CN218970231U - Building steel structure - Google Patents

Building steel structure Download PDF

Info

Publication number
CN218970231U
CN218970231U CN202222942218.1U CN202222942218U CN218970231U CN 218970231 U CN218970231 U CN 218970231U CN 202222942218 U CN202222942218 U CN 202222942218U CN 218970231 U CN218970231 U CN 218970231U
Authority
CN
China
Prior art keywords
column
fixed
steel structure
fixed sleeve
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202222942218.1U
Other languages
Chinese (zh)
Inventor
李宝平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Fulin Construction Engineering Co ltd
Original Assignee
Hunan Fulin Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Fulin Construction Engineering Co ltd filed Critical Hunan Fulin Construction Engineering Co ltd
Priority to CN202222942218.1U priority Critical patent/CN218970231U/en
Application granted granted Critical
Publication of CN218970231U publication Critical patent/CN218970231U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

本实用新型公开了一种建筑钢结构,涉及建筑钢结构技术领域,包括立柱和横梁,所述立柱具体为方形管状构造,所述横梁具体为工字钢构造,所述立柱表面从上到下分别套设有第一固定套和第二固定套,所述第一固定套和第二固定套均焊接固定在立柱表面,所述第一固定套侧壁开设有多个插接槽,所述横梁插接在插接槽内,所述横梁表面还安装有斜撑杆,所述斜撑杆另一端与第二固定套侧壁连接。本实用新型中,通过设置的第一固定套、第二固定套以及斜撑杆,可以实现对横梁与立柱的快速组装,并且保证横梁与立柱之间的连接强度,起到加强固定的效果。

Figure 202222942218

The utility model discloses a building steel structure, which relates to the technical field of building steel structures, and comprises a column and a beam, the column is specifically a square tubular structure, the beam is specifically an I-shaped steel structure, and the surface of the column is from top to bottom The first fixed sleeve and the second fixed sleeve are respectively sleeved, and the first fixed sleeve and the second fixed sleeve are welded and fixed on the surface of the column. The side wall of the first fixed sleeve is provided with a plurality of insertion slots. The crossbeam is inserted into the insertion slot, and the surface of the crossbeam is also equipped with a diagonal strut, and the other end of the diagonal strut is connected with the side wall of the second fixed sleeve. In the utility model, through the first fixing sleeve, the second fixing sleeve and the diagonal brace, the fast assembly of the beam and the column can be realized, and the connection strength between the beam and the column can be ensured, so as to strengthen the fixing effect.

Figure 202222942218

Description

一种建筑钢结构a building steel structure

技术领域technical field

本实用新型涉及建筑钢结构技术领域,尤其涉及一种建筑钢结构。The utility model relates to the technical field of building steel structures, in particular to a building steel structure.

背景技术Background technique

钢材强度高,使得钢结构柱广泛应用于建筑行业,尤其是那些大跨度或超高建筑中经常用到。现有的钢结构柱主要是用于建筑物上的梁柱,其大多采用“工”字结构,即由两横向平板为上下主筋,中间纵向竖板为支撑腹板构成。The high strength of steel makes steel structural columns widely used in the construction industry, especially those often used in long-span or super high buildings. Existing steel structure columns are mainly used for beams and columns on buildings, and most of them adopt the "I" structure, that is, two horizontal flat plates are the upper and lower main ribs, and the middle vertical vertical plate is a supporting web.

目前常规的钢结构在安装时,一般是先固定立柱,然后在立柱侧边对横梁进行固定,而横梁的固定方式也有多种,通过螺栓固定或者焊接,不过大多数是直接将横梁与立柱对接进行固定,不过仅仅是横梁与立柱连接处受力从而导致横梁的受力过于集中,连接处可能会出现开裂或松动的情况,导致受力强度不够高。At present, when installing a conventional steel structure, the column is generally fixed first, and then the beam is fixed on the side of the column. There are also many ways to fix the beam, such as fixing with bolts or welding, but most of them directly connect the beam to the column. Fix it, but only the force on the connection between the beam and the column will cause the force on the beam to be too concentrated, and the connection may crack or loosen, resulting in insufficient stress strength.

实用新型内容Utility model content

本实用新型的目的在于:为了解决上述的问题,而提出的一种建筑钢结构。The purpose of this utility model is: in order to solve the above-mentioned problems, a kind of building steel structure proposed.

为了实现上述目的,本实用新型采用了如下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:

一种建筑钢结构,包括立柱和横梁,所述立柱具体为方形管状构造,所述横梁具体为工字钢构造,所述立柱表面从上到下分别套设有第一固定套和第二固定套,所述第一固定套和第二固定套均焊接固定在立柱表面,所述第一固定套侧壁开设有多个插接槽,所述横梁插接在插接槽内,所述横梁表面还安装有斜撑杆,所述斜撑杆另一端与第二固定套侧壁连接。A building steel structure, including a column and a beam, the column is specifically a square tubular structure, the beam is specifically an I-shaped steel structure, and the surface of the column is respectively sleeved with a first fixing sleeve and a second fixing sleeve from top to bottom. The first fixed sleeve and the second fixed sleeve are welded and fixed on the surface of the column. The side wall of the first fixed sleeve is provided with a plurality of insertion slots, and the crossbeam is inserted into the insertion groove. The crossbeam A diagonal strut is also installed on the surface, and the other end of the diagonal strut is connected to the side wall of the second fixed sleeve.

作为上述技术方案的进一步描述:As a further description of the above technical solution:

所述斜撑杆两端均通过销轴连接有铰接座,所述铰接座与横梁以及第二固定套之间均通过焊接固定。Both ends of the diagonal brace are connected with a hinge seat through a pin shaft, and the hinge seat, the beam and the second fixed sleeve are all fixed by welding.

作为上述技术方案的进一步描述:As a further description of the above technical solution:

多个所述插接槽内均焊接固定有两个限位板,两个所述限位板之间留有间隙,且所述限位板与横梁配合使用。Two limiting plates are welded and fixed in each of the plurality of insertion slots, a gap is left between the two limiting plates, and the limiting plates are used in conjunction with the beam.

作为上述技术方案的进一步描述:As a further description of the above technical solution:

所述第一固定套侧壁还开设有螺纹孔,所述螺纹孔内通过螺纹旋合有紧固螺栓,所述紧固螺栓贯穿两个限位板并与第一固定套内部固定。The side wall of the first fixing sleeve is also provided with a threaded hole, and a fastening bolt is screwed into the threaded hole, and the fastening bolt passes through the two limiting plates and is fixed with the inside of the first fixing sleeve.

作为上述技术方案的进一步描述:As a further description of the above technical solution:

所述斜撑杆中部还铰接有辅助杆,所述辅助杆另一端与立柱表面焊接固定。An auxiliary rod is also hinged in the middle of the diagonal brace, and the other end of the auxiliary rod is welded and fixed to the surface of the column.

综上所述,由于采用了上述技术方案,本实用新型的有益效果是:In summary, due to the adoption of the above technical solution, the beneficial effects of the utility model are:

本实用新型中,通过设置的第一固定套、第二固定套以及斜撑杆,可以实现对横梁与立柱的快速组装,并且保证横梁与立柱之间的连接强度,起到加强固定的效果。In the utility model, through the first fixing sleeve, the second fixing sleeve and the diagonal bracing rod, the fast assembly of the beam and the column can be realized, and the connection strength between the beam and the column can be ensured, so as to strengthen the fixing effect.

附图说明Description of drawings

图1示出了根据本实用新型提供的整体外部结构示意图;Fig. 1 shows a schematic diagram of the overall external structure provided according to the utility model;

图2示出了根据本实用新型提供的整体剖面结构示意图;Fig. 2 shows a schematic diagram of the overall cross-sectional structure provided according to the utility model;

图3示出了根据本实用新型提供的图1俯视剖面结构示意图。Fig. 3 shows a schematic diagram of a top view sectional structure of Fig. 1 provided according to the present invention.

图例说明:1、立柱;2、横梁;3、第一固定套;4、第二固定套;5、斜撑杆;6、限位板;7、辅助杆。Legend: 1. Upright column; 2. Beam; 3. First fixed sleeve; 4. Second fixed sleeve; 5. Diagonal brace; 6. Limiting plate; 7. Auxiliary rod.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其它实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without creative efforts belong to the scope of protection of the present utility model.

请参阅图1-3,本实用新型提供一种技术方案:一种建筑钢结构,包括立柱1和横梁2,立柱1具体为方形管状构造,横梁2具体为工字钢构造,立柱1表面从上到下分别套设有第一固定套3和第二固定套4,第一固定套3和第二固定套4均焊接固定在立柱1表面,第一固定套3以及第二固定套4是先套设在立柱1表面,再进行四周焊接,从而能够保证其受力均匀,提高受力强度,第一固定套3侧壁开设有多个插接槽,横梁2插接在插接槽内,并且横梁2与插接槽之间通过焊接进行加强固定,插接槽能够延长横梁2的受力力臂,从而减小横梁2与立柱1连接处的剪切力,横梁2表面还安装有斜撑杆5,斜撑杆5另一端与第二固定套4侧壁连接。Please refer to Figures 1-3, the utility model provides a technical solution: a building steel structure, including a column 1 and a beam 2, the column 1 is specifically a square tubular structure, the beam 2 is specifically an I-shaped steel structure, and the surface of the column 1 is from The first fixed sleeve 3 and the second fixed sleeve 4 are respectively sleeved from top to bottom. The first fixed sleeve 3 and the second fixed sleeve 4 are welded and fixed on the surface of the column 1. The first fixed sleeve 3 and the second fixed sleeve 4 are Set it on the surface of the column 1 first, and then weld around it, so as to ensure that it is evenly stressed and increase the strength of the force. The side wall of the first fixed sleeve 3 is provided with multiple insertion slots, and the beam 2 is inserted into the insertion slots. , and the beam 2 and the socket groove are strengthened and fixed by welding, the socket groove can extend the force arm of the beam 2, thereby reducing the shear force at the connection between the beam 2 and the column 1, and the surface of the beam 2 is also installed with Diagonal strut 5 , the other end of which is connected to the side wall of the second fixed sleeve 4 .

斜撑杆5两端均通过销轴连接有铰接座,铰接座与横梁2以及第二固定套4之间均通过焊接固定,多个插接槽内均焊接固定有两个限位板6,两个限位板6之间留有间隙,限位板6刚好能够与工字钢型的横梁2两侧贴合,从而能够对横梁2起到限位的作用,防止横梁2出现大幅度摆动的情况,且限位板6与横梁2配合使用,第一固定套3侧壁还开设有螺纹孔,螺纹孔内通过螺纹旋合有紧固螺栓,紧固螺栓能够将限位板6与横梁2进行固定,起到辅助固定的作用,紧固螺栓贯穿两个限位板6并与第一固定套3内部固定。Both ends of the diagonal strut 5 are connected with a hinge seat through a pin shaft, and the hinge seat, the beam 2 and the second fixed sleeve 4 are all fixed by welding, and two limit plates 6 are welded and fixed in a plurality of insertion slots. There is a gap between the two limiting plates 6, and the limiting plate 6 can just fit the two sides of the I-shaped beam 2, so as to limit the position of the beam 2 and prevent the beam 2 from swinging greatly In the case where the limiting plate 6 is used in conjunction with the beam 2, the side wall of the first fixing sleeve 3 is also provided with a threaded hole, and a fastening bolt is threaded in the threaded hole, and the fastening bolt can connect the limiting plate 6 to the beam. 2 for fixing, which plays the role of auxiliary fixing, and the fastening bolts pass through the two limiting plates 6 and are fixed inside the first fixing sleeve 3 .

斜撑杆5中部还铰接有辅助杆7,辅助杆7另一端与立柱1表面焊接固定,辅助杆7能够起到对斜撑杆5的受力进行分散的作用,从而提高斜撑杆5的受力强度。The middle part of the diagonal strut 5 is also hinged with an auxiliary rod 7, and the other end of the auxiliary rod 7 is welded and fixed to the surface of the column 1. The auxiliary rod 7 can play a role in dispersing the force of the diagonal strut 5, thereby improving the force of the diagonal strut 5. Stress strength.

工作原理:使用时,首先对立柱1进行固定安装,随后将第一固定套3以及第二固定套4套设在立柱1表面,并通过焊接进行固定,随后将横梁2一端插接至插接槽内,并使得横梁2两侧刚好与限位板6贴合,随后通过紧固螺栓进行预固定,进一步将斜撑杆5一端与第二固定套4侧壁进行焊接固定,再将斜撑杆5另一端与横梁2下端焊接固定,完成斜撑杆5的安装,进而调整辅助杆7的角度,将辅助杆7与立柱1固定焊接,从而完成钢结构的组装。Working principle: When in use, first fix the column 1, then set the first fixed sleeve 3 and the second fixed sleeve 4 on the surface of the column 1, and fix them by welding, and then plug one end of the beam 2 into the socket slot, and make both sides of the crossbeam 2 just fit with the limit plate 6, and then pre-fix by fastening bolts, and further weld and fix one end of the diagonal brace 5 with the side wall of the second fixing sleeve 4, and then the diagonal brace The other end of the rod 5 is welded and fixed to the lower end of the beam 2 to complete the installation of the diagonal brace 5, and then adjust the angle of the auxiliary rod 7, and weld the auxiliary rod 7 and the column 1 to complete the assembly of the steel structure.

以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above is only a preferred embodiment of the utility model, but the scope of protection of the utility model is not limited thereto. The equivalent replacement or change of the new technical solution and the concept of the utility model shall be covered by the protection scope of the utility model.

Claims (5)

1.一种建筑钢结构,包括立柱(1)和横梁(2),所述立柱(1)具体为方形管状构造,所述横梁(2)具体为工字钢构造,其特征在于,所述立柱(1)表面从上到下分别套设有第一固定套(3)和第二固定套(4),所述第一固定套(3)和第二固定套(4)均焊接固定在立柱(1)表面,所述第一固定套(3)侧壁开设有多个插接槽,所述横梁(2)插接在插接槽内,所述横梁(2)表面还安装有斜撑杆(5),所述斜撑杆(5)另一端与第二固定套(4)侧壁连接。1. A building steel structure, comprising a column (1) and a beam (2), the column (1) is specifically a square tubular structure, and the beam (2) is specifically an I-shaped steel structure, and it is characterized in that the The surface of the column (1) is respectively covered with a first fixed sleeve (3) and a second fixed sleeve (4) from top to bottom, and the first fixed sleeve (3) and the second fixed sleeve (4) are welded and fixed on the On the surface of the column (1), the side wall of the first fixed sleeve (3) is provided with a plurality of insertion slots, the crossbeam (2) is inserted into the insertion slots, and the surface of the crossbeam (2) is also equipped with a diagonal A strut (5), the other end of the diagonal strut (5) is connected to the side wall of the second fixing sleeve (4). 2.根据权利要求1所述的一种建筑钢结构,其特征在于,所述斜撑杆(5)两端均通过销轴连接有铰接座,所述铰接座与横梁(2)以及第二固定套(4)之间均通过焊接固定。2. A building steel structure according to claim 1, characterized in that, both ends of the diagonal brace (5) are connected with a hinged seat through a pin shaft, and the hinged seat is connected to the beam (2) and the second The fixing sleeves (4) are all fixed by welding. 3.根据权利要求1所述的一种建筑钢结构,其特征在于,多个所述插接槽内均焊接固定有两个限位板(6),两个所述限位板(6)之间留有间隙,且所述限位板(6)与横梁(2)配合使用。3. A building steel structure according to claim 1, characterized in that two limiting plates (6) are welded and fixed in a plurality of said insertion grooves, and two said limiting plates (6) There is a gap between them, and the limiting plate (6) is used in cooperation with the beam (2). 4.根据权利要求3所述的一种建筑钢结构,其特征在于,所述第一固定套(3)侧壁还开设有螺纹孔,所述螺纹孔内通过螺纹旋合有紧固螺栓,所述紧固螺栓贯穿两个限位板(6)并与第一固定套(3)内部固定。4. A building steel structure according to claim 3, characterized in that, the side wall of the first fixing sleeve (3) is also provided with a threaded hole, and a fastening bolt is threaded in the threaded hole, The fastening bolts pass through the two limiting plates (6) and are fixed inside the first fixing sleeve (3). 5.根据权利要求1所述的一种建筑钢结构,其特征在于,所述斜撑杆(5)中部还铰接有辅助杆(7),所述辅助杆(7)另一端与立柱(1)表面焊接固定。5. A building steel structure according to claim 1, characterized in that an auxiliary rod (7) is hinged in the middle of the diagonal brace (5), and the other end of the auxiliary rod (7) is connected to the column (1 ) The surface is welded and fixed.
CN202222942218.1U 2022-11-05 2022-11-05 Building steel structure Expired - Fee Related CN218970231U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222942218.1U CN218970231U (en) 2022-11-05 2022-11-05 Building steel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222942218.1U CN218970231U (en) 2022-11-05 2022-11-05 Building steel structure

Publications (1)

Publication Number Publication Date
CN218970231U true CN218970231U (en) 2023-05-05

Family

ID=86163558

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222942218.1U Expired - Fee Related CN218970231U (en) 2022-11-05 2022-11-05 Building steel structure

Country Status (1)

Country Link
CN (1) CN218970231U (en)

Similar Documents

Publication Publication Date Title
CN209837294U (en) Assembled building steel skeleton is connected
CN110258786B (en) Full-assembled concrete beam-concrete column-steel support combined connection node
CN217590666U (en) Photovoltaic support
CN107542262A (en) Double-arc spline socket joint type disk buckle type scaffold
CN218970231U (en) Building steel structure
CN211774554U (en) A reinforced steel structure load-bearing beam structure for building
CN214739791U (en) Truss type cantilever beam combined structure for climbing frame
CN218622586U (en) Assembled beam column node connecting piece
CN218091400U (en) Structure swaying column for fixing unit curtain wall
CN212001591U (en) A prefabricated connection node of a box-shaped steel column and a PEC beam
CN211037307U (en) Connecting structure for preventing fault at building joint
CN211201129U (en) Wall-attached hanging piece for attached lifting scaffold
CN102127962A (en) Improved bidirectionally stressed foundation knot attached to lifting scaffold
CN209907909U (en) Shaped steel cantilever beam lower supporting device
CN215670524U (en) Reinforced structure of wooden house truss
CN114776066A (en) A traditional village building protection device
CN219240856U (en) A safe steel structure node component
CN219137438U (en) Cast-in-situ box girder support structure
CN222632506U (en) Multifunctional tripod support frame
CN218757958U (en) A construction-based quick-install steel structure
CN221346246U (en) Support frame suitable for no cable setting condition
CN218541646U (en) Beam column reinforcing structure for building
CN211646757U (en) Bolt connector for connecting beam and column
CN214006025U (en) Beam structure for assembly type building
CN219930694U (en) Assembled bracing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240620

Address after: Room 2423, Jiezuo Building, No. 828, Section 1, Furong South Road, Tianxin District, Changsha City, Hunan Province, 410000

Patentee after: Hunan Leiteng Radiation Protection Technology Co.,Ltd.

Country or region after: China

Address before: 410000 Room 1503, Platinum Tower, Building 1, Sunshine Lijing, Xingsha Avenue, Xingsha Street, Changsha County, Changsha City, Hunan Province

Patentee before: Hunan Fulin Construction Engineering Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240731

Address after: 410000 Room 1503, Platinum Tower, Building 1, Sunshine Lijing, Xingsha Avenue, Xingsha Street, Changsha County, Changsha City, Hunan Province

Patentee after: Hunan Fulin Construction Engineering Co.,Ltd.

Country or region after: China

Address before: Room 2423, Jiezuo Building, No. 828, Section 1, Furong South Road, Tianxin District, Changsha City, Hunan Province, 410000

Patentee before: Hunan Leiteng Radiation Protection Technology Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230505

CF01 Termination of patent right due to non-payment of annual fee