CN106533362A - Photovoltaic module power testing method - Google Patents

Photovoltaic module power testing method Download PDF

Info

Publication number
CN106533362A
CN106533362A CN201611254045.7A CN201611254045A CN106533362A CN 106533362 A CN106533362 A CN 106533362A CN 201611254045 A CN201611254045 A CN 201611254045A CN 106533362 A CN106533362 A CN 106533362A
Authority
CN
China
Prior art keywords
photovoltaic module
standard film
testing
information
tester
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611254045.7A
Other languages
Chinese (zh)
Other versions
CN106533362B (en
Inventor
尹修伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
In building materials jetion science and Technology Co Ltd
Original Assignee
China National Building Materials Group Corp Jetion Solar (china) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Building Materials Group Corp Jetion Solar (china) Co Ltd filed Critical China National Building Materials Group Corp Jetion Solar (china) Co Ltd
Priority to CN201611254045.7A priority Critical patent/CN106533362B/en
Publication of CN106533362A publication Critical patent/CN106533362A/en
Application granted granted Critical
Publication of CN106533362B publication Critical patent/CN106533362B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02SGENERATION OF ELECTRIC POWER BY CONVERSION OF INFRARED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, e.g. USING PHOTOVOLTAIC [PV] MODULES
    • H02S50/00Monitoring or testing of PV systems, e.g. load balancing or fault identification
    • H02S50/10Testing of PV devices, e.g. of PV modules or single PV cells
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Photovoltaic Devices (AREA)
  • Testing Of Individual Semiconductor Devices (AREA)

Abstract

The invention discloses a photovoltaic module power testing method. The method comprises the following steps: S1, manufacturing a series of standard sheets; S2, establishing a database according to the information of each standard sheet in S1; S3, bringing the database established in the S1 into a tester software system for the retrieval of a testing interface; S4, selecting a standard sheet satisfying a testing requirement from the testing interface in the S3; S5, calibrating the tester by use of the standard sheet selected in the step S4; and S6, testing a to-be-tested photovoltaic module by use of the calibrated tester in the S5. Through the adoption of the photovoltaic module power testing method disclosed by the invention, the intelligent management on the standard sheet can be realized, the fault standard use problem easily caused by the manual operation and other problems can be reduced even completely eradicated; and meanwhile, the participation degree of the manual operation in the whole testing process is lowered; the accuracy of the whole testing process is improved to some extent, and the testing efficiency is improved.

Description

Photovoltaic module power method of testing
Technical field
The present invention relates to a kind of photovoltaic module power method of testing, belongs to photovoltaic module verification test field.
Background technology
In the current photovoltaic module course of processing, the power test of photovoltaic module is particularly important, especially for processing For enterprise, photovoltaic module power test can not only detect that the quality of component more can directly determine the price of component.Therefore this One test is extremely subject to processing the attention of enterprise.
And during photovoltaic module power is tested, standard film plays highly important role.But at present for mark The management of quasi- piece, each processing enterprise still can be carried out using manual type mostly.Because there is more leak in labor management, because , during practical operation, the management effect of standard film is not good for this.Also just because of this, test in current photovoltaic module power During, the accuracy of test hardly results in guarantee.
Therefore, how a kind of photovoltaic module power method of testing that can effectively improve test accuracy is provided, just into For those skilled in that art institute problem demanding prompt solution.
The content of the invention
A kind of in view of prior art has drawbacks described above, the purpose of the present invention is to propose to photovoltaic module power method of testing.
The purpose of the present invention, will be achieved by the following technical programs:
Photovoltaic module power method of testing, comprises the following steps:
S1, makes series of standards piece;
S2, sets up data base according to the information of each standard film in S1;
The data base set up in S2 is included tester software system, is had access to for test interface by S3;
S4, chooses the standard film for meeting test request from tester software system;
S5, with the standard film calibration tester chosen in S4;
S6, treats survey photovoltaic module and is tested with the tester after S5 alignments.
Preferably, data base described in S2 comprising the standard film electrical parameter information, suitable for photovoltaic group to be detected The EL test result informations of the type information of part, pot life information and each standard film.
Preferably, the electrical parameter information includes power, open-circuit voltage, short circuit current, maximum working voltage, maximum work Make electric current, fill factor, curve factor.
Preferably, tester software system described in S3 is MES system.
Preferably, test interface described in S3 includes calibration next time count down information, can use standard film information, at present may be used Test photovoltaic assembly type information.
Preferably, S4 comprises the steps:
S41, the standard film matched with model photovoltaic module to be measured according to the model of photovoltaic module to be measured, selection;
S42, the electrical parameter information of standard film selected by extraction are simultaneously judged, into next step if qualified, if unqualified, Then system alarm;
S43, extract selected by the pot life information of standard film simultaneously judged, jump into next step if qualified, if unqualified, Then system alarm;
S44, extract selected by the EL test result informations of standard film simultaneously judged, jump into S5 if qualified, if unqualified, System alarm;
Preferably, in S6, treating survey photovoltaic module using the tester after calibration carries out comparing analysis, if qualified, enters Enter subsequent processing, if unqualified, system alarm.
The present invention prominent effect be:The photovoltaic module power method of testing of the present invention can realize the intelligence to standard film Change management, reduce and even prevented standard film that artificial operation is easily caused using the problems such as error.Simultaneously as the survey of the present invention Method for testing is reduced, and is not only improved to a certain extent and was entirely tested The accuracy of journey, also shortens the time of whole power test, improves testing efficiency.
Hereinafter just the specific embodiment of the present invention is described in further detail, so that technical solution of the present invention is easier to reason Solution, grasp.
Specific embodiment
Present invention is disclosed a kind of photovoltaic module power method of testing, it is characterised in that comprise the following steps:
S1, makes series of standards piece;
S2, sets up data base according to the information of each standard film in S1;
The data base set up in S2 is included tester software system, is had access to for test interface by S3;
S4, chooses the standard film for meeting test request from tester software system;
S5, with the standard film calibration tester chosen in S4;
S6, treats survey photovoltaic module and is tested with the tester after S5 alignments.
Tester software system described in S3 is MES system.MES system is that manufacturing enterprise's production process performs management system System, is the production information management system of a set of Manufacture Enterprise workshop execution level.Substantially, operation of the invention is also base In the MES system.
Data base described in S2 comprising the standard film electrical parameter information, suitable for the model of photovoltaic module to be detected The EL test result informations of information, pot life information and each standard film.
The electrical parameter information is one group of test result that third party's laboratory is given under standard test condition, including Power, open-circuit voltage, short circuit current, maximum working voltage, maximum operating currenbt, fill factor, curve factor.Every piece of standard film has and only has One group of electrical parameter, the electrical parameter are to contrast automatically each tester calibration whether qualified sole criterion using MES. MES be capable of achieving using the calibration range that each company oneself defines contrast automatically each target to test whether in the range of and every Whether secondary calibration is qualified.General processing enterprise carrys out calibration tester using power or short circuit current, and the scope calibrated respectively has Difference, such as Pmax ± 0.2W, Pmax ± 0.1%, Isc ± 0.3A etc..And controlled when tester calibration is unqualified by MES system, Component can not be tested.It should be noted that not tester of can not testing herein is unable to test suite, but whole test is flowed Cheng Buneng is covered, and the module information after such as testing can not enter MES system, so as to reach fool proof effect.
After every piece of standard film calibration tester, tester can only test component corresponding with current standard film model, model Mainly include mono-crystal component, polycrystalline component, 60 components, 72 components, solar double-glass assemblies etc..MES system passes through this of standard film Partial information can test the component of which kind of model judging current calibrated tester.Herein it should be added that, on The premise for stating step is to need the operator must be by component model Data Enter MES so as to match with standard film model, Jin Erda To the purpose for preventing standard film to be suitable for mistake.
Pot life information is automatically reminded to and expired unusable management to realize that standard film is expired.It is wherein automatic Remind and associated mail can be sent automatically to corresponding personnel by MES, and expired unusable be accomplished by directly in test interface what is said or talked about Go out dialog box teaching process person this standard film out of date unusable.
The EL test result informations of the standard film are to be related to the whether available another key factor of the standard film, this Part needs EL testers after the EL for having tested standard film every time by test result typing MES system, so as to by MES systems System automatically controls whether standard film can use.
Test interface described in S3 include next time calibration count down information, can use standard film information, at present can test light Volt component type information.This part is exactly that partial information above-mentioned is shown in the test interface of MES system in fact, just Observe in employee.It is specifically as follows:
Next time calibration count down information be to ensure that operator fully according to documentation requirements frequency go monitor tester such as per 2 A hour tester of calibration.Certainly a foolproof function, i.e. countdown certain hour can also be increased here also not weighing The component of new calibration tester so follow-up test can not typing MES system.
The mark of which numbering can should be used using the order or component that standard film information is operator's inquiry production at present Quasi- piece.Just prompting should be using the standard of which numbering automatically for the relevant information of operation this order of employee's typing or component to be tested Piece.
Photovoltaic assembly type information can be tested at present refer to tested standard film in operator or calibration is good tests After instrument, this interface needs to show the testable component model of current tester, and it is current to be tested to facilitate operator to compare Whether component is corresponding with standard film.Along with foolproof function ensures that the component for mismatching model with standard film can not be tested.
In addition, in addition it is also necessary to supplement, the Data Enter of the test interface is needed to prevent the artificial typing of employee from slipping up It is set to only barcode scanner to sweep, Pasting and is not manually entered.
S4 comprises the steps:
S41, the standard film matched with model photovoltaic module to be measured according to the model of photovoltaic module to be measured, selection;
S42, the electrical parameter information of standard film selected by extraction are simultaneously judged, into next step if qualified, if unqualified, Then system alarm;
S43, extract selected by the pot life information of standard film simultaneously judged, jump into next step if qualified, if unqualified, Then system alarm;
S44, extract selected by the EL test result informations of standard film simultaneously judged, jump into S5 if qualified, if unqualified, System alarm;
In S6, treating survey photovoltaic module using the tester after calibration carries out comparing analysis, if qualified, into next work Sequence, if unqualified, system alarm.
The photovoltaic module power method of testing of the present invention can realize the intelligent management to standard film, reduce and even prevent The standard film that artificial operation is easily caused is using the problems such as error.Simultaneously as the method for testing of the present invention reduces artificial behaviour Make the participation in whole test process, not only improve the accuracy of whole test process to a certain extent, also shorten Time of whole power test, improve testing efficiency.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie In the case of spirit and essential characteristics without departing substantially from the present invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power Profit is required rather than described above is limited, it is intended that all in the implication and scope of the equivalency of claim by falling Change is included in the present invention.
Moreover, it will be appreciated that although this specification is been described by according to embodiment, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of description is only that those skilled in the art should for clarity Using description as an entirety, the technical scheme in each embodiment can also Jing it is appropriately combined, form those skilled in the art Understandable other embodiment.

Claims (7)

1. photovoltaic module power method of testing, it is characterised in that comprise the following steps:
S1, makes series of standards piece;
S2, sets up data base according to the information of each standard film in S1;
The data base set up in S2 is included tester software system, is had access to for test interface by S3;
S4, chooses the standard film for meeting test request from tester software system;
S5, with the standard film calibration tester chosen in S4;
S6, treats survey photovoltaic module and is tested with the tester after S5 alignments.
2. photovoltaic module power method of testing according to claim 1, it is characterised in that:Described in S2, data base includes The electrical parameter information of the standard film, the type information suitable for photovoltaic module to be detected, pot life information and each institute State the EL test result informations of standard film.
3. photovoltaic module power method of testing according to claim 2, it is characterised in that:The electrical parameter information includes Power, open-circuit voltage, short circuit current, maximum working voltage, maximum operating currenbt, fill factor, curve factor.
4. photovoltaic module power method of testing according to claim 1, it is characterised in that:Tester software system described in S3 Unite as MES system.
5. photovoltaic module power method of testing according to claim 1, it is characterised in that:Described in S3, test interface includes Calibration next time count down information, can be using standard film information, can test photovoltaic assembly type information at present.
6. photovoltaic module power method of testing according to claim 2, it is characterised in that:S4 comprises the steps:
S41, the standard film matched with model photovoltaic module to be measured according to the model of photovoltaic module to be measured, selection;
S42, the electrical parameter information of standard film selected by extraction are simultaneously judged, into next step if qualified, if unqualified, Then system alarm;
S43, extract selected by the pot life information of standard film simultaneously judged, jump into next step if qualified, if unqualified, Then system alarm;
S44, extract selected by the EL test result informations of standard film simultaneously judged, jump into S5 if qualified, if unqualified, System alarm.
7. photovoltaic module power method of testing according to claim 1, it is characterised in that:In S6, using the survey after calibration Examination instrument is treated survey photovoltaic module and carries out comparing analysis, if qualified, into subsequent processing, if unqualified, system alarm.
CN201611254045.7A 2016-12-30 2016-12-30 Photovoltaic module power test method Active CN106533362B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611254045.7A CN106533362B (en) 2016-12-30 2016-12-30 Photovoltaic module power test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611254045.7A CN106533362B (en) 2016-12-30 2016-12-30 Photovoltaic module power test method

Publications (2)

Publication Number Publication Date
CN106533362A true CN106533362A (en) 2017-03-22
CN106533362B CN106533362B (en) 2019-04-19

Family

ID=58335780

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611254045.7A Active CN106533362B (en) 2016-12-30 2016-12-30 Photovoltaic module power test method

Country Status (1)

Country Link
CN (1) CN106533362B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109520404A (en) * 2018-12-11 2019-03-26 王永强 A kind of device that pressure inductive detection foot is long
CN109755147A (en) * 2018-11-26 2019-05-14 北京铂阳顶荣光伏科技有限公司 Membrane photovoltaic component test method and membrane photovoltaic component

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102842654A (en) * 2012-08-24 2012-12-26 四川汉能光伏有限公司 Method for analyzing and processing amorphous silicon thin film solar cell low-power chips
CN104579169A (en) * 2014-12-25 2015-04-29 黄河水电光伏产业技术有限公司 Light intensity calibration method used for solar battery piece testing device
CN105278441A (en) * 2015-10-09 2016-01-27 协鑫集成科技股份有限公司 Data interaction system
CN205404444U (en) * 2016-03-11 2016-07-27 张家港协鑫集成科技有限公司 Photovoltaic module defect detecting device and photovoltaic module defect detecting type system
CN106067491A (en) * 2016-06-21 2016-11-02 张家港协鑫集成科技有限公司 The optimization method of photovoltaic module power and system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102842654A (en) * 2012-08-24 2012-12-26 四川汉能光伏有限公司 Method for analyzing and processing amorphous silicon thin film solar cell low-power chips
CN104579169A (en) * 2014-12-25 2015-04-29 黄河水电光伏产业技术有限公司 Light intensity calibration method used for solar battery piece testing device
CN105278441A (en) * 2015-10-09 2016-01-27 协鑫集成科技股份有限公司 Data interaction system
CN205404444U (en) * 2016-03-11 2016-07-27 张家港协鑫集成科技有限公司 Photovoltaic module defect detecting device and photovoltaic module defect detecting type system
CN106067491A (en) * 2016-06-21 2016-11-02 张家港协鑫集成科技有限公司 The optimization method of photovoltaic module power and system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109755147A (en) * 2018-11-26 2019-05-14 北京铂阳顶荣光伏科技有限公司 Membrane photovoltaic component test method and membrane photovoltaic component
CN109520404A (en) * 2018-12-11 2019-03-26 王永强 A kind of device that pressure inductive detection foot is long

Also Published As

Publication number Publication date
CN106533362B (en) 2019-04-19

Similar Documents

Publication Publication Date Title
CN105304954B (en) The method for group matching and its combo system of a kind of battery
CN102650678B (en) Multi-channel calibration and checking method for power management ICs (integrated circuits)
Martínez‐Moreno et al. On the testing of large PV arrays
CN203502579U (en) System used for calibrating light source capable of simulating solar radiation spectrum
CN102252820B (en) On-line automatic testing system in production of optical module
ATE545036T1 (en) TEST EQUIPMENT FOR AUTOMATED QUALITY CONTROL OF THIN FILM SOALR MODULES
CN104808168A (en) Rapid electric energy meter verification method based on segmented current technology
CN104459408A (en) Method for verifying product reliability through temperature-stress-increased accelerated lift test
CN106291437A (en) A kind of method for evaluating reliability of intelligent electric energy meter
CN101750597A (en) Effectiveness calibrating method used for automatic testing equipment
US20200241076A1 (en) Battery detection method
CN106886003A (en) Batteries of electric automobile monitoring module Auto-Test System and method
CN106533362A (en) Photovoltaic module power testing method
CN110244256A (en) A kind of intelligent electric energy meter fault recognition method, device and equipment
US20110241720A1 (en) Dc test point for locating defective pv modules in a pv system
CN101271136A (en) Full-automatic on-line test approach of ballast and tester
CN107356882B (en) A kind of PD power supply product ageing testing method
CN105606999A (en) Multichannel intermediate relay verification apparatus
CN107273984A (en) A kind of oil for electric power chemical supervision management method and system
CN105842650B (en) Electric energy meter calibrating method
CN103076586B (en) Method for improving standard sheet calibrating and monitoring of solar simulator
CN107015154B (en) A kind of method of accurate measurement battery capacity
CN113289922B (en) Synchronous aging screening method for multiple rubidium atomic clocks
CN208026841U (en) A kind of protective relaying device intelligent checking system
CN110442109A (en) A kind of controller for electric vehicle full-automatic test system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 214400 No. 1011 Chengcheng Road, Shengang Town, Jiangyin City, Wuxi City, Jiangsu Province

Patentee after: In building materials jetion science and Technology Co Ltd

Address before: 214400 No. 1011 Chengcheng Road, Shengang Town, Jiangyin City, Wuxi City, Jiangsu Province

Patentee before: China National Building Materials Group Corporation Jetion Solar (China) Co., Ltd.