CN218970231U - Building steel structure - Google Patents
Building steel structure Download PDFInfo
- Publication number
- CN218970231U CN218970231U CN202222942218.1U CN202222942218U CN218970231U CN 218970231 U CN218970231 U CN 218970231U CN 202222942218 U CN202222942218 U CN 202222942218U CN 218970231 U CN218970231 U CN 218970231U
- Authority
- CN
- China
- Prior art keywords
- column
- fixed
- steel structure
- fixed sleeve
- sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
本实用新型公开了一种建筑钢结构,涉及建筑钢结构技术领域,包括立柱和横梁,所述立柱具体为方形管状构造,所述横梁具体为工字钢构造,所述立柱表面从上到下分别套设有第一固定套和第二固定套,所述第一固定套和第二固定套均焊接固定在立柱表面,所述第一固定套侧壁开设有多个插接槽,所述横梁插接在插接槽内,所述横梁表面还安装有斜撑杆,所述斜撑杆另一端与第二固定套侧壁连接。本实用新型中,通过设置的第一固定套、第二固定套以及斜撑杆,可以实现对横梁与立柱的快速组装,并且保证横梁与立柱之间的连接强度,起到加强固定的效果。
The utility model discloses a building steel structure, which relates to the technical field of building steel structures, and comprises a column and a beam, the column is specifically a square tubular structure, the beam is specifically an I-shaped steel structure, and the surface of the column is from top to bottom The first fixed sleeve and the second fixed sleeve are respectively sleeved, and the first fixed sleeve and the second fixed sleeve are welded and fixed on the surface of the column. The side wall of the first fixed sleeve is provided with a plurality of insertion slots. The crossbeam is inserted into the insertion slot, and the surface of the crossbeam is also equipped with a diagonal strut, and the other end of the diagonal strut is connected with the side wall of the second fixed sleeve. In the utility model, through the first fixing sleeve, the second fixing sleeve and the diagonal brace, the fast assembly of the beam and the column can be realized, and the connection strength between the beam and the column can be ensured, so as to strengthen the fixing effect.
Description
技术领域technical field
本实用新型涉及建筑钢结构技术领域,尤其涉及一种建筑钢结构。The utility model relates to the technical field of building steel structures, in particular to a building steel structure.
背景技术Background technique
钢材强度高,使得钢结构柱广泛应用于建筑行业,尤其是那些大跨度或超高建筑中经常用到。现有的钢结构柱主要是用于建筑物上的梁柱,其大多采用“工”字结构,即由两横向平板为上下主筋,中间纵向竖板为支撑腹板构成。The high strength of steel makes steel structural columns widely used in the construction industry, especially those often used in long-span or super high buildings. Existing steel structure columns are mainly used for beams and columns on buildings, and most of them adopt the "I" structure, that is, two horizontal flat plates are the upper and lower main ribs, and the middle vertical vertical plate is a supporting web.
目前常规的钢结构在安装时,一般是先固定立柱,然后在立柱侧边对横梁进行固定,而横梁的固定方式也有多种,通过螺栓固定或者焊接,不过大多数是直接将横梁与立柱对接进行固定,不过仅仅是横梁与立柱连接处受力从而导致横梁的受力过于集中,连接处可能会出现开裂或松动的情况,导致受力强度不够高。At present, when installing a conventional steel structure, the column is generally fixed first, and then the beam is fixed on the side of the column. There are also many ways to fix the beam, such as fixing with bolts or welding, but most of them directly connect the beam to the column. Fix it, but only the force on the connection between the beam and the column will cause the force on the beam to be too concentrated, and the connection may crack or loosen, resulting in insufficient stress strength.
实用新型内容Utility model content
本实用新型的目的在于:为了解决上述的问题,而提出的一种建筑钢结构。The purpose of this utility model is: in order to solve the above-mentioned problems, a kind of building steel structure proposed.
为了实现上述目的,本实用新型采用了如下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:
一种建筑钢结构,包括立柱和横梁,所述立柱具体为方形管状构造,所述横梁具体为工字钢构造,所述立柱表面从上到下分别套设有第一固定套和第二固定套,所述第一固定套和第二固定套均焊接固定在立柱表面,所述第一固定套侧壁开设有多个插接槽,所述横梁插接在插接槽内,所述横梁表面还安装有斜撑杆,所述斜撑杆另一端与第二固定套侧壁连接。A building steel structure, including a column and a beam, the column is specifically a square tubular structure, the beam is specifically an I-shaped steel structure, and the surface of the column is respectively sleeved with a first fixing sleeve and a second fixing sleeve from top to bottom. The first fixed sleeve and the second fixed sleeve are welded and fixed on the surface of the column. The side wall of the first fixed sleeve is provided with a plurality of insertion slots, and the crossbeam is inserted into the insertion groove. The crossbeam A diagonal strut is also installed on the surface, and the other end of the diagonal strut is connected to the side wall of the second fixed sleeve.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
所述斜撑杆两端均通过销轴连接有铰接座,所述铰接座与横梁以及第二固定套之间均通过焊接固定。Both ends of the diagonal brace are connected with a hinge seat through a pin shaft, and the hinge seat, the beam and the second fixed sleeve are all fixed by welding.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
多个所述插接槽内均焊接固定有两个限位板,两个所述限位板之间留有间隙,且所述限位板与横梁配合使用。Two limiting plates are welded and fixed in each of the plurality of insertion slots, a gap is left between the two limiting plates, and the limiting plates are used in conjunction with the beam.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
所述第一固定套侧壁还开设有螺纹孔,所述螺纹孔内通过螺纹旋合有紧固螺栓,所述紧固螺栓贯穿两个限位板并与第一固定套内部固定。The side wall of the first fixing sleeve is also provided with a threaded hole, and a fastening bolt is screwed into the threaded hole, and the fastening bolt passes through the two limiting plates and is fixed with the inside of the first fixing sleeve.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
所述斜撑杆中部还铰接有辅助杆,所述辅助杆另一端与立柱表面焊接固定。An auxiliary rod is also hinged in the middle of the diagonal brace, and the other end of the auxiliary rod is welded and fixed to the surface of the column.
综上所述,由于采用了上述技术方案,本实用新型的有益效果是:In summary, due to the adoption of the above technical solution, the beneficial effects of the utility model are:
本实用新型中,通过设置的第一固定套、第二固定套以及斜撑杆,可以实现对横梁与立柱的快速组装,并且保证横梁与立柱之间的连接强度,起到加强固定的效果。In the utility model, through the first fixing sleeve, the second fixing sleeve and the diagonal bracing rod, the fast assembly of the beam and the column can be realized, and the connection strength between the beam and the column can be ensured, so as to strengthen the fixing effect.
附图说明Description of drawings
图1示出了根据本实用新型提供的整体外部结构示意图;Fig. 1 shows a schematic diagram of the overall external structure provided according to the utility model;
图2示出了根据本实用新型提供的整体剖面结构示意图;Fig. 2 shows a schematic diagram of the overall cross-sectional structure provided according to the utility model;
图3示出了根据本实用新型提供的图1俯视剖面结构示意图。Fig. 3 shows a schematic diagram of a top view sectional structure of Fig. 1 provided according to the present invention.
图例说明:1、立柱;2、横梁;3、第一固定套;4、第二固定套;5、斜撑杆;6、限位板;7、辅助杆。Legend: 1. Upright column; 2. Beam; 3. First fixed sleeve; 4. Second fixed sleeve; 5. Diagonal brace; 6. Limiting plate; 7. Auxiliary rod.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其它实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without creative efforts belong to the scope of protection of the present utility model.
请参阅图1-3,本实用新型提供一种技术方案:一种建筑钢结构,包括立柱1和横梁2,立柱1具体为方形管状构造,横梁2具体为工字钢构造,立柱1表面从上到下分别套设有第一固定套3和第二固定套4,第一固定套3和第二固定套4均焊接固定在立柱1表面,第一固定套3以及第二固定套4是先套设在立柱1表面,再进行四周焊接,从而能够保证其受力均匀,提高受力强度,第一固定套3侧壁开设有多个插接槽,横梁2插接在插接槽内,并且横梁2与插接槽之间通过焊接进行加强固定,插接槽能够延长横梁2的受力力臂,从而减小横梁2与立柱1连接处的剪切力,横梁2表面还安装有斜撑杆5,斜撑杆5另一端与第二固定套4侧壁连接。Please refer to Figures 1-3, the utility model provides a technical solution: a building steel structure, including a column 1 and a
斜撑杆5两端均通过销轴连接有铰接座,铰接座与横梁2以及第二固定套4之间均通过焊接固定,多个插接槽内均焊接固定有两个限位板6,两个限位板6之间留有间隙,限位板6刚好能够与工字钢型的横梁2两侧贴合,从而能够对横梁2起到限位的作用,防止横梁2出现大幅度摆动的情况,且限位板6与横梁2配合使用,第一固定套3侧壁还开设有螺纹孔,螺纹孔内通过螺纹旋合有紧固螺栓,紧固螺栓能够将限位板6与横梁2进行固定,起到辅助固定的作用,紧固螺栓贯穿两个限位板6并与第一固定套3内部固定。Both ends of the
斜撑杆5中部还铰接有辅助杆7,辅助杆7另一端与立柱1表面焊接固定,辅助杆7能够起到对斜撑杆5的受力进行分散的作用,从而提高斜撑杆5的受力强度。The middle part of the
工作原理:使用时,首先对立柱1进行固定安装,随后将第一固定套3以及第二固定套4套设在立柱1表面,并通过焊接进行固定,随后将横梁2一端插接至插接槽内,并使得横梁2两侧刚好与限位板6贴合,随后通过紧固螺栓进行预固定,进一步将斜撑杆5一端与第二固定套4侧壁进行焊接固定,再将斜撑杆5另一端与横梁2下端焊接固定,完成斜撑杆5的安装,进而调整辅助杆7的角度,将辅助杆7与立柱1固定焊接,从而完成钢结构的组装。Working principle: When in use, first fix the column 1, then set the first
以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above is only a preferred embodiment of the utility model, but the scope of protection of the utility model is not limited thereto. The equivalent replacement or change of the new technical solution and the concept of the utility model shall be covered by the protection scope of the utility model.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222942218.1U CN218970231U (en) | 2022-11-05 | 2022-11-05 | Building steel structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222942218.1U CN218970231U (en) | 2022-11-05 | 2022-11-05 | Building steel structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN218970231U true CN218970231U (en) | 2023-05-05 |
Family
ID=86163558
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202222942218.1U Expired - Fee Related CN218970231U (en) | 2022-11-05 | 2022-11-05 | Building steel structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN218970231U (en) |
-
2022
- 2022-11-05 CN CN202222942218.1U patent/CN218970231U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN209837294U (en) | Assembled building steel skeleton is connected | |
| CN110258786B (en) | Full-assembled concrete beam-concrete column-steel support combined connection node | |
| CN217590666U (en) | Photovoltaic support | |
| CN107542262A (en) | Double-arc spline socket joint type disk buckle type scaffold | |
| CN218970231U (en) | Building steel structure | |
| CN211774554U (en) | A reinforced steel structure load-bearing beam structure for building | |
| CN214739791U (en) | Truss type cantilever beam combined structure for climbing frame | |
| CN218622586U (en) | Assembled beam column node connecting piece | |
| CN218091400U (en) | Structure swaying column for fixing unit curtain wall | |
| CN212001591U (en) | A prefabricated connection node of a box-shaped steel column and a PEC beam | |
| CN211037307U (en) | Connecting structure for preventing fault at building joint | |
| CN211201129U (en) | Wall-attached hanging piece for attached lifting scaffold | |
| CN102127962A (en) | Improved bidirectionally stressed foundation knot attached to lifting scaffold | |
| CN209907909U (en) | Shaped steel cantilever beam lower supporting device | |
| CN215670524U (en) | Reinforced structure of wooden house truss | |
| CN114776066A (en) | A traditional village building protection device | |
| CN219240856U (en) | A safe steel structure node component | |
| CN219137438U (en) | Cast-in-situ box girder support structure | |
| CN222632506U (en) | Multifunctional tripod support frame | |
| CN218757958U (en) | A construction-based quick-install steel structure | |
| CN221346246U (en) | Support frame suitable for no cable setting condition | |
| CN218541646U (en) | Beam column reinforcing structure for building | |
| CN211646757U (en) | Bolt connector for connecting beam and column | |
| CN214006025U (en) | Beam structure for assembly type building | |
| CN219930694U (en) | Assembled bracing structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20240620 Address after: Room 2423, Jiezuo Building, No. 828, Section 1, Furong South Road, Tianxin District, Changsha City, Hunan Province, 410000 Patentee after: Hunan Leiteng Radiation Protection Technology Co.,Ltd. Country or region after: China Address before: 410000 Room 1503, Platinum Tower, Building 1, Sunshine Lijing, Xingsha Avenue, Xingsha Street, Changsha County, Changsha City, Hunan Province Patentee before: Hunan Fulin Construction Engineering Co.,Ltd. Country or region before: China |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20240731 Address after: 410000 Room 1503, Platinum Tower, Building 1, Sunshine Lijing, Xingsha Avenue, Xingsha Street, Changsha County, Changsha City, Hunan Province Patentee after: Hunan Fulin Construction Engineering Co.,Ltd. Country or region after: China Address before: Room 2423, Jiezuo Building, No. 828, Section 1, Furong South Road, Tianxin District, Changsha City, Hunan Province, 410000 Patentee before: Hunan Leiteng Radiation Protection Technology Co.,Ltd. Country or region before: China |
|
| TR01 | Transfer of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |