CN106532689B - Power distribution network topology structure optimization method and system - Google Patents

Power distribution network topology structure optimization method and system Download PDF

Info

Publication number
CN106532689B
CN106532689B CN201611047038.XA CN201611047038A CN106532689B CN 106532689 B CN106532689 B CN 106532689B CN 201611047038 A CN201611047038 A CN 201611047038A CN 106532689 B CN106532689 B CN 106532689B
Authority
CN
China
Prior art keywords
switch
distribution network
power distribution
target
topological structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611047038.XA
Other languages
Chinese (zh)
Other versions
CN106532689A (en
Inventor
魏文潇
于力
郭晓斌
雷金勇
简淦杨
占恺峤
白浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China South Power Grid International Co ltd
Original Assignee
China South Power Grid International Co ltd
Power Grid Technology Research Center of China Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China South Power Grid International Co ltd, Power Grid Technology Research Center of China Southern Power Grid Co Ltd filed Critical China South Power Grid International Co ltd
Priority to CN201611047038.XA priority Critical patent/CN106532689B/en
Publication of CN106532689A publication Critical patent/CN106532689A/en
Application granted granted Critical
Publication of CN106532689B publication Critical patent/CN106532689B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/18Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a method and a system for optimizing a topological structure of a power distribution network, wherein the method comprises the following steps: when the closing times of the target contact switch in the current power distribution network topological structure are judged to be smaller than a preset time threshold value, closing the target contact switch to form a loop; disconnecting the target section switch in the loop; determining a target function value after the target section switch is disconnected; traversing each section switch in the closed loop to obtain a minimum objective function value; when the minimum objective function value is smaller than the initial objective function value, the section switch and the target interconnection switch in the closed loop corresponding to the minimum objective function value are exchanged; taking any one contact switch except the target contact switch in the current power distribution network topological structure as a new target contact switch, and returning to the step of closing the target contact switch; and when the preset traversal times are judged to be completed, obtaining the optimal distribution network topological structure. The invention effectively reduces the voltage deviation of the power distribution network in different running states, reduces the network loss of the power distribution network and improves the power supply quality of the power distribution network.

Description

Power distribution network topological structure optimization method and system
Technical field
The present invention relates to power distribution network running optimizatin technical fields, more particularly to a kind of power distribution network topological structure optimization method And system.
Background technique
With the development and utilization of new energy, the scale of distributed generation resource access power distribution network increases day by day, to power distribution network Influence is also increasingly enhanced, and causes the operating condition of existing power distribution network more complicated.New energy power output has uncertainty, to distribution The influence on system operation of net also can not qualitative description, original distribution method of operation calculation method has been unable to satisfy the reality of electric system Production requirement.
For the problem of power distribution network method of operation uncertainty, tradition is by converting multiple determinations for uncertain problem Property the problem power distribution network topological structure network loss that carries out analysis and solution, but analyzed based on fixed scene or firm demand Greatly, power distribution network power supply quality is reduced, is unable to satisfy using needs.
Summary of the invention
Based on this, it is necessary to big, reduction power distribution network power supply be lost for the power distribution network topological structure network after tradition optimization The problem of quality, provides a kind of power distribution network topological structure optimization method and system.
To achieve the goals above, the embodiment of technical solution of the present invention are as follows:
A kind of power distribution network topological structure optimization method, comprising the following steps:
When the closure number for determining target interconnection switch in current power distribution network topological structure is less than default first frequency threshold value When, it is closed the target interconnection switch and forms closed loop, update the closure number of the target interconnection switch, the target connection Network switch is any one interconnection switch in the current power distribution network topological structure;
The target segment switch in the closed loop is disconnected, updates block switch disconnection times, the target segment is opened It closes as any one block switch in the closed loop;
According to the voltage out-of-limit for disconnecting each power distribution network node in the power distribution network topological structure after the target segment switchs Probability determines the target function value of the power distribution network topological structure after disconnecting the target segment switch;
The block switch that any one in the closed loop does not turn off operation is opened as new target segment The step of closing, returning to the target segment switch disconnected in the closed loop;
When determining that updated block switch disconnection times are equal to default second frequency threshold value, from determining each target The smallest target function value is obtained in functional value;
It, will when the smallest target function value is less than the initial target functional value of the current power distribution network topological structure Block switch and the target interconnection switch in the corresponding closed loop of the smallest target function value exchange, described Initial target functional value is according to the voltage out-of-limit determine the probability of power distribution network node each in the current power distribution network topological structure;
It will appoint in remaining each interconnection switch in addition to the target interconnection switch in the current power distribution network topological structure An interconnection switch anticipate as new target interconnection switch, returns to the target connection when in judgement current power distribution network topological structure When the closure number of network switch is less than default first frequency threshold value, it is closed the step that the target interconnection switch forms closed loop Suddenly;
When determining to complete default traversal number, optimal power distribution network topological structure is obtained.
A kind of power distribution network topological structure optimization system, comprising:
Interconnection switch is closed module, for when the closure number for determining target interconnection switch in current power distribution network topological structure When less than default first frequency threshold value, it is closed the target interconnection switch and forms closed loop, update the target interconnection switch Closure number, the target interconnection switch be the current power distribution network topological structure in any one interconnection switch;
Interconnection switch is closed number update module, for the target interconnection switch in closure current power distribution network topological structure Afterwards, it updates interconnection switch and is closed number;
Block switch disconnects module, and for disconnecting the switch of the target segment in the closed loop, the target segment is opened It closes as any one block switch in the closed loop;
Block switch disconnection times update module, for after disconnecting the target segment switch in the closed loop, more New block switch disconnection times;
Target function value determining module, for each in the power distribution network topological structure after the target segment switchs according to disconnecting The voltage out-of-limit probability of a power distribution network node determines the target letter of the power distribution network topological structure after disconnecting the target segment switch Numerical value;
First iteration module, the block switch for any one in the closed loop not turned off to operation are made It is switched for new target segment, returns to the block switch and disconnect module;
Target function value optimal value obtains module, for when determining that updated block switch disconnection times are equal to default the When two frequency threshold values, the smallest target function value is obtained from determining each target function value;
Switch exchanges module, for being less than the first of the current power distribution network topological structure when the smallest target function value When beginning target function value, by the corresponding closed loop of the smallest target function value block switch and the target Interconnection switch exchanges, and the initial target functional value is according to the electricity of power distribution network node each in the current power distribution network topological structure Press out-of-limit determine the probability;
Secondary iteration module, for by the current power distribution network topological structure in addition to the target interconnection switch it is remaining Any one interconnection switch returns to the interconnection switch closure module as new target interconnection switch in each interconnection switch;
Optimal power distribution network topological structure obtains module, for obtaining optimal distribution when determining the default traversal number of completion Net topology structure.
Compared with prior art, the invention has the benefit that power distribution network topological structure optimization method of the present invention and system, First when the closure number for determining target interconnection switch in current power distribution network topological structure is less than default first frequency threshold value, close It closes the target interconnection switch and forms closed loop, update target interconnection switch closure number;Disconnect the target in closed loop Block switch updates block switch disconnection times;Matched according to each in the power distribution network topological structure after disconnection target segment switch The voltage out-of-limit probability of grid nodes determines the target function value of the power distribution network topological structure after disconnecting target segment switch;It will The block switch that any one in closed loop does not turn off operation is switched as new target segment, is returned and is disconnected closure The step of target segment in loop switchs;The first frequency threshold value is preset when determining that updated block switch disconnection times are equal to When, the smallest target function value is obtained from determining each target function value;Currently match when the smallest target function value is less than When the initial target functional value of topological structure of electric, by the corresponding closed loop of the smallest target function value block switch with Target interconnection switch exchanges;By in current power distribution network topological structure in addition to above-mentioned target interconnection switch remaining each interconnection switch In any one interconnection switch as new target interconnection switch, return to the step of being closed above-mentioned target interconnection switch;Work as judgement When completing default traversal number, optimal power distribution network topological structure is obtained.The present invention is based on the interconnection switch in power distribution network and divide Duan Kaiguan, the folding condition by changing line switching convert to obtain optimal network topology structure, make each node of power distribution network Voltage out-of-limit probability it is minimum, distribution network voltage deviation of the power distribution network under different operating statuses is effectively reduced, reduces power distribution network Network loss promotes the power supply quality of power distribution network, meets practical application needs.
Detailed description of the invention
Fig. 1 is power distribution network topological structure optimization method flow chart in one embodiment;
Fig. 2 is based on power distribution network topological structure optimization method flow chart in method one shown in Fig. 1 specific example;
Fig. 3 is power distribution network topological structure optimization system structure diagram in one embodiment.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention more comprehensible, with reference to the accompanying drawings and embodiments, to this Invention is described in further detail.It should be appreciated that the specific embodiments described herein are only used to explain the present invention, And the scope of protection of the present invention is not limited.
Power distribution network topological structure optimization method in one embodiment, as shown in Figure 1, comprising the following steps:
Step S101: when the closure number for determining target interconnection switch in current power distribution network topological structure is less than default first When frequency threshold value, it is closed the target interconnection switch and forms closed loop, update the closure number of the target interconnection switch, institute Stating target interconnection switch is any one interconnection switch in the current power distribution network topological structure;
Here, interconnection switch plays contact, is mainly used on the branch line or section route of distribution line.
Specifically, it is closed any one interconnection switch in current power distribution network topological structure, forms a closed circuit, is recorded The closure number of the interconnection switch sets the closure number initial value of the interconnection switch as zero.
Step S102: the target segment switch in the closed loop is disconnected, block switch disconnection times, the mesh are updated Marking block switch is any one block switch in the closed loop;
Here, block switch is mainly used on the branch line or section route of distribution line.
Specifically, any one block switch in above-mentioned first closed circuit is disconnected, block switch disconnection times are recorded, Block switch disconnection times initial value is set as zero.
Step S103: according to each power distribution network node in the power distribution network topological structure after the disconnection target segment switch Voltage out-of-limit probability determines the target function value of the power distribution network topological structure after disconnecting the target segment switch;
Step S104: any one in the closed loop block switch of operation is not turned off into as new mesh Mark block switch, return step S102;
Here, repeat step S102-S103, one block switch of every disconnection, obtain one disconnect the block switch after The target function value of power distribution network topological structure.
Step S105: when determining that updated block switch disconnection times are equal to default second frequency threshold value, from determination Each target function value in obtain the smallest target function value;
Specifically, default second frequency threshold value is set according to actual needs, such as default second frequency threshold value is set and is equal to The total number of all block switches in above-mentioned closed loop, when the disconnection times for determining updated block switch are equal to close ring In road when the total number of all block switches, the smallest target function value is obtained from determining each target function value, that is, is closed After all block switches successively disconnect in cyclization road, the smallest target function value in each target function value is obtained.
Step S106: when the smallest target function value is less than the initial target letter of the current power distribution network topological structure When numerical value, by the block switch and the target interconnection switch in the corresponding closed loop of the smallest target function value It exchanges, the initial target functional value is general according to the voltage out-of-limit of power distribution network node each in the current power distribution network topological structure Rate determines;
Here, if the smallest target function value is that the block switch M disconnected in closed loop is obtained, closed loop is closure Interconnection switch N is formed, when above-mentioned the smallest target function value is less than the initial target functional value of current power distribution network topological structure, Using block switch M as new interconnection switch N, interconnection switch N is as new block switch M, i.e. block switch M and interconnection switch N is exchanged.When above-mentioned the smallest target function value is greater than or equal to the initial target functional value of current power distribution network topological structure, no It is interchangeable operation.
Step S107: by remaining each contact in addition to the target interconnection switch in the current power distribution network topological structure Any one interconnection switch is as new target interconnection switch, return step S101 in switch;
Here, the interconnection switch in one current power distribution network topological structure of every closure repeats step S101-S106.
Step S108: when determining to complete default traversal number, optimal power distribution network topological structure is obtained.
Specifically, default traversal number is set according to actual needs, such as owns according in current power distribution network topological structure The total number of interconnection switch and the default traversal number of above-mentioned first frequency threshold value setting, when determining to complete default traversal number, Obtain optimal power distribution network topological structure.
Here, the traversal strategies based on elementary cycle can effectively avoid falling into local optimum, it is ensured that each solution is can Row solution, reduces and calculates the time.It can repeat the above steps S101- step S107 preset times to improve the accuracy of result Whether verification result is accurate.
It is evidenced from the above discussion that power distribution network topological structure optimization method of the present invention, based in power distribution network interconnection switch and Block switch, the folding condition by changing line switching convert to obtain optimal network topology structure, make each section of power distribution network The voltage out-of-limit probability of point is minimum, and distribution network voltage deviation of the power distribution network under different operating statuses is effectively reduced, and reduces distribution Net network loss promotes the power supply quality of power distribution network.
In addition, in a specific example, according to expression formula:It determines after disconnecting the target segment switch The target function value F of power distribution network topological structure, wherein n is to match in the power distribution network topological structure after disconnecting the target segment switch Grid nodes quantity,Voltage out-of-limit for the i-th node in the power distribution network topological structure after the disconnection target segment switch is general Rate,Wherein pitIt is the i-th node in the power distribution network topological structure after the disconnection target segment switch in T time state Voltage out-of-limit probability is spent, T is time state quantity.
Specifically, on the basis of meeting system load flow constraint, operation constraint, network topology constraint, objective function are as follows:Wherein n is power distribution network number of nodes,For the voltage out-of-limit probability of the i-th node, T is time state quantity.Wherein pitIt is the i-th node in T time attitude voltage out-of-limit probability.
Constraint condition:
1) system load flow constrains:
G (x)=0
2) system operation constraint may be expressed as:
In formula, Ui,minAnd Ui,maxThe respectively minimum allowable voltage value and maximum allowable voltage of node i;Iij,maxFor branch The maximum allowed current value of road ij.
3) network topology constrains, and after optimizing operating mode, power distribution network should be radial.
In addition, in a specific example, the side of the target interconnection switch in the closure current power distribution network topological structure Formula includes:
The default serial number of each interconnection switch in the current power distribution network topological structure is stored in default first array;
Rule, which is obtained, according to default interconnection switch serial number obtains the target interconnection switch from described preset in the first array Default serial number;
It is closed target connection corresponding with the default serial number of the target interconnection switch in the current power distribution network topological structure Network switch.
Here, the default serial number of interconnection switch each in current power distribution network topological structure is stored in array Aopen, according to from It arrives greatly small or from small to large or other acquisitions rule is from array AopenThe middle default serial number for obtaining target interconnection switch, according to target The default serial number of interconnection switch is closed target interconnection switch.
In addition, in a specific example, the mode for disconnecting the target segment switch in the closed loop includes:
It, will be each in the closed loop according to the default serial number of each block switch in the current power distribution network topological structure The default serial number of a block switch is stored in default second array;
Rule is obtained according to default block switch serial number, and the target segment switch is obtained from default second array Default serial number;
Target segment corresponding with the default serial number of target segment switch in the closed loop is disconnected to switch.
Here, the default serial number of block switch each in current power distribution network topological structure is stored in array Aclosed, will be closed The default serial number deposit group array L of each block switch in loop, according to from big to small or from small to large or other acquisitions rule The default serial number that target segment switch is obtained from array L disconnects target segment according to the default serial number of target segment switch and opens It closes.
In addition, default second frequency threshold value is according to block switch in the closed loop in a specific example Total number setting, the default traversal number is according to the total number of interconnection switch and institute in the current power distribution network topological structure State default first frequency threshold value setting.It can be set according to actual needs default first frequency threshold value, default second frequency threshold value With default traversal number.
The above method in order to better understand, a power distribution network topological structure optimization method of the present invention detailed below Application example.
On the basis of meeting system load flow constraint, operation constraint, network topology constraint, objective function are as follows: Wherein n is power distribution network number of nodes,For the voltage out-of-limit probability of the i-th node, T is time state quantity.Wherein pitIt is the i-th node in T time attitude voltage out-of-limit probability.
Constraint condition:
1) system load flow constrains:
G (x)=0
2) system operation constraint may be expressed as:
In formula, Ui,minAnd Ui,maxThe respectively minimum allowable voltage value and maximum allowable voltage of node i;Iij,maxFor branch The maximum allowed current value of road ij.
As shown in Fig. 2, power distribution network topological structure optimization method may comprise steps of:
Step S201: initialization system topological reads in system data, the system data includes current power distribution net topology knot The voltage value of the default serial number of each interconnection switch, the default serial number of each block switch and each power distribution network node in structure;
Step S202: according to the voltage value of power distribution network node each in above-mentioned current power distribution network topological structure and above-mentioned target Function calculates the initial target functional value of current power distribution network topological structure;
Step S203: the interconnection switch (normal open switch) in current power distribution network topological structure is preset into serial number nopenIt is stored in number Group Aopen, the block switch (normally closed switch) in current power distribution network topological structure is preset into serial number nclosedIt is stored in array Aclosed
Step S204: from AopenAn interconnection switch Ti is taken by forward read in array, when the closure time for determining interconnection switch Ti It when number is less than three times, is closed, forms closed loop, the block switch in closed loop is preset into serial number and is stored in array L;
Step S205: it according to the storage order of block switch, selects a block switch Sj and is disconnected;
Step S206: it is got over according to the voltage of each power distribution network node in the power distribution network topological structure after disconnection block switch Sj Probability and above-mentioned objective function are limited, the target function value of the power distribution network topological structure after disconnecting block switch Sj is calculated;
Here, the voltage out-of-limit probability root of each power distribution network node in the power distribution network topological structure after disconnecting block switch Sj According to the distribution net topology knot after the voltage value and disconnection block switch Sj of power distribution network node each in current power distribution network topological structure Structure determines.
Step S207: judge whether to have traversed the block switch in array L;
Step S208: if so, from the mesh for disconnecting the power distribution network topological structure in closed loop after each block switch is calculated The smallest target function value is obtained in offer of tender numerical value, otherwise, repeats step S205- step S207;
Step S209: when above-mentioned the smallest target function value is less than the initial target letter of above-mentioned current power distribution network topological structure When numerical value, by the corresponding closed loop of the smallest target function value block switch and interconnection switch Ti exchange;
Here, if the smallest target function value is that the block switch M disconnected in closed loop is obtained, when above-mentioned the smallest mesh When offer of tender numerical value is less than the initial target functional value of current power distribution network topological structure, using block switch M as new interconnection switch Ti, interconnection switch Ti are exchanged as new block switch M, i.e. block switch M and interconnection switch Ti.When above-mentioned the smallest target letter When numerical value is greater than or equal to the initial target functional value of current power distribution network topological structure, operated without exchanging.
Step S210: judge whether to have traversed array AopenIn interconnection switch;
Step S211: if so, repeating step S204- step S210 three times, optimal power distribution network topological structure is obtained.
Here, the traversal strategies based on elementary cycle can effectively avoid falling into local optimum, it is ensured that each solution is can Row solution, reduces and calculates the time.
It is evidenced from the above discussion that the interconnection switch in the present embodiment current power distribution network topological structure, which presets serial number, is stored in array Aopen, when the interconnection switch Ti closure number in current power distribution network topological structure is less than three times, closure interconnection switch Ti formation is closed Cyclization road;Block switch in closed loop is preset into serial number and is stored in array L, disconnects the block switch Sj in closed loop;Root According to the voltage out-of-limit probability of each power distribution network node in the power distribution network topological structure after disconnection block switch Sj, determines and disconnect segmentation The target function value of power distribution network topological structure after switch Sj;The block switch in array L is traversed, from determining each target The smallest target function value is obtained in functional value;When the smallest target function value is less than the initial mesh of current power distribution network topological structure When offer of tender numerical value, the block switch in the corresponding closed loop of the smallest target function value is exchanged with interconnection switch Ti;Traversal Complete array AopenIn interconnection switch after, repeat the above steps three times, obtain optimal power distribution network topological structure.The present invention is based on Interconnection switch and block switch in power distribution network, the folding condition by changing line switching convert to obtain optimal network topology Structure keeps the voltage out-of-limit probability of each node of power distribution network minimum, distribution of the power distribution network under different operating statuses is effectively reduced Net voltage deviation reduces distribution network loss, promotes the power supply quality of power distribution network, meet practical application needs.
Power distribution network topological structure optimization system in one embodiment, as shown in Figure 3, comprising:
Interconnection switch is closed module 301, for when the closure for determining target interconnection switch in current power distribution network topological structure When number is less than default first frequency threshold value, it is closed the target interconnection switch and forms closed loop, the target interconnection switch For any one interconnection switch in the current power distribution network topological structure;
Interconnection switch is closed number update module 302, for the target contact in closure current power distribution network topological structure After switch, the closure number of the interconnection switch is updated;
Block switch disconnects module 303, for disconnecting the switch of the target segment in the closed loop, the target segment Switch is any one block switch in the closed loop;
Block switch disconnection times update module 304, for after disconnecting the target segment switch in the closed loop, Update block switch disconnection times;
Target function value determining module 305, for according to the power distribution network topological structure after the disconnection target segment switch In each power distribution network node voltage out-of-limit probability, determine the mesh of the power distribution network topological structure after disconnecting target segment switch Offer of tender numerical value;
First iteration module 306, the segmentation for any one in the closed loop not to be turned off operation are opened It closes and is switched as new target segment, return to the block switch and disconnect module 303;
Target function value optimal value obtains module 307, for when the updated block switch disconnection times of judgement are equal to pre- If when the second frequency threshold value, obtaining the smallest target function value from determining each target function value;
Switch exchanges module 308, for being less than the current power distribution network topological structure when the smallest target function value Initial target functional value when, by the corresponding closed loop of the smallest target function value block switch with it is described Target interconnection switch exchanges, and the initial target functional value is according to power distribution network node each in the current power distribution network topological structure Voltage out-of-limit determine the probability;
Secondary iteration module 309, for will be remained in addition to the target interconnection switch in the current power distribution network topological structure Any one interconnection switch returns to the interconnection switch closure mould as new target interconnection switch in remaining each interconnection switch Block;
Optimal power distribution network topological structure obtains module 310, for obtaining optimal match when determining the default traversal number of completion Topological structure of electric.
As shown in figure 3, in a specific embodiment, the target function value determining module 305 is according to expression formula:Determine the target function value F of the power distribution network topological structure after disconnecting the target segment switch, wherein n is disconnection institute Power distribution network number of nodes in power distribution network topological structure after stating target segment switch,After disconnecting the target segment switch The voltage out-of-limit probability of i-th node in power distribution network topological structure,Wherein pitTo disconnect the target segment switch For the i-th node in T time attitude voltage out-of-limit probability, T is time state quantity in power distribution network topological structure afterwards.
As shown in figure 3, in a specific embodiment, the interconnection switch closure module 301 includes:
Interconnection switch serial number storage unit 3011, for by each interconnection switch in the current power distribution network topological structure Default serial number is stored in default first array;
Interconnection switch serial number acquiring unit 3012, for obtaining rule from described default the according to default interconnection switch serial number The default serial number of the target interconnection switch is obtained in one array;
Interconnection switch closed cell 3013 is opened for being closed in the current power distribution network topological structure with target contact The corresponding target interconnection switch of default serial number closed.
As shown in figure 3, in a specific embodiment, the block switch disconnects module 303 and includes:
Block switch serial number storage unit 3031, for according to each block switch in the current power distribution network topological structure Default serial number, the default serial number of block switch each in the closed loop is stored in default second array;
Block switch serial number acquiring unit 3032, for obtaining rule from described default the according to default block switch serial number The default serial number of the target segment switch is obtained in two arrays;
Block switch switching units 3033, for disconnecting the default sequence in the closed loop with target segment switch Number corresponding target segment switch.
In addition, in a specific embodiment, default second frequency threshold value is opened according to segmentation in the closed loop The total number of pass is arranged, the default traversal number according to the total number of interconnection switch in the current power distribution network topological structure with The default first frequency threshold value setting.
It is evidenced from the above discussion that power distribution network topological structure optimization system of the present invention, based in power distribution network interconnection switch and Block switch, the folding condition by changing line switching convert to obtain optimal network topology structure, make each section of power distribution network The voltage out-of-limit probability of point is minimum, and distribution network voltage deviation of the power distribution network under different operating statuses is effectively reduced, and reduces distribution Net network loss promotes the power supply quality of power distribution network.
Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, all should be considered as described in this specification.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (10)

1. a kind of power distribution network topological structure optimization method, which comprises the following steps:
When the closure number for determining target interconnection switch in current power distribution network topological structure is less than default first frequency threshold value, close It closes the target interconnection switch and forms closed loop, update the closure number of the target interconnection switch, the target contact is opened It closes as any one interconnection switch in the current power distribution network topological structure;
The target segment switch in the closed loop is disconnected, block switch disconnection times are updated, the target segment switch is Any one block switch in the closed loop;
The voltage out-of-limit probability of each power distribution network node in power distribution network topological structure after being switched according to the disconnection target segment, Determine the target function value of the power distribution network topological structure after disconnecting the target segment switch;
The block switch that any one in the closed loop does not turn off operation is switched as new target segment, is returned The step of returning the target segment switch disconnected in the closed loop;
When determining that updated block switch disconnection times are equal to default second frequency threshold value, from determining each objective function The smallest target function value is obtained in value;
It, will be described when the smallest target function value is less than the initial target functional value of the current power distribution network topological structure Block switch and the target interconnection switch in the corresponding closed loop of the smallest target function value exchange, described initial Target function value is according to the voltage out-of-limit determine the probability of power distribution network node each in the current power distribution network topological structure;
By in the current power distribution network topological structure in addition to the target interconnection switch in remaining each interconnection switch it is any one A interconnection switch returns to the target contact when in judgement current power distribution network topological structure and opens as new target interconnection switch When the closure number of pass is less than default first frequency threshold value, it is closed the step of target interconnection switch forms closed loop;
When determining to complete default traversal number, optimal power distribution network topological structure is obtained.
2. power distribution network topological structure optimization method according to claim 1, which is characterized in that according to expression formula:Determine the target function value F of the power distribution network topological structure after disconnecting the target segment switch, wherein n is to disconnect Power distribution network number of nodes in power distribution network topological structure after the target segment switch,To disconnect the target segment switch The voltage out-of-limit probability of i-th node in power distribution network topological structure afterwards,Wherein pitTo disconnect the target point For the i-th node in the voltage out-of-limit probability of t time state, T is time state quantity in power distribution network topological structure after Duan Kaiguan.
3. power distribution network topological structure optimization method according to claim 1, which is characterized in that the closure current power distribution network The mode of target interconnection switch in topological structure includes:
The default serial number of each interconnection switch in the current power distribution network topological structure is stored in default first array;
Rule is obtained according to default interconnection switch serial number, obtains the pre- of the target interconnection switch from default first array If serial number;
Target contact corresponding with the default serial number of the target interconnection switch in the current power distribution network topological structure is closed to open It closes.
4. power distribution network topological structure optimization method according to claim 1, which is characterized in that disconnect in the closed loop Target segment switch mode include:
According to the default serial number of each block switch in the current power distribution network topological structure, by each point in the closed loop The default serial number of Duan Kaiguan is stored in default second array;
Rule is obtained according to default block switch serial number, the pre- of the target segment switch is obtained from default second array If serial number;
Target segment corresponding with the default serial number of target segment switch in the closed loop is disconnected to switch.
5. power distribution network topological structure optimization method as claimed in any of claims 1 to 4, which is characterized in that described Default second frequency threshold value is arranged according to the total number of block switch in the closed loop, and the default traversal number is according to institute State the total number of interconnection switch and the default first frequency threshold value setting in current power distribution network topological structure.
6. a kind of power distribution network topological structure optimization system characterized by comprising
Interconnection switch is closed module, for being less than when the closure number for determining target interconnection switch in current power distribution network topological structure When default first frequency threshold value, it is closed the target interconnection switch and forms closed loop, update closing for the target interconnection switch Number is closed, the target interconnection switch is any one interconnection switch in the current power distribution network topological structure;
Interconnection switch be closed number update module, for closure current power distribution network topological structure in target interconnection switch after, It updates interconnection switch and is closed number;
Block switch disconnects module, and for disconnecting the switch of the target segment in the closed loop, the target segment switch is Any one block switch in the closed loop;
Block switch disconnection times update module, for updating and dividing after disconnecting the target segment switch in the closed loop Duan Kaiguan disconnection times;
Target function value determining module, for being matched according to each in the power distribution network topological structure after the disconnection target segment switch The voltage out-of-limit probability of grid nodes determines the objective function of the power distribution network topological structure after disconnecting the target segment switch Value;
First iteration module, for any one in the closed loop not turned off to the block switch of operation as new Target segment switch, return to the block switch and disconnect module;
Target function value optimal value obtains module, for being equal to default second when the updated block switch disconnection times of judgement When number threshold value, the smallest target function value is obtained from determining each target function value;
Switch exchanges module, for being less than the initial mesh of the current power distribution network topological structure when the smallest target function value When offer of tender numerical value, by the corresponding closed loop of the smallest target function value block switch and the target get in touch with Switch exchanges, and the initial target functional value is got over according to the voltage of power distribution network node each in the current power distribution network topological structure Limit determine the probability;
Secondary iteration module, for by the current power distribution network topological structure in addition to the target interconnection switch it is remaining each Any one interconnection switch returns to the interconnection switch closure module as new target interconnection switch in interconnection switch;
Optimal power distribution network topological structure obtains module, for obtaining optimal power distribution network and opening up when determining the default traversal number of completion Flutter structure.
7. power distribution network topological structure optimization system according to claim 6, which is characterized in that the target function value determines Module is according to expression formula:Determine the objective function of the power distribution network topological structure after disconnecting the target segment switch Value F, wherein n is power distribution network number of nodes in the power distribution network topological structure after disconnecting the target segment switch,To disconnect institute The voltage out-of-limit probability of i-th node in power distribution network topological structure after stating target segment switch,Wherein pitFor In power distribution network topological structure after disconnecting target segment switch the i-th node t time state voltage out-of-limit probability, when T is Between state quantity.
8. power distribution network topological structure optimization system according to claim 6, which is characterized in that the interconnection switch is closed mould Block includes:
The default serial number storage unit of interconnection switch, for by the current power distribution network topological structure each interconnection switch it is pre- If serial number is stored in default first array;
The default serial number acquiring unit of interconnection switch, for obtaining rule from described default first according to default interconnection switch serial number The default serial number of the target interconnection switch is obtained in array;
Interconnection switch closed cell, it is default with the target interconnection switch in the current power distribution network topological structure for being closed The corresponding target interconnection switch of serial number.
9. power distribution network topological structure optimization system according to claim 6, which is characterized in that the block switch disconnects mould Block includes:
The default serial number storage unit of block switch, for according to each block switch in the current power distribution network topological structure The default serial number of block switch each in the closed loop is stored in default second array by default serial number;
The default serial number acquiring unit of block switch, for obtaining rule from described default second according to default block switch serial number The default serial number of the target segment switch is obtained in array;
Block switch switching units, it is corresponding with the default serial number of target segment switch in the closed loop for disconnecting Target segment switch.
10. power distribution network topological structure optimization system according to any one of claims 6 to 9, which is characterized in that described Default second frequency threshold value is arranged according to the total number of block switch in the closed loop, and the default traversal number is according to institute State the total number of interconnection switch and the default first frequency threshold value setting in current power distribution network topological structure.
CN201611047038.XA 2016-11-23 2016-11-23 Power distribution network topology structure optimization method and system Active CN106532689B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611047038.XA CN106532689B (en) 2016-11-23 2016-11-23 Power distribution network topology structure optimization method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611047038.XA CN106532689B (en) 2016-11-23 2016-11-23 Power distribution network topology structure optimization method and system

Publications (2)

Publication Number Publication Date
CN106532689A CN106532689A (en) 2017-03-22
CN106532689B true CN106532689B (en) 2019-03-22

Family

ID=58357963

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611047038.XA Active CN106532689B (en) 2016-11-23 2016-11-23 Power distribution network topology structure optimization method and system

Country Status (1)

Country Link
CN (1) CN106532689B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106329714B (en) * 2015-06-30 2018-08-14 西门子电力自动化有限公司 A kind of method that dynamic judges power network switch type
CN108711850B (en) * 2018-06-05 2022-01-25 国网上海市电力公司 Method for judging safety loop closing operation of medium-voltage distribution network
CN110516876B (en) * 2019-08-28 2022-12-27 国网上海市电力公司 Optimal breaking switch optimization method and system
CN112241586B (en) * 2020-09-16 2022-10-25 国网宁夏电力有限公司培训中心 Method and device for judging state of topological switch node of alternating current network for station
CN112615368A (en) * 2020-12-11 2021-04-06 国网辽宁省电力有限公司鞍山供电公司 Distributed sensing-based platform area topology generation method and sensing terminal device
CN112564114B (en) * 2020-12-15 2023-04-14 深圳供电局有限公司 Power distribution network reconstruction optimization method and system based on limited radiation type constraint
CN113392592A (en) * 2021-07-13 2021-09-14 南方电网科学研究院有限责任公司 Distribution network topological graph layout method, device and equipment

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102136721B (en) * 2011-03-08 2014-02-19 中国电力科学研究院 Multi-object optimized power supply recovery reasoning and searching method
CN102496915B (en) * 2011-11-29 2014-05-28 航天科工深圳(集团)有限公司 Power distribution network fault processing method and system thereof
CN103078391A (en) * 2013-01-10 2013-05-01 长兴县供电局 Power distribution network power supply power restoration method based on photovoltaic power generation system
CN103903062A (en) * 2014-03-12 2014-07-02 国家电网公司 Method for reconstructing power distribution network based on double-ant-colony optimization

Also Published As

Publication number Publication date
CN106532689A (en) 2017-03-22

Similar Documents

Publication Publication Date Title
CN106532689B (en) Power distribution network topology structure optimization method and system
Teng et al. A novel ACS-based optimum switch relocation method
CN110348048B (en) Power distribution network optimization reconstruction method based on consideration of heat island effect load prediction
CN100367620C (en) Power network topology error identification method based on mixed state estimation
CN108075975B (en) Method and system for determining route transmission path in Internet of things environment
CN104505820A (en) Power distribution network intelligent reconstruction method based on multi-information associated utilization
CN111141992B (en) Self-adaptive layered section positioning method utilizing FTU remote signaling and remote measuring data
CN109474023A (en) Intelligent distribution network section real time updating method, system, storage medium and terminal
CN114844812B (en) Low-delay low-overhead path deployment method for active network remote sensing
Carpaneto et al. Ant-colony search-based minimum losses reconfiguration of distribution systems
CN116826725A (en) Multi-objective fault power supply recovery method for substation-oriented medium-voltage distribution power supply area (S-SCDN) feeder line group FC
CN115754578A (en) Active power distribution network fault positioning method and system based on self-adaptive ant colony algorithm
Khoa et al. Ant colony search-based loss minimum for reconfiguration of distribution systems
CN103595652B (en) The stage division of QoS efficiency in a kind of powerline network
Zhang et al. Service restoration based on dynamic programming
Radha et al. A modified genetic algorithm for optimal electrical distribution network reconfiguration
Montoya et al. A new approach to solve the distribution system planning problem considering automatic reclosers
CN111146815B (en) Distributed power generation planning configuration method for intelligent power distribution network
CN116546598A (en) Energy consumption control method and device
CN108122054B (en) Graph calculation-based real-time calculation method for topology of power system
CN113542115B (en) SDN power communication network-based data path determination method, device and system
Álzate et al. Optimal location of reclosers in distribution systems considering reliability in communication channels
CN112436507B (en) Method for locally correcting jacobian matrix in large power grid power flow calculation
Yong et al. Optimization strategy of SDN control deployment based on simulated annealing-genetic hybrid algorithm
CN107911763A (en) A kind of intelligent adapted telecommunication net EPON network plan methods based on QoS

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210604

Address after: 510700 3rd, 4th and 5th floors of building J1 and 3rd floor of building J3, No.11 Kexiang Road, Science City, Luogang District, Guangzhou City, Guangdong Province

Patentee after: China South Power Grid International Co.,Ltd.

Address before: 510663 No.11 Kexiang Road, Science City, Luogang District, Guangzhou City, Guangdong Province

Patentee before: POWER GRID TECHNOLOGY RESEARCH CENTER. CHINA SOUTHERN POWER GRID

Patentee before: China South Power Grid International Co.,Ltd.