose of the invention is by following technical solution implementing:Cofferdam under the conditions of water delivery is not interrupted in canal lining reparation The method of island foundation ditch, it is characterised in that:Comprise the steps;
1. obturator is installed,:Cofferdam is provided with above the liner plate of described water flowing channel, described cofferdam is with Dry foundation pit is surrounded between the liner plate at end, described dry foundation pit does not carry out draining in advance, remove dry foundation pit periphery second Or after some row's non-return valves, then obturator is installed in the hole that non-return valve is stayed removing, described obturator obstruction water flowing The water stream channel of water and bottom drainage blanket in channel;
2., installing submersible pump:In the range of the obturator obstruction outside dry foundation pit between dry foundation pit border in Immersible pump is respectively mounted on the aperture of non-return valve;
3., do foundation pit internal drainage to process:The non-return valve in dry foundation pit region described in keeping is opened wide all the time;
4., cofferdam demolition:After the completion of channel is repaired, by cofferdam dismounting for several buoyancy tanks, by tractor tug by buoyancy tank water Fortune or land transportation of debarking are repaired to next point to be repaired.
In above-mentioned technical proposal:If occurring a large amount of infiltrations in described dry foundation pit, can be in described dry foundation pit peace Dress immersible pump.
The present invention has following technological merit:1st, cofferdam of the present invention adopts modular buoyancy tank steel construction, is easy to lay in, transports It is defeated, it is capable of achieving cofferdam and rises and falls in water, is conducive to the underwater construction and dismounting in cofferdam, ditch water flow will not be polluted, and It is repeatable to utilize, it is cost-effective.
2nd, cofferdam bottom of the present invention sets one layer of valve rubber, prevents which from causing two with central line tunnel concrete lining in south plate directly contact Secondary destruction, while certain sealing effect is played under steel cofferdam working condition.
3rd, cofferdam of the present invention is arranged as " mouth " type in channel and forms semi-wrapped style foundation ditch, defeated by channel of the beam after narrow Water, with higher conveyance power of water, the 75%-90% that can reach designed capacity to Middle Line Project For Transferring Water From South To North general main canal conveyance power of water is left It is right.
4th, the present invention can be greatly reduced the head in foundation ditch, effectively reduce the uplift pressure that foundation ditch inside lining is born, make base The uplift pressure undertaken by hole inside lining is within the scope of structure can be born, it is to avoid lining cutting occurs uplift pressure destruction.
5th, the present invention solves the channel in the case where water supply conditions are not interrupted and repairs problem, with larger social benefit and economic effect Benefit.
Description of the drawings
Fig. 1 horizontal layout schematic diagrams of the present invention.
Fig. 2 A-A faces drawings in side sectional elevation of the present invention.
In figure:Water flowing channel 1, liner plate 2, canal slope 3, cofferdam 4, aerofluxuss, discharge structure 4.1, dry foundation pit 5, impervious barrier 6th, drainage blanket 7, Water penetrative flexible pipe 8, non-return valve 9, obturator 10, immersible pump 11.
Specific embodiment
Describe the performance of the present invention below in conjunction with the accompanying drawings in detail, but they do not constitute limitation of the invention, only It is for example, at the same by illustrate advantages of the present invention will become clearer from it is easy to understand.
Technical research is carried out to one phase of Middle Line Project For Transferring Water From South To North general main canal, the engineering adopts trapezoidal cross-section, tunneling boring is cast-in-place Concrete lining thickness of slab 8cm-10cm, liner plate bottom adopt impermeable composite geomembrane, and channel drainage system is typically by draining pad Layer, closed drain (Water penetrative flexible pipe), non-return valve etc. are constituted, the representativeness with long distance water transfer channel.
Cofferdam island foundation ditch under the conditions of water delivery is not interrupted in canal lining reparation of the present invention, it is characterised in that:Water flowing channel 1 is wrapped Include along the liner plate 2 of water delivery direction laying and along the symmetrically arranged inclined canal slope of described liner plate 23;
Be provided with cofferdam 4 on water flowing channel 1, described cofferdam 4 be located at the middle part lower end of described water flowing channel 1 with Canal slope 3 is fixed together, (cofferdam 4 is not necessarily in 3 middle of canal slope, just can be with described liner plate 2, while Ensure that the both sides of the dry foundation pit 5 that lower end is formed continue water flowing, do not stop);
The bottom in described cofferdam 4 forms dry foundation pit 5 with the water flowing channel 1,
Described cofferdam 4 is modular buoyancy tank steel construction, is internally provided with aerofluxuss, discharge structure in described cofferdam 4 4.1, the bottom in described cofferdam 4 is provided with valve rubber, described valve rubber is close on described liner plate 2;
It is made up of several casings in described cofferdam 4, by latching connection between each casing, and in adjacent casing Between be provided with water sealing structure;
Drainage blanket 7 is provided with the bottom of described liner plate 2 and impervious barrier 6, is equidistantly installed in described drainage blanket 7 There is Water penetrative flexible pipe 8, the end of the Water penetrative flexible pipe 8 described in each is provided with non-return valve 9, it is peripheral in described dry foundation pit 5 On obturator 10 is installed on the non-return valve 9 removed, it is inverse between the edge in described obturator 10 and described cofferdam 4 Only immersible pump 11 is mounted on valve 9, draw water and discharge on the spot.
Described cofferdam 4 is in " mouth " font structure in canal for water conveyance 1, and the both sides of described dry foundation pit 5 remain Uninterrupted water flowing.
Described obturator 10 is arranged on having removed on the second row of described 5 periphery of dry foundation pit or some rows (it is not each row's non-return valve 9 after the dry 5 peripheral second row of foundation pit of dismounting, after simply removing second row on non-return valve 9 A certain row's non-return valve 9, including including second row non-return valve 9).
The drainage blanket 7 arranged between described dry foundation pit 5 and described water flowing channel 1 is remained and is connected;Described Water flowing channel 1 for inverted trapezoidal structure or rectangular configuration;The non-return valve 9 in cofferdam 4 described in keeping keeps opening-wide state.
The method that cofferdam island foundation ditch under the conditions of water delivery is not interrupted in canal lining reparation of the present invention, it is characterised in that:Including Following steps;
1. obturator is installed,:The top of the liner plate 2 of described water flowing channel 1 is provided with cofferdam 4, described cofferdam 4 Surround dry foundation pit 5 between liner plate 2, described dry foundation pit 5 does not carry out draining in advance, remove dry 5 periphery of foundation pit the Two or some row's non-return valves 9 after, then removing in the hole that non-return valve 9 is stayed installation obturator 10, described obturator 10 The water stream channel of water and bottom drainage blanket 7 in obstruction water flowing channel 1;
2., installing submersible pump:In the range of the obstruction of obturator 10 outside dry foundation pit 5 between 5 border of dry foundation pit Immersible pump 11 is respectively mounted on the aperture of interior non-return valve 9;
3., do foundation pit internal drainage to process:The non-return valve 9 in 5 region of dry foundation pit described in keeping is opened wide all the time;
4., cofferdam demolition:After the completion of channel is repaired, cofferdam 4 is dismantled as several buoyancy tanks, by tractor tug by buoyancy tank water Fortune or land transportation of debarking are repaired to next point to be repaired.
When occurring a large amount of infiltrations in described dry foundation pit 5, can be in described 5 installing submersible pump 11 of dry foundation pit.
Technical research has been carried out to one phase of Middle Line Project For Transferring Water From South To North general main canal:Simultaneously declare with this patent《One kind is not interrupted The drainage of foundation pit method that canal lining is repaired dryly under the conditions of water delivery》The analytical calculation of similar operating mode, analytical calculation canal are carried out The canal dike in road bankets infiltration coefficient for 1 × 10-4Cm/s, it is 1 × 10 that ground is the infiltration coefficient of uniform aquiclude-5Cm/s, canal Road water level is 7.2m, even if being the situation of 10m in phreatic high, arranges miniature row simultaneously using the technical program in foundation ditch Pumping for water pump, the uplift pressure that canal liner plate bears in foundation ditch are 0m heads.
Using the technical program, in foundation ditch, water percolating capacity is obviously reduced, the construction of foundation ditch internal drainage and liner plate interfere it is little, Be conducive to the repairing construction of foundation ditch inside lining plate.Analytical calculation shows the technical program in foundation ditch while arranging micro-drainage pump Draw water, when level of ground water is 10m, in foundation ditch, water percolating capacity is 4-5m3/d。
Above-mentioned unspecified part is prior art.

Claims (10)

1. cofferdam island foundation ditch under the conditions of water delivery is not interrupted in canal lining reparation, it is characterised in that:Water flowing channel (1) is included along defeated Water direction laying liner plate (2) and along the described symmetrically arranged inclined canal slope (3) of liner plate (2);
Be provided with cofferdam (4) on water flowing channel (1), described cofferdam (4) positioned at the middle part of described water flowing channel (1) and under End is fixed together with canal slope (3);
The bottom in described cofferdam (4) forms dry foundation pit (5) with the water flowing channel (1),
Described cofferdam (4) is modular buoyancy tank steel construction, is internally provided with aerofluxuss, discharge structure in the cofferdam (4) told (4.1), the bottom in described cofferdam (4) is provided with valve rubber, and described valve rubber is close on described liner plate (2);
Be made up of several casings in described cofferdam (4), between each casing by latch connection, and adjacent casing it Between be provided with water sealing structure;
Drainage blanket (7) is provided with the bottom of described liner plate (2) and impervious barrier (6), it is equidistant in described drainage blanket (7) Water penetrative flexible pipe (8) is installed, the end of the Water penetrative flexible pipe (8) described in each is provided with non-return valve (9), described dry Place outside foundation ditch (5) and obturator (10) is installed on the non-return valve (9) removed, enclose with described in described obturator (10) Immersible pump (11) is mounted on non-return valve (9) between the edge on weir (4).
2. cofferdam island foundation ditch under the conditions of water delivery is not interrupted in canal lining reparation according to claim 1, it is characterised in that: Described cofferdam (4) is in " mouth " font structure in canal for water conveyance (1).
3. cofferdam island foundation ditch under the conditions of water delivery is not interrupted in canal lining reparation according to claim 1 and 2, and its feature exists In:Described obturator (10) having removed on the second row of described dry foundation pit (5) periphery or some rows On non-return valve (9).
4. cofferdam island foundation ditch under the conditions of water delivery is not interrupted in canal lining reparation according to claim 3, it is characterised in that: The drainage blanket (7) arranged between described dry foundation pit (5) and described water flowing channel (1) is remained and is connected.
5. cofferdam island foundation ditch under the conditions of water delivery is not interrupted in canal lining reparation according to claim 4, it is characterised in that: Described water flowing channel (1) for inverted trapezoidal structure.
6. cofferdam island foundation ditch under the conditions of water delivery is not interrupted in the canal lining reparation according to claim 4 or 5, and its feature exists In:The both sides of described dry foundation pit (5) remain uninterrupted water flowing.
7. cofferdam island foundation ditch under the conditions of water delivery is not interrupted in canal lining reparation according to claim 6, it is characterised in that: The non-return valve (9) in cofferdam (4) described in keeping keeps opening-wide state.
8. cofferdam island foundation ditch under the conditions of water delivery is not interrupted in canal lining reparation according to claim 7, it is characterised in that: Immersible pump (11) is installed in described dry foundation pit (5).
9. cofferdam island under the conditions of water delivery is not interrupted in the canal lining reparation according to any claim in claim 1-8 The method of foundation ditch, it is characterised in that:Comprise the steps;
1. obturator is installed,:Cofferdam (4) is provided with above the liner plate (2) of described water flowing channel (1), described encloses Dry foundation pit (5) is surrounded between weir (4) and liner plate (2), described dry foundation pit (5) does not carry out draining in advance, removes dry ground Behind foundation ditch (5) periphery second or some row's non-return valves (9), then removing installation obturator in the hole that non-return valve (9) is stayed (10), the water stream channel of the water and bottom drainage blanket (7) in described obturator (10) obstruction water flowing channel (1);
2., installing submersible pump:In the range of dry foundation pit (5) obturator (10) obstruction outward with dry foundation pit (5) border it Immersible pump (11) is respectively mounted on the aperture of interior non-return valve (9);
3., do foundation pit internal drainage to process:The non-return valve (9) in dry foundation pit (5) region described in keeping is opened wide all the time;
4., cofferdam demolition:After the completion of channel is repaired, by cofferdam (4) dismounting for several buoyancy tanks, by tractor tug by buoyancy tank water transport Or disembarkation land transportation is repaired to next point to be repaired.
10. the method that cofferdam island foundation ditch under the conditions of water delivery is not interrupted in canal lining reparation according to claim 9, which is special Levy and be:If occurring a large amount of infiltrations in described dry foundation pit (5), can be in described dry foundation pit (5) installing submersible pump (11).
CN201610914651.0A 2016-10-20 2016-10-20 Cofferdam island foundation pit structure and construction method under the conditions of water delivery are not interrupted in canal lining reparation Active CN106545022B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610914651.0A CN106545022B (en) 2016-10-20 2016-10-20 Cofferdam island foundation pit structure and construction method under the conditions of water delivery are not interrupted in canal lining reparation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610914651.0A CN106545022B (en) 2016-10-20 2016-10-20 Cofferdam island foundation pit structure and construction method under the conditions of water delivery are not interrupted in canal lining reparation

Publications (2)

Publication Number Publication Date
CN106545022A true CN106545022A (en) 2017-03-29
CN106545022B CN106545022B (en) 2018-09-14

Family

ID=58391990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610914651.0A Active CN106545022B (en) 2016-10-20 2016-10-20 Cofferdam island foundation pit structure and construction method under the conditions of water delivery are not interrupted in canal lining reparation

Country Status (1)

Country Link
CN (1) CN106545022B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565665A (en) * 2019-09-18 2019-12-13 河南省水利勘测设计研究有限公司 Construction method for repairing channel side slope without water cut based on canopy type cofferdam

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5806252A (en) * 1995-11-24 1998-09-15 Sibelon S.P.A. Waterproofing system for hydraulic structures with rigid sheets in synthetic material
CN103046514A (en) * 2013-01-11 2013-04-17 北京泰宁科创雨水利用技术股份有限公司 Liner used for ditches
CN103967026A (en) * 2014-04-04 2014-08-06 河海大学 Temporary cofferdam applied to maintenance of urban tidal river concrete anti-flood wall and construction method thereof
CN104372803A (en) * 2014-11-10 2015-02-25 黄河水利职业技术学院 Combined type movable cofferdam for embankment danger elimination and reinforcement
CN104790417A (en) * 2015-04-17 2015-07-22 中水北方勘测设计研究有限责任公司 Spliced chamber cofferdam for repair of canal lining projects
CN206143787U (en) * 2016-10-20 2017-05-03 长江勘测规划设计研究有限责任公司 Cofferdam island formula foundation ditch under uninterrupted water delivery condition of canal lining restoration

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5806252A (en) * 1995-11-24 1998-09-15 Sibelon S.P.A. Waterproofing system for hydraulic structures with rigid sheets in synthetic material
CN103046514A (en) * 2013-01-11 2013-04-17 北京泰宁科创雨水利用技术股份有限公司 Liner used for ditches
CN103967026A (en) * 2014-04-04 2014-08-06 河海大学 Temporary cofferdam applied to maintenance of urban tidal river concrete anti-flood wall and construction method thereof
CN104372803A (en) * 2014-11-10 2015-02-25 黄河水利职业技术学院 Combined type movable cofferdam for embankment danger elimination and reinforcement
CN104790417A (en) * 2015-04-17 2015-07-22 中水北方勘测设计研究有限责任公司 Spliced chamber cofferdam for repair of canal lining projects
CN206143787U (en) * 2016-10-20 2017-05-03 长江勘测规划设计研究有限责任公司 Cofferdam island formula foundation ditch under uninterrupted water delivery condition of canal lining restoration

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565665A (en) * 2019-09-18 2019-12-13 河南省水利勘测设计研究有限公司 Construction method for repairing channel side slope without water cut based on canopy type cofferdam

Also Published As

Publication number Publication date
CN106545022B (en) 2018-09-14

Similar Documents

Publication Publication Date Title
CN106337424B (en) Cofferdam semi-wrapped style foundation pit and method under the conditions of water delivery are not interrupted in canal lining reparation
CN106381842B (en) Canal lining repairs pipe laying water delivery and cofferdam clean cut system foundation pit and construction method
CN106400746B (en) Canal lining repairs bypass pipe water delivery and cofferdam clean cut system foundation pit and construction method
CN101768976A (en) Base pit dewatering and water saving device and construction method thereof
US11566390B2 (en) Construction method of reclaiming land from the sea based on basement utilization
CN206143787U (en) Cofferdam island formula foundation ditch under uninterrupted water delivery condition of canal lining restoration
CN107859145A (en) A kind of drainpipe is plugged into construction method under water
CN206143722U (en) Canal lining restores pipe laying water delivery and formula foundation ditch is cuted in cofferdam
CN105484773A (en) System plugging and draining structure for tunnel leakage treatment
CN102535384B (en) In-trench water-stone separation siphoning-drainage debris flow control method
CN106381843B (en) One kind not interrupting canal lining under water delivery and repairs drainage of foundation pit structure and construction method dryly
CN206143723U (en) Canal lining restores bypass pipe water delivery and formula foundation ditch is cuted in cofferdam
CN104088263A (en) Self-adaptive deforming impermeable channel applied to mining
CN106545022B (en) Cofferdam island foundation pit structure and construction method under the conditions of water delivery are not interrupted in canal lining reparation
CN206143786U (en) Formula foundation ditch was partly enclosed in cofferdam under canal lining restoreed uninterrupted water delivery condition
CN206655715U (en) A kind of efficient drainage arrangement in tunnel
CN206143724U (en) Canal lining restores foundation ditch drainage structures futilely under uninterrupted water delivery
CN207727514U (en) A kind of library basin antiseepage is anti-to lift structure
CN110206062A (en) The dark construction method of underground river shallow embedding is worn under a kind of Urban Underground pipe gallery
CN1130712A (en) Drainage cut-off (deep ditch high-building method) drainage and supplying optimization combination for preventing and harnessing groud water
CN110468837B (en) Underwater hollowing defect repairing method and device for ship lock navigation wall pile foundation on gravel layer basis
CN210636421U (en) Underwater hollowing defect repairing device for navigation wall pile foundation of ship lock on gravel layer foundation
CN203977385U (en) Be applied to the self adaptation distortion anti-seepage channel of minery
CN208965510U (en) A kind of open diversion canal antiseepage drainage system
CN103850246A (en) End part protective shoe sleeve of steel plate pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant