The content of the invention
In order to overcome the shortcoming of prior art, the invention provides a kind of remote heavy caliber collecting pipe corrosion inhibiter list ball is pre-
Membranous system and method, are mainly used in the internal corrosion of the such pipeline of effective control, improve its service life, guarantee that operational management is pacified
Entirely.Its equipment is with the function such as corrosion inhibiter injection and corrosion inhibiter recovery;It is mainly used in more quickly and easily compounding practice personnel
Complete the pre- membrane operations of corrosion inhibiter list ball.
The technical solution adopted in the present invention is:A kind of pre- membranous system of remote heavy caliber collecting pipe corrosion inhibiter list ball, bag
Include vehicle-mounted corrosion inhibiter injected system, pipe cleaning valve service system, pipe cleaning valve and receive ball system and corrosion inhibiter recovery system, wherein:
The vehicle-mounted corrosion inhibiter injected system includes load wagon, corrosion inhibiter tank and electric submersible pump, in corrosion inhibiter tank top pipe
Ball valve V7 is provided with mouth;
The pipe cleaning valve service system includes the pipe cleaning valve V3 being arranged on outgoing line, the row of being provided with pipe cleaning valve V3
Dirty valve V6, pressure gauge G2 and safety vent valve V8, it is other on safety vent valve V8 to be connected to ball valve V4;Pipe cleaning valve V3 upstreams arrange dry
Thread ball valve V1, pipe cleaning valve V3 downstream is sequentially connected main line ball valve V2 and crosses ball indicator;
The pipe cleaning valve receives ball system to be included being arranged on the pipe cleaning valve V10 entered the station on pipeline, is provided with pipe cleaning valve V10
Blowoff valve V14, safety vent valve V19 and pressure gauge G5, it is other on safety vent valve V19 to be connected to ball valve V21;On pipe cleaning valve V10
Trip was sequentially connected ball indicator and main line ball valve V11, pipe cleaning valve V10 downstream connection ball valve V15, main line ball valve V12, ball valve
V18 and main line ball valve V13;
The corrosion inhibiter recovery system includes load wagon and skid slug catcher, in skid slug catcher entrance
Place arranges ball valve V16;At skid slug catcher gaseous phase outlet, ball valve V17 is set.
Present invention also offers a kind of remote heavy caliber collecting pipe corrosion inhibiter list ball prefilming method, including following content:
First, pipe cleaning valve service and corrosion inhibiter filling:
(1) corrosion inhibitor solution has been configured in corrosion inhibiter storage tank according to adding amount needed for pre- film, and has been transported to by load wagon
At pipe cleaning valve V3;
(2) main line ball valve V1 is closed, closes pipe cleaning valve V3, open ball valve V4, when pressure gauge G2 is shown as 0, open clear
The Quick Release valve gap of pipe valve V3, is put into corrosion inhibiter fluid column leading edge control plug, closes the Quick Release valve gap of pipe cleaning valve V3 and open pipe cleaning valve
V3;
(3) ball valve V7 is connected by snap joint with the blowoff valve V6 of pipe cleaning valve V3, opens V6 and V7, corrosion inhibiter is molten
Liquid is filled in outgoing line, and forms corrosion inhibiter fluid column in control plug rear end;
(4) after filling is finished, V6, V7 are closed, closes electric submersible pump, remove snap joint;
(5) pipe cleaning valve V3 is closed, opens blowoff valve V6 and discharge surplus liquid in spherical cavity, open ball valve V4, treat pressure gauge G2
0 is shown as, the Quick Release valve gap of pipe cleaning valve V3 is opened, loads pre- film ball, close the Quick Release valve gap of pipe cleaning valve V3, open main line ball valve
V1, opens pipe cleaning valve V3, releases pre- film ball, corrosion inhibitor solution and control plug using air pressure in station;
(6) served as after ball indicator shows that pre- film ball is outbound, adjusting natural gas Outlet pressure, controlling the operation of pre- film ball
Speed, makes the corrosion inhibiter full-section pipe-flow length before pre- film ball and its time of staying meet pre- film requirement;
2nd, pipe cleaning valve receives ball and corrosion inhibiter is reclaimed:
(1) the ball valve V16 and ball valve V17 of corrosion inhibiter recovery system are received into ball system with pipe cleaning valve respectively by snap joint
Ball valve V15 be connected with ball valve V18, close main line ball valve V12, open ball valve V15, V16, V17, V18, make to enter the station in pipeline
Fluid flows into downstream main line valve V13 through skid slug catcher;
(2) served as after ball indicator sends signal, confirmed corrosion inhibiter fluid column leading edge control plug in pipe cleaning valve V10,
Pipe cleaning valve V10 is closed, ball valve V21 and blowoff valve V14 is opened, by blowoff valve V14 emptying ball intracavity liquids, treats that pressure gauge G5 shows
The Quick Release valve gap of pipe cleaning valve V10 when being shown as 0, is opened, corrosion inhibiter fluid column leading edge control plug is taken out;
(3) the Quick Release valve gap of pipe cleaning valve V10 is sealed up, pipe cleaning valve V10 is opened, hydrops flows into sled in unnecessary corrosion inhibiter and pipe
Dress slug catcher, corrosion inhibiter and sewage mixed solution fall to skid slug catcher bottom, and natural gas is through catching mist
Device, ball valve V17 and ball valve V18 flow into the line downstream that enters the station;When pre- film ball is in pipe cleaning valve V10, pipe cleaning valve V10 is closed,
Ball valve V15, V16, V17, V18 are closed, snap joint is removed, main line ball valve V12 is opened;
(4) ball valve V21 and blowoff valve V14 is opened, pigging valve insertion dirt is discharged by blowoff valve V14;As pressure gauge G5
The Quick Release valve gap of pipe cleaning valve V10 when being shown as 0, is opened, pre- film ball is taken out, and with the remaining dirts of clean water pipe cleaning valve V10;
The Quick Release valve gap of pipe cleaning valve V10 is sealed up, pipe cleaning valve V10 is opened.
Compared with prior art, the positive effect of the present invention is:The present invention is asked for the existing pair of pre- membrane technology presence of ball
Topic, proposes a kind of new method for being adapted to the pre- film of remote heavy caliber air transmission pipeline corrosion inhibitor, enriches and expand the pre- membrane technology of corrosion inhibiter
And its range of application, concrete advantage shows as follows:
(1) process is simple:The present invention is by controlling gas pressure, and then controls the pre- film ball speed of service, so as to pipeline
Carry out the pre- film of corrosion inhibiter;Cooperation is equipped, more convenient to operate, and the equipment can be reused in multiple yards, saves a large amount of bases
Build investment and operational administrative expense.
(2) it is safe and reliable:The present invention possesses the operating processes such as emptying with pressure, blowdown and slug flow trapping, it is ensured that in yard
Technological process and equipment safety stable operation.
(3) investment reduction:Receiving ball tube or pipe cleaning valve that the present invention is carried by yard, strong adaptability, without the need for newly-built
Large-Scale Equipment, not only can investment reduction, be also convenient for operation.
Specific embodiment
A kind of pre- membranous system of remote heavy caliber collecting pipe corrosion inhibiter list ball, including vehicle-mounted corrosion inhibiter injected system, pigging
Valve service system, pipe cleaning valve receive ball system and corrosion inhibiter recovery system.
Illustrate that present system is constituted and connected mode below in conjunction with the accompanying drawings.
Fig. 2 is that corrosion inhibiter injects and pre- film ball transmission system, wherein:
Vehicle-mounted corrosion inhibiter injected system is by 12 groups of load wagon 9, corrosion inhibiter tank 10, electric submersible pump 11, ball valve V7 and snap joint
Into;Corrosion inhibiter tank 10 is directly anchored on load wagon 9 by saddle;10 bottom of corrosion inhibiter storage tank sets sewage draining exit N1, and top sets pipe
Mouth N2;Ball valve V7 can be connected with the blowoff valve V6 of pipe cleaning valve V3 by snap joint 12;Electric submersible pump 11 can be stretched into by ozzle N2
Pot bottom simultaneously aspirates corrosion inhibitor solution, and corrosion inhibiter is injected in outbound pipeline 6.
Pipe cleaning valve serves a ball system by outgoing line 6, excessively ball indicator 7, insulating joint 8, main line ball valve V1~V2, pipe cleaning valve
V3, ball valve V4~V5, blowoff valve V6, safety vent valve V8~V9 and pressure gauge G1~G3 compositions;Pipe cleaning valve V3 is arranged in outbound
On pipeline 6, the connection of pipe cleaning valve V3 upstreams main line ball valve V1 and pressure gauge G1, pipe cleaning valve V3 downstream connection pressure gauge G3 are put safely
Empty valve V9, main line ball valve V2, cross ball indicator 7 and insulating joint 8;Connect blowoff valve V6, pressure gauge G2 and peace on pipe cleaning valve V3
Full atmospheric valve V8;It is connected on by ball valve V4 on safety vent valve V8, is connected on by ball valve V5 on safety vent valve V9.
Fig. 3 is corrosion inhibiter and pre- film ball recovery system, wherein:
Corrosion inhibiter recovery system is by 22 groups of load wagon 16, skid slug catcher 17, snap joint 21 and snap joint
Into;Skid slug catcher 17 is fixed on load wagon 16 by saddle;17 Inlet ball valve V16 of skid slug catcher can
To be connected by snap joint 21 and ball valve V15;17 gaseous phase outlet ball valve V17 of skid slug catcher passes through snap joint 22
Connect with ball valve V18;Skid slug catcher inner port arranges cyclone separator 18, and bottom arranges a point liquid baffle plate 19, point
Bottom on the left of liquid baffle plate 19 arranges corrosion inhibiter and reclaims ozzle N3, and the bottom on the right side of point liquid baffle plate 19 arranges blowdown ozzle N4;Sled
Mist eliminator 20, inspection manhole N5 and safety vent valve V20 are set at the top of dress slug catcher 17, by ball valve V22, safety is connected on
On atmospheric valve V20.
Pipe cleaning valve receives ball system by the pipeline 13 that enters the station, excessively insulating joint 14, ball indicator 15, pipe cleaning valve V10, main line ball valve
V11~V13, blowoff valve V14, ball valve V15, ball valve V18, ball valve V21, safety vent valve V19 and pressure gauge G4~G6 compositions;Clearly
Pipe valve V10 is arranged in and enters the station on pipeline 13, and pipe cleaning valve V10 upstreams connect insulating joint 14, cross ball indicator 15, main line ball valve
V11 and pressure gauge G4, pipe cleaning valve V10 downstream connection ball valve V15, main line ball valve V12, ball valve V18, main line ball valve V13 and pressure
Table G6;Connect blowoff valve V14, safety vent valve V19, pressure gauge G5 on pipe cleaning valve V10;Safety vent valve is connected on by ball valve V21
V19。
The Main Function and operation principle of each system of the invention are illustrated below.
As shown in figure 1, the pre- film of corrosion inhibiter list ball sends the control of corrosion inhibiter fluid column leading edge using the pipe cleaning valve V3 of service system
Plug 4, pre-processes to inner-walls of duct, removes the impurity such as hydrops in inwall iron rust and pipe, while ensureing that corrosion inhibiter fluid column is in all the time
Full pipe condition.
Quantitative corrosion inhibitor solution 3 is pumped into collecting pipe using vehicle-mounted corrosion inhibiter injected system by the pre- film of corrosion inhibiter list ball.
The pre- film of corrosion inhibiter list ball sends pre- film ball 2 using the pipe cleaning valve V3 of service system.
The pre- film of corrosion inhibiter list ball receives fluid column leading edge control plug 4 using the pipe cleaning valve V10 for receiving ball system.
The pre- film of corrosion inhibiter list ball reclaims unnecessary delaying using the trapping of skid slug catcher 17 of corrosion inhibiter recovery system
Agent liquid plug is lost, and is transported to central treating station process and reused.
The pre- film of corrosion inhibiter list ball receives pre- film ball 2 using the pipe cleaning valve V10 for receiving ball system.
The pre- film of corrosion inhibiter list ball controls pre- 2 speed of service of film ball using natural gas Outlet pressure in yard, makes in full packages
The corrosion inhibitor solution of stream meets pre- film requirement in the time of staying of pipeline section.
Pipe cleaning valve is served a ball and corrosion inhibiter fills flow process as shown in Fig. 2 its specific implementation step is as follows:
(1) the corrosion inhibiter adding amount needed for pre- film is calculated according to formula (1), in advance according to adding amount in corrosion inhibiter storage tank 10
In configured corrosion inhibitor solution, and pipe cleaning valve V3 moved to by load wagon 9 serve a ball at system;
(2) main line ball valve V1 is closed, closes pipe cleaning valve V3, open ball valve V4, treated that pressure gauge G2 is shown as 0, open pigging
The Quick Release valve gap of valve V3, is put into corrosion inhibiter fluid column leading edge control plug 4, closes the Quick Release valve gap of pipe cleaning valve V3, open pipe cleaning valve V3.
(3) the pump discharge ball valve V7 of car-mounted device is connected by snap joint 12 with the blowoff valve V6 of pipe cleaning valve V3, is beaten
Opening ball valve V6 and V7, open electric submersible pump 11, the corrosion inhibitor solution in storage tank 10 are filled in outgoing line 6, and in control plug 4
Rear end forms corrosion inhibiter fluid column.
(4), after injection is finished, ball valve V6, V7 are closed successively, electric submersible pump 11 is closed, is removed snap joint 12.
(5) pipe cleaning valve V3 is closed, opens blowoff valve V6 and discharge surplus liquid in spherical cavity, open ball valve V4, treat pressure gauge G2
0 is shown as, the Quick Release valve gap of pipe cleaning valve V3 is opened, loads pre- film ball 2, close the Quick Release valve gap of pipe cleaning valve V3, open main line ball
Valve V1, opens pipe cleaning valve V3, pushes away pre- film ball 2, corrosion inhibitor solution 3 and corrosion inhibiter fluid column leading edge control plug 4 using air pressure in station
Go out.
(6) served as after ball indicator 7 shows that pre- film ball 2 is outbound, to be adjusted according to pipeline fluctuation situation and formula (3)
Natural gas Outlet pressure, controls pre- 2 speed of service of film ball, and before making pre- film ball 2, corrosion inhibiter full-section pipe-flow length and its time of staying expire
The pre- film of foot is required.
Pipe cleaning valve receives ball and corrosion inhibiter recovery process as shown in figure 3, its specific implementation step is as follows:
(1) snap joint 21 and 22 of equipment is connected with ball valve V15 and ball valve V18 respectively, closes main line ball valve
V12, opens valve V15, V16, V17, V18;Fluid is entered the station in pipeline 13 now under the inflow of skid slug catcher 17
Trip main line valve V13.
(2) served as after ball indicator 15 sends signal, confirming corrosion inhibiter fluid column leading edge control plug 4 in pipe cleaning valve V10
It is interior, pipe cleaning valve V10 is closed, ball valve V21 and blowoff valve V14 is opened, by blowoff valve V14 emptying ball intracavity liquids, is treated pressure gauge
The Quick Release valve gap of pipe cleaning valve V10 when G5 is shown as 0, is opened, corrosion inhibiter fluid column leading edge control plug 4 is taken out.
(3) the Quick Release valve gap of pipe cleaning valve V10 is sealed up, pipe cleaning valve V10 is opened, hydrops flows into sled in unnecessary corrosion inhibiter and pipe
Dress slug catcher 17, corrosion inhibitor solution is through 18 pre-separation of cyclone separator;Corrosion inhibiter and sewage mixed solution fall to
17 bottom of skid slug catcher, natural gas flow into 13 downstream of pipeline of entering the station through mist eliminator 20, ball valve V17 and ball valve V18;
When pre- film ball 2 is in pipe cleaning valve V10, pipe cleaning valve V10 is closed, close ball valve V15, V16, V17, V18, remove snap joint
21 and 22, open main line ball valve V12.
(4) ball valve V21 and blowoff valve V14 is opened, pigging valve insertion dirt is discharged by blowoff valve V14;As pressure gauge G5
The Quick Release valve gap of pipe cleaning valve V10 when being shown as 0, is opened, pre- film ball 2 is taken out, and it is remaining dirty with clean water pipe cleaning valve V10
Thing.
(5) the Quick Release valve gap of pipe cleaning valve V10 is sealed up, pipe cleaning valve V10 is opened, equipment is tidied up, recovers production in station.
(6) load wagon 16 draws in skid slug catcher 17 in treating stations, sewage disposal system in sewage draining exit N4 and station
System connection, is processed to sewage, and corrosion inhibiter recovery port N3 is connected with corrosion inhibiter recovery system, reclaims and to store corrosion inhibiter molten
Liquid.
1 corrosion inhibiter adding amount is calculated
Formula (1) is shown in the calculating of corrosion inhibiter adding amount:
Q=K π D1·H·L+Q1
The additional coefficient of discharges of K in formula, generally 1.15;
Q corrosion inhibiter usage amounts, L;
D1Internal diameter of the pipeline, m;
H sustained release agent film forming thickness, mm typically take 0.076~0.125;
L pipeline total lengths, m;
Q1Pipeline section threeway, sewage draining exit isometric(al), L on pipeline;
D2Prop up pipeline section internal diameter, m;
L2Prop up the length of pipeline section, m;
QOtherOther blowdown waste sums, L.
Air volume calculation needed for 2
Total air inflow needed for pigging should be estimated before pigging, tolerance traffic control is arranged properly.If dirt, hydrops in pipeline
Many, depth displacement is larger, especially it should be noted that the deposit of tolerance.Typically with the total air inflow of following equation approximate estimation:
QAlways=Q1+Q2(2)
Q in formula1Upward slope section consumes air inflow, m3;
Q2Lower slope section consumes air inflow, m3;
QAlwaysTotal air inflow, m3;
F internal diameter of the pipeline cross-sectional areas, m2;
L1Pre- film ball upward slope range ability, km;
L2Pre- film ball descending range ability, km;
Average pressure after pre- film ball, MPa;
ρ corrosion inhibiter density, kg/m3;
G acceleration of gravity, m/s2;
H corrosion inhibiter liquid column lengths, m;
θ pipeline inclination angles.
The 3 pre- film ball speeds of service and run time are calculated
The theoretical instantaneous velocity of the pre- film ball operations of v, km/h in formula;
The instantaneous gas transmission flows of Q, m3/d;
F internal diameter of the pipeline cross-sectional areas, m2;
Average pressure after pre- film ball, MPa;
ρ corrosion inhibiter density, kg/m3;
G acceleration of gravity, m/s2;
H corrosion inhibiter liquid column lengths, m;
θ pipeline inclination angles.
4 pre- film ball range ability estimations
General approximate formula is:
D in formula0=0.101325MPa, T0=293.15K;
The pre- film ball range abilities of L, km;
QbAdd up air inflow, m after sending out film ball pre-3;
F internal diameter of the pipeline cross-sectional areas, m2;
Average pressure after pre- film ball, MPa;
Gas mean temperature, K in pipeline section after the pre- film balls of T;
The compressed coefficients of the Z under average pressure.