CN106501761A - Three-phase intelligent electric-energy meter simulation detection system - Google Patents

Three-phase intelligent electric-energy meter simulation detection system Download PDF

Info

Publication number
CN106501761A
CN106501761A CN201611216293.2A CN201611216293A CN106501761A CN 106501761 A CN106501761 A CN 106501761A CN 201611216293 A CN201611216293 A CN 201611216293A CN 106501761 A CN106501761 A CN 106501761A
Authority
CN
China
Prior art keywords
energy meter
concentrator
current
electric
terminals
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611216293.2A
Other languages
Chinese (zh)
Other versions
CN106501761B (en
Inventor
韩冬军
张加海
孙国栋
王贵现
慕健
孙华玺
王辉昱
宿林昊
刘良涛
李鹏
张金刚
单瞾国
叶剑波
刘春�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yantai Dongfang Wisdom Electric Co Ltd
Original Assignee
Yantai Dongfang Wisdom Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yantai Dongfang Wisdom Electric Co Ltd filed Critical Yantai Dongfang Wisdom Electric Co Ltd
Priority to CN201611216293.2A priority Critical patent/CN106501761B/en
Publication of CN106501761A publication Critical patent/CN106501761A/en
Application granted granted Critical
Publication of CN106501761B publication Critical patent/CN106501761B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass
    • G01R35/04Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a kind of three-phase intelligent electric-energy meter simulation detection system, including power source, the concentrator for also including electric energy meter and being connected with electric energy meter;The power source is that concentrator and electric energy meter are powered with current system by switch unit, current transformer and the switching switch for switching switch unit between direct powering mode and indirect powering mode is provided with the switch unit, the direct powering mode refers to that the electric current of power source output directly feeds concentrator, and the indirect pattern refers to that the electric current of power source output resupplies concentrator after being changed by current transformer.The present invention is concentrator and electric energy meter unification power supply using a set of power source, and meets the use requirement of the electric energy meter of different current specifications.

Description

Three-phase intelligent electric-energy meter simulation detection system
Technical field
The present invention relates to a kind of electric energy meter simulation detection system.
Background technology
Intelligent electric energy meter is for electric energy trade settlement between genco and electric company, electric company and Electricity customers Important measurement instrument.For verifying error testing and the copy reading data of three-phase intelligent electric-energy meter, need to build simulation detection system, lead to Cross concentrator copy reading three-phase intelligent electric-energy meter, complete correlated performance detection.
In three-phase intelligent electric-energy meter simulation detection system of the prior art, due to required when concentrator and electric energy meter work The size of current that wants is different, it is therefore desirable to be respectively concentrator using two sets of power sources and electric energy meter is powered, wiring relation is complicated, High cost.On the other hand the current specification of electric energy meter to be detected differs, it is difficult to using same power source to concentrator and electric energy Table is powered simultaneously.
Content of the invention
The invention provides three-phase intelligent electric-energy meter simulation detection system, its problem to be solved is:(1)Using a set of Power source is that concentrator and electric energy meter are together powered;(2)Meet the use requirement of the electric energy meter of different supply current specifications.
Technical scheme is as follows:
Three-phase intelligent electric-energy meter simulation detection system, including power source, the collection for also including electric energy meter and being connected with electric energy meter Middle device;
The power source is that concentrator and electric energy meter are powered with current system by switch unit, is provided with electricity in the switch unit Current transformer and the switching switch for switching switch unit between direct powering mode and indirect powering mode are described straight Connect powering mode and refer to that the electric current of power source output directly feeds concentrator, the indirect pattern refers to the electric current of power source output Concentrator is resupplied by current transformer after being changed.
As a further improvement on the present invention:The switch unit have for the electric current end of incoming cables that connects with power source and Current outlet end, and also including the first outfan and the second outfan for powering for electric energy meter and be used for being concentrator 3rd outfan and the 4th outfan of power supply;
There are the current transformer primary side the first terminals and the second terminals, secondary side there are the 3rd terminals and the 4th Terminals;
The switching switch includes the first switching switch and the second switching switch, the common port and electric current of the first switching switch Leading-out terminal is connected, normal-closed end is connected with the first terminals, normally opened end is connected with the 3rd terminals, and second switching is opened The common port of pass is connected with the 3rd outfan, normal-closed end is connected with the 4th terminals, normally opened end is connected with the second terminals Connect;
3rd terminals are connected with the 4th outfan, and the electric current end of incoming cables is connected with the first outfan, and described Two terminals are connected with the second outfan.
As a further improvement on the present invention:Also include control device, the control device and first switching switch and Second switching switch is respectively connected with to control the first switching switch with the second switching switch synchronization action.
As a further improvement on the present invention:Also include control device, the concentrator is connected with control device.
As a further improvement on the present invention:Also include control device, the power source is connected with control device.
As a further improvement on the present invention:The concentrator is connected with electric energy meter by harvester.
Relative to prior art, the present invention has following good effect:The present invention is provided to power source by switch unit Electric current be converted, there is provided directly or indirectly two kinds of powering modes:Directly under powering mode, power source is in control device Control under directly together supply small current for concentrator and electric energy meter;Indirectly under powering mode, power source is directly supplied for electric energy meter High current, while power for concentrator after current transformer converts electrical current into small current, so as to ensure that concentrator is needed Normal power supply when wanting small current, electric energy meter to need high current.It is electric energy meter and concentration that the present invention can use a set of power source Device is together powered, and meets the use requirement of the electric energy meter of different current specifications.
Description of the drawings
Structural representations of the Fig. 1 for switch unit.
Specific embodiment
Technical scheme is described in detail below in conjunction with the accompanying drawings:
Three-phase intelligent electric-energy meter simulation detection system, including power source and control device, also includes electric energy meter and and electric energy meter The concentrator being connected.The concentrator is connected with electric energy meter by harvester, adopts carrier wave between concentrator and harvester Mode communicates connection, communicates connection using RS485 modes between harvester and electric energy meter, and the electric energy meter is three-phase intelligent electric energy Table.
The concentrator is also connected with control device respectively with power source, and the control device includes industrial computer and upper Machine.
The power source is that concentrator and electric energy meter are powered with current system by switch unit, sets in the switch unit There are current transformer and the switching switch for switching switch unit between direct powering mode and indirect powering mode, institute State direct powering mode and refer to that the electric current of power source output directly feeds concentrator, the indirect pattern refers to power source output Electric current resupplies concentrator after being changed by current transformer.
Further:There is the electric current end of incoming cables 1 for being connected with power source and electric current to go out for such as Fig. 1, the switch unit Line end 2, and also including the first outfan 5 and the second outfan 8 for powering for electric energy meter and be used for supplying for concentrator 3rd outfan 9 and the 4th outfan 10 of electricity;
There are the current transformer primary side the first terminals 3 and the second terminals 4, secondary side there is 6 He of the 3rd terminals 4th terminals 7;
The switching switch includes the first switching switch 12 and the second switching switch 11, the common port of the first switching switch 12 It is connected with current outlet end 2, normal-closed end is connected with the first terminals 3, normally opened end is connected with the 3rd terminals 6, described Second switching switch 11 common port be connected with the 3rd outfan 9, normal-closed end is connected with the 4th terminals 7, normally opened end and Second terminals 4 are connected;
3rd terminals 6 are connected with the 4th outfan 10, and the electric current end of incoming cables 1 is connected with the first outfan 5, institute State the second terminals 4 to be connected with the second outfan 8.
The control device is respectively connected with and is cut with controlling first with the first switching switch 12 and the second switching switch 11 Change switch 12 and the second switching 11 synchronization actions of switch.
The first switching switch 12 and the second switching switch 11 can be realized by relay.
The exportable three-phase current of power source is that concentrator and electric energy meter are powered, and each phase current each switches by one respectively Unit is connected with the phase current input terminal on concentrator and electric energy meter.
The workflow of this detecting system is:
After the completion of wiring, testing staff determines the operating current specifications of concentrator and this electric energy meter to be detected first.If Concentrator needs using small current and electric energy meter needs high current, then keep default setting to use indirect powering mode:Power source The electric current of output pass sequentially through electric current end of incoming cables 1, the first outfan 5, the electric energy meter of some series connection, current transformer primary side with And current outlet end 2 forms loop and supplies high current for electric energy meter, meanwhile, current transformer changes the small current to be formed in secondary side Export, pass through the 4th terminals 7, the 3rd outfan 9, the concentrator of some series connection, the 4th outfan 10 and 6 shape of the 3rd terminals Small current is supplied into loop for concentrator.If the current specification that concentrator is needed with electric energy meter is identical, control device control the One switching switch 12 and the second switching switch 11 synchronization actions, are switched to direct powering mode, the electric current of now power source output Pass sequentially through electric current end of incoming cables 1, the first outfan 5, the electric energy meter of some series connection, the second outfan 8, the 3rd outfan 9, some The concentrator of series connection, the 4th outfan 10, the 3rd terminals 6 and current outlet end 2 form a total loop, by electric energy meter and collection Middle device series connection, offer supply identical electric current.

Claims (6)

1. three-phase intelligent electric-energy meter simulation detection system, it is characterised in that:Including power source, also include electric energy meter and and electric energy The concentrator that table is connected;
The power source is that concentrator and electric energy meter are powered with current system by switch unit, is provided with electricity in the switch unit Current transformer and the switching switch for switching switch unit between direct powering mode and indirect powering mode are described straight Connect powering mode and refer to that the electric current of power source output directly feeds concentrator, the indirect pattern refers to the electric current of power source output Concentrator is resupplied by current transformer after being changed.
2. three-phase intelligent electric-energy meter simulation detection system as claimed in claim 1, it is characterised in that:The switch unit has For the electric current end of incoming cables connected with power source(1)With current outlet end(2), and also including for powering for electric energy meter One outfan(5)With the second outfan(8)And the 3rd outfan for powering for concentrator(9)With the 4th outfan (10);
The current transformer primary side has the first terminals(3)With the second terminals(4), secondary side is with the 3rd terminals (6)With the 4th terminals(7);
The switching switch includes the first switching switch(12)With the second switching switch(11), the first switching switch(12)'s Common port and current outlet end(2)Be connected, normal-closed end and the first terminals(3)Be connected, normally opened end and the 3rd terminals(6) It is connected, the second switching switch(11)Common port and the 3rd outfan(9)Be connected, normal-closed end and the 4th terminals (7)Be connected, normally opened end and the second terminals(4)It is connected;
3rd terminals(6)With the 4th outfan(10)It is connected, the electric current end of incoming cables(1)With the first outfan(5) It is connected, second terminals(4)With the second outfan(8)It is connected.
3. three-phase intelligent electric-energy meter simulation detection system as claimed in claim 2, it is characterised in that:Also include control device, The control device and the first switching switch(12)And second switching switch(11)It is respectively connected with and is opened with controlling the first switching Close(12)With the second switching switch(11)Synchronization action.
4. three-phase intelligent electric-energy meter simulation detection system as claimed in claim 1, it is characterised in that:Also include control device, The concentrator is connected with control device.
5. three-phase intelligent electric-energy meter simulation detection system as claimed in claim 1, it is characterised in that:Also include control device, The power source is connected with control device.
6. the three-phase intelligent electric-energy meter simulation detection system as described in claim 1 to 5 is arbitrary, it is characterised in that:The concentration Device is connected with electric energy meter by harvester.
CN201611216293.2A 2016-12-26 2016-12-26 Three-phase intelligent ammeter simulation detection system Active CN106501761B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611216293.2A CN106501761B (en) 2016-12-26 2016-12-26 Three-phase intelligent ammeter simulation detection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611216293.2A CN106501761B (en) 2016-12-26 2016-12-26 Three-phase intelligent ammeter simulation detection system

Publications (2)

Publication Number Publication Date
CN106501761A true CN106501761A (en) 2017-03-15
CN106501761B CN106501761B (en) 2023-07-21

Family

ID=58333958

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611216293.2A Active CN106501761B (en) 2016-12-26 2016-12-26 Three-phase intelligent ammeter simulation detection system

Country Status (1)

Country Link
CN (1) CN106501761B (en)

Citations (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0267968A (en) * 1988-09-02 1990-03-07 Omron Tateisi Electron Co Watthour meter
CN2300110Y (en) * 1997-04-14 1998-12-09 北京无线电技术研究所 AC power electric energy meter
EP1626490A1 (en) * 2004-08-11 2006-02-15 SMK Corporation A synchronous rectifying switching power source circuit
CN101281693A (en) * 2007-12-29 2008-10-08 重庆电力高级技工学校 Device for simulating false wiring of electric energy metering equipment
CN201638439U (en) * 2010-04-15 2010-11-17 秦皇岛开发区海纳电测仪器有限责任公司 Full-metering simulation device
CN201689169U (en) * 2010-04-28 2010-12-29 保定市博达同创电力科技有限公司 Detector for low-voltage electric energy metering device
CN102110518A (en) * 2009-12-29 2011-06-29 西安华伟光电技术有限公司 Automatic measurement range switching device of electronic current transformer
CN102435869A (en) * 2011-08-26 2012-05-02 东北大学 Experimental device for automatic regulation and compensation of three-phase unbalanced load and control method thereof
CN202631626U (en) * 2012-06-19 2012-12-26 上海贝电实业(集团)股份有限公司 Multi-path collection system of intelligent electric meter
CN103021157A (en) * 2012-11-26 2013-04-03 山东电力集团公司电力科学研究院 Device and method for completely simulating site to detect electricity consumption information acquisition terminal
CN203261121U (en) * 2013-05-29 2013-10-30 北京荣华恒信开关技术有限公司 Rapid switching control power supply of solenoid valve
CN203324466U (en) * 2013-05-08 2013-12-04 广东电网公司电力科学研究院 Verification system capable of verifying multiple electric-energy meters with different current specifications at the same time
CN103456199A (en) * 2013-09-13 2013-12-18 郑州万特电气股份有限公司 Power utilization information collection simulation system
WO2014083073A1 (en) * 2012-11-27 2014-06-05 Eaton Electrical Ip Gmbh & Co. Kg Switching device having a measuring apparatus
CN104064081A (en) * 2014-05-30 2014-09-24 国家电网公司 Fault simulating training device of current transformer
CN203981735U (en) * 2014-06-04 2014-12-03 国家电网公司 Variable specific current transformer self-checking device
CN204314448U (en) * 2014-08-01 2015-05-06 云南电力试验研究院(集团)有限公司电力研究院 Single three-phase electric energy meter electrical voltage system tripping device
CN104730334A (en) * 2013-12-18 2015-06-24 上海宝钢工业技术服务有限公司 Electric energy metering method based on dynamic switching input signal
CN105301551A (en) * 2015-10-29 2016-02-03 国网上海市电力公司 Watt-hour meter calibration device and method outputting current under 1mA
CN105487044A (en) * 2016-01-29 2016-04-13 国家电网公司 Current switching apparatus for electric energy meter remote calibration apparatus and switching method
CN205157764U (en) * 2015-12-01 2016-04-13 国家电网公司 Multipurpose is single, three -phase electric energy meter verifying attachment
CN105845007A (en) * 2016-06-13 2016-08-10 国网辽宁省电力有限公司朝阳供电公司 Intelligent electric energy meter simulation application test stand and use method thereof
CN106249019A (en) * 2016-08-12 2016-12-21 山东亿玛信诺电气有限公司 Unified no-load voltage ratio molded breadth width metering current mulual inductor
CN206258571U (en) * 2016-12-26 2017-06-16 烟台东方威思顿电气有限公司 Three-phase intelligent electric-energy meter simulation detection system

Patent Citations (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0267968A (en) * 1988-09-02 1990-03-07 Omron Tateisi Electron Co Watthour meter
CN2300110Y (en) * 1997-04-14 1998-12-09 北京无线电技术研究所 AC power electric energy meter
EP1626490A1 (en) * 2004-08-11 2006-02-15 SMK Corporation A synchronous rectifying switching power source circuit
CN101281693A (en) * 2007-12-29 2008-10-08 重庆电力高级技工学校 Device for simulating false wiring of electric energy metering equipment
CN102110518A (en) * 2009-12-29 2011-06-29 西安华伟光电技术有限公司 Automatic measurement range switching device of electronic current transformer
CN201638439U (en) * 2010-04-15 2010-11-17 秦皇岛开发区海纳电测仪器有限责任公司 Full-metering simulation device
CN201689169U (en) * 2010-04-28 2010-12-29 保定市博达同创电力科技有限公司 Detector for low-voltage electric energy metering device
CN102435869A (en) * 2011-08-26 2012-05-02 东北大学 Experimental device for automatic regulation and compensation of three-phase unbalanced load and control method thereof
CN202631626U (en) * 2012-06-19 2012-12-26 上海贝电实业(集团)股份有限公司 Multi-path collection system of intelligent electric meter
CN103021157A (en) * 2012-11-26 2013-04-03 山东电力集团公司电力科学研究院 Device and method for completely simulating site to detect electricity consumption information acquisition terminal
WO2014083073A1 (en) * 2012-11-27 2014-06-05 Eaton Electrical Ip Gmbh & Co. Kg Switching device having a measuring apparatus
CN203324466U (en) * 2013-05-08 2013-12-04 广东电网公司电力科学研究院 Verification system capable of verifying multiple electric-energy meters with different current specifications at the same time
CN203261121U (en) * 2013-05-29 2013-10-30 北京荣华恒信开关技术有限公司 Rapid switching control power supply of solenoid valve
CN103456199A (en) * 2013-09-13 2013-12-18 郑州万特电气股份有限公司 Power utilization information collection simulation system
CN104730334A (en) * 2013-12-18 2015-06-24 上海宝钢工业技术服务有限公司 Electric energy metering method based on dynamic switching input signal
CN104064081A (en) * 2014-05-30 2014-09-24 国家电网公司 Fault simulating training device of current transformer
CN203981735U (en) * 2014-06-04 2014-12-03 国家电网公司 Variable specific current transformer self-checking device
CN204314448U (en) * 2014-08-01 2015-05-06 云南电力试验研究院(集团)有限公司电力研究院 Single three-phase electric energy meter electrical voltage system tripping device
CN105301551A (en) * 2015-10-29 2016-02-03 国网上海市电力公司 Watt-hour meter calibration device and method outputting current under 1mA
CN205157764U (en) * 2015-12-01 2016-04-13 国家电网公司 Multipurpose is single, three -phase electric energy meter verifying attachment
CN105487044A (en) * 2016-01-29 2016-04-13 国家电网公司 Current switching apparatus for electric energy meter remote calibration apparatus and switching method
CN105845007A (en) * 2016-06-13 2016-08-10 国网辽宁省电力有限公司朝阳供电公司 Intelligent electric energy meter simulation application test stand and use method thereof
CN106249019A (en) * 2016-08-12 2016-12-21 山东亿玛信诺电气有限公司 Unified no-load voltage ratio molded breadth width metering current mulual inductor
CN206258571U (en) * 2016-12-26 2017-06-16 烟台东方威思顿电气有限公司 Three-phase intelligent electric-energy meter simulation detection system

Also Published As

Publication number Publication date
CN106501761B (en) 2023-07-21

Similar Documents

Publication Publication Date Title
CN102629778B (en) Multi-system modularization emergency power supply (EPS)
CN102843051B (en) Power supply adaptor
CN201637771U (en) Test box and test system
CN218974478U (en) Load detection circuit, power supply equipment and electronic device
CN202285349U (en) Multi-system modularized emergency power supply (EPS)
CN207801476U (en) A kind of CPCI power supply backplanes with alternating current-direct current automatic switching function
CN102157944B (en) Co-compensation type low-voltage intelligent combined reactive power compensator
CN208110328U (en) A kind of switch test control device of band PD fast charge agreement
CN205080239U (en) Alternator testing system
CN206258571U (en) Three-phase intelligent electric-energy meter simulation detection system
CN206038763U (en) Impulse current's testing arrangement
CN204681157U (en) A kind of intelligent double-power control system
CN106501761A (en) Three-phase intelligent electric-energy meter simulation detection system
CN206270399U (en) A kind of voltage circuit test circuit
CN101378204B (en) Device and method for AC/UPS mixed networking
CN202817886U (en) Uninterruptible power source
CN206147025U (en) Unbalanced three phase treatment system's testing arrangement
CN206540944U (en) Multivoltage automatically supplies intelligence test load box
CN202393858U (en) Correcting unit for reverse connection of current wires of field electric meter
CN209913497U (en) Three-phase power supply circuit and device
CN204374376U (en) The proving installation of branch crushing machine control circuit
CN206557573U (en) A kind of coffee machine standby zero power consumption circuit
CN207039471U (en) A kind of supply unit of zero stand-by power consumption
CN202256445U (en) Voltage detection circuit
CN202471797U (en) Universal phase volt-ampere meter

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 264003 Laishan City, Yantai province Venture Center, Shandong

Applicant after: YANTAI DONGFANG WISDOM ELECTRIC Co.,Ltd.

Address before: 264003 Laishan City, Yantai province Venture Center, Shandong

Applicant before: YANTAI DONGFANG WISDOM ELECTRIC CO.,LTD.

GR01 Patent grant
GR01 Patent grant