CN106544463A - A kind of method for maintaining converter - Google Patents

A kind of method for maintaining converter Download PDF

Info

Publication number
CN106544463A
CN106544463A CN201510594940.2A CN201510594940A CN106544463A CN 106544463 A CN106544463 A CN 106544463A CN 201510594940 A CN201510594940 A CN 201510594940A CN 106544463 A CN106544463 A CN 106544463A
Authority
CN
China
Prior art keywords
slag
pig iron
converter
tapping
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510594940.2A
Other languages
Chinese (zh)
Other versions
CN106544463B (en
Inventor
王宏明
高学中
徐延浩
郭春媛
栾花冰
孙亚伟
常丽芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Steel Co Ltd
Original Assignee
Angang Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Steel Co Ltd filed Critical Angang Steel Co Ltd
Priority to CN201510594940.2A priority Critical patent/CN106544463B/en
Publication of CN106544463A publication Critical patent/CN106544463A/en
Application granted granted Critical
Publication of CN106544463B publication Critical patent/CN106544463B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Carbon Steel Or Casting Steel Manufacturing (AREA)

Abstract

The present invention provides a kind of method for maintaining converter, and being poured in converter finishing slag using the pig iron makes slag rapidly cool down, and the last pig iron is pasted in being rolled in slag on furnace lining, reaches the purpose of furnace retaining.Compared with prior art, the invention has the beneficial effects as follows:After method of the present invention charging furnace retaining; the pig iron and slag persistently can be kept more than 6 stoves meeting untouchable furnace retaining effect; instead of completely carries out the method for meeting untouchable fettling using magnesia big face mending material, and the purpose of environmental conservation is reached while maintaining converter effect is improved.The inventive method is simple in addition, and low cost, maintaining converter operating time are short, and the furnace retaining cycle is long, is conducive to improve production efficiency.

Description

A kind of method for maintaining converter
Technical field
The present invention relates to field of metallurgy, more particularly to a kind of method for maintaining converter.
Background technology
Converter is most fast position of deteriorating in whole steelmaking process, and affects whole stove to use as a servant the key link in cycle.It is existing In having technology, for the method that the maintenance of whole furnace lining uses slag splashing, the method for maintaining converter is for charging side for converter The big face mending material of magnesia class is mainly adopted, mending material is sintered using converter lining heat, using the mending material after sintering To reduce the impact to furnace lining.
In the method for slag splashing, magnesia class mending material can make converter dust-removing during production using Colophonium as binding agent Float severe overweight in water, will ultimately result in serious environmental pollution.
The content of the invention
It is an object of the invention to provide a kind of method for maintaining converter, being poured in converter finishing slag using the pig iron makes slag rapidly cool down, The last pig iron is pasted on furnace lining in being rolled in slag, reaches the purpose of furnace retaining.It is after using method of the present invention charging furnace retaining, raw Ferrum and slag persistently can be kept more than 6 stoves meeting untouchable furnace retaining effect, be instead of completely and are entered using magnesia big face mending material The method that row meets untouchable fettling, reaches the purpose of environmental conservation while maintaining converter effect is improved.
For achieving the above object, the present invention employs the following technical solutions realization:
A kind of method for maintaining converter, the pig iron is poured in converter finishing slag makes slag rapidly cool down, and the last pig iron is glued in being rolled in slag It is attached on furnace lining, reaches the purpose of furnace retaining, concrete grammar step is as follows:
1) after tapping terminates, the pig iron is ploughed under in liquid slag in 3min, ploughs under the pig iron and meet ferrum direction backward and converter is shaken To level;
2) converter is shaken to level the time of staying and is:When slag temperature is 1650-1670 DEG C after tapping, 13-15min is stopped; When slag temperature is 1630-1650 DEG C after tapping, 10-13min is stopped;After tapping, slag temperature is 1610-1630 DEG C When, stop 7-10min;
3) pig iron is poured in converter into, is shaken to level and is stopped after cooling, converter is shaken to vertically carrying out splashing slag, slag pressure is splashed 1.1-1.4MPa;Splashing the slag time is:When slag temperature is 1650-1670 DEG C after tapping, slag 2.5-3.0min is splashed;When going out When slag temperature is 1630-1650 DEG C after steel, slag 2.2-2.5min is splashed;When after tapping, slag temperature is 1610-1630 DEG C, Splash slag 2.0-2.3min;
4) deslagging operation is carried out after splashing slag, floating slag in stove is all poured in slag ladle.
The pig iron composition is:C:3.7%-4.5%, Si:0.20%-0.80%, Mn:0.05%-0.35%, P:< 0.090%, S:< 0.060%, remaining is ferrum and inevitable impurity.
Described pig iron usage amount is:When slag temperature is 1650-1670 DEG C after tapping, pig iron 2.0-2.2 tons are added; When slag temperature is 1630-1650 DEG C after tapping, pig iron 1.8-2.0 tons are added;After tapping, slag temperature is When 1610-1630 DEG C, pig iron 1.5-1.8 tons are added.
Compared with prior art, the invention has the beneficial effects as follows:
A kind of method for maintaining converter, being poured in converter finishing slag using the pig iron makes slag rapidly cool down, and the last pig iron is rolled in slag Paste on furnace lining, reach the purpose of furnace retaining.After method of the present invention charging furnace retaining, the pig iron and slag are meeting untouchable Furnace retaining effect persistently can keep more than 6 stoves, and instead of completely carries out the method for meeting untouchable fettling using magnesia big face mending material, The purpose of environmental conservation is reached while maintaining converter effect is improved.The inventive method is simple in addition, low cost, converter shield The stove operating time is short, and the furnace retaining cycle is long, is conducive to improve production efficiency.
Specific embodiment
Below the present invention is described in detail, it should be noted that the enforcement of the present invention is not limited to following embodiment.
A kind of method for maintaining converter, the pig iron is poured in converter finishing slag makes slag rapidly cool down, and the last pig iron is glued in being rolled in slag It is attached on furnace lining, reaches the purpose of furnace retaining, concrete grammar step is as follows:
1) after tapping terminates, the pig iron is ploughed under in liquid slag in 3min, ploughs under the pig iron and meet ferrum direction backward and converter is shaken To level;
2) converter is shaken to level the time of staying and is:When slag temperature is 1650-1670 DEG C after tapping, 13-15min is stopped; When slag temperature is 1630-1650 DEG C after tapping, 10-13min is stopped;After tapping, slag temperature is 1610-1630 DEG C When, stop 7-10min;
3) pig iron is poured in converter into, is shaken to level and is stopped after cooling, converter is shaken to vertically carrying out splashing slag, slag pressure is splashed 1.1-1.4MPa;Splashing the slag time is:When slag temperature is 1650-1670 DEG C after tapping, slag 2.5-3.0min is splashed;When going out When slag temperature is 1630-1650 DEG C after steel, slag 2.2-2.5min is splashed;When after tapping, slag temperature is 1610-1630 DEG C, Splash slag 2.0-2.3min;
4) deslagging operation is carried out after splashing slag, floating slag in stove is all poured in slag ladle.
The pig iron composition is:C:3.7%-4.5%, Si:0.20%-0.80%, Mn:0.05%-0.35%, P:< 0.090%, S:< 0.060%, remaining is ferrum and inevitable impurity.
Described pig iron usage amount is:When slag temperature is 1650-1670 DEG C after tapping, pig iron 2.0-2.2 tons are added; When slag temperature is 1630-1650 DEG C after tapping, pig iron 1.8-2.0 tons are added;After tapping, slag temperature is When 1610-1630 DEG C, pig iron 1.5-1.8 tons are added.
A kind of method for maintaining converter of the present invention, 6 stoves are a furnace retaining cycle, i.e. 6 furnace rear of converter cyclic production, are entered The row once operation of method for maintaining converter as above.
Heretofore described method is specifically described below by specific embodiment.
Embodiment 1:
1) take the pig iron to pour in liquid slag, be that liquid slag is lowered the temperature, pig iron composition:C:3.7%th, Si:0.20%th, Mn: 0.05%th, P:< 0.090%, S:< 0.060%.
2) pig iron usage amount:1650-1670 DEG C of slag temperature after tapping, adds 2.0 tons of the pig iron.
3) after tapping terminates, the pig iron is ploughed under in liquid slag in 3min, ploughs under the pig iron and meet ferrum direction backward and converter is shaken To level.
4) time of staying is shaken to level in converter:1650-1670 DEG C of slag temperature after tapping, stops 13-15min.
5) pig iron is poured in converter into, is shaken to level and is stopped after cooling, converter is shaken to vertically carrying out splashing slag, slag pressure is splashed 1.1-1.4MPa.Splash the slag time:1650-1670 DEG C of slag temperature after tapping, splashes slag 2.5-3.0min.
6) deslagging operation is carried out after splashing slag, floating slag in stove is all poured in slag ladle.
Embodiment 2:
1) take the pig iron to pour in liquid slag, be that liquid slag is lowered the temperature, pig iron composition:C:4.5%th, Si:0.80%th, Mn:0.35%th, P:< 0.090%, S:< 0.060%.
2) pig iron usage amount:1630-1650 DEG C of slag temperature after tapping, adds 1.8 tons of the pig iron.
3) after tapping terminates, the pig iron is ploughed under in liquid slag in 3min, ploughs under the pig iron and meet ferrum direction backward and converter is shaken To level.
4) time of staying is shaken to level in converter:1630-1650 DEG C of slag temperature after tapping, stops 10-13min.
5) pig iron is poured in converter into, is shaken to level and is stopped after cooling, converter is shaken to vertically carrying out splashing slag, slag pressure is splashed 1.1-1.4MPa.Splash the slag time:1630-1650 DEG C of slag temperature after tapping, splashes slag 2.2-2.5min.
6) deslagging operation is carried out after splashing slag, floating slag in stove is all poured in slag ladle.
Embodiment 3:
1) take the pig iron to pour in liquid slag, be that liquid slag is lowered the temperature, pig iron composition:C:4.0%th, Si:0.5%th, Mn: 0.2%th, P:< 0.090%, S:< 0.060%.
2) pig iron usage amount:1610-1630 DEG C of slag temperature after tapping, adds 1.5 tons of the pig iron.
3) after tapping terminates, the pig iron is ploughed under in liquid slag in 3min, ploughs under the pig iron and meet ferrum direction backward and converter is shaken To level.
4) time of staying is shaken to level in converter:1610-1630 DEG C of slag temperature after tapping, stops 7-10min.
5) pig iron is poured in converter into, is shaken to level and is stopped after cooling, converter is shaken to vertically carrying out splashing slag, slag pressure is splashed 1.1-1.4MPa.Splash the slag time:1610-1630 DEG C of slag temperature after tapping, splashes slag 2.0-2.3min.
6) deslagging operation is carried out after splashing slag, floating slag in stove is all poured in slag ladle.

Claims (3)

1. a kind of method for maintaining converter, it is characterised in that pouring the pig iron in converter finishing slag into makes slag rapidly cool down, finally The pig iron is pasted in being rolled in slag on furnace lining, reaches the purpose of furnace retaining, and concrete grammar step is as follows:
1) after tapping terminates, the pig iron is ploughed under in liquid slag in 3min, ploughs under the pig iron and meet ferrum direction backward and converter is shaken To level;
2) converter is shaken to level the time of staying and is:When slag temperature is 1650-1670 DEG C after tapping, 13-15min is stopped; When slag temperature is 1630-1650 DEG C after tapping, 10-13min is stopped;After tapping, slag temperature is 1610-1630 DEG C When, stop 7-10min;
3) pig iron is poured in converter into, is shaken to level and is stopped after cooling, converter is shaken to vertically carrying out splashing slag, slag pressure is splashed 1.1-1.4MPa;Splashing the slag time is:When slag temperature is 1650-1670 DEG C after tapping, slag 2.5-3.0min is splashed;When going out When slag temperature is 1630-1650 DEG C after steel, slag 2.2-2.5min is splashed;When after tapping, slag temperature is 1610-1630 DEG C, Splash slag 2.0-2.3min;
4) deslagging operation is carried out after splashing slag, floating slag in stove is all poured in slag ladle.
2. a kind of method for maintaining converter according to claim 1, it is characterised in that the pig iron composition is: C:3.7%-4.5%, Si:0.20%-0.80%, Mn:0.05%-0.35%, P:< 0.090%, S:< 0.060%, remaining For ferrum and inevitable impurity.
3. a kind of method for maintaining converter according to claim 1, it is characterised in that described pig iron usage amount is: When slag temperature is 1650-1670 DEG C after tapping, pig iron 2.0-2.2 tons are added;After tapping, slag temperature is When 1630-1650 DEG C, pig iron 1.8-2.0 tons are added;When slag temperature is 1610-1630 DEG C after tapping, the pig iron is added 1.5-1.8 ton.
CN201510594940.2A 2015-09-17 2015-09-17 A kind of method for maintaining converter Active CN106544463B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510594940.2A CN106544463B (en) 2015-09-17 2015-09-17 A kind of method for maintaining converter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510594940.2A CN106544463B (en) 2015-09-17 2015-09-17 A kind of method for maintaining converter

Publications (2)

Publication Number Publication Date
CN106544463A true CN106544463A (en) 2017-03-29
CN106544463B CN106544463B (en) 2018-12-04

Family

ID=58361343

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510594940.2A Active CN106544463B (en) 2015-09-17 2015-09-17 A kind of method for maintaining converter

Country Status (1)

Country Link
CN (1) CN106544463B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108034787A (en) * 2017-11-17 2018-05-15 河钢股份有限公司承德分公司 A kind of method using magnetic separation slag iron to half steel steelmaking converter furnace retaining
CN108676956A (en) * 2018-06-12 2018-10-19 山东泰山钢铁集团有限公司 A kind of on-line maintenance method of oxygen top-blown converter furnace bottom

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102776312A (en) * 2012-07-24 2012-11-14 黑龙江建龙钢铁有限公司 Converter protecting method
CN102888486A (en) * 2012-09-17 2013-01-23 宣化钢铁集团有限责任公司 Converter slag iron furnace protecting technology

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102776312A (en) * 2012-07-24 2012-11-14 黑龙江建龙钢铁有限公司 Converter protecting method
CN102888486A (en) * 2012-09-17 2013-01-23 宣化钢铁集团有限责任公司 Converter slag iron furnace protecting technology

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
琚泽龙 等: ""转炉渣补技术的应用与实践"", 《河南冶金》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108034787A (en) * 2017-11-17 2018-05-15 河钢股份有限公司承德分公司 A kind of method using magnetic separation slag iron to half steel steelmaking converter furnace retaining
CN108676956A (en) * 2018-06-12 2018-10-19 山东泰山钢铁集团有限公司 A kind of on-line maintenance method of oxygen top-blown converter furnace bottom

Also Published As

Publication number Publication date
CN106544463B (en) 2018-12-04

Similar Documents

Publication Publication Date Title
CN102212640B (en) Convertor steelmaking method capable of reducing slag quantity
CN102409238B (en) 42CrMo alloy constructional steel super-thick plate and production method thereof
CN101654760B (en) Unalloyed structural steel S355J2 steel plate and production method thereof
CN105112595A (en) Smelting method capable of realizing phosphorus content of less than 70ppm in high-carbon converter tapping
CN103334050A (en) Process utilizing sheet billet continuous casting to manufacture low aluminum silicon calm carbon structural steel
CN105483501A (en) Method for smelting phosphorus-containing ultra-low carbon steel
CN105154623A (en) Efficient alloying method for smelting 38CrMoAl steel
CN103725955A (en) Steel 13MnNiMoR steel plate for pressure container and production method of steel plate
CN102965465A (en) Method for curing converter slag
CN102220540A (en) Spheroidizing treatment technology by rush-in method
CN103966399B (en) A kind of method of semisteel smelting medium carbon steel
CN107058679A (en) A kind of method for stablizing half steel quality
CN106544463A (en) A kind of method for maintaining converter
CN102344984B (en) Semisteel smelting and slag remaining method under dry dedusting conduction
CN103725821B (en) A kind of method improved containing vanadium titanium semi-steel making converter lining life
CN102691019B (en) A kind of melting method controlling nitrogen nuclear grade stainless steel
CN104726645A (en) Dephosphorization method of mid-high phosphorus semisteel
CN102260767A (en) Method for producing minus 40 DEG C low temperature casting-state nodular graphite cast iron with large cross section
CN106995866A (en) A kind of low-cost high-efficiency converter fettling technique
CN103305639B (en) A kind of thermal slag high efficiente callback utilizes technique
CN103966387B (en) Adopt the method for semi-steel making
CN105177217A (en) Process for reducing steel slag quantity during converter smelting
CN108251598A (en) A kind of carburetting control nitrogen production process of middle carbon high-alloy steel
CN111394538A (en) Converter and furnace lining thereof and preparation method
CN103276143A (en) Automobile steel and production technology thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant