CN106522262B - The construction method of the parallel cross combined girder steel tower crane of steel structural roof - Google Patents

The construction method of the parallel cross combined girder steel tower crane of steel structural roof Download PDF

Info

Publication number
CN106522262B
CN106522262B CN201610967085.XA CN201610967085A CN106522262B CN 106522262 B CN106522262 B CN 106522262B CN 201610967085 A CN201610967085 A CN 201610967085A CN 106522262 B CN106522262 B CN 106522262B
Authority
CN
China
Prior art keywords
girder steel
steel
tower crane
support bar
parallel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610967085.XA
Other languages
Chinese (zh)
Other versions
CN106522262A (en
Inventor
丁昌银
谢永超
冯少鹏
梁静远
黄华
麦维力
杨翔
邓恺坚
肖焕詹
陈智富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU MACHINE FACILITIES CONSTRUCTION GROUP CO Ltd
Original Assignee
GUANGZHOU MACHINE FACILITIES CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU MACHINE FACILITIES CONSTRUCTION GROUP CO Ltd filed Critical GUANGZHOU MACHINE FACILITIES CONSTRUCTION GROUP CO Ltd
Priority to CN201610967085.XA priority Critical patent/CN106522262B/en
Publication of CN106522262A publication Critical patent/CN106522262A/en
Application granted granted Critical
Publication of CN106522262B publication Critical patent/CN106522262B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses the steel structural roof construction methods of parallel cross combined girder steel tower crane, the parallel cross combined girder steel tower crane of the steel structural roof includes the cross steelframe for being equipped with tower crane and the parallel chassis for being fixedly installed in steel plate wall, and cross steelframe includes the first girder steel and the second girder steel of cross-fixing connection;The two sides of first girder steel have symmetrically split first support bar, and one end of first support bar is articulated with the first girder steel, and the other end of first support bar is articulated with tower crane;The two sides of second girder steel have symmetrically split second support bar, and one end of second support bar is articulated with the second girder steel, and the other end of second support bar is articulated with tower crane;Parallel chassis includes two foundation beams, and the first girder steel is fixed in the side of bottom beam, and the second girder steel is fixed in the other side of bottom beam;Two bottom beams are arranged in parallel and the two sides of be symmetrically placed in first girder steel and the second girder steel infall.Uniform force when of the invention its can be such that cross steelframe is mounted on steel plate wall, and improve stability.

Description

The construction method of the parallel cross combined girder steel tower crane of steel structural roof
Technical field
The present invention relates to the steel structural roof construction methods of parallel cross combined girder steel tower crane.
Background technique
With the rapid development of building construction technology, high-rise and building is come into being like the mushrooms after rain, skyscraper glass Glass curtain wall external decoration also emerges one after another.The installment work of curtain wall is carried out using derrick crane lifting glass curtain wall, and for state Family's realization " green construction " offer New Technical Condition, the cross parallel chassis of tower crane multiselect of tower crane, but due to all steel The bearing point of the offer of structural construction roofing only has steel plate wall, but has the ratio with the horizontal span of steel plate wall and longitudinal span Gap is larger, when cross steelframe is directly installed on steel plate wall, will lead to the span in length and breadth of cross than one with steel plate wall Sample, but because tower crane limitation, only the span of steel plate wall than it is equidistant when, the stress of cross steelframe could balance, thus will When cross is directly installed on steel plate wall, two connecting nodes that cross chassis is connect positioned at the same side with girder steel frame are not mutually right Claim, easily leads to the unbalance stress of cross steelframe, and stability is poor.
Summary of the invention
For overcome the deficiencies in the prior art, the purpose of the present invention is to provide the parallel crosses of steel structural roof to combine steel The construction method of beam tower crane.
The purpose of the present invention is implemented with the following technical solutions:
The construction method of the parallel cross combined girder steel tower crane of steel structural roof, the parallel cross group of steel structural roof Closing girder steel tower crane includes that top is equipped with the cross steelframe of tower crane and below cross steelframe and is fixedly installed in steel plate The parallel chassis of wall, the cross steelframe include the first girder steel and the second girder steel of cross-fixing connection;First girder steel Two sides have symmetrically split first support bar, and one end of first support bar is articulated with the first girder steel, the first support bar it is another End is articulated with tower crane;The two sides of second girder steel have symmetrically split second support bar, and one end of second support bar is articulated with The other end of two girder steels, the second support bar is articulated with tower crane;The parallel chassis include two foundation beams, the one of the bottom beam The first girder steel is fixed in side, and the second girder steel is fixed in the other side of the bottom beam;Two bottom beams are arranged in parallel and symmetrically split In the two sides of first girder steel and the second girder steel infall;Include the following steps:
S1. cross steelframe is made using the first girder steel and the second girder steel cross-fixing;
S2., tower crane is fixedly mounted on to the top of the cross steelframe;
S3. first support bar is respectively set in the two sides of the first girder steel, one end of first support bar is hinged on the first steel The corresponding side of beam, the other end of first support bar is hinged on tower crane;Second is respectively set in the two sides of the second girder steel One end of second support bar is hinged on the corresponding side of the second girder steel, the other end of second support bar is hinged on tower by strut It hangs on;
S4. two foundation beams of parallel chassis are placed on the lower section of cross steelframe, and two foundation beams is arranged in parallel and right Claim the two sides of first girder steel and the second girder steel infall of being placed in;
S5. the side of every foundation beam is fixed on the first girder steel, the other side of every foundation beam is fixed on the second girder steel On;
S6. parallel chassis is fixed on steel plate wall.
Preferably, the first support bar has first connecting portion, the first girder steel tool close to one end of the first girder steel There are two first mounting portions being arranged in a one-to-one correspondence with two first connecting portions;The first connecting portion and corresponding first installation Portion passes through the first pin shaft pin joint;The second support bar has second connecting portion, second steel close to one end of the second girder steel Beam has two second mounting portions being arranged in a one-to-one correspondence with two second connecting portions;The second connecting portion and corresponding described second Mounting portion passes through the second pin shaft pin joint.
Preferably, the first stiffener plate is fixed between the tower crane and first girder steel;The tower crane and described The second stiffener plate is fixed between two girder steels.
Preferably, the two sides of each bottom beam have symmetrically split pressing plate, further include being correspondingly arranged and being fixed on pressing plate The bracket of steel plate wall, the bracket are fixedly connected in such a way that the first high-strength bolt connects with the pressing plate;The pressing plate and The bracket is matched for clamping tightly the bottom beam.
Preferably, pad is equipped with thick steel plate between the bottom beam and steel plate wall.
Preferably, first girder steel includes the two connection girder steels being fixedly connected, two connection girder steels one end close to each other Offer the inserting hole being mutually aligned;Second girder steel, which passes through two inserting holes and fixes with the two connection girder steels, to be connected It connects.
Preferably, ribbed stiffener is fixedly connected between first girder steel and connection girder steel.
Preferably, each connection girder steel is opened up there are four plug-in opening, is inserted described in the every two of the connection girder steel Two plug-in openings of Kong Weiyi group, every group of girder steel of the connection are sequentially arranged at intervals along the short transverse of connection girder steel, institute Two groups of plug-in openings for stating connection girder steel are sequentially arranged at intervals along connection girder steel extending direction and the inserting hole that is symmetrically placed in Two sides.
Compared with prior art, the beneficial effects of the present invention are:The present invention is parallel and right by two bottom beams of parallel chassis Claim the two sides of cross steelframe of being placed in, four connecting nodes of parallel chassis and cross steelframe are symmetrical, make cross steelframe by Power is uniform, then parallel chassis is fixed on steel plate wall, thus uniform force when cross steelframe being enable to be mounted on steel plate wall, and Improve its stability;Meanwhile the bottom beam of parallel chassis need to be only arranged perpendicular to the girder steel of steel plate wall, without calculating steel plate The central point of wall, do not need yet extend cross steelframe length, can be directly mounted on steel plate wall, make its stress with and mention Its high stability.Furthermore generating pulling force to first support bar or second support bar by the first girder steel or the second girder steel keeps its right Tower crane generates stress, to reduce the moment of flexure born in the middle part of the parallel chassis of cross, increases this steel structural roof in parallel The structural redundancy of cross combined girder steel tower crane, and then improve the safety that structure uses.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the parallel cross combined girder steel tower crane of steel structural roof of the present invention;
Fig. 2 is the steel structural roof of the present invention parallel chassis of parallel cross combined girder steel tower crane and the knot of steel plate wall Structure schematic diagram;
Fig. 3 is cross steelframe and the parallel chassis of the parallel cross combined girder steel tower crane of steel structural roof of the present invention Structural schematic diagram;
Fig. 4 is the top view of the parallel cross combined girder steel tower crane of steel structural roof of the present invention;
Fig. 5 is the flow chart of the steel structural roof of the present invention construction method of parallel cross combined girder steel tower crane.
In figure:1, cross steelframe;11, the first girder steel;111, girder steel is connected;1111, plug-in opening;1112, inserting hole;12, Second girder steel;2, parallel chassis;21, bottom beam;3, first support bar;41, the first mounting portion;42, first connecting portion;6, first adds Strengthening tendons plate;71, pressing plate;72, bracket;73, the first high-strength bolt;8, thick steel plate;9, steel plate wall;10, tower crane.
Specific embodiment
In the following, being described further in conjunction with attached drawing and specific embodiment to the present invention:
As shown in Figs 1-4, steel structural roof is equipped with tower crane with parallel 10 basis of cross combined girder steel tower crane, including top 10 cross steelframe 1 with positioned at the lower section of cross steelframe 1 and be fixedly installed in the parallel chassis 2 of steel plate wall 9, the cross steelframe 1 The first girder steel 11 and the second girder steel 12 including cross-fixing connection;The two sides of first girder steel 11 have symmetrically split first Strut 3, one end of first support bar 3 are articulated with the first girder steel 11, and the other end of the first support bar 3 is articulated with tower crane 10; The two sides of second girder steel 12 have symmetrically split second support bar, and one end of second support bar is articulated with the second girder steel 12, institute The other end for stating second support bar is articulated with tower crane 10;The parallel chassis 2 includes two foundation beams 21, the side of the bottom beam 21 It is fixed on the first girder steel 11, the second girder steel 12 is fixed in the other side of the bottom beam 21;Two bottom beams 21 are arranged in parallel and right Claiming the two sides of first girder steel 11 and 12 infall of the second girder steel of being placed in, tower crane 10 is fixed on cross steelframe 1, and ten Word steelframe 1 is fixedly connected with parallel chassis 2, and parallel chassis 2 is fixed on steel plate wall 9, after being installed, the masterpiece of tower crane 10 Used in cross steelframe 1 and it is transferred to parallel chassis 2 and steel plate wall 9, the present invention is parallel by two bottom beams 21 and is symmetrically placed in ten Two sides of word steelframe 1, and the angle of cross steelframe is 90 °, so that four of parallel chassis 2 and cross steelframe 1 connects and save mutually Symmetrically, make 1 uniform force of cross steelframe, then parallel chassis 2 is fixed on steel plate wall 9, so that cross steelframe 1 be made to be mounted on steel Energy uniform force when on board wall 9, and improve its stability;Simultaneously as the branch that cross steelframe 1 is only provided by parallel chassis 2 Support force, therefore 1 middle part stress of cross steelframe is larger and substantially without support, the present invention pass through first support bar 3 or second support bar, the The relationship mutually restricted is formed between one girder steel 11 or the second girder steel 12 and tower crane 10, passes through the first girder steel 11 or the second girder steel 12 Generating pulling force to first support bar 3 or second support bar makes it generate stress to tower crane 10, to reduce the parallel bottom of cross The moment of flexure born in the middle part of frame 2 increases this steel structural roof structural redundancy of parallel cross combined girder steel tower crane, and Each node and each component all pass through checking computations, and then improve the safety that structure uses.
Preferably, the first support bar 3 has first connecting portion 42, first steel close to one end of the first girder steel 11 Beam 11 has two first mounting portions 41 being arranged in a one-to-one correspondence with two first connecting portions 42;The first connecting portion 42 and corresponding First mounting portion 41 passes through the first pin shaft pin joint;The second support bar has the second connection close to one end of the second girder steel 12 Portion, second girder steel 12 have two second mounting portions being arranged in a one-to-one correspondence with two second connecting portions;The second connecting portion It can discharge girder steel by way of pin joint by the second pin shaft pin joint with corresponding second mounting portion and be connect with support rod The moment of flexure of node, further increases security performance, prolongs the service life.
The first stiffener plate 6 is fixed between the tower crane 10 and first girder steel 11;The tower crane 10 and described It is fixed with the second stiffener plate between two girder steels 12, reinforces the stability connected between tower crane 10 and cross steelframe 1.
Power is transferred on steel plate wall 9 after 2 stress of parallel chassis, and at the connecting node of parallel chassis 2 and steel plate wall 9 Stress is larger, it is preferred that the two sides of each bottom beam 21 of the parallel cross combined girder steel tower crane of this steel structural roof are equal Pressing plate 71 symmetrically has been split, has further included the bracket 72 that steel plate wall 9 is correspondingly arranged and be fixed on pressing plate 71, bracket 72 passes through first The mode that high-strength bolt 73 connects is fixedly connected with pressing plate 71;The pressing plate 71 and the bracket 72 are matched for clamping tightly the bottom beam 21, the cooperation of pressing plate 71, the first high-strength bolt 73 and bracket 72 is stably connected with the two, and bracket 72 also improves parallel chassis 2 with the rigidity of the connecting node of steel plate wall 9, greatly improve the stability of parallel chassis 2 and steel plate wall 9.
Preferably, pad is equipped with thick steel plate 8 between the bottom beam 21 and steel plate wall 9, contacts bottom beam 21 not with bracket 72, from And it ensure that the safety of bracket 72.
First girder steel 11 of the parallel cross combined girder steel tower crane of this steel structural roof is fixedly connected including two Connection girder steel 111, two connection girder steels 111 one end close to each other offer the inserting hole 1112 being mutually aligned;Described Two girder steels 12 are passed through and two inserting holes 1112 and are fixedly connected with the two connection girder steels 111, the first girder steel 11 of simplification and the The installation procedure of two girder steels 12.In order to further reinforce cross steelframe 1 intersection stability, due to first girder steel 11 It is fixedly connected with ribbed stiffener between connection girder steel 111, strengthen the first girder steel 11 and connects the rigid of 111 connecting node of girder steel Property, and can further resist torque when tower crane 10 rotates to cross steelframe 1.
Each connection girder steel 111 is opened up there are four plug-in opening 1111, is inserted described in the every two of the connection girder steel 111 Filling hole 1111 is one group, and two plug-in openings 1111 of 111 every groups of girder steel of the connection are along the short transverse for connecting girder steel 111 It is sequentially arranged at intervals, two groups of plug-in openings 1111 of the connection girder steel 111 are sequentially arranged at intervals along connection 111 extending direction of girder steel And the two sides for the inserting hole 1112 that is symmetrically placed in.The moment of flexure of the infall receiving of cross steelframe 1, torque in use It is larger with shearing, shearing and torque are resisted by using the second high-strength bolt, improves the stabilization of the intersection of cross steelframe 1, into One step improves the safety that structure uses, meanwhile, using multiple high-strength bolts, the effect of torque resistant and shearing can be improved, is reinforced Stability, and by force analysis, the requirement for resisting torque and intensity of shear is able to satisfy using four the second high-strength bolts.
The mode of welding can be used in ribbed stiffener and stiffener plate in the present invention.
As shown in Figure 5, the applying with parallel cross combined girder steel tower crane the invention also discloses above-mentioned steel structural roof Work method, includes the following steps:
S1. cross steelframe 1 is made using the first girder steel 11 and 12 cross-fixing of the second girder steel;
S2., tower crane 10 is fixedly mounted on to the top of the cross steelframe 1;
S3. first support bar 3 is respectively set in the two sides of the first girder steel 11, one end of first support bar 3 is hinged on The corresponding side of one girder steel 11, the other end of first support bar 3 is hinged on tower crane 10;Distinguish in the two sides of the second girder steel 12 Second support bar is set, one end of second support bar is hinged on the corresponding side of the second girder steel 12, by the another of second support bar One end is hinged on tower crane 10;
S4. two foundation beams 21 of parallel chassis 2 are placed on the lower section of cross steelframe 1, and set two foundation beams 21 in parallel It sets and the two sides of be symmetrically placed in first girder steel 11 and 12 infall of the second girder steel;
S5. the side of every foundation beam 21 is fixed on the first girder steel 11, the other side of every foundation beam 21 is fixed on On two girder steels 12;
S6. parallel chassis 2 is fixed on steel plate wall 9.
It will be apparent to those skilled in the art that can make various other according to the above description of the technical scheme and ideas Corresponding change and deformation, and all these changes and deformation all should belong to the protection scope of the claims in the present invention Within.

Claims (8)

1. the steel structural roof construction method of parallel cross combined girder steel tower crane, which is characterized in that steel structural roof is used Parallel cross combined girder steel tower crane includes that top is equipped with the cross steelframe of tower crane and is located at below cross steelframe and fixed It is installed on the parallel chassis of steel plate wall, the cross steelframe includes the first girder steel and the second girder steel of cross-fixing connection;It is described The two sides of first girder steel have symmetrically split first support bar, and one end of first support bar is articulated with the first girder steel, and described first The other end of strut is articulated with tower crane;The two sides of second girder steel have symmetrically split second support bar, and the one of second support bar End is articulated with the second girder steel, and the other end of the second support bar is articulated with tower crane;The parallel chassis includes two foundation beams, institute The first girder steel is fixed in the side for stating bottom beam, and the second girder steel is fixed in the other side of the bottom beam;Two bottom beams are arranged in parallel And the two sides of be symmetrically placed in first girder steel and the second girder steel infall;Include the following steps:
S1. cross steelframe is made using the first girder steel and the second girder steel cross-fixing;
S2., tower crane is fixedly mounted on to the top of the cross steelframe;
S3. first support bar is respectively set in the two sides of the first girder steel, one end of first support bar is hinged on the first girder steel pair The other end of first support bar is hinged on tower crane by the side answered;Second support bar is respectively set in the two sides of the second girder steel, One end of second support bar is hinged on the corresponding side of the second girder steel, the other end of second support bar is hinged on tower crane;
S4. two foundation beams of parallel chassis are placed on the lower section of cross steelframe, and two foundation beams is made to be arranged in parallel and symmetrically divide It is placed in the two sides of first girder steel and the second girder steel infall;
S5. the side of every foundation beam is fixed on the first girder steel, the other side of every foundation beam is fixed on the second girder steel;
S6. parallel chassis is fixed on steel plate wall.
2. the steel structural roof as described in claim 1 construction method of parallel cross combined girder steel tower crane, feature It is:The first support bar has first connecting portion close to one end of the first girder steel, and first girder steel has and two first Two first mounting portions that interconnecting piece is arranged in a one-to-one correspondence;The first connecting portion and corresponding first mounting portion pass through first Pin shaft pin joint;The second support bar has second connecting portion close to one end of the second girder steel, and second girder steel has and two Two second mounting portions that second connecting portion is arranged in a one-to-one correspondence;The second connecting portion and corresponding second mounting portion pass through Second pin shaft pin joint.
3. the parallel cross combined girder steel tower crane of steel structural roof as described in claim 1, which is characterized in that the tower It hangs and is fixed with the first stiffener plate between first girder steel;Second is fixed between the tower crane and second girder steel to add Strengthening tendons plate.
4. the parallel cross combined girder steel tower crane of steel structural roof as described in claim 1, which is characterized in that each described The two sides of bottom beam have symmetrically split pressing plate, further include the bracket that steel plate wall is correspondingly arranged and be fixed on pressing plate, the bracket It is fixedly connected in such a way that the first high-strength bolt connects with the pressing plate;The pressing plate and the bracket are matched for clamping tightly the bottom Beam.
5. the parallel cross combined girder steel tower crane of steel structural roof as claimed in claim 4, which is characterized in that the bottom Pad is equipped with thick steel plate between beam and steel plate wall.
6. the parallel cross combined girder steel tower crane of steel structural roof as described in claim 1, which is characterized in that described One girder steel includes the two connection girder steels being fixedly connected, two connection girder steels one end close to each other offer be mutually aligned it is interspersed Hole;Second girder steel passes through two inserting holes and is fixedly connected with the two connection girder steels.
7. the parallel cross combined girder steel tower crane of steel structural roof as claimed in claim 6, which is characterized in that described Ribbed stiffener is fixedly connected between one girder steel and connection girder steel.
8. the parallel cross combined girder steel tower crane of steel structural roof as claimed in claim 6, which is characterized in that each described Connection girder steel is opened up there are four plug-in opening, and plug-in opening described in the every two of the connection girder steel is one group, the connection girder steel The plug-in opening of two of every group is sequentially arranged at intervals along the short transverse of connection girder steel, two groups of plug-in openings of the connection girder steel Edge connection girder steel extending direction is sequentially arranged at intervals and the two sides for the inserting hole that is symmetrically placed in.
CN201610967085.XA 2016-10-28 2016-10-28 The construction method of the parallel cross combined girder steel tower crane of steel structural roof Active CN106522262B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610967085.XA CN106522262B (en) 2016-10-28 2016-10-28 The construction method of the parallel cross combined girder steel tower crane of steel structural roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610967085.XA CN106522262B (en) 2016-10-28 2016-10-28 The construction method of the parallel cross combined girder steel tower crane of steel structural roof

Publications (2)

Publication Number Publication Date
CN106522262A CN106522262A (en) 2017-03-22
CN106522262B true CN106522262B (en) 2018-11-23

Family

ID=58327089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610967085.XA Active CN106522262B (en) 2016-10-28 2016-10-28 The construction method of the parallel cross combined girder steel tower crane of steel structural roof

Country Status (1)

Country Link
CN (1) CN106522262B (en)

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2687085Y (en) * 2003-11-03 2005-03-23 鞍钢集团房产建设第五建筑工程公司 Assembled base for fixed tower crane
KR100467091B1 (en) * 2004-08-19 2005-01-24 (주)에이프러스 씨엠 건축사사무소 The foundation anchor for construction
CN2878311Y (en) * 2005-12-16 2007-03-14 四川建设机械(集团)股份有限公司 Composite chassis for tower crane
CN201746847U (en) * 2009-11-10 2011-02-16 新乡克瑞重型机械科技股份有限公司 Combined multifunctional base of tower crane
CN202265836U (en) * 2011-10-12 2012-06-06 浙江巨匠钢业有限公司 Basic structure of communication tower
CN202449770U (en) * 2011-11-29 2012-09-26 中联重科股份有限公司 Tower crane lower support assembly and tower crane with same
CN202466616U (en) * 2012-02-07 2012-10-03 浙江瑞能通信科技有限公司 Prefabricated-assembled-embedded type weight system
CN103787213B (en) * 2014-01-27 2015-09-02 徐州建机工程机械有限公司 A kind of tower crane interpolation type underframe hound structure
CN204454360U (en) * 2014-10-30 2015-07-08 浙江庞源机械工程有限公司 A kind of tower crane

Also Published As

Publication number Publication date
CN106522262A (en) 2017-03-22

Similar Documents

Publication Publication Date Title
CN204252286U (en) A kind of rectangular steel-tube concrete column-steel beam connecting joint
CN205688573U (en) Prefabricated assembled floorboard attachment means
CN104947850B (en) Shuttle-shaped roof truss and construction method thereof
CN103015536A (en) Beam-column joint connecting device for multi-story/high-rise assembly type steel structure system
CN205775852U (en) Acting force conversion support for top of steel structure supporting jig frame
CN206360399U (en) The existing reinforced concrete coupling beam bracing means of one species " doubly-linked beam "
CN106522262B (en) The construction method of the parallel cross combined girder steel tower crane of steel structural roof
CN205348415U (en) Steel frame structure H type beam column node
CN201485968U (en) Node connecting structure of box-shaped post and framework beam
CN202401573U (en) Structure of batter brace serving as purline bolt
CN214614567U (en) Titanium-nickel memory alloy high-strength bolt steel truss beam column connecting part
CN205637134U (en) Steel construction anti -wind post node
CN206143950U (en) Vertical truss and building steel structure assembly
CN206205239U (en) Steel structural roof is with parallel cross combined girder steel tower crane
CN104018586A (en) Connecting device for steel structure column and steel structure column
CN204738401U (en) Assemble integral steel construction secondary beam and absolutely dry formula connection structure of concrete girder lateral part rigid connection
CN207892026U (en) A kind of Staggered Truss Structure Systems using part coupled column
CN112267562A (en) Assembled steel truss beam column connection part
CN205840138U (en) A kind of assembled wide span steel roof frame structure
CN206941810U (en) A kind of multidirectional rope crossover node
CN207110068U (en) A kind of connecting node of i-shape steel beam and steel box column
CN218970231U (en) Building steel structure
CN206204784U (en) Steel anchor beam
CN205399746U (en) Steel construction shear force wall
CN214738765U (en) Green building frame steel column supports connected node structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant