CN106523011A - Simple light rack and top coal caving method applying rack - Google Patents

Simple light rack and top coal caving method applying rack Download PDF

Info

Publication number
CN106523011A
CN106523011A CN201611197831.8A CN201611197831A CN106523011A CN 106523011 A CN106523011 A CN 106523011A CN 201611197831 A CN201611197831 A CN 201611197831A CN 106523011 A CN106523011 A CN 106523011A
Authority
CN
China
Prior art keywords
coal
steel pipe
support
lead column
simple light
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611197831.8A
Other languages
Chinese (zh)
Other versions
CN106523011B (en
Inventor
郭军杰
吴金刚
韩红强
郭兵兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Institute of Engineering
Original Assignee
Henan Institute of Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Institute of Engineering filed Critical Henan Institute of Engineering
Priority to CN201611197831.8A priority Critical patent/CN106523011B/en
Publication of CN106523011A publication Critical patent/CN106523011A/en
Application granted granted Critical
Publication of CN106523011B publication Critical patent/CN106523011B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/0004Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor along the working face
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/04Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a simple light rack. The rack comprises a base plate, a lower level plate, an upper support plate, a support reinforcement structure and a coal outlet support regulation mechanism. More than four jacking oil tanks are placed vertically on the base plate. The lower surface of the lower level plate is connected with the upper end of the jacking oil tank through a first hinge. The upper support plate is parallelly located above the lower level plate. The support reinforcement structure is located between the upper support plate and the lower level plate. The coal outlet support regulation mechanism is located on the base plate, and at the outer side of the jacking oil tank. The present invention further discloses a top coal caving method applying the rack. The method applies the placement of two coal outlets, namely the upper and lower coal outlets on a rack for the implementation of the top coal caving method. Briefly the method can be named as the one-rack-two-outlet-position top coal caving method. The method can effectively adapt to the mechanical mining of edge minefields and middle and small minefields in a large mine, can effectively adapt to the change of coal layer depth, achieve a high repeatable mining rate, enhance the repeatable mining rate, and can effectively prevent the rack damage and large area roof fall.

Description

A kind of simple light hydraulic support and adopt the support Sub-Level Caving coal-mining method
Technical field
The invention belongs to safety of coal mines coal-mining technique field, more particularly to a kind of simple light hydraulic support and put using the support Top coal coal-mining method.
Background technology
At present, in coal enterprise, when in field with "nine squares", coal seam is thicker and top coal is easily broken, for improve production efficiency and coal Recovery ratio, generally carries out resource exploitation using Sub-Level Caving coal-mining method.Sub-Level Caving coal-mining method, is substantially the edge in high seam Bottom arrange a 2~3m of mining height coal wall, carry out back production with conventional method, using mine pressure effect or Paving makes the crushing voerhead coal above support into after a prose style free from parallelism by support rear manually to loosen method(Top)Release, and via scraper plate Conveyer transports working face.But, in some medium and small colliery enterprise fields with "nine squares" or large coal mine enterprise corner field with "nine squares", due to coal seam thickness Degree is changed greatly, relatively difficult using large-scale mining, high cost.For improve production efficiency and coal recovery rate, lead to Resource exploitation is carried out frequently with light-duty simple rack Sub-Level Caving coal-mining method.Existing caving coal technology is as follows:
Existing caving coal technology is as follows:Coal discharge outlet is arranged on the tail end bottom of simple rack, generally using single-wheel, interval, many mouthfuls Coal is put, from the beginning of the haulage way of coal seam, is carried out to tailgate direction successively, first put the top on the odd numbers support such as 1#, 3#, 5# Coal, closes coal discharge outlet after seeing certain cash, leaves larger back coal;A delayed segment distance is put on the even numbers support such as 2#, 4#, 6# Top coal, releases a spheroid in the back coal that will be left behind.This kind of process for stoping shortcoming:
(1)Poor is adapted to irregular coal seam, coal seam is thicker(More than 6m)When, part top coal can not be put out, causes the rate of extraction low.
(2)When coal seam is thicker, back production is dangerous, and spoil falling speed is fast, and intense impact support, accident are more frequent.
(3)Light-duty simple rack stress is unstable, and the support strength of the gripper shoe of cradle top is relatively low, easily by top coal pressure It is curved, and less stable, the sinking of support front end is easily caused, afterbody is upwarped, and Jia is difficult for shifting, lengthens working hours, increased Labor strength.
Thus, it is necessary to provide a kind of modified light-duty one frame twoport Sub-Level Caving coal-mining method of simple rack, on overcoming State defect.
The content of the invention
In order to solve the weak point in existing pre-stress fibre sheet material stretching end anchoring process, the invention provides a kind of It is safe and reliable, can be directed to that the coal seam thick more than 6m carries out exploiting, support strength is high, the simple light hydraulic support of good stability and employing The support Sub-Level Caving coal-mining method.
For achieving the above object, concrete scheme of the invention is as follows:A kind of simple light hydraulic support, including base plate, lower flat board, Upper backup pad, support reinforcing structure, coal discharge outlet support adjustment mechanism and the jacking cylinder of more than four on base plate is vertically arranged, under Connected by first axle between flat board lower surface and jacking cylinder upper end, upper backup pad is set in parallel in above lower flat board, Support reinforcement structure is arranged between upper backup pad and lower flat board;Coal discharge outlet support adjustment mechanism is arranged on base plate and is located at jacking On the outside of oil cylinder;
Coal discharge outlet support adjustment mechanism includes that vertically the lifting that is located on base plate of fixation drives oil cylinder, interior lead column and outer for lower end Lead column, interior lead column and outer lead column are equipped with two, and an interior lead column and an outer lead column are positioned at the edge of base plate The edge opposite side of side, another interior lead column and another outer lead column positioned at base plate, in interior lead column and outer lead column It is fixedly connected by connecting plate between end, between interior lead column lower inside and base plate, is provided with tilt prop, interior lead column and outer Waste rock board is provided between lead column, gathering sill on the inside of outer lead column, is vertically provided with, is rotated on the outside of waste rock board and is provided with edge The directive wheel rolled in gathering sill, lifts and drives oil cylinder to be located on the inside of waste rock board, and lifting is driven on the inside of cylinder upper end and waste rock board Between connected by link, lifting is driven, and is connected It is fixedly connected with waste rock board inner surface on the outside of frame.
Support reinforcing structure includes at least three steel pipes be arrangeding in parallel, and steel pipe top is welded with upper backup pad lower surface, Steel pipe bottom is welded with lower flat board upper surface, and the inside at every steel pipe two ends is provided with a positioning connection structure;Each Positioning connection structure includes radius rod and located lateral bar, and radius rod is provided with least five and is parallel to each other and sets Put, the lower end of every radius rod is fixedly connected with steel pipe lower inner wall;The upper end of every radius rod is fixed to be connected A centring ring is connected to, by horizontal stroke between two neighboring centring ring, between two centring rings of both sides and steel pipe side interior wall Connect to locating rod, all of located lateral bar is arranged in straight line, located lateral bar is vertical with radius rod;Same By bar connecting of the corresponding inserted in centring ring between two positioning connection structures in steel pipe, reinforcing bar is rolled at centring ring Hook is curved, steel pipe two ends arrange closure plate, concrete mortar is filled with steel pipe.
Using simple light supports caving mining coal-mining method, comprise the following steps:
1), using fully-mechanized mining working gallery deep hole and shallow bore hole, detection of coal seam thickness change, and draw coal seam thickness figure;
2), process support reinforcement structure on the ground:The levels such as not all isometric 5 piece of longitudinal direction are welded in steel pipe lower inner wall first The radius rod of distance, longitudinally in each the length of locating rod be both less than the radius of steel pipe, while will ensure that all of longitudinal direction is fixed The line of position bar upper end point-blank, then welds centring ring in the upper end of radius rod, successively finally again adjacent Connect in alignment by welding located lateral bar between two centring rings, between centring ring and steel pipe walls, be then used by Centring ring corresponding to five reinforcing bars through two positioning connection structures, and reinforcing bar two ends are bent at centring ring Hook, then welds upper plugging plate at steel pipe two ends, opens injected hole in steel pipe top, inject concrete by injected hole into steel pipe Mortar, while concrete mortar solidifies, the first axle in the welding of lower flat board lower surface, after concrete mortar solidification, will Some steel pipe uniform parallels are placed on lower flat board and steel pipe are welded as a whole with lower flat board upper surface, then in steel pipe top Upper backup pad is placed in portion, and steel pipe is welded as a whole with upper backup pad lower surface;
3), the simple light hydraulic support described in some groups transported in fully-mechanized mining working gallery and installed, along the length of gallery Degree direction is sequentially arranged simple light hydraulic support, and per group of simple light hydraulic support is numbered in order:1#, 2#, 3# ... n#, Make each simple light hydraulic support coal discharge outlet support adjustment mechanism two outer lead columns on the outside of sidewall contact with gallery, start Upper backup pad is contacted and is had certain pressure with top coal seam lower surface by jacking cylinder, due to setting between lower flat board and upper backup pad The support reinforcing structure put, makes upper backup pad keep good support flatness;
4), according to the coal seam thickness figure drawn, be more than 6m sections in thickness, first implement it is upper put coal, now waste rock board is located at and interior leads The bottom of the outer lead columns of Xiang Zhuhe, forms between lower surface and two outer lead columns on the right side of waste rock board upper edge, lower flat board and puts Coal mouth;Caving mode puts coal according to interval, order, equivalent, first puts above the simple light hydraulic support of 1#, 3#, 5#, 7# ... odd numbers Top coal, the top coal above the simple light hydraulic support of even numbers of then putting 2#, 4#, 6#, 8# ... put coal amount at per group of simple light hydraulic support For 0~3m3Or see that cash, i.e. thickness are reduced to and the thinner seam thickness one on the thickness figure of coal seam more than the thickness in the coal seam of 6m sections After cause, start lifting and drive oil cylinder, lifting drives oil cylinder to drive waste rock board to move up upwardly through link, on waste rock board Directive wheel is moved up along the gathering sill in outer lead column, and the upper coal discharge outlet closure on top completes upper to put coal operation;
5), waste rock board lower edge, lower coal discharge outlet is formed between upper surface and two outer lead columns on the right side of base plate, from lower coal discharge outlet Coal is put using single-wheel, interval, many mouthfuls, from the beginning of the haulage way of coal seam, is carried out to tailgate direction successively, first put 1#, 3#, Top coal on the simple light hydraulic support of 5#, 7# ... odd numbers, closes lower coal discharge outlet, leaves larger back coal after seeing certain cash;It is stagnant Top coal above latter segment distance puts 2#, 4#, 6#, 8# ... the simple light hydraulic support of even numbers, releases one in the back coal that will be left behind Individual spheroid, completes coal mining activity.
Using above-mentioned technical proposal, the simple light hydraulic support of the present invention is due to arranging between upper backup pad and lower flat board Support reinforcing structure, support reinforcing structure adopt many steel pipes, and reinforced concrete structure is arranged in steel pipe, and steel pipe is mainly used In the high-strength concrete mortar contained and inside lock ring, pressure possesses higher pressure resistance from top to bottom to make concrete Degree.After the solidification of high-strength concrete mortar under the axial direction of steel pipe and hoop constraint, compression strength is greatly improved.
Reinforcing bar is by being arranged in steel pipe through centring ring.The number of the centring ring of each positioning connection structure is equal to required The total number of the reinforcing bar wanted.As reinforcing bar has good tensile strength and ductility.Reinforcing bar is arranged in the bottom of steel pipe, reinforcing bar The embedded rigidity for being to reduce for the tensile strength for improving bracing frame bracing frame, prevents bracing frame from tensile shear occur in local Destruction and brittle break, improve the overall stability of support.The intervention of reinforcing bar simultaneously can also improve the overall ductility of bracing frame, prevent Only in high confining pressure lower bracing frame brittle break.The length of locating rod is both less than the radius of steel pipe longitudinally in each, is easy to save certain Master Cost.
Centring ring reinforcing bar in construction just can smoothly insert position predetermined in steel pipe, preferably play the tension of reinforcing bar Intensity, and the place of the centring ring at steel pipe two ends is bent into hook, so can fully improve the tensile property of support and steady It is qualitative.
Waste rock board is lifted using hydraulic-driven, and is rolled along gathering sill by directive wheel, so reduces the resistance for moving up and down Power.It is fixedly connected by connecting plate between interior lead column and outer lead column upper end, is set between interior lead column lower inside and base plate Tilt prop is equipped with, the stability in vertical direction of interior lead column and outer lead column so can be fully improved, further, since in oil The base plate that cylinder bottom portion is arranged, lifts support strength, can so avoid the larger slotting bottom of cylinder force.
In sum, the present invention mines for the thicker section Sub-Level Caving of irregular coal seam, there is provided a kind of safe efficient, operation The strong support of property and coal-mining method, i.e., upper and the next two coal discharge outlets are arranged on a support carries out Sub-Level Caving coal-mining method (A referred to as frame dibit Sub-Level Caving coal-mining method).By methods described when unstable high seam carries out back production, can be effectively The mechanical mining in the corner field with "nine squares" and medium and small field with "nine squares" of large-scale mine is adapted to, bigger Coal Seam Thickness Change can be effectively adapted to, The higher rate of extraction is realized, back production efficiency is improved, can effectively prevent support from damaging and large area roof fall.
Description of the drawings
Fig. 1 is the structural representation of the simple light hydraulic support of the present invention;
Fig. 2 is the transverse sectional view of steel pipe in Fig. 1;
Fig. 3 is that the present invention carries out putting schematic diagram when coal is mined by upper coal discharge outlet;
Fig. 4 is the schematic diagram in cross section in Fig. 3;
Fig. 5 is that the present invention carries out putting schematic diagram when coal is mined by lower coal discharge outlet;
Fig. 6 is the schematic diagram in cross section in Fig. 5.
Specific embodiment
As shown in figures 1 to 6, a kind of simple light hydraulic support of the invention, including base plate 1, lower flat board 2, upper backup pad 3, support Reinforcement structure, coal discharge outlet support adjustment mechanism and the jacking cylinder 4 of more than four on base plate 1 is vertically arranged, lower 2 lower surface of flat board It is connected by first axle 5 between 4 upper end of jacking cylinder, upper backup pad 3 is set in parallel in above lower flat board 2, support reinforcing Structure setting is between upper backup pad 3 and lower flat board 2;Coal discharge outlet support adjustment mechanism is arranged on base plate 1 and is located at jacking oil On the outside of cylinder 4.
Coal discharge outlet support adjustment mechanism includes that the lower end lifting that vertically fixation is located on base plate 1 drives oil cylinder 6, interior guiding Post 7 and outer lead column 8, interior lead column 7 and outer lead column 8 are equipped with two, an interior lead column 7 and outer lead column 8 In the edge side of base plate 1, another interior lead column 7 and another outer lead column 8 are located at the edge opposite side of base plate 1, inside lead To being fixedly connected by connecting plate 9 between 8 upper end of post 7 and outer lead column, arrange between 7 lower inside of interior lead column and base plate 1 There is tilt prop 10, waste rock board 11 is provided between interior lead column 7 and outer lead column 8, is vertically provided with the inside of outer lead column 8 Gathering sill 12, rotates on the outside of waste rock board 11 and is provided with the directive wheel 13 rolled along gathering sill 12, and lifting drives oil cylinder 6 to be located at gear cash On the inside of plate 11, lifting is connected by link 14 between driving on the inside of cylinder upper end and waste rock board 11, and lifting drives 6 upper end of oil cylinder It is hinged by second hinge 15 between 14 inside bottom of link, fixes with 11 inner surface of waste rock board on the outside of link 14 and connect Connect.
Support reinforcing structure includes at least three steel pipes 16 be arrangeding in parallel, 16 top of steel pipe and 3 lower surface of upper backup pad Welding, 16 bottom of steel pipe are welded with lower 2 upper surface of flat board, and the inside at every 16 two ends of steel pipe is provided with one and is located by connecting Structure;Each positioning connection structure includes radius rod 17 and located lateral bar 18, and radius rod 17 is provided with least five Root and arranged in parallel, the lower end of every radius rod 17 is fixedly connected with 16 lower inner wall of steel pipe;Per root, longitudinal direction is fixed The upper end of position bar 17 has been fixedly connected with a centring ring 19, between two neighboring centring ring 19, two centring rings 19 of both sides It is connected by located lateral bar 18 between 16 side interior wall of steel pipe, all of located lateral bar 18 is arranged in straight line, Located lateral bar 18 is vertical with radius rod 17;Inserted by correspondence between two positioning connection structures in same steel pipe 16 The reinforcing bar 20 being set in centring ring 19 connects, and reinforcing bar 20 is bent into hook at centring ring 19, and 16 two ends of steel pipe arrange closure plate 22, steel Concrete mortar 21 is filled with pipe 16.
The simple light supports caving mining coal-mining method of employing of the present invention, comprises the following steps:
1), using fully-mechanized mining working gallery deep hole and shallow bore hole, detection of coal seam thickness change, and draw coal seam thickness figure;
2), process support reinforcement structure on the ground:Water is waited in not all isometric 5 piece for first longitudinal direction being welded in 16 lower inner wall of steel pipe The radius rod 17 of flat distance, longitudinally in each the length of locating rod 17 be both less than steel pipe 16 radius, while will ensure own 17 upper end of radius rod line point-blank, then weld centring ring successively in the upper end of radius rod 17 19, finally again between two neighboring centring ring 19, between centring ring 19 and 16 wall of steel pipe by welding located lateral bar 18 Connection is in alignment, is then used by the centring ring 19 corresponding to five reinforcing bars 20 through two positioning connection structures, and 20 two ends of reinforcing bar are bent into into hook at centring ring 19, then upper plugging plate 22 are welded at 16 two ends of steel pipe, are opened at the top of steel pipe 16 Injected hole, concrete mortar 21 is injected into steel pipe 16 by injected hole, while concrete mortar 21 solidifies, lower flat The upper first axle 5 of 2 lower surface of plate welding, after concrete mortar 21 solidifies, some 16 uniform parallels of steel pipe is placed into lower flat It is welded as a whole with lower 2 upper surface of flat board on plate 2 and by steel pipe 16, then places upper backup pad 3 at the top of the steel pipe 16, and by steel Pipe 16 is welded as a whole with 3 lower surface of upper backup pad;
3), as shown in Figure 3 and Figure 4, the simple light hydraulic support 23 described in some groups is transported and is gone forward side by side in fully-mechanized mining working gallery Row is installed, and is sequentially arranged simple light hydraulic support 23 along the length direction of gallery, and per group of simple light hydraulic support 23 is entered in order Line number:1#, 2#, 3# ... n#, makes two outer lead columns 8 of the coal discharge outlet support adjustment mechanism of each simple light hydraulic support 23 Outside and the sidewall contact of gallery, start jacking cylinder 4 and contact and have a level pressure upper backup pad 3 with top coal seam lower surface Power, due to the support reinforcing structure arranged between lower flat board 2 and upper backup pad 3, makes upper backup pad 3 keep good support smooth Degree;
4), according to draw coal seam thickness figure, thickness be more than 6m sections, first implement it is upper put coal, now waste rock board 11 be located at it is interior The bottom of lead column 7 and outer lead column 8, between 11 upper edge of waste rock board, 2 right side lower surface of lower flat board and two outer lead columns 8 Coal discharge outlet 24 in formation;Caving mode puts coal according to interval, order, equivalent, first puts 1#, 3#, 5#, 7# ... odd numbers simply light-duty Top coal above the simple light hydraulic support of top coal above support 23, then put 2#, 4#, 6#, 8# ... even numbers 23, per group simple light-duty Coal amount of putting at support 23 is 0~3m3Or see cash, i.e. thickness more than 6m sections coal seam thickness be reduced to on the thickness figure of coal seam Thinner seam consistency of thickness after, start lifting drive oil cylinder 6, lifting drive oil cylinder 6 upwardly through link 14 drive gear cash Plate 11 is moved up, and the directive wheel 13 on waste rock board 11 is moved up along the gathering sill 12 in outer lead column 8, will be put on top Coal mouth 24 is blocked, and completes upper to put coal operation;
5), as shown in Figure 5 and Figure 6, between 11 lower edge of waste rock board, 1 right side upper surface of base plate and two outer lead columns 8 formed under Coal discharge outlet 25, puts coal using single-wheel, interval, many mouthfuls from lower coal discharge outlet 25, from the beginning of the haulage way of coal seam, flat to return air successively Lane direction is carried out, and first puts the top coal on the simple light hydraulic support of 1#, 3#, 5#, 7# ... odd numbers 23, and decentralization coal is closed after seeing certain cash Mouth 25, leaves larger back coal;Top above the simple light hydraulic support of a delayed segment distance puts 2#, 4#, 6#, 8# ... even numbers 23 Coal, releases a spheroid, completes coal mining activity in the back coal that will be left behind.
Other accompanying drawings mark in the present invention in Fig. 3-Fig. 6 is respectively:26- coal seams;27- spoil layers;29- soft coal levels; Tunnel close to the simple light hydraulic supports of 1# is haulage way 30;Tunnel close to the simple light hydraulic supports of n# is haulage way 30.
The present invention simple light hydraulic support 23 due to the support reinforcing structure arranged between upper backup pad 3 and lower flat board 2, Support reinforcing structure adopts many steel pipes 16, and 20 xoncrete structure of reinforcing bar is arranged in steel pipe 16, and steel pipe 16 is mainly used in containing High-strength concrete mortar 21 inside dress lock ring, pressure possesses higher compression strength from top to bottom to make concrete. After the solidification of high-strength concrete mortar 21 under the axial direction of steel pipe 16 and hoop constraint, compression strength is greatly improved.
Reinforcing bar 20 is by being arranged in steel pipe 16 through centring ring 19.The number of the centring ring 19 of each positioning connection structure Equal to the total number of required reinforcing bar 20.As reinforcing bar 20 has good tensile strength and ductility.Arrangement reinforcing bar 20 is in steel The bottom of pipe 16, the embedded rigidity for being to reduce for the tensile strength for improving bracing frame bracing frame of reinforcing bar 20, prevents bracing frame There is tensile shear destruction and brittle break in local, improve the overall stability of support.The intervention of reinforcing bar 20 simultaneously can also be carried The overall ductility of high carriage, prevents in high confining pressure lower bracing frame brittle break.The length of locating rod 17 is both less than longitudinally in each The radius of steel pipe 16, is easy to save certain Master Cost.
The reinforcing bar 20 in construction of centring ring 19 just can smoothly insert position predetermined in steel pipe 16, preferably play reinforcing bar 20 tensile strength, and the place of the centring ring 19 at 16 two ends of steel pipe is bent into hook, so can fully improve support Tensile property and stability.
Waste rock board 11 is lifted using hydraulic-driven, and is rolled along gathering sill 12 by directive wheel 13, is so reduced and is moved down Dynamic resistance.Interior lead column 7 and outer lead column are fixedly connected by connecting plate 9 between 8 upper end, 7 lower inside of interior lead column with Tilt prop 10 is provided between base plate 1, the stablizing in vertical direction of interior lead column 7 and outer lead column 8 so can be fully improved Property, further, since the base plate 1 arranged in oil cylinder bottom, lifts support strength, can so avoid the larger slotting bottom of cylinder force.
Above example is only to illustrative and not limiting technical scheme, although reference above-described embodiment is to this It is bright to be described in detail, it will be understood by those within the art that:Still the present invention can be modified or be waited With replacing, any modification or partial replacement without departing from the spirit and scope of the present invention, which all should cover the power in the present invention In the middle of sharp claimed range.

Claims (3)

1. a kind of simple light hydraulic support, it is characterised in that:Including base plate, lower flat board, upper backup pad, support reinforcing structure, put coal Mouthful support adjustment mechanism and be vertically arranged the jacking cylinder of more than four on base plate, lower flat board lower surface and jacking cylinder upper end it Between connected by first axle, upper backup pad is set in parallel in above lower flat board, support reinforcing structure setting in upper backup pad and Between lower flat board;Coal discharge outlet support adjustment mechanism is arranged on base plate and is located on the outside of jacking cylinder;
Coal discharge outlet support adjustment mechanism includes that vertically the lifting that is located on base plate of fixation drives oil cylinder, interior lead column and outer for lower end Lead column, interior lead column and outer lead column are equipped with two, and an interior lead column and an outer lead column are positioned at the edge of base plate The edge opposite side of side, another interior lead column and another outer lead column positioned at base plate, in interior lead column and outer lead column It is fixedly connected by connecting plate between end, between interior lead column lower inside and base plate, is provided with tilt prop, interior lead column and outer Waste rock board is provided between lead column, gathering sill on the inside of outer lead column, is vertically provided with, is rotated on the outside of waste rock board and is provided with edge The directive wheel rolled in gathering sill, lifts and drives oil cylinder to be located on the inside of waste rock board, and lifting is driven on the inside of cylinder upper end and waste rock board Between connected by link, lifting is driven, and is connected It is fixedly connected with waste rock board inner surface on the outside of frame.
2. a kind of simple light hydraulic support according to claim 1, it is characterised in that:Support reinforcing structure includes be arrangeding in parallel At least three steel pipes, steel pipe top and upper backup pad lower surface weld, and steel pipe bottom is welded with lower flat board upper surface, every steel Inside at pipe two ends is provided with a positioning connection structure;Each positioning connection structure is including radius rod and laterally Locating rod, radius rod are provided with least five and arranged in parallel, the lower end of every radius rod with steel pipe bottom Inwall is fixedly connected;The upper end of every radius rod has been fixedly connected with a centring ring, between two neighboring centring ring, two Connected by located lateral bar between two centring rings of side and steel pipe side interior wall, all of located lateral bar is straight in one Line arranges that located lateral bar is vertical with radius rod;By correspondence between two positioning connection structures in same steel pipe The bar connecting in centring ring is plugged, reinforcing bar is bent into hook at centring ring, and steel pipe two ends arrange closure plate, are filled with steel pipe Concrete mortar.
3. using simple light supports caving mining coal-mining method as claimed in claim 2, it is characterised in that:Including following step Suddenly:
1), using fully-mechanized mining working gallery deep hole and shallow bore hole, detection of coal seam thickness change, and draw coal seam thickness figure;
2), process support reinforcement structure on the ground:The levels such as not all isometric 5 piece of longitudinal direction are welded in steel pipe lower inner wall first The radius rod of distance, longitudinally in each the length of locating rod be both less than the radius of steel pipe, while will ensure that all of longitudinal direction is fixed The line of position bar upper end point-blank, then welds centring ring in the upper end of radius rod, successively finally again adjacent Connect in alignment by welding located lateral bar between two centring rings, between centring ring and steel pipe walls, be then used by Centring ring corresponding to five reinforcing bars through two positioning connection structures, and reinforcing bar two ends are bent at centring ring Hook, then welds upper plugging plate at steel pipe two ends, opens injected hole in steel pipe top, inject concrete by injected hole into steel pipe Mortar, while concrete mortar solidifies, the first axle in the welding of lower flat board lower surface, after concrete mortar solidification, will Some steel pipe uniform parallels are placed on lower flat board and steel pipe are welded as a whole with lower flat board upper surface, then in steel pipe top Upper backup pad is placed in portion, and steel pipe is welded as a whole with upper backup pad lower surface;
3), the simple light hydraulic support described in some groups transported in fully-mechanized mining working gallery and installed, along the length of gallery Degree direction is sequentially arranged simple light hydraulic support, and per group of simple light hydraulic support is numbered in order:1#, 2#, 3# ... n#, Make each simple light hydraulic support coal discharge outlet support adjustment mechanism two outer lead columns on the outside of sidewall contact with gallery, start Upper backup pad is contacted and is had certain pressure with top coal seam lower surface by jacking cylinder, due to setting between lower flat board and upper backup pad The support reinforcing structure put, makes upper backup pad keep good support flatness;
4), according to the coal seam thickness figure drawn, be more than 6m sections in thickness, first implement it is upper put coal, now waste rock board is located at and interior leads The bottom of the outer lead columns of Xiang Zhuhe, forms between lower surface and two outer lead columns on the right side of waste rock board upper edge, lower flat board and puts Coal mouth;Caving mode puts coal according to interval, order, equivalent, first puts above the simple light hydraulic support of 1#, 3#, 5#, 7# ... odd numbers Top coal, the top coal above the simple light hydraulic support of even numbers of then putting 2#, 4#, 6#, 8# ... put coal amount at per group of simple light hydraulic support For 0~3m3Or see that cash, i.e. thickness are reduced to and the thinner seam thickness one on the thickness figure of coal seam more than the thickness in the coal seam of 6m sections After cause, start lifting and drive oil cylinder, lifting drives oil cylinder to drive waste rock board to move up upwardly through link, on waste rock board Directive wheel is moved up along the gathering sill in outer lead column, and the upper coal discharge outlet closure on top completes upper to put coal operation;
5), waste rock board lower edge, lower coal discharge outlet is formed between upper surface and two outer lead columns on the right side of base plate, from lower coal discharge outlet Coal is put using single-wheel, interval, many mouthfuls, from the beginning of the haulage way of coal seam, is carried out to tailgate direction successively, first put 1#, 3#, Top coal on the simple light hydraulic support of 5#, 7# ... odd numbers, closes lower coal discharge outlet, leaves larger back coal after seeing certain cash;It is stagnant Top coal above latter segment distance puts 2#, 4#, 6#, 8# ... the simple light hydraulic support of even numbers, releases one in the back coal that will be left behind Individual spheroid, completes coal mining activity.
CN201611197831.8A 2016-12-22 2016-12-22 A kind of simple light hydraulic support and use the holder Sub-Level Caving coal-mining method Expired - Fee Related CN106523011B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611197831.8A CN106523011B (en) 2016-12-22 2016-12-22 A kind of simple light hydraulic support and use the holder Sub-Level Caving coal-mining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611197831.8A CN106523011B (en) 2016-12-22 2016-12-22 A kind of simple light hydraulic support and use the holder Sub-Level Caving coal-mining method

Publications (2)

Publication Number Publication Date
CN106523011A true CN106523011A (en) 2017-03-22
CN106523011B CN106523011B (en) 2018-09-04

Family

ID=58340381

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611197831.8A Expired - Fee Related CN106523011B (en) 2016-12-22 2016-12-22 A kind of simple light hydraulic support and use the holder Sub-Level Caving coal-mining method

Country Status (1)

Country Link
CN (1) CN106523011B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108412530A (en) * 2018-02-05 2018-08-17 阳泉煤业(集团)有限责任公司 A kind of H-type sublevel caving hydrau lic support column pressing plate fixation shifting frame method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2349350Y (en) * 1998-06-04 1999-11-17 煤炭科学研究总院北京开采研究所 Working face end moving roof hydraulic support
CN2454541Y (en) * 2000-11-10 2001-10-17 王旭宏 Top coal support of track type slide top beam
RU2231647C1 (en) * 2002-11-29 2004-06-27 Институт угля и углехимии СО РАН Section of lining for supporting a breakage face of a steeply inclined coal seam
RU2235209C1 (en) * 2003-01-24 2004-08-27 Открытое акционерное общество "Проектно-конструкторский и экспериментальный институт угольного машиностроения" Powered support unit
CN206220857U (en) * 2016-11-24 2017-06-06 西南石油大学 A kind of alternately plow and the composite drill bit for scraping butt formula combined-breaking rock
CN206329353U (en) * 2016-12-22 2017-07-14 河南工程学院 A kind of simple light hydraulic support for Sub-Level Caving coal mining activity

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2349350Y (en) * 1998-06-04 1999-11-17 煤炭科学研究总院北京开采研究所 Working face end moving roof hydraulic support
CN2454541Y (en) * 2000-11-10 2001-10-17 王旭宏 Top coal support of track type slide top beam
RU2231647C1 (en) * 2002-11-29 2004-06-27 Институт угля и углехимии СО РАН Section of lining for supporting a breakage face of a steeply inclined coal seam
RU2235209C1 (en) * 2003-01-24 2004-08-27 Открытое акционерное общество "Проектно-конструкторский и экспериментальный институт угольного машиностроения" Powered support unit
CN206220857U (en) * 2016-11-24 2017-06-06 西南石油大学 A kind of alternately plow and the composite drill bit for scraping butt formula combined-breaking rock
CN206329353U (en) * 2016-12-22 2017-07-14 河南工程学院 A kind of simple light hydraulic support for Sub-Level Caving coal mining activity

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108412530A (en) * 2018-02-05 2018-08-17 阳泉煤业(集团)有限责任公司 A kind of H-type sublevel caving hydrau lic support column pressing plate fixation shifting frame method
CN108412530B (en) * 2018-02-05 2024-01-30 阳泉煤业(集团)有限责任公司 H-shaped caving coal support upright post pressing plate fixing and moving method

Also Published As

Publication number Publication date
CN106523011B (en) 2018-09-04

Similar Documents

Publication Publication Date Title
CN107060758B (en) A kind of section fender, which stays, sets construction method
CN105507951B (en) A kind of soft curtain encapsulating method in no coal column Duan Dingcheng lanes
CN108150206B (en) A method of passing through fully-mechanized mining working crossheading caving place
CN101915101A (en) Method of mining coal from heavy pitch thick coal seam
CN110925017B (en) Reserving and supporting method for long-wall mining special-shaped gob-side roadway in large-dip-angle medium-thickness coal seam trend
CN110145305B (en) Method for preventing and treating rock burst of roadway by hydraulic roof cutting and roadway retaining
CN109209490B (en) Working face withdrawing method for gangue filling auxiliary end mining stage
CN102720498A (en) Gob-side entry retaining mining process for coal face
CN111734466B (en) Gob-side entry retaining roadway support system and method for three-soft coal seam coal pillar-free mining
CN105134212B (en) A kind of method that three soft high seam tunnel ensures the rate of extraction along top driving longwall top coal caving
CN104405392B (en) Three soft high seam tunnel jackings are kept on file anchor rete cord active support longwall top coal caving method
CN101824986A (en) Coal mining process of drilling, loading, conveying and anchoring integral machine
CN106523011B (en) A kind of simple light hydraulic support and use the holder Sub-Level Caving coal-mining method
CN206329353U (en) A kind of simple light hydraulic support for Sub-Level Caving coal mining activity
CN201043474Y (en) Advanced support hydraulic support in series at upper and lower ends of coal mining tunnel
CN104265344A (en) Conveyor unloading part rear-mounted end hydraulic support
CN104533417A (en) Dual-system two-hardness short-wall coal seam mining method
CN108952715B (en) Gob-side entry driving top coal supporting and reinforcing method for inclined thick/extra-thick coal seam entry top
CN2758486Y (en) Fast supporter moving device of 'three soft' coal layer composite mining top coal supporter series
CN101233295B (en) Narrow bench mining system
CN201786365U (en) Hydraulic telescopic bracket for borehole coal mine
CN105937401B (en) The method for protecting support in Liu Sheshuan lanes is once tunneled in a kind of U-shaped ventilation
CN205638501U (en) Above coal tunnel supporting device
CN205445623U (en) Along empty facility of strutting of mineing coal seam closely in lane that protects
CN205477640U (en) Safety support device to collecting space area roof cutting release

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Guo Junjie

Inventor after: Guo Bingbing

Inventor after: Han Hongqiang

Inventor after: Wu Jingang

Inventor before: Guo Junjie

Inventor before: Wu Jingang

Inventor before: Han Hongqiang

Inventor before: Guo Bingbing

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180904

Termination date: 20211222

CF01 Termination of patent right due to non-payment of annual fee