CN106522372A - 一种混合式集成房屋及施工方法 - Google Patents
一种混合式集成房屋及施工方法 Download PDFInfo
- Publication number
- CN106522372A CN106522372A CN201610834686.3A CN201610834686A CN106522372A CN 106522372 A CN106522372 A CN 106522372A CN 201610834686 A CN201610834686 A CN 201610834686A CN 106522372 A CN106522372 A CN 106522372A
- Authority
- CN
- China
- Prior art keywords
- concrete
- house
- floor
- embedded
- embedded modular
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/348—Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
- E04B1/34815—Elements not integrated in a skeleton
- E04B1/34823—Elements not integrated in a skeleton the supporting structure consisting of concrete
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Residential Or Office Buildings (AREA)
- Foundations (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610834686.3A CN106522372B (zh) | 2016-09-20 | 2016-09-20 | 一种混合式集成房屋及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610834686.3A CN106522372B (zh) | 2016-09-20 | 2016-09-20 | 一种混合式集成房屋及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106522372A true CN106522372A (zh) | 2017-03-22 |
CN106522372B CN106522372B (zh) | 2019-01-15 |
Family
ID=58344176
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610834686.3A Active CN106522372B (zh) | 2016-09-20 | 2016-09-20 | 一种混合式集成房屋及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106522372B (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107130689A (zh) * | 2017-05-12 | 2017-09-05 | 扬州大学 | 整体装配式框架结构房屋 |
CN107558757A (zh) * | 2017-08-04 | 2018-01-09 | 深圳市晴方投资管理有限公司 | 节能环保的多功能层叠式建筑钢架构 |
WO2020228000A1 (zh) * | 2019-05-13 | 2020-11-19 | 长沙远大住宅工业集团股份有限公司 | 一种模块化建筑及其施工方法 |
CN112067199A (zh) * | 2020-08-31 | 2020-12-11 | 扬州大学 | 一种集成式房屋防雨试验装置及其试验方法 |
CN112282068A (zh) * | 2020-11-02 | 2021-01-29 | 台州学院 | 装配式混凝土建筑连接结构 |
WO2021103576A1 (zh) * | 2019-11-29 | 2021-06-03 | 青岛理工大学 | 框架梁与集成房屋骨架梁的连接方式及连接节点的确定方法 |
CN114033047A (zh) * | 2021-10-11 | 2022-02-11 | 深圳大学 | 连接件、模块化钢-混凝土组合结构及施工方法 |
CN115288292A (zh) * | 2022-08-26 | 2022-11-04 | 安徽省高迪循环经济产业园股份有限公司 | 装配式钢结构框架及集成房屋 |
US11885145B2 (en) | 2021-05-20 | 2024-01-30 | Sano Development Limited | Hybrid building system, building and method |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20070047958A (ko) * | 2005-11-03 | 2007-05-08 | 재단법인 포항산업과학연구원 | 모듈러 주택용 패널 박스 모듈 |
CN101725259A (zh) * | 2008-10-11 | 2010-06-09 | 黄昆 | 一种模块化房屋建筑结构及其建造方法 |
CN101806095A (zh) * | 2010-03-15 | 2010-08-18 | 中山市快而居房屋预制件有限公司 | 一种全预制装配整体式钢筋混凝土房屋及其建造方法 |
CN102261189A (zh) * | 2011-04-08 | 2011-11-30 | 应惠清 | 一种用于剪力墙体系住宅建筑的装配-现浇式密柱结构 |
ES2369947A1 (es) * | 2011-07-28 | 2011-12-09 | José Carlos Elipe Maicas | Sistema de construcción modular. |
KR101222549B1 (ko) * | 2011-12-26 | 2013-01-16 | 주식회사 포스코에이앤씨건축사사무소 | 기둥 벽체 일체식 패널화 벽체시스템 및 이를 이용한 모듈러 구조물 |
KR20140008144A (ko) * | 2012-07-11 | 2014-01-21 | 김정영 | 조립식 주택용 패널을 이용한 조립식 주택의 조립구조물 및 이를 포함하는 조립식 주택 |
CN104652608A (zh) * | 2015-02-05 | 2015-05-27 | 中国建筑第七工程局有限公司 | 一种装配式外墙与梁的连接结构 |
CN105569355A (zh) * | 2016-01-14 | 2016-05-11 | 中国建筑设计院有限公司 | 一种包括预制构件模块化住宅的装配方法 |
-
2016
- 2016-09-20 CN CN201610834686.3A patent/CN106522372B/zh active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20070047958A (ko) * | 2005-11-03 | 2007-05-08 | 재단법인 포항산업과학연구원 | 모듈러 주택용 패널 박스 모듈 |
CN101725259A (zh) * | 2008-10-11 | 2010-06-09 | 黄昆 | 一种模块化房屋建筑结构及其建造方法 |
CN101806095A (zh) * | 2010-03-15 | 2010-08-18 | 中山市快而居房屋预制件有限公司 | 一种全预制装配整体式钢筋混凝土房屋及其建造方法 |
CN102261189A (zh) * | 2011-04-08 | 2011-11-30 | 应惠清 | 一种用于剪力墙体系住宅建筑的装配-现浇式密柱结构 |
ES2369947A1 (es) * | 2011-07-28 | 2011-12-09 | José Carlos Elipe Maicas | Sistema de construcción modular. |
KR101222549B1 (ko) * | 2011-12-26 | 2013-01-16 | 주식회사 포스코에이앤씨건축사사무소 | 기둥 벽체 일체식 패널화 벽체시스템 및 이를 이용한 모듈러 구조물 |
KR20140008144A (ko) * | 2012-07-11 | 2014-01-21 | 김정영 | 조립식 주택용 패널을 이용한 조립식 주택의 조립구조물 및 이를 포함하는 조립식 주택 |
CN104652608A (zh) * | 2015-02-05 | 2015-05-27 | 中国建筑第七工程局有限公司 | 一种装配式外墙与梁的连接结构 |
CN105569355A (zh) * | 2016-01-14 | 2016-05-11 | 中国建筑设计院有限公司 | 一种包括预制构件模块化住宅的装配方法 |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107130689A (zh) * | 2017-05-12 | 2017-09-05 | 扬州大学 | 整体装配式框架结构房屋 |
CN107558757A (zh) * | 2017-08-04 | 2018-01-09 | 深圳市晴方投资管理有限公司 | 节能环保的多功能层叠式建筑钢架构 |
WO2020228000A1 (zh) * | 2019-05-13 | 2020-11-19 | 长沙远大住宅工业集团股份有限公司 | 一种模块化建筑及其施工方法 |
WO2021103576A1 (zh) * | 2019-11-29 | 2021-06-03 | 青岛理工大学 | 框架梁与集成房屋骨架梁的连接方式及连接节点的确定方法 |
CN112067199A (zh) * | 2020-08-31 | 2020-12-11 | 扬州大学 | 一种集成式房屋防雨试验装置及其试验方法 |
CN112282068A (zh) * | 2020-11-02 | 2021-01-29 | 台州学院 | 装配式混凝土建筑连接结构 |
CN112282068B (zh) * | 2020-11-02 | 2021-11-30 | 台州学院 | 装配式混凝土建筑连接结构 |
US11885145B2 (en) | 2021-05-20 | 2024-01-30 | Sano Development Limited | Hybrid building system, building and method |
US12091872B2 (en) | 2021-05-20 | 2024-09-17 | Sano Development Limited | Hybrid building system, building and method |
CN114033047A (zh) * | 2021-10-11 | 2022-02-11 | 深圳大学 | 连接件、模块化钢-混凝土组合结构及施工方法 |
CN114033047B (zh) * | 2021-10-11 | 2023-01-03 | 深圳大学 | 模块化钢-混凝土组合结构及施工方法 |
CN115288292A (zh) * | 2022-08-26 | 2022-11-04 | 安徽省高迪循环经济产业园股份有限公司 | 装配式钢结构框架及集成房屋 |
Also Published As
Publication number | Publication date |
---|---|
CN106522372B (zh) | 2019-01-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106522372A (zh) | 一种混合式集成房屋及施工方法 | |
CN106592755B (zh) | 一种模块化多高层整体装配式钢结构房屋结构体系 | |
CN106223463A (zh) | 一种预制节点和一种预制装配式框架结构及其构建方法 | |
CN204326300U (zh) | 一种用于建筑钢管混凝土组合体系的圈梁壳 | |
CN106088330B (zh) | 基于3d打印的装配式框架梁和框架柱的连接结构及其施工方法 | |
CN207003652U (zh) | 一种复式钢管混凝土柱与钢管混凝土梁组合框架结构 | |
CN106378861A (zh) | 一种预制装配式混凝土楼梯模具及楼梯制造方法 | |
CN106836475A (zh) | 模块化的多高层装配式钢结构体系 | |
CN101597920A (zh) | 装配式房屋构造及其方法 | |
CN109113306A (zh) | 一种模块化电梯井道及其施工方法 | |
CN104831811A (zh) | 一种空心的钢筋混凝土预制墙体模块 | |
CN108678445A (zh) | 一种厂房的结构 | |
WO2017054723A1 (zh) | 凹字型建筑物模板组施工方法 | |
CN209397737U (zh) | 预制梁节点安装结构 | |
CN207110035U (zh) | 基于钢板连通接头的装配式钢筋混凝土框架结构 | |
WO2017054724A1 (zh) | 凹字型楼层成型装置的吊装设备 | |
CN205348390U (zh) | 一种混凝土预制梁与现浇柱的连接结构 | |
CN204983213U (zh) | 一种预制装配式带暗支撑的大板剪力墙结构 | |
CN209179366U (zh) | 一种预制楼梯 | |
CN209523309U (zh) | 套筒式预制钢-混凝土梁节点连接结构 | |
TWI632273B (zh) | 凹字型建築物施工方法 | |
CN207436339U (zh) | 双向空腔钢筋混凝土板以及其制作设备 | |
CN206308883U (zh) | 一种外贴式模块化建筑结构 | |
CN207469617U (zh) | 一种女儿墙部位装配式屋框梁结构 | |
CN216552548U (zh) | 基于结构柱的装配式建筑外墙保温aac叠合墙板构造 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 201201 building 1-2, 6111 Longdong Avenue, Pudong New Area, Shanghai Patentee after: Shanghai xunzhu Construction Technology Co.,Ltd. Address before: 201201 building 1-2, 6111 Longdong Avenue, Pudong New Area, Shanghai Patentee before: SHANGHAI XUNZHU BUILDING TECHNOLOGY Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230703 Address after: 200433 floor 2, No. 100, Guokang Road, Yangpu District, Shanghai (centralized registration place) Patentee after: Youji construction technology development (Shanghai) Co.,Ltd. Address before: 201201 building 1-2, 6111 Longdong Avenue, Pudong New Area, Shanghai Patentee before: Shanghai xunzhu Construction Technology Co.,Ltd. |