CN106532689A - Optimization method and system for topological structure of power distribution network - Google Patents

Optimization method and system for topological structure of power distribution network Download PDF

Info

Publication number
CN106532689A
CN106532689A CN201611047038.XA CN201611047038A CN106532689A CN 106532689 A CN106532689 A CN 106532689A CN 201611047038 A CN201611047038 A CN 201611047038A CN 106532689 A CN106532689 A CN 106532689A
Authority
CN
China
Prior art keywords
switch
power distribution
distribution network
target
topological structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611047038.XA
Other languages
Chinese (zh)
Other versions
CN106532689B (en
Inventor
魏文潇
于力
郭晓斌
雷金勇
简淦杨
占恺峤
白浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Research Institute of Southern Power Grid Co Ltd
Original Assignee
Power Grid Technology Research Center of China Southern Power Grid Co Ltd
Research Institute of Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Power Grid Technology Research Center of China Southern Power Grid Co Ltd, Research Institute of Southern Power Grid Co Ltd filed Critical Power Grid Technology Research Center of China Southern Power Grid Co Ltd
Priority to CN201611047038.XA priority Critical patent/CN106532689B/en
Publication of CN106532689A publication Critical patent/CN106532689A/en
Application granted granted Critical
Publication of CN106532689B publication Critical patent/CN106532689B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/18Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Abstract

The invention discloses an optimization method and system for a topological structure of a power distribution network. The optimization method comprises the steps of when it is determined that the closing time of a target interconnection switch in the topological structure of the current power distribution network is less than a preset time threshold value, closing the target interconnection switch to form a loop; disconnecting a target section switch in the loop; determining a target function value after the target section switch is disconnected; traversing each section switch in the closed loop and obtaining a minimum target function value; when the minimum target function value is smaller than an initial target function value, performing interchange between the section switch in the closed loop corresponding to the minimum target function value and the target interconnection switch; taking any one interconnection switch except the target interconnection switch in the topological structure of the current power distribution network as a new target interconnection switch, and returning to perform the step of closing the target interconnection switch; and when it is determined that the preset traversing time is completed, obtaining the optimal topological structure of the power distribution network. By adoption of the optimization method and system, the voltage deviation of the power distribution network in different operating states of the power distribution network can be effectively lowered, the network loss of the power distribution network is lowered, and the power supply quality of the power distribution network is improved.

Description

Power distribution network topological structure optimization method and system
Technical field
The present invention relates to power distribution network running optimizatin technical field, more particularly to a kind of power distribution network topological structure optimization method And system.
Background technology
With the exploitation of new forms of energy, distributed power source accesses the scale of power distribution network to be increased day by day, and which is to power distribution network Impact also increasingly strengthens, and causes the ruuning situation of existing power distribution network more complicated.New forms of energy are exerted oneself and possess uncertainty, to distribution The influence on system operation of net also cannot qualitative description, original distribution method of operation computational methods cannot meet the reality of power system Production requirement.
For the probabilistic problem of the power distribution network method of operation, tradition is by being converted into multiple determinations by uncertain problem Sex chromosome mosaicism is analyzed solution, but the power distribution network topological structure network loss obtained based on fixed scene or firm demand analysis Greatly, reduce power distribution network power supply quality, it is impossible to which satisfaction applies needs.
The content of the invention
Based on this, it is necessary to big for the power distribution network topological structure network loss after tradition optimization, reduce power distribution network and power The problem of quality, there is provided a kind of power distribution network topological structure optimization method and system.
To achieve these goals, the embodiment of technical solution of the present invention is:
A kind of power distribution network topological structure optimization method, comprises the following steps:
In current power distribution network topological structure is judged, the closure number of times of target interconnection switch is less than default first frequency threshold value When, close the target interconnection switch and form closed circuit, update the closure number of times of the target interconnection switch, the target connection Network switch is any one interconnection switch in the current power distribution network topological structure;
The target segment switch in the closed circuit is disconnected, block switch disconnection times are updated, the target segment is opened Close as any one block switch in the closed circuit;
According to the voltage out-of-limit of each power distribution network node in the power distribution network topological structure disconnected after the target segment switch Probability, it is determined that disconnecting the target function value of the power distribution network topological structure after the target segment switch;
Any one block switch for not turning off operation in the closed circuit is opened as new target segment Close, the step of returning the target segment disconnected in the closed circuit and switch;
When block switch disconnection times after judging to update are equal to default second frequency threshold value, from each target for determining The target function value of minimum is obtained in functional value;
When initial target functional value of the minimum target function value less than the current power distribution network topological structure, will Block switch in the minimum corresponding closed circuit of target function value is exchanged with the target interconnection switch, described Voltage out-of-limit determine the probability of the initial target functional value according to each power distribution network node in the current power distribution network topological structure;
To appoint in remaining each interconnection switch in addition to the target interconnection switch in the current power distribution network topological structure One interconnection switch of meaning returns the target connection in current power distribution network topological structure is judged as new target interconnection switch When the closure number of times of network switch is less than default first frequency threshold value, the step that the target interconnection switch forms closed circuit is closed Suddenly;
When judging to complete default traversal number of times, optimum power distribution network topological structure is obtained.
A kind of power distribution network topological structure optimization system, including:
Interconnection switch closes module, for when the closure number of times for judging target interconnection switch in current power distribution network topological structure During less than default first frequency threshold value, close the target interconnection switch and form closed circuit, update the target interconnection switch Closure number of times, the target interconnection switch is any one interconnection switch in the current power distribution network topological structure;
Interconnection switch closes number of times update module, for the target interconnection switch in closure current power distribution network topological structure Afterwards, update interconnection switch closure number of times;
Block switch disconnects module, and for disconnecting the switch of the target segment in the closed circuit, the target segment is opened Close as any one block switch in the closed circuit;
Block switch disconnection times update module, after switching for the target segment in the closed circuit is disconnected, more New block switch disconnection times;
Target function value determining module, for according to each in the power distribution network topological structure disconnected after the target segment switch The voltage out-of-limit probability of individual power distribution network node, it is determined that disconnecting the target letter of the power distribution network topological structure after the target segment switch Numerical value;
First iteration module, for any one block switch for not turning off operation in the closed circuit is made Switch for new target segment, return the block switch and disconnect module;
Target function value optimal value acquisition module, for when judging that block switch disconnection times after renewal are equal to default the During two frequency threshold values, the target function value of minimum is obtained from each target function value for determining;
Switch and exchange module, for the first of the current power distribution network topological structure being less than when the minimum target function value During beginning target function value, by block switch and the target in the minimum corresponding closed circuit of target function value Interconnection switch is exchanged, electricity of the initial target functional value according to each power distribution network node in the current power distribution network topological structure Press out-of-limit determine the probability;
Secondary iteration module, for will be remaining in addition to the target interconnection switch in the current power distribution network topological structure In each interconnection switch, any one interconnection switch returns the interconnection switch and closes module as new target interconnection switch;
Optimum power distribution network topological structure obtains module, for completing default traversal number of times when judgement, obtains optimum distribution Net topology structure.
Compared with prior art, beneficial effects of the present invention are:Power distribution network topological structure optimization method of the present invention and system, When first in current power distribution network topological structure is judged, the closure number of times of target interconnection switch is less than default first frequency threshold value, close Close the target interconnection switch and form closed circuit, update the target interconnection switch and close number of times;Disconnect the target in closed circuit Block switch, updates block switch disconnection times;In power distribution network topological structure after being switched according to disconnection target segment, each is matched somebody with somebody The voltage out-of-limit probability of grid nodes, it is determined that disconnecting the target function value of the power distribution network topological structure after target segment switch;Will In closed circuit, any one block switch for not turning off operation is switched as new target segment, is returned and is disconnected closure The step of target segment in loop is switched;The first frequency threshold value is preset when judging that block switch disconnection times after renewal are equal to When, the target function value of minimum is obtained from each target function value for determining;Currently match somebody with somebody when minimum target function value is less than During the initial target functional value of topological structure of electric, by the block switch in the minimum corresponding closed circuit of target function value with Target interconnection switch is exchanged;By in current power distribution network topological structure in addition to above-mentioned target interconnection switch remaining each interconnection switch In any one interconnection switch as new target interconnection switch, return the step of closing above-mentioned target interconnection switch;Work as judgement When completing default traversal number of times, optimum power distribution network topological structure is obtained.The present invention is based on the interconnection switch in power distribution network and divides Duan Kaiguan, obtains the network topology structure of optimum, makes power distribution network each node by changing the folding condition conversion of line switching Voltage out-of-limit probability it is minimum, effectively reduce distribution network voltage deviation of the power distribution network under different running statuses, reduce power distribution network Network loss, lifts the power supply quality of power distribution network, meets practical application needs.
Description of the drawings
Fig. 1 is power distribution network topological structure optimization method flow chart in one embodiment;
Fig. 2 is based on power distribution network topological structure optimization method flow chart in method one shown in Fig. 1 specific example;
Fig. 3 is power distribution network topological structure optimization system structure diagram in one embodiment.
Specific embodiment
To make the objects, technical solutions and advantages of the present invention become more apparent, below in conjunction with drawings and Examples, to this Invention is described in further detail.It should be appreciated that specific embodiment described herein is only to explain the present invention, Protection scope of the present invention is not limited.
Power distribution network topological structure optimization method in one embodiment, as shown in figure 1, comprising the following steps:
Step S101:In current power distribution network topological structure is judged, the closure number of times of target interconnection switch is less than default first During frequency threshold value, close the target interconnection switch and form closed circuit, update the closure number of times of the target interconnection switch, institute It is any one interconnection switch in the current power distribution network topological structure to state target interconnection switch;
Here, interconnection switch plays contact effect, is mainly used on the branch line or section circuit of distribution line.
Specifically, any one interconnection switch in current power distribution network topological structure is closed, forms a closed-loop path, record The closure number of times of the interconnection switch, sets the closure number of times initial value of the interconnection switch as zero.
Step S102:The target segment switch in the closed circuit is disconnected, block switch disconnection times, the mesh is updated Mark block switch is any one block switch in the closed circuit;
Here, block switch is mainly used on the branch line or section circuit of distribution line.
Specifically, any one block switch in above-mentioned first closed-loop path is disconnected, block switch disconnection times are recorded, Block switch disconnection times initial value is set as zero.
Step S103:According to each power distribution network node in the power distribution network topological structure disconnected after the target segment switch Voltage out-of-limit probability, it is determined that disconnecting the target function value of the power distribution network topological structure after the target segment switch;
Step S104:Using in the closed circuit any one do not turn off the block switch of operation as new mesh Mark block switch, return to step S102;
Here, repeat step S102-S103, often disconnect a block switch, obtain one disconnect the block switch after The target function value of power distribution network topological structure.
Step S105:When block switch disconnection times after judging to update are equal to default second frequency threshold value, from determination Each target function value in obtain minimum target function value;
Specifically, according to default second frequency threshold value of setting is actually needed, for example, default second frequency threshold value is set and is equal to The total number of all block switches in above-mentioned closed circuit, when the disconnection times of the block switch judged after renewal are equal to closure ring The target function value of minimum in road during the total number of all block switches, is obtained from each target function value for determining, that is, is closed After all block switches disconnect successively in cyclization road, the target function value of minimum in each target function value is obtained.
Step S106:When the minimum target function value is less than the initial target letter of the current power distribution network topological structure During numerical value, by block switch and the target interconnection switch in the minimum corresponding closed circuit of target function value Exchange, the initial target functional value is general according to the voltage out-of-limit of each power distribution network node in the current power distribution network topological structure Rate determines;
Here, obtain if the target function value of minimum is the block switch M disconnected in closed circuit, closed circuit is closure Interconnection switch N is formed, when initial target functional value of the above-mentioned minimum target function value less than current power distribution network topological structure, Using block switch M as new interconnection switch N, interconnection switch N is used as new block switch M, i.e. block switch M and interconnection switch N is exchanged.When initial target functional value of the above-mentioned minimum target function value more than or equal to current power distribution network topological structure, no It is interchangeable operation.
Step S107:By remaining each contact in addition to the target interconnection switch in the current power distribution network topological structure In switch, any one interconnection switch is used as new target interconnection switch, return to step S101;
Here, often close interconnection switch repeat step S101-S106 in a current power distribution network topological structure.
Step S108:When judging to complete default traversal number of times, optimum power distribution network topological structure is obtained.
Specifically, according to the default traversal number of times of setting is actually needed, for example, own according in current power distribution network topological structure The total number of interconnection switch and above-mentioned first frequency threshold value arrange default traversal number of times, when judging to complete default traversal number of times, Obtain the power distribution network topological structure of optimum.
Here, the traversal strategies based on elementary cycle can be prevented effectively from and be absorbed in local optimum, it is ensured that each solution is can Row solution, reduces the calculating time.In order to the accuracy for improving result can be with repeat the above steps S101- step S107 preset times Whether the result is accurate.
It is evidenced from the above discussion that, power distribution network topological structure optimization method of the present invention, based on the interconnection switch in power distribution network and Block switch, obtains the network topology structure of optimum by changing the folding condition conversion of line switching, and each saves to make power distribution network The voltage out-of-limit probability of point is minimum, effectively reduces distribution network voltage deviation of the power distribution network under different running statuses, reduces distribution Net network loss, lifts the power supply quality of power distribution network.
Additionally, in a specific example, according to expression formula:It is determined that after disconnecting the target segment switch The target function value F of power distribution network topological structure, wherein n are to match somebody with somebody in power distribution network topological structure after disconnecting target segment switch Grid nodes quantity,Voltage out-of-limit to disconnect the i-th node in the power distribution network topological structure after the target segment switch is general Rate,Wherein pitBe in the power distribution network topological structure after disconnecting target segment switch the i-th node in T time state Degree voltage out-of-limit probability, T are time state quantity.
Specifically, on the basis of meeting system load flow constraint, running constraint, network topology constraint, object function is:Wherein n is power distribution network number of nodes,For the voltage out-of-limit probability of the i-th node, T is time state quantity.Wherein pitIt is the i-th node in T time attitude voltage out-of-limit probability.
Constraints:
1) system load flow constraint:
G (x)=0
2) system operation constraint is represented by:
In formula, Ui,minAnd Ui,maxRespectively the minimum of node i allows magnitude of voltage and maximum allowable voltage;Iij,maxTo prop up The maximum allowed current value of road ij.
3) network topology constraint, after optimizing operating mode, power distribution network should be radial.
Additionally, in a specific example, the side of the target interconnection switch in the closure current power distribution network topological structure Formula includes:
The default sequence number of each interconnection switch in the current power distribution network topological structure is stored in into default first array;
Rule is obtained according to default interconnection switch sequence number the target interconnection switch is obtained from default first array Default sequence number;
Close target connection corresponding with the default sequence number of the target interconnection switch in the current power distribution network topological structure Network is switched.
Here, the default sequence number of each interconnection switch in current power distribution network topological structure is stored in into array Aopen, according to from Arrive greatly it is little from small to large or other obtain rule from array AopenThe middle default sequence number for obtaining target interconnection switch, according to target The default sequence number closure target interconnection switch of interconnection switch.
Additionally, in a specific example, the mode for disconnecting the switch of the target segment in the closed circuit includes:
According to the default sequence number of each block switch in the current power distribution network topological structure, will be each in the closed circuit The default sequence number of individual block switch is stored in default second array;
Rule is obtained according to default block switch sequence number the target segment switch is obtained from default second array Default sequence number;
Disconnect target segment switch corresponding with the default sequence number of target segment switch in the closed circuit.
Here, the default sequence number of each block switch in current power distribution network topological structure is stored in into array Aclosed, will closure In loop, the default sequence number of each block switch is stored in group array L, according to from big to small or from small to large or other obtain rule The default sequence number of target segment switch is obtained from array L, target segment is disconnected according to the default sequence number of target segment switch and is opened Close.
Additionally, in a specific example, default second frequency threshold value is according to block switch in the closed circuit Total number arrange, it is described it is default traversal number of times according to the total number of interconnection switch and institute in the current power distribution network topological structure State default first frequency threshold value to arrange.Default first frequency threshold value, default second frequency threshold value can be set according to actual needs With default traversal number of times.
In order to more fully understand said method, a power distribution network topological structure optimization method of the present invention detailed below Application example.
On the basis of meeting system load flow constraint, running constraint, network topology constraint, object function is: Wherein n is power distribution network number of nodes,For the voltage out-of-limit probability of the i-th node, T is time state quantity.Wherein pitIt is the i-th node in T time attitude voltage out-of-limit probability.
Constraints:
1) system load flow constraint:
G (x)=0
2) system operation constraint is represented by:
In formula, Ui,minAnd Ui,maxRespectively the minimum of node i allows magnitude of voltage and maximum allowable voltage;Iij,maxTo prop up The maximum allowed current value of road ij.
As shown in Fig. 2 power distribution network topological structure optimization method may comprise steps of:
Step S201:Initialization system topology, reads in system data, and the system data includes that current power distribution net topology is tied The magnitude of voltage of the default sequence number of each interconnection switch, the default sequence number of each block switch and each power distribution network node in structure;
Step S202:According to the magnitude of voltage and above-mentioned target of each power distribution network node in above-mentioned current power distribution network topological structure Function, calculates the initial target functional value of current power distribution network topological structure;
Step S203:By default sequence number n of interconnection switch (normal open switch) in current power distribution network topological structureopenIt is stored in number Group Aopen, by default sequence number n of block switch (normally closed switch) in current power distribution network topological structureclosedIt is stored in array Aclosed
Step S204:From AopenAn interconnection switch Ti is taken by forward read in array, when the closure time for judging interconnection switch Ti When number is less than three times, closed, formed closed circuit, the default sequence number of block switch in closed circuit is stored in into array L;
Step S205:According to the storage order of block switch, select a block switch Sj and disconnected;
Step S206:Got over according to the voltage of each power distribution network node in the power distribution network topological structure disconnected after block switch Sj Limit probability and above-mentioned object function, calculate the target function value of the power distribution network topological structure after disconnecting block switch Sj;
Here, disconnect the voltage out-of-limit probability root of each power distribution network node in the power distribution network topological structure after block switch Sj According to the distribution net topology knot after the magnitude of voltage and disconnection block switch Sj of each power distribution network node in current power distribution network topological structure Structure determines.
Step S207:Judge whether to have traveled through the block switch in array L;
Step S208:If so, from the mesh of the power distribution network topological structure calculated in disconnection closed circuit after each block switch The target function value of minimum, otherwise, repeat step S205- step S207 are obtained in offer of tender numerical value;
Step S209:When above-mentioned minimum target function value is less than the initial target letter of above-mentioned current power distribution network topological structure During numerical value, the block switch in the corresponding closed circuit of minimum target function value is exchanged with interconnection switch Ti;
Here, obtain if the target function value of minimum is the block switch M disconnected in closed circuit, when above-mentioned minimum mesh When offer of tender numerical value is less than the initial target functional value of current power distribution network topological structure, using block switch M as new interconnection switch Ti, interconnection switch Ti are exchanged with interconnection switch Ti as new block switch M, i.e. block switch M.When above-mentioned minimum target letter When numerical value is more than or equal to the initial target functional value of current power distribution network topological structure, operation is not interchangeable.
Step S210:Judge whether to have traveled through array AopenIn interconnection switch;
Step S211:If so, repeat step S204- step S210 tri- times, obtain optimum power distribution network topological structure.
Here, the traversal strategies based on elementary cycle can be prevented effectively from and be absorbed in local optimum, it is ensured that each solution is can Row solution, reduces the calculating time.
It is evidenced from the above discussion that, the default sequence number of the interconnection switch in the present embodiment current power distribution network topological structure is stored in array Aopen, when the interconnection switch Ti closure number of times in current power distribution network topological structure is less than three times, closure interconnection switch Ti is formed and is closed Cyclization road;The default sequence number of block switch in closed circuit is stored in into array L, the block switch Sj in closed circuit is disconnected;Root According to the voltage out-of-limit probability of each power distribution network node in the power distribution network topological structure disconnected after block switch Sj, it is determined that disconnecting segmentation The target function value of the power distribution network topological structure after switch Sj;The block switch in array L is traveled through, from each target for determining The target function value of minimum is obtained in functional value;When minimum target function value is less than the initial mesh of current power distribution network topological structure During offer of tender numerical value, the block switch in the minimum corresponding closed circuit of target function value is exchanged with interconnection switch Ti;Traversal Complete array AopenIn interconnection switch after, repeat the above steps three times obtain optimum power distribution network topological structure.The present invention is based on Interconnection switch and block switch in power distribution network, obtains the network topology of optimum by changing the folding condition conversion of line switching Structure, makes the voltage out-of-limit probability minimum of each node of power distribution network, effectively reduces distribution of the power distribution network under different running statuses Net voltage deviation, reduces distribution network loss, lifts the power supply quality of power distribution network, meets practical application needs.
Power distribution network topological structure optimization system in one embodiment, as shown in figure 3, including:
Interconnection switch closes module 301, for when the closure for judging target interconnection switch in current power distribution network topological structure When number of times is less than default first frequency threshold value, closes the target interconnection switch and form closed circuit, the target interconnection switch For any one interconnection switch in the current power distribution network topological structure;
Interconnection switch closure number of times update module 302, for the target contact in closure current power distribution network topological structure After switch, the closure number of times of the interconnection switch is updated;
Block switch disconnects module 303, for disconnecting the switch of the target segment in the closed circuit, the target segment Switch as any one block switch in the closed circuit;
Block switch disconnection times update module 304, after switching for the target segment in the closed circuit is disconnected, Update block switch disconnection times;
Target function value determining module 305, for according to the power distribution network topological structure disconnected after the target segment switch In each power distribution network node voltage out-of-limit probability, it is determined that disconnecting the mesh of the power distribution network topological structure after target segment switch Offer of tender numerical value;
First iteration module 306, for any one segmentation for not turning off operation in the closed circuit is opened Close and switch as new target segment, return the block switch and disconnect module 303;
Target function value optimal value acquisition module 307, is equal to for block switch disconnection times after renewal is judged pre- If the target function value of minimum during the second frequency threshold value, is obtained from each target function value for determining;
Switch exchanges module 308, for being less than the current power distribution network topological structure when the minimum target function value Initial target functional value when, by the block switch in the minimum corresponding closed circuit of target function value with it is described Target interconnection switch is exchanged, and the initial target functional value is according to each power distribution network node in the current power distribution network topological structure Voltage out-of-limit determine the probability;
Secondary iteration module 309, for will remain in addition to the target interconnection switch in the current power distribution network topological structure In each remaining interconnection switch, any one interconnection switch returns the interconnection switch and closes mould as new target interconnection switch Block;
Optimum power distribution network topological structure obtains module 310, for completing default traversal number of times when judgement, obtains optimum matching somebody with somebody Topological structure of electric.
As shown in figure 3, in a specific embodiment, the target function value determining module 305 is according to expression formula:It is determined that disconnecting the target function value F of the power distribution network topological structure after the target segment switch, wherein n is disconnection institute Power distribution network number of nodes in the power distribution network topological structure after target segment switch is stated,To disconnect after the target segment switch The voltage out-of-limit probability of the i-th node in power distribution network topological structure,Wherein pitTo disconnect the target segment switch In power distribution network topological structure afterwards, in T time attitude voltage out-of-limit probability, T is time state quantity to the i-th node.
As shown in figure 3, in a specific embodiment, the interconnection switch closure module 301 includes:
Interconnection switch sequence number memory element 3011, for by each interconnection switch in the current power distribution network topological structure Default sequence number is stored in default first array;
Interconnection switch sequence number acquiring unit 3012, for obtaining rule from described default the according to default interconnection switch sequence number The default sequence number of the target interconnection switch is obtained in one array;
Interconnection switch closed cell 3013, is opened with target contact for closing in the current power distribution network topological structure The corresponding target interconnection switch of default sequence number for closing.
As shown in figure 3, in a specific embodiment, the block switch disconnects module 303 to be included:
Block switch sequence number memory element 3031, for according to each block switch in the current power distribution network topological structure Default sequence number, the default sequence number of each block switch in the closed circuit is stored in into default second array;
Block switch sequence number acquiring unit 3032, for obtaining rule from described default the according to default block switch sequence number The default sequence number of the target segment switch is obtained in two arrays;
Block switch switching units 3033, for disconnecting the default sequence in the closed circuit with target segment switch Number corresponding target segment switch.
Additionally, in a specific embodiment, default second frequency threshold value is opened according to segmentation in the closed circuit The total number of pass is arranged, the default traversal number of times according to the total number of interconnection switch in the current power distribution network topological structure and Default first frequency threshold value is arranged.
It is evidenced from the above discussion that, power distribution network topological structure optimization system of the present invention, based on the interconnection switch in power distribution network and Block switch, obtains the network topology structure of optimum by changing the folding condition conversion of line switching, and each saves to make power distribution network The voltage out-of-limit probability of point is minimum, effectively reduces distribution network voltage deviation of the power distribution network under different running statuses, reduces distribution Net network loss, lifts the power supply quality of power distribution network.
Each technical characteristic of embodiment described above arbitrarily can be combined, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope of this specification record is all considered to be.
Embodiment described above only expresses the several embodiments of the present invention, and its description is more concrete and detailed, but and Therefore can not be construed as limiting the scope of the patent.It should be pointed out that for one of ordinary skill in the art comes Say, without departing from the inventive concept of the premise, some deformations and improvement can also be made, these belong to the protection of the present invention Scope.Therefore, the protection domain of patent of the present invention should be defined by claims.

Claims (10)

1. a kind of power distribution network topological structure optimization method, it is characterised in that comprise the following steps:
When in current power distribution network topological structure is judged, the closure number of times of target interconnection switch is less than default first frequency threshold value, close Close the target interconnection switch and form closed circuit, update the closure number of times of the target interconnection switch, the target contact is opened Close as any one interconnection switch in the current power distribution network topological structure;
The target segment switch in the closed circuit is disconnected, block switch disconnection times are updated, the target segment switch is Any one block switch in the closed circuit;
According to the voltage out-of-limit probability of each power distribution network node in the power distribution network topological structure disconnected after the target segment switch, It is determined that disconnecting the target function value of the power distribution network topological structure after the target segment switch;
Any one block switch for not turning off operation in the closed circuit is switched as new target segment, is returned The step of target segment returned in the disconnection closed circuit is switched;
When block switch disconnection times after judging to update are equal to default second frequency threshold value, from each object function for determining The target function value of minimum is obtained in value;
When initial target functional value of the minimum target function value less than the current power distribution network topological structure, will be described Block switch in the minimum corresponding closed circuit of target function value is exchanged with the target interconnection switch, described initial Voltage out-of-limit determine the probability of the target function value according to each power distribution network node in the current power distribution network topological structure;
Will be any one in remaining each interconnection switch in addition to the target interconnection switch in the current power distribution network topological structure Individual interconnection switch returns the target contact in current power distribution network topological structure is judged and opens as new target interconnection switch When the closure number of times of pass is less than default first frequency threshold value, the step of closing the target interconnection switch and form closed circuit;
When judging to complete default traversal number of times, optimum power distribution network topological structure is obtained.
2. power distribution network topological structure optimization method according to claim 1, it is characterised in that according to expression formula: It is determined that disconnecting the target function value F of the power distribution network topological structure after the target segment switch, wherein n divides to disconnect the target Power distribution network number of nodes in power distribution network topological structure after Duan Kaiguan,Open up to disconnect the power distribution network after the target segment switch The voltage out-of-limit probability of the i-th node in structure is flutterred,Wherein pitTo disconnect the distribution after the target segment switch In net topology structure, in T time attitude voltage out-of-limit probability, T is time state quantity to the i-th node.
3. power distribution network topological structure optimization method according to claim 1, it is characterised in that the closure current power distribution network The mode of the target interconnection switch in topological structure includes:
The default sequence number of each interconnection switch in the current power distribution network topological structure is stored in into default first array;
Rule is obtained according to default interconnection switch sequence number the pre- of the target interconnection switch is obtained from default first array If sequence number;
Target contact corresponding with the default sequence number of the target interconnection switch in closing the current power distribution network topological structure is opened Close.
4. power distribution network topological structure optimization method according to claim 1, it is characterised in that disconnect in the closed circuit Target segment switch mode include:
According to the default sequence number of each block switch in the current power distribution network topological structure, by each point in the closed circuit The default sequence number of Duan Kaiguan is stored in default second array;
Rule is obtained according to default block switch sequence number the pre- of the target segment switch is obtained from default second array If sequence number;
Disconnect target segment switch corresponding with the default sequence number of target segment switch in the closed circuit.
5. power distribution network topological structure optimization method as claimed in any of claims 1 to 4, it is characterised in that described Default second frequency threshold value is arranged according to the total number of block switch in the closed circuit, and the default traversal number of times is according to institute The total number and default first frequency threshold value for stating interconnection switch in current power distribution network topological structure is arranged.
6. a kind of power distribution network topological structure optimization system, it is characterised in that include:
Interconnection switch closes module, for being less than when the closure number of times for judging target interconnection switch in current power distribution network topological structure During default first frequency threshold value, close the target interconnection switch and form closed circuit, update closing for the target interconnection switch Number of times is closed, the target interconnection switch is any one interconnection switch in the current power distribution network topological structure;
Interconnection switch close number of times update module, for closure current power distribution network topological structure in target interconnection switch after, Update interconnection switch closure number of times;
Block switch disconnects module, and for disconnecting the switch of the target segment in the closed circuit, the target segment switch is Any one block switch in the closed circuit;
Block switch disconnection times update module, after the target segment switch in the closed circuit is disconnected, renewal point Section switches off number of times;
Target function value determining module, for according in the power distribution network topological structure disconnected after target segment switch each match somebody with somebody The voltage out-of-limit probability of grid nodes, it is determined that disconnecting the object function of the power distribution network topological structure after the target segment switch Value;
First iteration module, for using in the closed circuit any one do not turn off the block switch of operation as new Target segment switch, return the block switch and disconnect module;
Target function value optimal value acquisition module, is equal to default second for block switch disconnection times after renewal is judged During number threshold value, the target function value of minimum is obtained from each target function value for determining;
Switch exchanges module, for when the minimum target function value is less than the initial mesh of the current power distribution network topological structure During offer of tender numerical value, the block switch in the minimum corresponding closed circuit of target function value is got in touch with the target Switch is exchanged, and the initial target functional value is got over according to the voltage of each power distribution network node in the current power distribution network topological structure Limit determine the probability;
Secondary iteration module, for by the current power distribution network topological structure in addition to the target interconnection switch it is remaining each In interconnection switch, any one interconnection switch returns the interconnection switch and closes module as new target interconnection switch;
Optimum power distribution network topological structure obtains module, for completing default traversal number of times when judgement, obtains optimum power distribution network and opens up Flutter structure.
7. power distribution network topological structure optimization system according to claim 6, it is characterised in that the target function value determines Module is according to expression formula:It is determined that disconnecting the target function value of the power distribution network topological structure after the target segment switch F, wherein n are to disconnect power distribution network number of nodes in the power distribution network topological structure after the target segment is switched,It is described to disconnect The voltage out-of-limit probability of the i-th node in power distribution network topological structure after target segment switch,Wherein pitTo disconnect In power distribution network topological structure after the target segment switch, in T time attitude voltage out-of-limit probability, T is time state to the i-th node Quantity.
8. power distribution network topological structure optimization system according to claim 6, it is characterised in that the interconnection switch closes mould Block includes:
Interconnection switch sequence number memory element, for by the default sequence number of each interconnection switch in the current power distribution network topological structure It is stored in default first array;
Interconnection switch sequence number acquiring unit, presets in the first array from described for obtaining rule according to default interconnection switch sequence number Obtain the default sequence number of the target interconnection switch;
Interconnection switch closed cell, it is default with the target interconnection switch in the current power distribution network topological structure for closing The corresponding target interconnection switch of sequence number.
9. power distribution network topological structure optimization system according to claim 6, it is characterised in that the block switch disconnects mould Block includes:
Block switch sequence number memory element, for the default sequence according to each block switch in the current power distribution network topological structure Number, the default sequence number of each block switch in the closed circuit is stored in into default second array;
Block switch sequence number acquiring unit, presets in the second array from described for obtaining rule according to default block switch sequence number Obtain the default sequence number of the target segment switch;
Block switch switching units, it is corresponding with the default sequence number of target segment switch in the closed circuit for disconnecting Target segment is switched.
10. the power distribution network topological structure optimization system according to any one in claim 6 to 9, it is characterised in that described Default second frequency threshold value is arranged according to the total number of block switch in the closed circuit, and the default traversal number of times is according to institute The total number and default first frequency threshold value for stating interconnection switch in current power distribution network topological structure is arranged.
CN201611047038.XA 2016-11-23 2016-11-23 Power distribution network topological structure optimization method and system Active CN106532689B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611047038.XA CN106532689B (en) 2016-11-23 2016-11-23 Power distribution network topological structure optimization method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611047038.XA CN106532689B (en) 2016-11-23 2016-11-23 Power distribution network topological structure optimization method and system

Publications (2)

Publication Number Publication Date
CN106532689A true CN106532689A (en) 2017-03-22
CN106532689B CN106532689B (en) 2019-03-22

Family

ID=58357963

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611047038.XA Active CN106532689B (en) 2016-11-23 2016-11-23 Power distribution network topological structure optimization method and system

Country Status (1)

Country Link
CN (1) CN106532689B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106329714A (en) * 2015-06-30 2017-01-11 西门子电力自动化有限公司 Method for dynamically judging switch type of power grid
CN108711850A (en) * 2018-06-05 2018-10-26 国网上海市电力公司 The determination method of safe Loop Closing Operation is carried out to medium voltage distribution network
CN110516876A (en) * 2019-08-28 2019-11-29 国网上海市电力公司 A kind of best section breaker optimization method and system
CN112241586A (en) * 2020-09-16 2021-01-19 国网宁夏电力有限公司培训中心 Method and device for judging state of topological switch node of alternating current network for station
CN112564114A (en) * 2020-12-15 2021-03-26 深圳供电局有限公司 Power distribution network reconstruction optimization method and system based on limited radiation type constraint
CN112615368A (en) * 2020-12-11 2021-04-06 国网辽宁省电力有限公司鞍山供电公司 Distributed sensing-based platform area topology generation method and sensing terminal device
CN113392592A (en) * 2021-07-13 2021-09-14 南方电网科学研究院有限责任公司 Distribution network topological graph layout method, device and equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102136721A (en) * 2011-03-08 2011-07-27 中国电力科学研究院 Multi-object optimized power supply recovery reasoning and searching method
CN102496915A (en) * 2011-11-29 2012-06-13 航天科工深圳(集团)有限公司 Power distribution network fault processing method and system thereof
CN103078391A (en) * 2013-01-10 2013-05-01 长兴县供电局 Power distribution network power supply power restoration method based on photovoltaic power generation system
CN103903062A (en) * 2014-03-12 2014-07-02 国家电网公司 Method for reconstructing power distribution network based on double-ant-colony optimization

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102136721A (en) * 2011-03-08 2011-07-27 中国电力科学研究院 Multi-object optimized power supply recovery reasoning and searching method
CN102496915A (en) * 2011-11-29 2012-06-13 航天科工深圳(集团)有限公司 Power distribution network fault processing method and system thereof
CN103078391A (en) * 2013-01-10 2013-05-01 长兴县供电局 Power distribution network power supply power restoration method based on photovoltaic power generation system
CN103903062A (en) * 2014-03-12 2014-07-02 国家电网公司 Method for reconstructing power distribution network based on double-ant-colony optimization

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周鑫等: "基于CYMDIST的配电网运行优化技术及算例分析", 《电网与清洁能源》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106329714A (en) * 2015-06-30 2017-01-11 西门子电力自动化有限公司 Method for dynamically judging switch type of power grid
CN106329714B (en) * 2015-06-30 2018-08-14 西门子电力自动化有限公司 A kind of method that dynamic judges power network switch type
CN108711850A (en) * 2018-06-05 2018-10-26 国网上海市电力公司 The determination method of safe Loop Closing Operation is carried out to medium voltage distribution network
CN108711850B (en) * 2018-06-05 2022-01-25 国网上海市电力公司 Method for judging safety loop closing operation of medium-voltage distribution network
CN110516876A (en) * 2019-08-28 2019-11-29 国网上海市电力公司 A kind of best section breaker optimization method and system
CN110516876B (en) * 2019-08-28 2022-12-27 国网上海市电力公司 Optimal breaking switch optimization method and system
CN112241586A (en) * 2020-09-16 2021-01-19 国网宁夏电力有限公司培训中心 Method and device for judging state of topological switch node of alternating current network for station
CN112241586B (en) * 2020-09-16 2022-10-25 国网宁夏电力有限公司培训中心 Method and device for judging state of topological switch node of alternating current network for station
CN112615368A (en) * 2020-12-11 2021-04-06 国网辽宁省电力有限公司鞍山供电公司 Distributed sensing-based platform area topology generation method and sensing terminal device
CN112564114A (en) * 2020-12-15 2021-03-26 深圳供电局有限公司 Power distribution network reconstruction optimization method and system based on limited radiation type constraint
CN112564114B (en) * 2020-12-15 2023-04-14 深圳供电局有限公司 Power distribution network reconstruction optimization method and system based on limited radiation type constraint
CN113392592A (en) * 2021-07-13 2021-09-14 南方电网科学研究院有限责任公司 Distribution network topological graph layout method, device and equipment

Also Published As

Publication number Publication date
CN106532689B (en) 2019-03-22

Similar Documents

Publication Publication Date Title
CN106532689A (en) Optimization method and system for topological structure of power distribution network
CN110348048B (en) Power distribution network optimization reconstruction method based on consideration of heat island effect load prediction
Raju et al. Efficient reconfiguration of balanced and unbalanced distribution systems for loss minimisation
CN108599180B (en) A kind of electric distribution network reactive-voltage optimization method considering power randomness
CN108075975B (en) Method and system for determining route transmission path in Internet of things environment
CN109873457B (en) Multi-time scale cascading failure prediction method for power system under typhoon weather condition
CN110554280B (en) Power distribution network fault positioning method based on hierarchical model and improved wolf optimization algorithm
CN109378815B (en) Power distribution network closed loop switching power supply control method, device and equipment
CN111612125B (en) Novel HTM time pool method and system for online learning
US20020091503A1 (en) Process for initializing and updating the topology of a high-voltage or medium-voltage electrical power station
CN111817286A (en) Detection method for false data injection attack of direct current micro-grid cluster
CN109474023A (en) Intelligent distribution network section real time updating method, system, storage medium and terminal
CN104124688A (en) Heuristic power distribution network reconstructing method based on minimum spanning tree
Azizipanah-Abarghooee et al. Modified shuffled frog leaping algorithm for multi-objective optimal power flow with FACTS devices
CN110046774A (en) A kind of electrical power distribution network fault location method, device and relevant device
CN112531655A (en) Rapid optimization configuration method and system for distribution network feeder line section switch
Carpaneto et al. Ant-colony search-based minimum losses reconfiguration of distribution systems
CN107846010B (en) Power distribution network reconstruction method considering closed-loop constraint
Khoa et al. Ant colony search-based loss minimum for reconfiguration of distribution systems
CN110298570A (en) Distribution network system topology status discrimination method, device, storage medium and equipment
Montoya et al. A new approach to solve the distribution system planning problem considering automatic reclosers
Mekhamer et al. A new intelligent optimization technique for distribution systems reconfiguration
CN111146815B (en) Distributed power generation planning configuration method for intelligent power distribution network
CN113421004B (en) Transmission and distribution cooperative active power distribution network distributed robust extension planning system and method
Mirhoseini et al. Multi-objective reconfiguration of distribution network using a heuristic modified ant colony optimization algorithm

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210604

Address after: 510700 3rd, 4th and 5th floors of building J1 and 3rd floor of building J3, No.11 Kexiang Road, Science City, Luogang District, Guangzhou City, Guangdong Province

Patentee after: China Southern Power Grid Research Institute Co.,Ltd.

Address before: 510663 No.11 Kexiang Road, Science City, Luogang District, Guangzhou City, Guangdong Province

Patentee before: CSG POWER GRID TECHNOLOGY RESEARCH CENTER

Patentee before: China Southern Power Grid Research Institute Co.,Ltd.

TR01 Transfer of patent right