CN106522838A - Traveling type tunnel trolley - Google Patents

Traveling type tunnel trolley Download PDF

Info

Publication number
CN106522838A
CN106522838A CN201611264933.7A CN201611264933A CN106522838A CN 106522838 A CN106522838 A CN 106522838A CN 201611264933 A CN201611264933 A CN 201611264933A CN 106522838 A CN106522838 A CN 106522838A
Authority
CN
China
Prior art keywords
crawler belt
type tunnel
bogie frame
hydraulic
tunnel trolley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611264933.7A
Other languages
Chinese (zh)
Inventor
刘国英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of 17th Bureau of China's Railroad Group
Second Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Original Assignee
Second Engineering Co Ltd of 17th Bureau of China's Railroad Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of 17th Bureau of China's Railroad Group filed Critical Second Engineering Co Ltd of 17th Bureau of China's Railroad Group
Priority to CN201611264933.7A priority Critical patent/CN106522838A/en
Publication of CN106522838A publication Critical patent/CN106522838A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a traveling type tunnel trolley. A steel frame air cavity converting device, a water pipe converting device, a drilling and blasting tool and electric welding equipment are arranged on a trolley frame, a crawler type traveling device is added, the currently advanced hydraulic transmission technology and the electric motor starting and stopping technology are introduced, original wind, water and electricity pipelines and the like and commonly used tool equipment are subjected to integrated design, and the electric control and remote control technologies are introduced. A riffled plate with holes is mounted at the top of the trolley to solve the problem that a tunnel vault system anchor rod cannot drill holes vertically. According to the traveling type tunnel trolley, original carrying through a loader is replaced by the mode that an engine hydraulically drives crawlers to travel, frequent carrying and no-load consumption of the loader are omitted, the time for coordinating loader drivers is saved, the construction progress is quickened, and the tunnel construction capacity is enhanced; meanwhile, repeated investment of various simple trolleys is reduced; and wind, water and electricity pipelines are the like are uniformly planned and scientifically and reasonably arranged, so that the safety performance is improved.

Description

A kind of walking type tunnel trolley
Technical field
The invention belongs to tunnel is with various simple chassis fields, and in particular to a kind of walking type tunnel trolley.
Background technology
The quick-fried chassis of simple drill is the gate rigid frame with both wings, is welded with I-steel, generally 6 meters of length.Gate The height of steelframe, width should be able to meet the normal pass of motor vehicles and machines, the width of both wings, highly should ensure that manipulator's is normal Operation.Beyond the pipe such as equipment, equipment and wind, water, electricity (line) road will being moved on to safe distance per separate explosion, after the completion of slagging tap Face is backed within again, and repeated work is very frequent.
Frequently draw and steelframe and its water pipe set up and airduct may be dragged bad, construction is impacted, but also It may happen that security incident.The airduct arbitrarily installed, water pipe, power lighting circuit and it is interim carry stack equipment, set It is standby, it is easy to which that the common personal injuries such as electric shock, object strike, falling from high altitude occur.Tunnel vault system anchor bolt is due to equipment With the factor of personnel cannot vertical drilling, construction quality is difficult to ensure that.
The shortcoming that the quick-fried chassis of simple drill is present:First, the frequent mobile carrying by loader of chassis, chassis processing are stupid Weight, inefficiency, and be easily damaged.Second, the equipment randomly placed on chassis and the pipeline of unordered installation are too many, there is peace Full hidden danger.3rd, the drilling of tunnel vault system anchor bolt needs personnel immediately below hole to help rig to drill, shields without platform, Performance difficulty.
Not only boring quick-fried chassis needs the dilatory of loader, other chassis in tunnel (as supporting chassis, shotcrete chassis, two Lined steel muscle colligation chassis etc.) also all it is to be moved by loader, it is very inconvenient in construction, and there is potential safety hazard.In view of The problem with present on, is reformed and upgrading to existing simple chassis.
The content of the invention
It is an object of the invention to overcome above-mentioned deficiency, there is provided a kind of walking type tunnel trolley, it is possible to decrease construction safety wind Danger, improve production efficiency are shortened construction period, realize standardized construction, and solve tunnel vault cannot vertical drilling difficulty Topic, it can be widely applied to each procedure operation of constructing tunnel, has very high practical value.
In order to achieve the above object, the present invention includes two crawler belt running gears be arrangeding in parallel, and two be arranged in parallel Crawler belt running gear drives the crawler belt of bogie frame both sides by being coupled bracket shared bogie frame, driven by engine hydraulic system Running gear, is provided with wind chamber conversion equipment, water pipe conversion equipment, the quick-fried equipment of brill and electric welding equipment on bogie frame and other are integrated The route of pipe line, electromotor started by electro-motor, and electro-motor and control chamber are controlled by way of manual, automatically controlled and remote control The advance of bogie frame, retrogressing and steering.
The hydraulic system includes that by engine-driven hydraulic pump hydraulic pump controls bogie frame both sides by control chamber Walk motor with hydraulic pressure, walk motor with hydraulic pressure and traveling retarding mechanism and drive wheel group be combined driving crawler belt running gear, Parking brake is provided with driving wheel.
Walk motor with hydraulic pressure, traveling retarding mechanism and drive wheel group are combined and set up separately in the both sides of bogie frame, electronic horse Up to, control chamber, electromotor and hydraulic pump be arranged on the work platformses on crawler belt top, walk motor with hydraulic pressure and hydraulic pump, control chamber It is connected by hydraulic tube oil pipe circuit.
The crawler belt running gear includes walking cross girders, and the one end for walking cross girders is provided with driving wheel, and the other end is provided with guiding Wheel, is arranged with crawler belt on driving wheel and directive wheel, walks cross girders bottom and be provided with some thrust wheels contacted with crawler belt, traveling back Portion is provided with the support sprocket wheel contacted with crawler belt, walks, and bearing spring is connected by tensioner connection Fork is connect, on connection fork, directive wheel is fixed with.
The connection bracket includes being coupled bracket cross bar, and connection bracket cross bar bottom is arranged with two connection brackets in parallel and stands Bar, is coupled on bracket cross bar and offers some connection eyelets.
The steelframe wind chamber conversion equipment includes double I-steel wind chamber, and the side in double I-steel wind chamber offers one The import of wind chamber, if opposite side offers the outlet of dry-air blast chamber.
The water pipe conversion equipment includes water pipe intermediate conversion cavity, and the side of water pipe intermediate conversion cavity offers one Water pipe import, opposite side offer some pipe outlets.
Be provided with checkered steel plate at the top of the bogie frame, remain on checkered steel plate in advance for tunnel vault system anchor bolt it is vertical Drilling provides the eyelet of the diameter 5cm of shielding platform.
Compared with prior art, the present invention arranges steelframe wind chamber conversion equipment, water pipe conversion equipment on bogie frame, bores quick-fried Equipment and electric welding equipment, and cterpillar drive is increased, opened using current advanced hydraulic transmission technology and electro-motor Stop the control technology of technology and hand-control electric-controlled one, (line) road is managed to original wind, water, electricity etc. and conventional plant enters Integrated design is gone, has employed automatically controlled and telecontrol engineering, realize advance, retrogressing and the steering of bogie frame.Walking type tunnel platform Car drives the walking manner of crawler belt to replace the carrying of original loader using engine hydraulic, saves loader and frequently carries And no-load consumption, the time for coordinating loader engineer is saved, construction speed is accelerated, is enhanced constructing tunnel ability, while Decrease the overlapping investment of various simple chassis.Pipe (line) road unified planning arrangement science such as wind, water, electricity, reasonable, safety Can be improved.The present invention has higher promotional value and wide application prospect.
Further, the present invention is provided with eye checkered steel plate at the top of bogie frame, solves tunnel vault system anchor Bar cannot vertical drilling a difficult problem.
Description of the drawings
Fig. 1 is the front view of the present invention;
Fig. 2 is the side view of the present invention;
Fig. 3 is the front view of crawler belt running gear of the present invention;
Fig. 4 is crawler belt running gear top view of the present invention;
Schematic diagrams of the Fig. 5 for present hydraulic system;
Fig. 6 is the front view that the present invention is coupled bracket;
Fig. 7 is the side view that the present invention is coupled bracket;
Fig. 8 is the schematic diagram that the present invention is coupled bracket cross bar;
Fig. 9 is the schematic diagram of steelframe wind chamber conversion equipment of the present invention;
Figure 10 is the schematic diagram of water pipe conversion equipment of the present invention;
Figure 11 is the schematic diagram of chassis top of the present invention checkered steel plate.
Specific embodiment
The present invention will be further described below in conjunction with the accompanying drawings.
Referring to Fig. 1 to Figure 10, the present invention includes two crawler belt running gears 3 be arrangeding in parallel, two shoes be arrangeding in parallel Band running gear 3 drives the shoe of bogie frame both sides by being coupled 2 shared bogie frame 1 of bracket, electromotor 7 by hydraulic system Band running gear 3, is provided with steelframe wind chamber conversion equipment 4, water pipe conversion equipment 5, bores quick-fried equipment, electric welding equipment on bogie frame 1 With other integrated routes of pipe line, by 6 start and stop of electro-motor, electro-motor 6 and control chamber 7-2 can be using manual, electricity for electromotor 7 The mode of control and remote control controls the traveling function of chassis.
Hydraulic system includes that the hydraulic pump 7-1 driven by electromotor 7, hydraulic pump 7-1 control chassis by control chamber 7-2 The walk motor with hydraulic pressure 7-3 of frame both sides, walk motor with hydraulic pressure 7-3 drive corresponding traveling retarding mechanism 7-4 and driving wheel 3-1, is provided with parking brake 7-4 on driving wheel 3-1, it is ensured that the braking effect of chassis.
Crawler belt running gear 3 includes walking cross girders 3-4, and the one end for walking cross girders 3-4 is provided with driving wheel 3-1, and the other end is arranged Have on directive wheel 3-5, driving wheel 3-1 and directive wheel 3-5 and be arranged with crawler belt 3-2, walk cross girders 3-4 bottoms and be provided with some and crawler belt The thrust wheel 3-3 of 3-2 contacts, is walked and is provided with the support sprocket wheel 3-7 contacted with crawler belt 3-2 at the top of cross girders 3-4, walked and set on cross girders 3-4 Bearing spring 3-6 is equipped with, bearing spring 3-6 is fixed with guiding by tensioner 3-8 connection connection fork 3-9 on connection fork 3-9 Wheel 3-5.
Being coupled bracket 2 includes being coupled bracket cross bar 2-2, is coupled bracket cross bar 2-2 bottoms and is arranged with two connection cattle in parallel Lower limb vertical rod 2-1, is coupled on bracket cross bar 2-1 and offers some connection eyelet 2-3.
Steelframe wind chamber conversion equipment 4 includes double I-steel wind chamber 4-3, and the side of double I-steel wind chamber 4-3 begins with One wind chamber import 4-1, if opposite side begins with dry-air blast chamber outlet 4-2.
Water pipe conversion equipment 5 includes water pipe intermediate conversion cavity 5-3, and the side of water pipe intermediate conversion cavity 5-3 offers One water pipe import 5-1, opposite side offer some pipe outlet 5-2.
When chassis need to be moved, Diesel engine 7 is started by electro-motor 6, hydraulic pump 7-1 just starts working, operation control Operation handle on case 7-2 processed, the change for implementing oil circuit bring driving walk motor with hydraulic pressure 7-3, the structure of static hydraulic drive system Principle is that Diesel engine 7 drives hydraulic pressure 7-1 pumps to produce hydraulic oil, passes through oil pipe feed drive walk motor with hydraulic pressure by pressure oil 7-3 rotates, then drives driving wheel 3-1 to rotate by walk motor with hydraulic pressure 7-3.Static hydraulic drive system by bidirectional variable hydraulic pump, Walk motor with hydraulic pressure, whole drive mechanism composition, using double pump double loop closed type hydraulic system.
Electro-motor 6 starts Diesel engine 7, by the operation handle on control chamber 7-2, implement chassis advance, after Move back and turn to, after reaching work surface, close electromotor 7, implement procedures in tunnel, need shift position again, repeat with Upper work.Chassis can be processed into according to the size of tunnel cross-section it is small-sized, medium-sized and large-scale, it is small-sized integrally to manufacture, it is big or middle Type considers transport and the needs for dismounting, and can be processed with sub-unit, be fitted together finally by bolted mode.The tunnel Road chassis may not only be applied to the quick-fried work of brill in tunnel, and can be additionally used in the installation of steel arch-shelf, the bolt-spary supports in tunnel, two lined steels The colligation of muscle.
Output direction of rotation of the control per side walk motor with hydraulic pressure 7-3, so that it may realize turning to, when control chamber 7-2 is in During position, hydraulic throttle is capable of achieving service brake.Change the fuel delivery of walk motor with hydraulic pressure 7-3, can just change its rotating speed, from And change the travel speed of chassis;Change fuel feeding direction, walk motor with hydraulic pressure 7-3 can just inverted, so as to realize falling for chassis Move back.
Electro-motor 6 and control chamber 7-2 adopt the controlling party of Electronic control, remote control start and stop and manual reverse of direction speed governing one Formula.Hydraulic pump 7-1 is controlled using automatic variable, and the advance of crawler belt running gear 3, retrogressing, turning and speed are adjusted, by handss Dynamic to adjust control chamber 7-2 to realize, crushing is little, infinitely variable speeds, reliability easy to adjust.
The manufacture method of the present invention, comprises the steps:
(1) according to tunnel cross-section size, both wings formula steelframe operating platform is made using I-steel, platform steel plate adopts decorative pattern The form of steel plate, the eyelet of the reserved diameter 5cm of platform top are some, determine according to the spacing that vault system anchor bolt is designed.
(2) cavity that the double I-steel in tunnel entrance side is formed makes double I-steel wind chamber 4-3, reserves wind chamber import 4- 1 and wind chamber outlet 4-2, the difference operation of general side one, it is ensured that blast.Middle I-steel sets up a steel being mutually communicated Pipe, reserves water pipe import 5-1, and pipe outlet 5-2 is some, used as the intermediate conversion device of pressure water.
(3) crawler unit 3 two is assembled, and respectively by whole drive mechanism, parking brake, walk motor with hydraulic pressure group It is mounted on driving wheel 3-1;And the steelframe of walking to be respectively welded on cross girders 3-4 in each crawler unit 3 is coupled bracket 3 three, Formed using two channel-section steel weldings back to by the way of.
(4) crawler unit is arranged in juxtaposition according to the width of bogie frame, is arranged at four angles of crawler unit For install hydraulic jack 4, lift steelframe operating platform to hydraulic jack, by hydraulic jack gradually under Put, complete the installation of bogie frame, be coupled bracket 2 and the mode with bolts of bogie frame 1.
(5) by electro-motor 6 and its hydraulic system such as assembly switch, Diesel engine 7, control chamber 7-2, hydraulic pump 7-1 It is assembled on the bottom girder of chassis side, and driver seat operation chassis is set;Hydraulic oil pipeline 7-5 is laid in I-shaped along steelframe Under the flange plate of steel, the walk motor with hydraulic pressure 7-3 and hydraulic pump 7-1 of both sides are coupled together, form closed-circuit system.
(6) distribution box, switch-box and integrated welding equipment are fixed on the longeron of chassis opposite side;Electric line It is laid in along steelframe under the flange plate of I-steel, the corresponding construction part of illuminating safety anti-explosive light irradiation;Conventional brill is quick-fried Equipment hutch is installed on the operational platform.
(7) the top laying checkered steel plate of bogie frame, and the eyelet of a diameter of 5cm is reserved, in quincuncial arrangement, it is tunnel The vertical drilling of vault system anchor bolt creates conditions.
(8) chassis guardrail and safety climbing ladder are installed, brushing salmon pink paint pastes reflecting strips along chassis surrounding.
In said method, described steelframe wind chamber need to be checked through the water pressure test.The startup and stopping of electromotor 7 is by electricity The assembly of dynamic motor 6 switchs to realize, the operation of chassis adopts the control mode of manual, automatically controlled or remote control.Tunnel platform of the present invention Car can be processed into large, medium and small type, and small-sized chassis integrally can be manufactured, and big or middle, type chassis considers transport and the needs for dismounting, can Sub-unit processing is fitted together.

Claims (8)

1. a kind of walking type tunnel trolley, it is characterised in that including two crawler belt running gears (3) be arrangeding in parallel, two are put down The crawler belt running gear (3) that row is arranged drives hydraulic system by being coupled bracket (2) shared bogie frame (1), electromotor (7) The crawler belt running gear (3) of bogie frame both sides is driven, wind chamber conversion equipment (4), water pipe conversion equipment on bogie frame (1), is provided with (5) quick-fried equipment and electric welding equipment and other integrated routes of pipe line, are bored, electromotor (7) is started by electro-motor (6), electronic horse Advance, retrogressing and the steering of bogie frame (1) is controlled by way of manual, automatically controlled and remote control up to (6) and control chamber (7-2).
2. a kind of walking type tunnel trolley according to claim 1, it is characterised in that the hydraulic system is included by sending out The hydraulic pump (7-1) that motivation (7) drives, hydraulic pump (7-1) control the hydraulic pressure row of bogie frame (1) both sides by control chamber (7-2) Motor (7-3) is walked, walk motor with hydraulic pressure (7-3) is combined driving with traveling retarding mechanism (7-4) and driving wheel (3-1) and carried out Band running gear (3), is provided with parking brake (7-4) on driving wheel (3-1).
3. a kind of walking type tunnel trolley according to claim 2, it is characterised in that walk motor with hydraulic pressure (7-3), walking Reducing gear (7-4) and driving wheel (3-1) combine the both sides set up separately in bogie frame (1), electro-motor (6), control chamber (7-2), electromotor (7) and hydraulic pump (7-1) are arranged on the work platformses on crawler belt top, walk motor with hydraulic pressure (7-3) and hydraulic pressure Pump (7-1), control chamber (7-2) are connected by hydraulic tube oil pipe circuit (7-5).
4. a kind of walking type tunnel trolley according to claim 1, it is characterised in that described crawler belt running gear (3) wrap Cross girders (3-4) is included away, the one end for walking cross girders (3-4) is provided with driving wheel (3-1), and the other end is provided with directive wheel (3-5), driven Crawler belt (3-2) is arranged with wheel (3-1) and directive wheel (3-5), walks cross girders (3-4) bottom and be provided with some to connect with crawler belt (3-2) Tactile thrust wheel (3-3), is walked and is provided with the support sprocket wheel (3-7) contacted with crawler belt (3-2) at the top of cross girders (3-4), walk cross girders (3-4) On be provided with bearing spring (3-6), bearing spring (3-6) is by tensioner (3-8) connection connection fork (3-9), connection fork (3- 9) directive wheel (3-5) is fixed with.
5. a kind of walking type tunnel trolley according to claim 1, it is characterised in that described connection bracket (2) include connection Knot bracket cross bar (2-2), is coupled bracket cross bar (2-2) bottom and is arranged with two connections bracket vertical rod (2-1) in parallel, be coupled bracket Some connections eyelet (2-3) are offered on cross bar (2-2).
6. a kind of walking type tunnel trolley according to claim 1, it is characterised in that the steelframe wind chamber conversion equipment (4) include double I-steel wind chamber (4-3), the side of double I-steel wind chamber (4-3) offers a wind chamber import (4-1), If opposite side offers dry-air blast chamber outlet (4-2).
7. a kind of walking type tunnel trolley according to claim 1, it is characterised in that described water pipe conversion equipment (5) wrap Water pipe intermediate conversion cavity (5-3) is included, the side of water pipe intermediate conversion cavity (5-3) offers a water pipe import (5-1), separately Side offers some pipe outlets (5-2).
8. a kind of walking type tunnel trolley according to claim 1, it is characterised in that be provided with flower at the top of the bogie frame Stricture of vagina steel plate (8), the eyelet of the diameter 5cm for remaining in advance providing shielding platform for anchor pole vertical drilling on checkered steel plate (8).
CN201611264933.7A 2016-12-30 2016-12-30 Traveling type tunnel trolley Pending CN106522838A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611264933.7A CN106522838A (en) 2016-12-30 2016-12-30 Traveling type tunnel trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611264933.7A CN106522838A (en) 2016-12-30 2016-12-30 Traveling type tunnel trolley

Publications (1)

Publication Number Publication Date
CN106522838A true CN106522838A (en) 2017-03-22

Family

ID=58336337

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611264933.7A Pending CN106522838A (en) 2016-12-30 2016-12-30 Traveling type tunnel trolley

Country Status (1)

Country Link
CN (1) CN106522838A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111392352A (en) * 2020-04-17 2020-07-10 上海岚致环保科技有限公司 Walking weighing trolley

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1167321A1 (en) * 1983-11-09 1985-07-15 Ордена Трудового Красного Знамени Научно-Исследовательский Горнорудный Институт Drilling carriage
SU1189983A1 (en) * 1984-06-21 1985-11-07 Научно-исследовательский и проектно-конструкторский институт по добыче полезных ископаемых открытым способом Drilling rig
CN203129948U (en) * 2012-12-27 2013-08-14 陈海斌 Multifunctional cutting drilling machine
CN103244054A (en) * 2013-05-03 2013-08-14 山西晋煤集团金鼎煤机矿业有限责任公司 Movable vertical-spindle-type drill carriage
CN104695984A (en) * 2015-02-10 2015-06-10 甘肃路桥第四公路工程有限责任公司 Multifunctional tunnel construction trolley
CN205778524U (en) * 2016-06-03 2016-12-07 中铁十二局集团第一工程有限公司 A kind of chassis of one people controlled multiple stage rock drill

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1167321A1 (en) * 1983-11-09 1985-07-15 Ордена Трудового Красного Знамени Научно-Исследовательский Горнорудный Институт Drilling carriage
SU1189983A1 (en) * 1984-06-21 1985-11-07 Научно-исследовательский и проектно-конструкторский институт по добыче полезных ископаемых открытым способом Drilling rig
CN203129948U (en) * 2012-12-27 2013-08-14 陈海斌 Multifunctional cutting drilling machine
CN103244054A (en) * 2013-05-03 2013-08-14 山西晋煤集团金鼎煤机矿业有限责任公司 Movable vertical-spindle-type drill carriage
CN104695984A (en) * 2015-02-10 2015-06-10 甘肃路桥第四公路工程有限责任公司 Multifunctional tunnel construction trolley
CN205778524U (en) * 2016-06-03 2016-12-07 中铁十二局集团第一工程有限公司 A kind of chassis of one people controlled multiple stage rock drill

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111392352A (en) * 2020-04-17 2020-07-10 上海岚致环保科技有限公司 Walking weighing trolley

Similar Documents

Publication Publication Date Title
CN104343263A (en) Rotary lifting type three-dimensional garage
CN203412327U (en) Rotary lift type stereo garage
CN101509350A (en) Pneumatic crawler hydraulic jumbo
CN100564791C (en) The drilling machine shaft frame two-layer platform mechanical arm grasping drill pipe device
CN106638185A (en) Track layer automatically changing span in advancing process and use method
CN206070619U (en) Dual-use type construction of diaphragm wall equipment
CN102162333A (en) Fully-electric crawler suspension remote control pile driver
CN206987883U (en) The long steep inclined shaft transportation system of light section
CN105633899A (en) Excavation device of direct burial cable trench
CN104763212B (en) Photovoltaic ecological paradise intelligent car storing dock
CN204023597U (en) A kind of trailer system of carrying large caisson
CN202560321U (en) Shield split starting pipeline synchronous moving device
CN201953312U (en) Polar low-temperature mechanically driven trailer-mounted drill rig
CN106522838A (en) Traveling type tunnel trolley
CN203998667U (en) A kind of rope rolls frame and can roll over dress gauntry crane
CN203684019U (en) Height and span adjustable track laying machine for subway construction
CN209908511U (en) Multifunctional bridge type vehicle for tunnel
CN108221512A (en) Adjustable track laying machine
CN207194826U (en) Underground horizontal drilling machine
CN203097891U (en) Rocker type transverse drum shearer
CN200985752Y (en) Drill headframe two-deck platform mechanical arm grabbing drill stem mechanism
CN206942682U (en) A kind of flywheel energy storage low-carbon environment-friendly Self propelled type well repairing machine
CN206942659U (en) A kind of flywheel energy storage self power generation Self propelled type well repairing machine
CN208330386U (en) A kind of large diameter shield tunnel cable suspension construction assistance platform
CN202754729U (en) Crawler excavator and rescue traction system thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170322

RJ01 Rejection of invention patent application after publication