CN106506190A - A kind of communication network runtime and operation method - Google Patents
A kind of communication network runtime and operation method Download PDFInfo
- Publication number
- CN106506190A CN106506190A CN201610836450.3A CN201610836450A CN106506190A CN 106506190 A CN106506190 A CN 106506190A CN 201610836450 A CN201610836450 A CN 201610836450A CN 106506190 A CN106506190 A CN 106506190A
- Authority
- CN
- China
- Prior art keywords
- network
- business
- optical cable
- path
- transmission
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/14—Network analysis or design
- H04L41/145—Network analysis or design involving simulating, designing, planning or modelling of a network
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/06—Management of faults, events, alarms or notifications
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Optical Communication System (AREA)
- Telephonic Communication Services (AREA)
Abstract
The present invention provides a kind of communication network runtime and operation method, and wherein, the runtime includes that application platform, business network platform and carrying platform, the application platform include communication network business module;The business network platform is included for carrying the dispatch data net of scheduling data traffic and distribution automation business, for carrying the scheduling exchange network of dispatching telephone, for carrying the integrated data network of production management information service and video conference and soft switch service;The carrying platform includes the first transmission network and the second transmission network, and wherein, first transmission network is used for carrying route protection, stable system, pulse code modulation PCM business and dispatch data net;Second transmission network is used for carrying route protection, stable system, scheduling exchange network and dispatch data net.A kind of communication network runtime and operation method that the present invention is provided, can realize the stable operation of communication network, and can to communication network in failure investigated in time.
Description
Technical field
The present invention relates to technical field of communication network, more particularly to a kind of communication network runtime and operation method.
Background technology
As the quickening of the strong intelligent grid of grid company and " three collection five are big " management system construction is advanced and is in full swing,
Production and operation business is for the requirement more and more higher of the safe and stable operation of communication network.In order to lift the safe operation wind of communication network
Dangerous pre-control ability, it is ensured that production and operation safety and stability is operated, being currently needed for one being capable of stable operation being capable of error correction in time
The communication network runtime that fixes a breakdown and operation method.
Content of the invention
It is an object of the invention to provide a kind of communication network runtime and operation method, can realize stablizing for communication network
Operation, and can to communication network in failure investigated in time.
For achieving the above object, the present invention provides a kind of communication network runtime, including application platform, business network platform
And carrying platform, the application platform includes communication network business module, and the business in the communication network business module is according to pre-
If rule is divided;The business network platform is included for carrying the scheduling of scheduling data traffic and distribution automation business
Data network, for carrying the scheduling exchange network of dispatching telephone, for carrying production management information service and video conference and soft
The integrated data network of exchange business;The carrying platform includes the first transmission network and the second transmission network, wherein, first transmission
Net is used for carrying route protection, stable system, pulse code modulation PCM business and dispatch data net;Second transmission network is used
In carrying route protection, stable system, scheduling exchange network and dispatch data net.
Further, the business network platform also include using Softswitch technology build and be carried on the synthesis
Administrative exchange network on data network.
Further, the communication network business module includes producing business module and management business module;Wherein, the life
Produce business module and communication connection is set up with first transmission network and the second transmission network respectively by the dispatch data net, described
Production business module sets up communication connection also by the scheduling exchange network with second transmission network;The management business module
Communication connection is set up with second transmission network by the integrated data network.
For achieving the above object, the application also provides a kind of communication network operation method, and methods described includes:Based on described logical
Fiber resource data and transfer resource data in letter network operation system, draw and combine optical cable topological diagram and transport network topology figure
Network topology management figure;Light path route in the network topology management figure and transmission circuit are adjusted respectively;From tune
The circuit information that breaks down is corrected in network topology management figure after whole and the light path to breaking down is positioned.
Further, the light path route in the network topology management figure is adjusted and is specifically included:In response to light path
The adjust instruction of route, plans optical circuit path in the network topology management figure and determines from the optical circuit path of planning optimum
Path;Distribute corresponding resource for each website in the optimal path, when the available and described optimum road of the resource of distribution
When footpath is complete, optimal path of the preview through resource allocation;When the corresponding real resource of each described website and the resource of distribution
When inconsistent, the resource updates by corresponding for each described website distribution are real resource.
Further, the operation method also includes:Same cable is carried out to the optical circuit path in the network topology management figure
Detection, so that the main standby route of same business is worked in different optical cables.
Further, the operation method also includes:Fibre core is determined in the optical circuit path of the network topology management figure
Disabled path;Disabled for fibre core path is rejected from the optical circuit path, and in the network topology management
Optical circuit path is planned in figure again.
Further, the transmission circuit in the network topology management figure is adjusted and is specifically included:Determine default industry
The passed through Transmission system of business;By in the distributing slot resources related to the pre-set business to the Transmission system for determining;
The service topology figure corresponding with the Transmission system for being assigned with time interval resource is generated, and judges whether the service topology figure is complete
Whole;When the service topology figure is complete, according to the service topology figure time slot money actual to actual Transmission system distribution
Source.
Further, carry out positioning to the light path for breaking down in the network topology management figure from after adjustment to specifically include:
Optical cable collection of the inquiry comprising failure business, and determine optical cable number to be sought;Extraction quantity is concentrated to meet from the optical cable described
The optical cable of optical cable number, and the optical cable for extracting is constituted target light cable member;When doubtful optical cable concentrate arbitrary optical cable member equal
When being not included in the target optical cable member, judge in the target optical cable member, whether contain the faulty business of institute;If
The faulty business of institute is contained in the target optical cable member, adds the doubtful optical cable to concentrate the target optical cable member;
Each optical cable member that the doubtful optical cable is concentrated is sorted from small to large according to optical cable hop count and unduplicated business number.
Therefore, the present invention, can be with by the modules in application platform, business network platform and carrying platform
Set up the communication network runtime for being capable of stable operation.Wherein, by the first transmission network and the second transmission network to different business
Carried, ensured carrying out in order for every business.Additionally, by optical cable topological diagram and transport network topology figure are integrated into
Network topology management figure, such that it is able to easily carry out to the fault or light path failure that occur in network topology management figure
Investigation, to guarantee to exclude the failure produced in runtime in time.
Description of the drawings
The structural representation of the communication network runtime that Fig. 1 is provided for embodiment of the present invention;
Fig. 2 is the adjustment schematic flow sheet of light path in embodiment of the present invention;
Fig. 3 is the adjustment schematic flow sheet of transmission circuit in embodiment of the present invention;
Fig. 4 is the schematic flow sheet light path for breaking down positioned in embodiment of the present invention.
Specific embodiment
In order that those skilled in the art more fully understand the technical scheme in the application, below in conjunction with the application reality
The accompanying drawing in mode is applied, the technical scheme in the application embodiment is clearly and completely described, it is clear that described
Embodiment is only a part of embodiment of the application, rather than whole embodiment.Embodiment party in based on the application
Formula, all other embodiment that those of ordinary skill in the art are obtained under the premise of creative work is not made, all answers
When the scope for belonging to the application protection.
Refer to Fig. 1, the present invention provides a kind of communication network runtime, including application platform, business network platform and
Carrying platform, wherein, the application platform includes communication network business module, and the business in the communication network business module is according to pre-
If rule is divided;The business network platform is included for carrying the scheduling of scheduling data traffic and distribution automation business
Data network, for carrying the scheduling exchange network of dispatching telephone, for carrying production management information service and video conference and soft
The integrated data network of exchange business;The carrying platform includes the first transmission network and the second transmission network, wherein, first transmission
Net is used for carrying route protection, stable system, pulse code modulation PCM business and dispatch data net;Second transmission network is used
In carrying route protection, stable system, scheduling exchange network and dispatch data net.
In the present embodiment, the business network platform also include using Softswitch technology build and be carried on institute
State the online administrative exchange network of integrated data.
In the present embodiment, the communication network business module includes producing business module and management business module;Wherein,
The production business module sets up communication link with first transmission network and the second transmission network respectively by the dispatch data net
Connect, the production business module sets up communication connection also by the scheduling exchange network with second transmission network;The management
Business module sets up communication connection by the integrated data network with second transmission network.
Fig. 2 to Fig. 4 is referred to, the present invention also provides a kind of communication network operation method, and methods described includes:
Based on fiber resource data and transfer resource data in the communication network runtime, draw and combine optical cable topology
Figure and the network topology management figure of transport network topology figure;
Light path route in the network topology management figure and transmission circuit are adjusted respectively;
The circuit information and the light path to breaking down for breaking down is corrected in network topology management figure from after adjustment
Positioned.
In the present embodiment, the light path route in the network topology management figure is adjusted and is specifically included:
In response to the adjust instruction of light path route, optical circuit path is planned in the network topology management figure and from planning
Optimal path is determined in optical circuit path;
Distribute corresponding resource for each website in the optimal path, when the available and described optimum of the resource of distribution
When path is complete, optimal path of the preview through resource allocation;
When the corresponding real resource of each described website is inconsistent with the resource of distribution, will be corresponding for each described website
The resource updates of distribution are real resource.
In the present embodiment, the operation method also includes:
Same cable detection is carried out to the optical circuit path in the network topology management figure, so that the active and standby road of same business
By working in different optical cables.
In the present embodiment, the operation method also includes:
The disabled path of fibre core is determined in the optical circuit path of the network topology management figure;
Disabled for fibre core path is rejected from the optical circuit path, and weight in the network topology management figure
New planning optical circuit path.
In the present embodiment, the transmission circuit in the network topology management figure is adjusted and is specifically included:
Determine the Transmission system passed through by pre-set business;
By in the distributing slot resources related to the pre-set business to the Transmission system for determining;
The service topology figure corresponding with the Transmission system for being assigned with time interval resource is generated, and judges the service topology figure
Whether complete;
When the service topology figure is complete, according to the service topology figure actual to actual Transmission system distribution when
Gap resource.
In the present embodiment, the light path for breaking down is carried out positioning specifically in the network topology management figure from after adjustment
Including:
Optical cable collection of the inquiry comprising failure business, and determine optical cable number to be sought;
The optical cable for extracting that quantity meets the optical cable number is concentrated from the optical cable, and the optical cable for extracting is constituted target light
Cable member;
When arbitrary optical cable member that doubtful optical cable is concentrated is not included in the target optical cable member, the mesh is judged
Whether institute faulty business is contained in mark optical cable member;
If containing the faulty business of institute in the target optical cable member, the target optical cable member is added described doubtful
Optical cable is concentrated;
Each optical cable member that the doubtful optical cable is concentrated is carried out from little according to optical cable hop count and unduplicated business number
To big sequence.
Specifically, in a practical application scene of the invention, energy communication service is divided according to service attribute substantially may be used
To be divided into two big class, that is, produce business and management business;Divide according to traffic flow types, voice, data and many can be divided into again
Media business;Divide according to time delay, real time business and non-real-time service can be divided into again;Divide according to service distribution, again may be used
To be divided into centrality business, adjacency business and uniformity business;Divide according to user object, transformer station's industry can be divided into again
Several big class such as business, line activities and grid company, power supply administration, power supply station, business office;According to electric power secondary system safety protective tube
Reason system is divided, and can be divided into I, II, III, the four big safety zone business such as IV again.
At present, plant stand communication service mainly has:Route protection, stable system, dispatching automation, dispatching telephone, electric energy meter
Amount, protection information management system, stable Control management system, wide area measurement system, fault localization system, quality of power supply prison
The business such as examining system, transformer substation video monitoring system, waterpower scheduling automation, lightning location system;With sending out for intelligent grid
Exhibition, the new business such as transforming plant primary equipment on-line monitoring and condition detecting system, optical cable monitoring system will engender;Electrical network
The user communication business such as company, power supply administration, secondary unit mainly have:The management information system business such as financial system, marketing system,
And the quickening with IT application in enterprises paces, also gradually will increase with the business of telecom operators cooperation development.
Under conventional communications network way to manage, the information of each section optical cable itself is only focused on as optical cable topology Fig. 1
And the static information of carried business, and transport network topology figure only focuses on the logical relation of each light path, optical cable topological diagram with
Transport network topology figure is independently present, between intuitively do not contact.In networking, Re-construction planning, need to be to network
Topological sum Optical Cable carries out comprehensive analysis consideration, and Communication Personnel need to consult different optical cable data and transmission equipment data, enter
Row is compared and manual analysis, and real work will take a substantial amount of time and energy.
Therefore, in the present invention, the transfer resource data with fiber resource data and in centralized network management, by informationization
With digitized process, both data is organically combined, realized that topological diagram is drawn automatically, Communication Personnel can be in optical cable
Any transport network topology figure is generated simultaneously on topological diagram, intuitively association between the two can be presented, be network
Planning and daily O&M provide lively, easily data display.
The daily maintenance work that communicates mainly includes the adjustment of optical cable topology and the adjustment of transmission network circuit.Optical cable topology adjustment
Including the newly-increased of light path, topology adjustment and deletion;The adjustment of transmission circuit includes the newly-increased of circuit time slot, time slot off-the-line and conjunction
Ring etc..
Such work is required to carry out in numerous and diverse fiber topology net and transmission network time-slot cross matrix, error probability compared with
Greatly, the operation risk of power telecom network increased, it is therefore desirable to the thorough consideration of veteran operations staff, careful operation.?
In present embodiment, the normal operation of communication network can be ensured, it is to avoid maloperation by detailed light path task control method
Appearance.
Visible in conjunction with Fig. 2, after task is connected to, operation maintenance personnel needs the light path route to adjusting to plan,
How to be quickly found out available high-quality route in planning process is a great problem in maintenance work.To often consult in the past big
Amount data, crosschecks, and particularly in the case where the light path for needing planning is more, will spend substantial amounts of energy and time, work
Make inefficiency.In the present embodiment, retrieval, the analysis means of cable resource based on optical cable data, are studied, is established
The strategy of path intelligent planning, quickly finds most suitable path.By the utilization of this method, it is to avoid a large amount of numerous and diverse data
The verification and comparison of data, drastically increases operating efficiency and work quality, and there is auxiliary well to determine in actual applications
Plan function.
For preventing the main standby route of a business to be operated in same optical cable, cause business after interruption of optical cables and meanwhile in
Disconnected.After the completion of the route planning that selectes, same cable detection can be carried out to the path that plans, each according to preserved in database
Ring-network topology, compares through cable road to which successively, so as to judge whether coaxial route risk.
In path planning, when there is the unavailable situation of fibre core, then need to reselect path planning, in path planning function
In be also added into the method that particular path is evaded, to evade falling disabled path.
Operation maintenance personnel is determined after the Adjusted Option of optical cable path by regulation and presetting method, can be by action and adjustment
Drawing is printed pays field personnel, and field personnel needs to carry out optical fiber tune according to field condition and drawing after reaching the spot
Whole.By supervising employee's specification according to flow operations, the data that can be allowed in database are used by oneself, and effectively increase work effect
Rate.
Visible in conjunction with Fig. 3, information communication operation maintenance personnel is after adjustment task is connected to, it is necessary to first determine the transmission system passed through by business
System.Determine by way of Transmission system after, operation maintenance personnel need by needed for adjustment business take time interval resource matched somebody with somebody item by item
Put.The time-slot cross that derives from each network management system configures the database of parsed formation, can show area with intuitively form
The information of transmission network, including the title of network element, unit type, groove position, board model, port type information, and establishes each
Port and port between individual network element, the corresponding annexation of time slot and time slot, the transmission network time interval resource for making analogue simulation huge
Management is possibly realized, and the panorama for making operation maintenance personnel obtain resource shows.
Operation maintenance personnel is completed see after time slot cross connection that done configuration is by the time interval resource that allocates in advance
No it is anticipated that Electromagnetic coupling.Above-mentioned service topology shows there be an extraordinary directive function simultaneously, intuitively can point out
O&M, the correctness of administrative staff's business configuration, when business configuration makes a mistake or slip (indivedual station interconnection mismatch or leakage
Match somebody with somebody), when causing to fail to configure complete, errors present can be projected mark on topological diagram, very intuitively.
By such method, operation maintenance personnel is prevented to a great extent and may produce when early stage distributes time interval resource
Mistake.After the completion of topological diagram, operation maintenance personnel can generate task instruction explanation, be used for referring to during network management configuration.True
After real network management configuration terminates, webmaster operator is derived configuration data, draws formal service topology figure again, with preview
Topological diagram is contrasted, to verify the correctness of configuration.The equal inerrancy of each step is being proved, transmission network adjustment can be just being accused and be completed.
By such flow process, it is pre- that webmaster operating personnel first can be operated before configuration service on the operational platform
Drill, in advance the operation of whole webmaster is familiar with;The service topology that simultaneously can be listed with system in actual disposition as foundation,
To reduce the maloperation being likely to occur in practical operation.The service topology that configuration is completed can also be carried out after configuration is complete
Inspection, realizes " three insurances " of webmaster operation, thoroughly prevents the possibility of network management configuration error
When optical cable breaks down, communication monitoring, operation maintenance personnel are only capable of interruption and the light for obtaining various optical transport business
The light path warning information that communication equipment webmaster is produced, and interrupt which optical cable segment cannot be learnt.Many times, network management system
Multiple alarms are quoted simultaneously, it is more likely that be caused as same optical cable segment breaks down.It is being not set up efficiently
During method for managing resource, need to take more time verification data and be analyzed, positioning failure has to rely on transports when value
The degree of awareness and optical cable, the familiarity of optical fiber service condition of the dimension personnel to transmission looped network, it is most likely that delay failure fixed
Position time, or even misjudgement, failure of failing to judge.For this phenomenon, according to system optical cable data, research establishes optical cable event to the application
The automatic positioning method of barrier.
Enter line search and calculating according to the flow process shown in Fig. 4, be possible in the case of current failure interrupt can be obtained
Optical cable, the failure business of input are more, and the precision of positioning is higher, can provide effective Auxiliary support for breakdown repair work.
As can be seen from Fig. 4, when entering line search every time, optical cable number can be improved one by one, until optical cable number exceedes the optical cable number that optical cable is concentrated
Till.
Therefore, the present invention, can be with by the modules in application platform, business network platform and carrying platform
Set up the communication network runtime for being capable of stable operation.Wherein, by the first transmission network and the second transmission network to different business
Carried, ensured carrying out in order for every business.Additionally, by optical cable topological diagram and transport network topology figure are integrated into
Network topology management figure, such that it is able to easily carry out to the fault or light path failure that occur in network topology management figure
Investigation, to guarantee to exclude the failure produced in runtime in time.
Those skilled in the art are supplied to the purpose for describing to the description of the various embodiments of the application above.Which is not
Be intended to exhaustion or be not intended to limit the invention to single disclosed embodiment.As described above, the application's is various
Substitute and change is will be apparent for above-mentioned technology one of ordinary skill in the art.Therefore, although specifically beg for
The embodiment of some alternatives is discussed, but other embodiment will be apparent, or those skilled in the art are relative
Easily draw.The application is intended to be included in all replacements, modification and the change of this present invention for having discussed, and falls
Other embodiment in the spirit and scope of above-mentioned application.
Each embodiment in this specification is described by the way of going forward one by one, identical similar between each embodiment
Part mutually referring to what each embodiment was stressed is the difference with other embodiment.
Although depict the application by embodiment, it will be appreciated by the skilled addressee that the application has many deformations
With change without deviating from spirit herein, it is desirable to which appended claim includes these deformations and change without deviating from the application
Spirit.
Claims (9)
1. a kind of communication network runtime, including application platform, business network platform and carrying platform, it is characterised in that institute
Stating application platform includes that communication network business module, the business in the communication network business module are divided according to preset rules;
The business network platform is included for carrying the dispatch data net of scheduling data traffic and distribution automation business, for carrying
The scheduling exchange network of dispatching telephone, for carrying the comprehensive number of production management information service and video conference and soft switch service
According to net;The carrying platform includes the first transmission network and the second transmission network, and wherein, first transmission network is used for carrying circuit guarantor
Shield, stable system, pulse code modulation PCM business and dispatch data net;Second transmission network is used for carrying route protection, peace
Steady system, scheduling exchange network and dispatch data net.
2. runtime according to claim 1, it is characterised in that the business network platform also includes adopting soft switch
Technique construction and be carried on the online administrative exchange network of the integrated data.
3. runtime according to claim 1, it is characterised in that the communication network business module includes production business mould
Block and management business module;Wherein, described production business module by the dispatch data net respectively with first transmission network
Communication connection is set up with the second transmission network, the production business module is also by the scheduling exchange network and second transmission network
Set up communication connection;The management business module sets up communication connection by the integrated data network with second transmission network.
4. a kind of communication network operation method being applied in claims 1 to 3 in arbitrary communication network runtime, its feature
It is, methods described includes:
Based on fiber resource data and transfer resource data in the communication network runtime, draw combine optical cable topological diagram and
The network topology management figure of transport network topology figure;
Light path route in the network topology management figure and transmission circuit are adjusted respectively;
Correcting the circuit information that breaks down and the light path to breaking down in network topology management figure from after adjustment is carried out
Positioning.
5. operation method according to claim 4, it is characterised in that the light path in the network topology management figure is route
It is adjusted and specifically includes:
In response to the adjust instruction of light path route, planning optical circuit path the light path from planning in the network topology management figure
Optimal path is determined in path;
Distribute corresponding resource for each website in the optimal path, when the available and described optimal path of the resource of distribution
When complete, optimal path of the preview through resource allocation;
When the corresponding real resource of each described website is inconsistent with the resource of distribution, by corresponding for each described website distribution
Resource updates be real resource.
6. operation method according to claim 4, it is characterised in that the operation method also includes:
Same cable detection is carried out to the optical circuit path in the network topology management figure, so that the main standby route work of same business
Make in different optical cables.
7. operation method according to claim 4, it is characterised in that the operation method also includes:
The disabled path of fibre core is determined in the optical circuit path of the network topology management figure;
Disabled for fibre core path is rejected from the optical circuit path, and is advised in the network topology management figure again
Draw optical circuit path.
8. operation method according to claim 4, it is characterised in that to the transmission circuit in the network topology management figure
It is adjusted and specifically includes:
Determine the Transmission system passed through by pre-set business;
By in the distributing slot resources related to the pre-set business to the Transmission system for determining;
The service topology figure corresponding with the Transmission system for being assigned with time interval resource is generated, and whether judges the service topology figure
Completely;
When the service topology figure is complete, according to the service topology figure time slot money actual to actual Transmission system distribution
Source.
9. operation method according to claim 4, it is characterised in that to occurring in the network topology management figure from after adjustment
The light path of failure carries out positioning and specifically includes:
Optical cable collection of the inquiry comprising failure business, and determine optical cable number to be sought;
Concentrate from the optical cable and extract quantity and meet the optical cable of the optical cable number, and by the optical cable for extracting composition target light cable into
Member;
When arbitrary optical cable member that doubtful optical cable is concentrated is not included in the target optical cable member, the target light is judged
Whether institute faulty business is contained in cable member;
If the faulty business of institute is contained in the target optical cable member, the target optical cable member is added the doubtful optical cable
Concentrate;
Each optical cable member that the doubtful optical cable is concentrated is carried out from small to large according to optical cable hop count and unduplicated business number
Sequence.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610836450.3A CN106506190B (en) | 2016-09-20 | 2016-09-20 | A kind of communication network operating system and operation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610836450.3A CN106506190B (en) | 2016-09-20 | 2016-09-20 | A kind of communication network operating system and operation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106506190A true CN106506190A (en) | 2017-03-15 |
CN106506190B CN106506190B (en) | 2019-10-18 |
Family
ID=58290373
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610836450.3A Active CN106506190B (en) | 2016-09-20 | 2016-09-20 | A kind of communication network operating system and operation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106506190B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110417461A (en) * | 2019-07-31 | 2019-11-05 | 国网河北省电力有限公司邢台供电分公司 | Optical cable localization method, device and the terminal device of multiple faults point |
CN110445665A (en) * | 2019-09-06 | 2019-11-12 | 国网江苏省电力公司信息通信分公司 | Based on the powerline network alarm association method for digging for improving GSP |
CN112187355A (en) * | 2020-09-30 | 2021-01-05 | 上海新炬网络信息技术股份有限公司 | Transmission network security analysis method based on micro front-end architecture |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6952729B2 (en) * | 2001-05-08 | 2005-10-04 | At&T Corp. | Network management method and system for managing a broadband network providing multiple services |
CN104009793A (en) * | 2014-06-17 | 2014-08-27 | 国家电网公司 | Optical cable fault positioning method |
CN105323087A (en) * | 2014-07-11 | 2016-02-10 | 江苏长宁电力科技有限公司 | Integrated network management system of electric power communication network |
-
2016
- 2016-09-20 CN CN201610836450.3A patent/CN106506190B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6952729B2 (en) * | 2001-05-08 | 2005-10-04 | At&T Corp. | Network management method and system for managing a broadband network providing multiple services |
CN104009793A (en) * | 2014-06-17 | 2014-08-27 | 国家电网公司 | Optical cable fault positioning method |
CN105323087A (en) * | 2014-07-11 | 2016-02-10 | 江苏长宁电力科技有限公司 | Integrated network management system of electric power communication network |
Non-Patent Citations (2)
Title |
---|
孟凡博,金鑫: "电力通信系统业务分类及运行方式的研究与应用", 《东北电力技术》 * |
陆嘉恩: "承载全业务的电力传输网发展规划", 《通讯世界》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110417461A (en) * | 2019-07-31 | 2019-11-05 | 国网河北省电力有限公司邢台供电分公司 | Optical cable localization method, device and the terminal device of multiple faults point |
CN110445665A (en) * | 2019-09-06 | 2019-11-12 | 国网江苏省电力公司信息通信分公司 | Based on the powerline network alarm association method for digging for improving GSP |
CN110445665B (en) * | 2019-09-06 | 2022-06-14 | 国网江苏省电力有限公司信息通信分公司 | Electric power communication network alarm association mining method based on improved GSP |
CN112187355A (en) * | 2020-09-30 | 2021-01-05 | 上海新炬网络信息技术股份有限公司 | Transmission network security analysis method based on micro front-end architecture |
Also Published As
Publication number | Publication date |
---|---|
CN106506190B (en) | 2019-10-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101588518B (en) | Transport network topological structure safety analytical method and implementation system | |
CN110474806B (en) | Power communication network key node identification method | |
JP5833530B2 (en) | EMS power outage management apparatus and method | |
CN103310387B (en) | A kind of power telecom network method of operation Security Checking method | |
CN110336375A (en) | A kind of processing method and system of power system monitor warning information | |
CN111884840A (en) | IPRAN network equipment fault alarm merging analysis processing method and device | |
CN110647567B (en) | Power failure plan auxiliary decision system based on end data fusion | |
CN104579775B (en) | A kind of power telecom network optical fiber and optical transmission device resource allocation method and equipment | |
JP2017034752A (en) | Monitoring control system | |
CN110740394B (en) | Power optical transmission network optimization method and system based on site classification business classification | |
CN103177327A (en) | Comprehensive management system for low-voltage power operations based on B/S (browser/server) and C/S (client/server) architectures | |
CN106815373A (en) | Big data methods of exhibiting and system are rushed to repair in distribution based on BI analyses | |
CN106506190A (en) | A kind of communication network runtime and operation method | |
CN115660494A (en) | Electric power communication network structure risk assessment system | |
CN112887207A (en) | Service route distribution method and device for power IP-optical communication network | |
CN111147288A (en) | Power dispatching communication network node importance identification and evaluation method | |
CN110401556A (en) | A kind of method and apparatus of IDC computer room cable visualization Automatic dispatching | |
CN106921519A (en) | A kind of method that IP route closure is carried out based on automatic dispatching and workflow management | |
CN104243218B (en) | A kind of communication of power system mode list preparation method based on more schedule constraints | |
CN100571138C (en) | The method of assessment transmission network performance | |
CN111476547A (en) | Method for analyzing assets of distribution network line ring-out point arrangement in user | |
CN201467146U (en) | Transmission network topological structure safety analysis system | |
CN109150706B (en) | Risk path identification method and device | |
CN110309943A (en) | Optimal service path planning method for power transmission network | |
CN102208059A (en) | Production management information distribution method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |