CN106541549B - A kind of preparation process of plastics crossbeam tubing string - Google Patents

A kind of preparation process of plastics crossbeam tubing string Download PDF

Info

Publication number
CN106541549B
CN106541549B CN201610896548.8A CN201610896548A CN106541549B CN 106541549 B CN106541549 B CN 106541549B CN 201610896548 A CN201610896548 A CN 201610896548A CN 106541549 B CN106541549 B CN 106541549B
Authority
CN
China
Prior art keywords
tubing string
crossbeam tubing
crossbeam
mold
rigidity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610896548.8A
Other languages
Chinese (zh)
Other versions
CN106541549A (en
Inventor
徐钦
吴当敬
皇甫玉兴
田厚林
戴维波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Hengyuansheng Molding Co Ltd
Original Assignee
Suzhou Hengyuansheng Molding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Hengyuansheng Molding Co Ltd filed Critical Suzhou Hengyuansheng Molding Co Ltd
Priority to CN201610896548.8A priority Critical patent/CN106541549B/en
Publication of CN106541549A publication Critical patent/CN106541549A/en
Application granted granted Critical
Publication of CN106541549B publication Critical patent/CN106541549B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/76Measuring, controlling or regulating
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/26Moulds
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/76Measuring, controlling or regulating
    • B29C45/78Measuring, controlling or regulating of temperature
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C2945/00Indexing scheme relating to injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould
    • B29C2945/76Measuring, controlling or regulating
    • B29C2945/76494Controlled parameter
    • B29C2945/76531Temperature
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C2945/00Indexing scheme relating to injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould
    • B29C2945/76Measuring, controlling or regulating
    • B29C2945/76655Location of control
    • B29C2945/76732Mould
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C2945/00Indexing scheme relating to injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould
    • B29C2945/76Measuring, controlling or regulating
    • B29C2945/76655Location of control
    • B29C2945/76769Moulded articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29KINDEXING SCHEME ASSOCIATED WITH SUBCLASSES B29B, B29C OR B29D, RELATING TO MOULDING MATERIALS OR TO MATERIALS FOR MOULDS, REINFORCEMENTS, FILLERS OR PREFORMED PARTS, e.g. INSERTS
    • B29K2077/00Use of PA, i.e. polyamides, e.g. polyesteramides or derivatives thereof, as moulding material
    • B29K2077/10Aromatic polyamides [polyaramides] or derivatives thereof
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29LINDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES
    • B29L2031/00Other particular articles
    • B29L2031/30Vehicles, e.g. ships or aircraft, or body parts thereof
    • B29L2031/3005Body finishings
    • B29L2031/3008Instrument panels

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Mechanical Engineering (AREA)
  • Injection Moulding Of Plastics Or The Like (AREA)

Abstract

The invention discloses a kind of preparation processes of plastics crossbeam tubing string, including:Sample crossbeam tubing string is first prepared, the Constrained mode of crossbeam tubing string and steering quality point is then analyzed, then analyzes the rigidity and intensity of crossbeam tubing string, then analyzes ODB intensity and lateral strength, if the Mechanical Data of crossbeam tubing string meets the requirements, is carried out in next step;The shape for determining crossbeam tubing string determines assembled part after the integrally formed part of crossbeam tubing string and mould;Determine crossbeam tubing string each section material;According to crossbeam tubing string configuration design mold, and mold is analyzed, obtains crossbeam tubing string injection forming mold;Injection molding obtains crossbeam tubing string product.The present invention determines the feasibility of product structure from product mechanical analysis, then determines product material, original iron material or aluminum-magnesium alloy material are replaced with plastic material, the requirement of product can be reached on mechanics.

Description

A kind of preparation process of plastics crossbeam tubing string
Technical field
The present invention relates to auto parts and components fields, and in particular to a kind of preparation process of plastics crossbeam tubing string.
Background technology
Instrument board is located at the front of driver, is furnished with trip odometer, speedometer, engine speed in general above Table, fuel gauge and emergency warning lamp, signal lamp etc..Driver can not only understand the basic transport condition of vehicle by instrument board, And air port, sound equipment, air-conditioning and light etc. can be controlled, so that it is guaranteed that while safe, enjoy more drive and find pleasure in Interest.
In order to ensure the various instrument supported and part can run at high speed and vibrational state under work normally, instrument The crossbeam tubing string of dash board and support instrument dash board must have enough rigidity, and external force pair when accident occurs to reduce Just, the impact of copilot also requires instrument board to have good energy absorption capacity.And the synthesis mechanics of the crossbeam tubing string to instrument board Performance has higher requirement.
Traditional crossbeam tubing string disclosure satisfy that crossbeam using the materials such as iron, almag, the intensity and rigidity of traditional material Current automobile industry lightweight, small capital cost are not applied in the requirement of tubing string, but its cost is higher, and heavier-weight It is required that.
Invention content
It is an object of the invention to overcome problem above of the existing technology, a kind of preparation of plastics crossbeam tubing string is provided Technique, preparation process of the invention can prepare plastics crossbeam tubing string, and the plastics crossbeam tubing string is than traditional ferrous material weight Amount is light, reduces cost.
To realize above-mentioned technical purpose and the technique effect, the invention is realized by the following technical scheme:
A kind of preparation process of plastics crossbeam tubing string, includes the following steps:
101 product mechanical analyses of S:Sample crossbeam tubing string is first prepared, crossbeam tubing string and steering quality point are then analyzed Constrained mode, then analyze the rigidity and intensity of crossbeam tubing string, ODB intensity and lateral strength then analyzed, if beam pipe The Mechanical Data of column meets the requirements, and carries out in next step;
S 102 determines the shape of crossbeam tubing string, determines assembled part after the integrally formed part of crossbeam tubing string and mould;
S 103 determines crossbeam tubing string each section material;
104 mold analysis of S:According to the crossbeam tubing string configuration design mold in S102, and carry out mold flow analysis and mold Structural analysis obtains crossbeam tubing string injection forming mold;
Injection molding in mold of the material in S 103 in S104 is obtained crossbeam tubing string product by S 105.
Further, 101 product mechanical properties of S analysis includes the following steps:
S 201 analyzes the Constrained mode of crossbeam tubing string and steering quality point, under real vehicle state, in steering matter Heart position increases quality point, and first-order modal 54.4Hz, > 33Hz meets the requirements;
The rigidity and intensity of 202 crossbeam tubing strings of S:First, under real vehicle state, steering centroid position apply X to The power of 450N measures X to deformation 0.015, and X is 30000N/mm to rigidity, and X is more than 450N/mm to rigidity, and X is conformed to rigidity It asks;
Secondly, under real vehicle state, in the power of steering centroid position application-Z-direction 550N, Z-direction deformation is measured 0.088, Z-direction rigidity is 6250N/mm, and Z-direction rigidity is more than 550N/mm, and Z-direction rigidity meets the requirements;
Then, under real vehicle state, apply the power of Z-direction 4000N, parts of plastics maximum stress in steering centroid position For 566.8MPa, for maximum stress at pedal installation point, other regional stresses are less than 160MPa, structural break do not occur, by force Degree meets the requirements;
S 203ODB intensity:Under real vehicle state, applies 9000N load in front panel installation site, big face do not occur Product fracture, it is eligible;
204 lateral strengths of S:Apply 16000N loads in the left side of crossbeam tubing string, does not occur large area fracture, it is lateral strong Degree meets the requirements.
Further, the shape of crossbeam tubing string determining in S 102 includes:Guan Liang, the Guan Liang be equipped with its one at The first connector, the second connector, the third connector of type, first connector, the second connector, third connector are in institute The homonymy of Guan Liang is stated, the end of second connector is equipped with U shape fixed seat, and the fixed seat is connect with described second Part is embedded to be integrally formed, and the fixed seat connects steering wheel shaft;
Two free ends of the Guan Liang are respectively equipped with first support and second support, and the centre of the Guan Liang is equipped with middle control iron Piece, the middle control iron plate are arranged between first connector and the second connector, and institute is assembled to after the middle control iron plate mould It states on Guan Liang.
Further, in S103, the material that crossbeam tubing string is integrally formed part is GVL-6H, and GVL-6H includes aromatic series Buddhist nun The Young's modulus of dragon and 60% long fibre, GVL-6H is 22000MPa, Poisson's ratio 0.4, density 1.69.
Further, in S 104, mold analysis:The volume of mold injection molding product is 1824.3cm2, product wall thickness For 3mm, 3.5mm, mold includes two template dies, 12 needle-valve hot flow paths, and melting temperature is 295-335 DEG C when injection molding, mould It is 100 DEG C to have temperature, projected area 1749.5cm2
Further, S105 injection moldings include:
Various raw materials are carried out mixture by S 301, and are plasticized;
S 302 melts the raw material after plasticizing, and forms thin polymer film by die head;
Material is sent into double screw extruder and is squeezed out by S 303;
The mixing material squeezed out in double screw extruder is pressed into injection mold and carries out integrated injection molding by S 304.
The beneficial effects of the invention are as follows:
The preparation process of the present invention, the feasibility of product structure is determined from product mechanical analysis, then determines product material Material, original iron material or aluminum-magnesium alloy material are replaced with plastic material, the requirement of product can be reached on mechanics.In reality Under car state, apply power of the X to 450N in steering centroid position, measure X to deformation 0.015, X to rigidity be 30000N/ Mm, X are more than 450N/mm to rigidity, and X meets the requirements to rigidity;Under real vehicle state, in steering centroid position application-Z-direction The power of 550N measures Z-direction deformation 0.088, and Z-direction rigidity is 6250N/mm, and Z-direction rigidity is more than 550N/mm, and Z-direction rigidity conforms to It asks;Under real vehicle state, apply the power of Z-direction 4000N in steering centroid position, parts of plastics maximum stress is 566.8MPa, for maximum stress at pedal installation point, other regional stresses are less than 160MPa, structural break, intensity do not occur It meets the requirements;ODB intensity:Under real vehicle state, applies 9000N load in front panel installation site, it is disconnected large area do not occur It splits, it is eligible;Lateral strength:Apply 16000N loads in the left side of crossbeam tubing string, does not occur large area fracture, lateral strength It meets the requirements.
The base pipe beam and holder part of the crossbeam tubular column structure of the present invention are existed using Shooting Technique, the structure is integrally formed There is excellent in strength and rigidity, low warpage, high-dimensional stability, the weight ratio of plastics crossbeam tubing string under different temperature and humidities Traditional material weight mitigates 40%, cost reduction 15%.
Above description is only the general introduction of technical solution of the present invention, in order to better understand the technical means of the present invention, And can be implemented in accordance with the contents of the specification, below with presently preferred embodiments of the present invention and after coordinating attached drawing to be described in detail such as. The specific implementation mode of the present invention is shown in detail by following embodiment and its attached drawing.
Description of the drawings
Technical solution in technology in order to illustrate the embodiments of the present invention more clearly, in being described below to embodiment technology Required attached drawing is briefly described, it should be apparent that, the accompanying drawings in the following description is only some realities of the present invention Example is applied, it for those of ordinary skill in the art, without creative efforts, can also be according to these attached drawings Obtain other attached drawings.
Fig. 1 is present invention process flow chart;
Fig. 2 is the structural schematic diagram of the plastics crossbeam tubing string of the present invention;
1- pipe beams, the first connectors of 101-, the second connectors of 102-, 103- third connectors, 104- fixed seats, 105- connect Connect iron plate, 201- first supports, 202- second supports control iron plate in 203-.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other without creative efforts Embodiment shall fall within the protection scope of the present invention.
Embodiment 1
Shown in referring to Fig.1, a kind of preparation process of plastics crossbeam tubing string is disclosed in embodiment 1, is included the following steps:
101 product mechanical analyses of S:Sample crossbeam tubing string is first prepared, crossbeam tubing string and steering quality point are then analyzed Constrained mode, then analyze the rigidity and intensity of crossbeam tubing string, ODB intensity and lateral strength then analyzed, if beam pipe The Mechanical Data of column meets the requirements, and carries out in next step.
S 102 determines the shape of crossbeam tubing string, determines assembled part after the integrally formed part of crossbeam tubing string and mould.
S 103 determines crossbeam tubing string each section material.
104 mold analysis of S:According to the crossbeam tubing string configuration design mold in S102, and carry out mold flow analysis and mold Structural analysis obtains crossbeam tubing string injection forming mold.
Injection molding in mold of the material in S 103 in S104 is obtained crossbeam tubing string product by S 105.
Wherein, 101 product mechanical properties of S analysis includes the following steps:
S 201 analyzes the Constrained mode of crossbeam tubing string and steering quality point, under real vehicle state, in steering matter Heart position increases quality point, and first-order modal 54.4Hz, > 33Hz meets the requirements.
The rigidity and intensity of 202 crossbeam tubing strings of S:First, under real vehicle state, steering centroid position apply X to The power of 450N measures X to deformation 0.015, and X is 30000N/mm to rigidity, and X is more than 450N/mm to rigidity, and X is conformed to rigidity It asks.
Secondly, under real vehicle state, in the power of steering centroid position application-Z-direction 550N, Z-direction deformation is measured 0.088, Z-direction rigidity is 6250N/mm, and Z-direction rigidity is more than 550N/mm, and Z-direction rigidity meets the requirements.
Then, under real vehicle state, apply the power of Z-direction 4000N, parts of plastics maximum stress in steering centroid position For 566.8MPa, for maximum stress at pedal installation point, other regional stresses are less than 160MPa, structural break do not occur, by force Degree meets the requirements.
S 203ODB intensity:Under real vehicle state, applies 9000N load in front panel installation site, big face do not occur Product fracture, it is eligible.
204 lateral strengths of S:Apply 16000N loads in the left side of crossbeam tubing string, does not occur large area fracture, it is lateral strong Degree meets the requirements.
In S103, the material that crossbeam tubing string is integrally formed part is GVL-6H, and GVL-6H includes aromatic nylon and 60% The Young's modulus of long fibre, GVL-6H is 22000MPa, Poisson's ratio 0.4, density 1.69.
In S 104, mold analysis:The volume of mold injection molding product is 1824.3cm2, product wall thickness is 3mm, 3.5mm, mold include two template dies, and 12 needle-valve hot flow paths, melting temperature is 295-335 DEG C when injection molding, mold temperature It is 100 DEG C, projected area 1749.5cm2
S105 injection moldings include:
Various raw materials are carried out mixture by S 301, and are plasticized;
S 302 melts the raw material after plasticizing, and forms thin polymer film by die head;
Material is sent into double screw extruder and is squeezed out by S 303;
The mixing material squeezed out in double screw extruder is pressed into injection mold and carries out integrated injection molding by S 304.
Above-mentioned preparation process determines the feasibility of product structure from product mechanical analysis, then determines product material, uses Plastic material replaces original iron material or aluminum-magnesium alloy material, and the requirement of product can be reached on mechanics.In real vehicle shape Under state, apply power of the X to 450N in steering centroid position, measure X to deformation 0.015, X to rigidity be 30000N/mm, X It is more than 450N/mm to rigidity, X meets the requirements to rigidity;Under real vehicle state, in steering centroid position application-Z-direction 550N Power, measure Z-direction deformation 0.088, Z-direction rigidity is 6250N/mm, and Z-direction rigidity is more than 550N/mm, and Z-direction rigidity meets the requirements; Under real vehicle state, apply the power of Z-direction 4000N in steering centroid position, parts of plastics maximum stress is 566.8MPa, maximum For stress at pedal installation point, other regional stresses are less than 160MPa, structural break do not occur, intensity meets the requirements;ODB is strong Degree:Under real vehicle state, applies 9000N load in front panel installation site, large area fracture do not occur, it is eligible;Side To intensity:Apply 16000N loads in the left side of crossbeam tubing string, does not occur large area fracture, lateral strength meets the requirements.
Embodiment 2
The plastics crossbeam tubing string prepared in embodiment 1 is disclosed in embodiment 2, with reference to shown in Fig. 2 comprising:Pipe beam 1, Above-mentioned pipe beam 1 is equipped with the first connector 101, the second connector 102, third connector 103, above-mentioned first connector 101, the Two connectors 102, third connector 103 are in the homonymy of above-mentioned pipe beam 1, also, above-mentioned first connector 101, the second connector 102, third connector 103 and above-mentioned 1 same material of pipe beam, and be integrally formed.
Above-mentioned first connector 101, the second connector 102, third connector 103 are for control instrument in connecting or zero Part is equipped with limit hole in the free end of above-mentioned first connector 101.
Above-mentioned second connector 102 is equipped with several pulling rivet bolts, and above-mentioned pulling rivet bolt and above-mentioned second connector 102 are embedding Modeling is integrally formed.The end of above-mentioned second connector 102 is equipped with U shape fixed seat 104, above-mentioned fixed seat 104 and above-mentioned the Two connectors 102 are embedded to be integrally formed, and above-mentioned fixed seat 104 connects steering wheel shaft.
Above-mentioned third connector 103 is equipped with connection iron plate 105, and above-mentioned connection iron plate 105 is to be assembled to above-mentioned the after mould On three connectors 103.
It is respectively equipped with first support 201 and second support 202, the centre of above-mentioned pipe beam 1 in two free ends of above-mentioned pipe beam 1 Equipped with middle control iron plate 203, iron plate 203 is controlled among the above and is arranged between 201 and second connector 202 of above-mentioned first connector.On It states first support 201 and second support 202 is connect with vehicle frame respectively.
In the present embodiment, it is assembled on above-mentioned pipe beam 1 after controlling 203 mould of iron plate among the above.
The base pipe beam and holder part of above-mentioned crossbeam tubular column structure are using Shooting Technique is integrally formed, and the structure is in difference Temperature and humidity under have excellent in strength and rigidity, low warpage, high-dimensional stability, plastics crossbeam tubing string weight ratio tradition Material weight mitigate 40%, cost reduction 15%.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest range caused.

Claims (2)

1. a kind of preparation process of plastics crossbeam tubing string, which is characterized in that include the following steps:
S101 product mechanical analyses:Sample crossbeam tubing string is first prepared, the pact of crossbeam tubing string and steering quality point is then analyzed Beam mode, then the rigidity and intensity of crossbeam tubing string are analyzed, ODB intensity and lateral strength are then analyzed, if crossbeam tubing string Mechanical Data meets the requirements, and carries out in next step;
S102 determines the shape of crossbeam tubing string, determines assembled part after the integrally formed part of crossbeam tubing string and mould;
S103 determines crossbeam tubing string each section material;
S104 mold analysis:According to the crossbeam tubing string configuration design mold in S102, and carry out mold flow analysis and mould structure Analysis obtains crossbeam tubing string injection forming mold;
Injection molding in mold of the material in S103 in S104 is obtained crossbeam tubing string product by S105;
The analysis of S101 product mechanical properties includes the following steps:
S201 analyzes the Constrained mode of crossbeam tubing string and steering quality point, under real vehicle state, in steering barycenter position Increase quality point is set, first-order modal 54.4Hz, > 33Hz meets the requirements;
The rigidity and intensity of S202 crossbeam tubing strings:First, under real vehicle state, apply X to 450N in steering centroid position Power, measure X to deformation 0.015, X is 30000N/mm to rigidity, and X is more than 450N/mm to rigidity, and X meets the requirements to rigidity;
Secondly, under real vehicle state, in the power of steering centroid position application-Z-direction 550N, Z-direction deformation 0.088, Z-direction are measured Rigidity is 6250N/mm, and Z-direction rigidity is more than 550N/mm, and Z-direction rigidity meets the requirements;
Then, under real vehicle state, apply the power of Z-direction 4000N in steering centroid position, parts of plastics maximum stress is 566.8MPa, for maximum stress at pedal installation point, other regional stresses are less than 160MPa, structural break, intensity do not occur It meets the requirements;
S203ODB intensity:Under real vehicle state, applies 9000N load in front panel installation site, it is disconnected large area do not occur It splits, it is eligible;
S204 lateral strengths:Apply 16000N loads in the left side of crossbeam tubing string, does not occur large area fracture, lateral strength meets It is required that;
The shape of determining crossbeam tubing string includes in S102:Guan Liang, the Guan Liang are equipped with integrally formed first to be connect with its Part, the second connector, third connector, first connector, the second connector, third connector are same the Guan Liang's The end of side, second connector is equipped with U shape fixed seat, the fixed seat and the embedded one of second connector Molding, the fixed seat connect steering wheel shaft;
Two free ends of the Guan Liang are respectively equipped with first support and second support, and the centre of the Guan Liang is equipped with middle control iron plate, The middle control iron plate is arranged between first connector and the second connector, and the pipe is assembled to after the middle control iron plate mould Liang Shang;
In S103, the material that crossbeam tubing string is integrally formed part is GVL-6H, and GVL-6H includes that aromatic nylon and 60% length are fine The Young's modulus of dimension, GVL-6H is 22000MPa, Poisson's ratio 0.4, density 1.69;
In S104, mold analysis:The volume of mold injection molding product is 1824.3cm2, product wall thickness is 3mm, 3.5mm, mold Including two template dies, 12 needle-valve hot flow paths, melting temperature is 295-335 DEG C when injection molding, and mold temperature is 100 DEG C, is thrown Shadow area is 1749.5cm2
2. the preparation process of plastics crossbeam tubing string according to claim 1, which is characterized in that S105 injection moldings include:
Various raw materials are carried out mixture by S301, and are plasticized;
S302 melts the raw material after plasticizing, and forms thin polymer film by die head;
Material is sent into double screw extruder and is squeezed out by S303;
The mixing material squeezed out in double screw extruder is pressed into injection mold and carries out integrated injection molding by S304.
CN201610896548.8A 2016-10-14 2016-10-14 A kind of preparation process of plastics crossbeam tubing string Active CN106541549B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610896548.8A CN106541549B (en) 2016-10-14 2016-10-14 A kind of preparation process of plastics crossbeam tubing string

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610896548.8A CN106541549B (en) 2016-10-14 2016-10-14 A kind of preparation process of plastics crossbeam tubing string

Publications (2)

Publication Number Publication Date
CN106541549A CN106541549A (en) 2017-03-29
CN106541549B true CN106541549B (en) 2018-08-21

Family

ID=58368846

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610896548.8A Active CN106541549B (en) 2016-10-14 2016-10-14 A kind of preparation process of plastics crossbeam tubing string

Country Status (1)

Country Link
CN (1) CN106541549B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107160637A (en) * 2017-07-14 2017-09-15 苏州恒源盛模塑有限公司 A kind of preparation technology of Plastic Instrument Board crossbeam assembly
CN109720419A (en) * 2019-02-22 2019-05-07 广州市银宝山新汽车零部件有限公司 Dashboard cross member and preparation method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104781060A (en) * 2012-10-31 2015-07-15 戴姆勒股份公司 Cross-member arrangement and method for production
CN205256458U (en) * 2015-12-14 2016-05-25 常州神鹰碳塑复合材料有限公司 Carbon -fibre composite auto steering supports assembly
CN105965757A (en) * 2016-05-19 2016-09-28 江苏新昌汽车部件有限公司 Injection molding method of framework instrument panel of pipe beam insert
CN106256670A (en) * 2015-06-16 2016-12-28 华晨汽车集团控股有限公司 A kind of optimization method of fascia board girder

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104781060A (en) * 2012-10-31 2015-07-15 戴姆勒股份公司 Cross-member arrangement and method for production
CN106256670A (en) * 2015-06-16 2016-12-28 华晨汽车集团控股有限公司 A kind of optimization method of fascia board girder
CN205256458U (en) * 2015-12-14 2016-05-25 常州神鹰碳塑复合材料有限公司 Carbon -fibre composite auto steering supports assembly
CN105965757A (en) * 2016-05-19 2016-09-28 江苏新昌汽车部件有限公司 Injection molding method of framework instrument panel of pipe beam insert

Also Published As

Publication number Publication date
CN106541549A (en) 2017-03-29

Similar Documents

Publication Publication Date Title
Yadav et al. Design & fabrication of ABS part by FDM for automobile application
Doshi et al. Printing parameters and materials affecting mechanical properties of FDM-3D printed Parts: Perspective and prospects
Li et al. Additively manufactured fiber-reinforced composites: A review of mechanical behavior and opportunities
Love et al. The importance of carbon fiber to polymer additive manufacturing
CN106541549B (en) A kind of preparation process of plastics crossbeam tubing string
Hosseinzadeh et al. Parametric study of automotive composite bumper beams subjected to low-velocity impacts
CN107160637A (en) A kind of preparation technology of Plastic Instrument Board crossbeam assembly
Gao et al. Influence of printing parameters and filament quality on structure and properties of polymer composite components used in the fields of automotive
Prabhakaran et al. Design and fabrication of composite bumper for light passenger vehicles
CN106515870A (en) Plastic crossbeam pipe column structure and plastic injecting and forming method thereof
CN103331899B (en) Novel air bag for composite material processing and molding
CN105849165A (en) Foamed molded article
CN110892007A (en) Door module
CN207060180U (en) A kind of Plastic Instrument Board crossbeam assembly
CN106867214A (en) It is a kind of for the low-temperature thermoplastic 3 D-printing material of BUILDINGS MODELS product and preparation
CN209617284U (en) Instrument support assembly and vehicle
CN202016400U (en) Unequal-diameter beam pipe for automobile instrument panel framework
CN206107359U (en) Plastics beam tube post structure
CN103612398B (en) A kind of micropore PC/ABS Alloy And Preparation Method
Bian et al. Exit morphology and mechanical property of FDM printed PLA: influence of hot melt extrusion process
CN109720419A (en) Dashboard cross member and preparation method thereof
Pathinettampadian et al. Some studies on functional behavior of novel multi-layered material for integrated structural application
CN104742978A (en) Automobile floor and framework integrated structure
CN104117212B (en) Car model framework
US8733827B2 (en) Composite tub structure for vehicle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant