CN106501054A - A kind of mould for preparing artificial side's rock core and the preparation method of square rock core - Google Patents

A kind of mould for preparing artificial side's rock core and the preparation method of square rock core Download PDF

Info

Publication number
CN106501054A
CN106501054A CN201710010829.3A CN201710010829A CN106501054A CN 106501054 A CN106501054 A CN 106501054A CN 201710010829 A CN201710010829 A CN 201710010829A CN 106501054 A CN106501054 A CN 106501054A
Authority
CN
China
Prior art keywords
rock core
mould
briquetting
plate
preparation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710010829.3A
Other languages
Chinese (zh)
Other versions
CN106501054B (en
Inventor
叶仲斌
印风军
施雷庭
朱诗杰
朱珊珊
陈洪
舒政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Petroleum University
Original Assignee
Southwest Petroleum University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Petroleum University filed Critical Southwest Petroleum University
Publication of CN106501054A publication Critical patent/CN106501054A/en
Application granted granted Critical
Publication of CN106501054B publication Critical patent/CN106501054B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/28Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q
    • G01N1/286Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q involving mechanical work, e.g. chopping, disintegrating, compacting, homogenising

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Press-Shaping Or Shaping Using Conveyers (AREA)
  • Sampling And Sample Adjustment (AREA)
  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The invention discloses the preparation method of a kind of mould for preparing artificial side's rock core and square rock core, the mould includes:Base plate;Pad;Square ring flat-plate, empties into four rectangular through-holes arranged side by side in the middle of which;Briquetting group, it include four briquettings matched with rectangular through-hole, are provided with T fonts exhaust passage inside briquetting, and three ports of exhaust passage are located at pressed surface and the left and right side of briquetting respectively;Instrument is struck off, which includes scraper plate, crossbeam, elastic adjusting knob and size adjusting knob, the crossbeam includes two clamping plates, two clamping plate side edges have for accommodating the recess of the scraper plate, and the recess of two clamping plates is oppositely arranged and scraper plate is clamped between two clamping plates.The preparation method of Fang Yanxin includes:(1) assembly jig;(2) cementing agent is prepared;(3) dispensing is die-filling;(4) compressing;(5) it is heating and curing;(6) demoulding.Present invention optimizes the preparation method of artificial side's rock core, improves efficiency and the core quality of rock core making.

Description

A kind of mould for preparing artificial side's rock core and the preparation method of square rock core
Technical field
The invention belongs to oil reservoir development technical field, and in particular to a kind of mould for preparing artificial side's rock core and square rock core Preparation method.
Background technology
In water controlled field development process, chemical oil displacement agent for improving ecology development effectiveness and improves oil recovery factor tool There is highly important effect, the oil displacement agent product for possessing certain function often has many, and this is accomplished by preferred to product.Product is excellent The foundation of choosing is its seepage characteristic in reservoir cores, that is, need to carry out rock core displacement test.At present, due to natural core valency Lattice are high and limited by source and specification, and when studies in China mechanism carries out rock core displacement test, majority adopts artificial core.
At present, Artificial Core Making method has quartz sand epoxy resin cementitious, quartz sand or glass marble filling and quartz sand Phosphoric acid aluminum sinter etc. is several, and wherein quartz sand aluminum phosphate sintering process makes the poor repeatability of rock core, quartz sand or glass marble filling Model does not contain cement, and the aspect such as its pore-size and pore structure is larger with natural core difference, the application of both rock cores It is restricted.Not only blowhole size and architectural feature are close with natural core for quartz sand epoxide-resin agglutinated, and Manufacture craft is simple, rock core is repeated excellent, thus is widely used in naphthology research at home.
But conventional epoxy resin is with liquid presentation, including aluminum phosphate, silicates epoxy resin.Liquid with solid The mixability of body is subject to the viscosity of liquid epoxy resin, during making rock core, as liquid-solid mixture is in mould The middle profit reduction and reserving time is longer, if liquid viscosity is not enough, then the adhesive force for being attached to particle surface is not enough, and liquid will be made in gravity Migrated to mold bottom with lower, the homogeneous rock core after shaping is heterogeneous to a certain extent, shows the cementing shape of hole formula Formula.It is the generation of unavoidably this phenomenon using liquid cementing agent.Therefore, for a rock core system for contact cement mode Make, the method is impracticable, need to open up new method.
Content of the invention
It is an object of the invention to solve at least the above and/or defect, and provide at least will be described later excellent Point.
It is a still further object of the present invention to provide the preparation method of a kind of mould for preparing artificial side's rock core and square rock core, is The cementing oil reservoir of experimental study point contact type and prepare the artificial side's rock core of contact, meet indoor with regard to a contact Oil Reservoir Types Experimental study.
In order to realize according to object of the present invention and further advantage, there is provided a kind of mould for preparing artificial core, Including:
Base plate;
Pad, its are laid on the substrate;
Square ring flat-plate, its are located above the pad, empty into four rectangular through-holes arranged side by side in the middle of the square ring flat-plate, The clear size of opening:The size of length × width × height is 300mm × 45mm × 135mm;
Briquetting group, it include four briquettings matched with rectangular through-hole, are provided with the exhaust of T fonts logical inside the briquetting Road, three ports of exhaust passage are located at pressed surface and the left and right side of briquetting respectively;
Instrument is struck off, which includes scraper plate, crossbeam, elastic adjusting knob and size adjusting knob, is provided with the scraper plate Located at the side top of scraper plate, the crossbeam, size scale, size adjusting knob include that two clamping plates, clamping plate side marginal center are opened Be provided with depressed part, the depressed part of two clamping plates is oppositely arranged, the scraper plate be arranged in the way of perpendicular to clamping plate two clamping plates it Between depressed part in, fixed by elastic adjusting knob, and slided up and down relative to two clamping plates sized.
Preferably, the corner location of the square ring flat-plate is respectively equipped with suspension ring.
Preferably, mold interior wall surfaces roughness Ra≤0.025 μm.
A kind of preparation method of artificial side's rock core, comprises the steps:
(1) assembly jig;
(2) cementing agent is prepared:The cementing agent by polyester resin, curing agent, levelling agent and barium sulfate by mass percentage Mix, wherein, polyester resin weight/mass percentage composition be 80%~94%, curing agent weight/mass percentage composition be 4.5%~ 14%, levelling agent weight/mass percentage composition is 1%~5%, and barium sulfate weight/mass percentage composition is 0.5%~1.0%;
(3) dispensing is die-filling:Quartz sand, clay mineral and cementing agent are mixed in proportion, the rectangle for loading mould leads to In hole;
(4) compressing:Briquetting and body die are fixed using bolt, the mould for having loaded are placed on a hydraulic press, Precompressed 10min under the conditions of pressing pressure 50MPa~58MPa, then keeps constant pressure 50MPa voltage stabilizing 15min;
(5) it is heating and curing:Mould after by release is integrally put in high temperature oven, first toasts 240min at 98 DEG C, so After be warming up to 120 DEG C baking 30min, be finally warming up to 210 DEG C baking 10min;
(6) demoulding:Rock core in the mould that process is heating and curing takes out, and dismantles base plate and briquetting bolt, and hydraulic press connects Connect suspension ring and lift mould, then select iron block support mode bottom, rock core is ejected using briquetting, the artificial side of shaping is finally given Rock core.
Preferably, the cementing agent is 1 with the mixing quality ratio of quartz sand:100~200.
Preferably, in the preparation method of artificial side's rock core in step (3), after feeding the mixture into mould, by mould Tool is put on vibrating device and vibrates, and then strikes off mixture surface with the instrument that strikes off, briquetting is placed in mixture surface finally.
Preferably, the preparation method of artificial side's rock core also includes that step (7) is cut:In air, nitrogen or liquid nitrogen Lower cutting rock core two ends of any one atmosphere protection in three, obtain length, width, height be respectively 300mm, 45mm, Artificial side's rock core of 45mm.
The present invention includes following beneficial effect:
One, the present invention can disposably prepare most four according to actual needs using the mould of designed, designed assembling Individual rock core, optimizes rock core briquetting internal structure, is provided with T fonts exhaust passage, three ports point of exhaust passage inside briquetting Not Wei Yu briquetting pressed surface and left and right side, it is to avoid during tamping, because the gas impingement mix in rock core cavity Composition granule, changes the particle contact relation after being well mixed, or even mixture is gone out from exhaust passage, base plate, square ring flat-plate And the surface of briquetting is polished coarse, is conducive to quartz sand particle to agree with mould during tamping, and does not affect to take out Damage during rock core to rock core wall;
The structure and size of strike off instrument two, are improved, and the instrument that strikes off of the size is matched with mould, and scrapes thickness of slab Degree is moderate, and scraper plate is formed with mould and most preferably agreed with, and can adjust blade height, being capable of stability contorting strike-off stick, it is ensured that strike off Plate is not inclined, it is ensured that strike off effect;
Three, cementing agent is optimized in the present invention, by polyester resin, curing agent, levelling agent and barium sulfate by most Good mass percent is mixed to prepare cementing agent, which has more preferable cementation solidifying shaping effect to compound particles, it is to avoid because Cementing agent content is excessive, is difficult to disperse, and is directly cemented to the phenomenon of dead hole gap structure, and then obtains the artificial core of high-quality;
Four, in compressing step, first precompressed 10min, then voltage stabilizing 15min, makes mixing by precompressed and voltage stabilizing The composition granule way of contact is more stable under the pressure condition;
Finally, in heat-curing step:First at 98 DEG C, 240min is toasted, then heats to 120 DEG C of baking 30min, 210 DEG C baking 10mins are finally warming up to, and first passing around heat transfer makes even heat in insulating box be transferred to each position inside rock core Put, be that place mat is made in next step heating, make the optimum temperature of polyester resin and melt under the time, it is to avoid pore structure changes, and then The rock core of prepared function admirable.
Part is embodied by the further advantage of the present invention, target and feature by description below, and part will also be by this The research and practice of invention and be understood by the person skilled in the art.
Description of the drawings
The mould structure schematic diagram of the artificial side's rock cores of Fig. 1;
Fig. 2 is briquette structure schematic diagram;
Fig. 3 is briquetting profile;
Fig. 4 is to strike off tool construction schematic diagram.
Label in figure:
Base plate 1, square ring flat-plate 2, pad 3, briquetting group 4, connector 5, rectangular through-hole 6, exhaust passage 7, port 8, suspension ring 9th, support 10, scraper plate 11, crossbeam 12, elastic adjusting knob 13, size scale 14, size adjusting knob 15.
Specific embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings, to make those skilled in the art with reference to specification text Word can be implemented according to this.
It should be appreciated that such as " with ", "comprising" and " including " term used herein are not precluded from one or many Other elements individual or the presence or interpolation of its combination.
As shown in Figure 1, Figure 2, Figure 3 and Figure 4, a kind of mould for preparing artificial core, including:
Base plate 1;
Pad 3, its are laid on above the base plate 1, and base plate and square ring flat-plate are separated by the pad, it is to avoid rock core and bottom The directly contact of plate, it is preferred that the film that the pad is made for plastics;
Square ring flat-plate 2, its are located above the pad 3, empty into four rectangles arranged side by side and lead in the middle of the square ring flat-plate Hole 6, the clear size of opening:The size of length × width × height is 300mm × 45mm × 135mm, can according to actual needs can be with one Secondary property prepares most four rock cores;
Briquetting group 4, it include four briquettings matched with rectangular through-hole, are provided with the exhaust of T fonts logical inside the briquetting Road 7, three ports 8 of exhaust passage be located at pressed surface and the left and right side of briquetting respectively, it is to avoid during tamping, because Gas impingement mix composition granule in rock core cavity, changes the particle contact relation after being well mixed, or even makes mixture from row Gas passage is gone out;
Instrument is struck off, as shown in figure 4, which includes scraper plate 11, crossbeam 12, elastic adjusting knob 13 and size adjusting knob 15, size scale 14 is provided with the scraper plate, size adjusting knob includes two folders located at the side top of scraper plate, the crossbeam Plate, two clamping plate side edges have for accommodating the recess of the scraper plate, and the recess of two clamping plates is oppositely arranged and clamps scraper plate Between two clamping plates, fixed by elastic adjusting knob, the scraper plate is slided up and down perpendicular to two clamping plates and relative to two clamping plates Sized, preferred size is:Scrape plate hight 220mm, width 299.5mm, thickness 20mm, the high 60mm of crossbeam, long 400mm, width 80mm, the instrument that strikes off of the size are matched with mould, and scraper thickness is moderate, and scraper plate is formed with mould and most preferably agreed with, and can To adjust blade height, being capable of stability contorting strike-off stick, it is ensured that strike-off stick is not inclined, it is ensured that strike off effect.
Another be that the corner location of the square ring flat-plate 2 is respectively equipped with suspension ring 9, moves mould by suspension ring in example Dynamic, convenient dismounting base plate, and then rock core is deviate from from mould.
In such scheme, the mould adopts steel material, and the surface of base plate, square ring flat-plate and briquetting is polished slightly Rough, roughness Ra≤0.025 μm, the roughness of the degree can be conducive to contract of the quartz sand particle with mould during tamping Damage when closing, and not affecting removal of core to rock core wall.
The preparation method of artificial side's rock core, comprises the steps:
First, reservoir condition is selected
According to Bohai Sea reservoir condition, its oil reservoir belongs to the lithology of loose sand contact cement, and permeability range exists 100mD-5000mD, porosity ranges are in 29%-35%.Have selected quartz sand particle size scope 100-120 mesh.
2nd, prepared by rock core
(1) assembly jig:First pad 3 is laid on above base plate 1, then square ring flat-plate 2 is placed in above pad 3, Base plate, pad and square ring flat-plate three are fixed by connector 5;
(2) cementing agent is prepared:The cementing agent by polyester resin, curing agent, levelling agent and barium sulfate by mass percentage Mix, wherein, polyester resin weight/mass percentage composition be 80%~94%, curing agent weight/mass percentage composition be 4.5%~ 14%, levelling agent weight/mass percentage composition is 1%~5%, and barium sulfate weight/mass percentage composition is 0.5%~1.0%;
(3) dispensing is die-filling:Quartz sand, clay mineral and cementing agent are mixed in proportion, cementing agent and quartz sand Mixing quality ratio is 1:100~200, the mixture for weighing four parts of identical weights is respectively charged in the rectangular through-hole of mould, by mould Tool is put on vibrating device and vibrates, and forms it into closely point contact to eliminate the bridging plug of mixture, then will with the instrument that strikes off Mixture surface strikes off, and briquetting is placed in mixture surface finally;
(4) compressing:Briquetting and body die are fixed using bolt, the mould for having loaded are placed on a hydraulic press, Precompressed 10min under the conditions of pressing pressure 50MPa~58MPa, then keeps constant pressure 50MPa voltage stabilizing 15min, using the pressure The reason for method processed is:First, the high 45mm of rock core, single rock core lifting surface area 45mm × 300mm, polylith rock core are suppressed together, Lifting surface area is larger, and pressure applied is bigger;Secondly, the disposable compacting that rock core pressing process is adopted, from vibrations side Formula eliminate crane span structure so that mixture lower half is tightr, but mixture lower half stress less (crushing presence), thus will be long when Between voltage stabilizing, make its compound particles way of contact more stable under the pressure condition;In real process, according to rock core to be made Determining size and the press time of pressure, core permeability is 2000mD or so to permeability herein, so adopting pressure above And the press time;
(5) it is heating and curing:Mould after by release is integrally put in high temperature oven, first toasts 240min at 98 DEG C, so After be warming up to 120 DEG C of baking 30min, be finally warming up to 210 DEG C of baking 10min, using the heating means be a little:First Temperature conditionss are that insulating box internal heat uniformly transfers to rock core each position so as to reach target temperature in order to conduct heat, Place mat is heated for next step;Polyester powder, under second temperature conditions starts to melt, but the time is difficult long, liquid meeting Flowing, causes pore structure to change, and frequent test of many times and rock core crush analytic electron microscope scanning, finally determine this value;? At three temperature, polyester powder curing molding;
(6) demoulding:Rock core in the mould that process is heating and curing takes out, and dismantles base plate and briquetting bolt, and hydraulic press connects Connect suspension ring and lift mould, then select iron block support mode bottom, rock core is ejected using briquetting, the artificial side of shaping is finally given Rock core.
In another kind of example, the preparation method of artificial side's rock core also includes that step (7) is cut:In air, nitrogen Or lower cutting rock core two ends of any one atmosphere protection in liquid nitrogen three, obtain length, width, height be respectively 300mm, Artificial side's rock core of 45mm, 45mm.
As described above, the invention has the advantages that:
First, the present invention can disposably prepare most four according to actual needs using the mould of designed, designed assembling Individual rock core, optimizes rock core briquetting internal structure, it is to avoid during tamping, because the gas impingement mix thing in rock core cavity Particle, changes the particle contact relation after being well mixed, or even mixture is gone out from exhaust passage, base plate, square ring flat-plate and The surface of briquetting is polished coarse, is conducive to quartz sand particle to agree with mould during tamping, and does not affect to take out rock The damage during heart to rock core wall;Secondly, the structure and size of the instrument of striking off improved, and the size strikes off instrument with mould phase Coupling, and scraper thickness is moderate, and scraper plate is formed with mould and most preferably agreed with, and can adjust blade height, can stability contorting scrape Flat board, it is ensured that strike-off stick is not inclined, it is ensured that strike off effect;Then, cementing agent is optimized in the present invention, by polyester tree Fat, curing agent, levelling agent and barium sulfate are mixed to prepare cementing agent by best in quality percentage, and which has more preferably to compound particles Cementation solidifying shaping effect, it is to avoid cementing agent content is excessive, is difficult to disperse, is directly cemented to the phenomenon of dead hole gap structure, And then obtain the artificial core of high-quality;Furthermore, in compressing step, compound particles contact side is made by precompressed and voltage stabilizing Formula is more stable under the pressure condition;Finally, toasted using gradient temperature, be transferred to even heat in insulating box through heat transfer Each position inside rock core, is that place mat is made in next step heating, makes the optimum temperature of polyester resin and melts under the time, it is to avoid hole Structure change, and then the rock core of function admirable is obtained.
Although embodiment of the present invention is disclosed as above, which is not restricted in specification and embodiment listed With.It can be applied to various suitable the field of the invention completely.For those skilled in the art, can be easily Realize other modification.Therefore, under the universal limited without departing substantially from claim and equivalency range, the present invention is not limited In specific details and shown here as the legend with description.

Claims (7)

1. a kind of mould for preparing artificial side's rock core, it is characterised in that include:
Base plate;
Pad, its are laid on the substrate;
Square ring flat-plate, its are located above the pad, empty into four rectangular through-holes arranged side by side in the middle of the square ring flat-plate, described Clear size of opening, the size of length × width × height is 300mm × 45mm × 135mm;
Briquetting group, it include four briquettings matched with rectangular through-hole, are provided with T fonts exhaust passage inside the briquetting, row Three ports of gas passage are located at pressed surface and the left and right side of briquetting respectively;
Instrument is struck off, and which includes scraper plate, crossbeam, elastic adjusting knob and size adjusting knob, size is provided with the scraper plate Scale, size adjusting knob include two clamping plates located at the side top of scraper plate, the crossbeam, and two clamping plate side edges are useful In the recess for accommodating the scraper plate, the recess of two clamping plates is oppositely arranged and scraper plate is clamped between two clamping plates, by elastic regulation Knob is fixed, and the scraper plate is slided up and down perpendicular to two clamping plates and relative to two clamping plates.
2. the mould of artificial side's rock core is prepared as claimed in claim 1, it is characterised in that the corner location of the square ring flat-plate It is respectively equipped with suspension ring.
3. the mould of artificial side's rock core is prepared as claimed in claim 1, it is characterised in that the mold interior wall surfaces roughness Ra≤0.025μm.
4. a kind of preparation method of artificial side's rock core, it is characterised in that comprise the steps:
(1) assembly jig;
(2) cementing agent is prepared:The cementing agent is mixed by mass percentage by polyester resin, curing agent, levelling agent and barium sulfate Form, wherein, polyester resin weight/mass percentage composition is 80%~94%, and curing agent weight/mass percentage composition is 4.5%~14%, stream Flat agent weight/mass percentage composition is 1%~5%, and barium sulfate weight/mass percentage composition is 0.5%~1.0%;
(3) dispensing is die-filling:Quartz sand, clay mineral and cementing agent are mixed in proportion, is loaded in the rectangular through-hole of mould;
(4) compressing:Briquetting and body die are fixed using bolt, the mould for having loaded is placed on a hydraulic press, in pressure Precompressed 10min under the conditions of pressing pressure 50MPa~58MPa, then keeps constant pressure 50MPa voltage stabilizing 15min;
(5) it is heating and curing:Mould after by release is integrally put in high temperature oven, first toasts 240min, Ran Housheng at 98 DEG C Temperature is finally warming up to 210 DEG C of baking 10min to 120 DEG C of baking 30min;
(6) demoulding:Rock core in the mould that process is heating and curing takes out, and dismantles base plate and briquetting bolt, and hydraulic press connection is hung Ring lifts mould, then selects iron block support mode bottom, ejects rock core using briquetting, finally give the artificial Fang Yan of shaping The heart.
5. the preparation method of artificial side's rock core as claimed in claim 4, it is characterised in that the cementing agent is mixed with quartz sand It is 1 to close mass ratio:100~200.
6. the preparation method of artificial side's rock core as claimed in claim 4, it is characterised in that in step (3), by mixture After adding mould, mould is put on vibrating device and is vibrated, then mixture surface is struck off with the instrument that strikes off, finally by briquetting It is placed in mixture surface.
7. the preparation method of artificial side's rock core as claimed in claim 4, it is characterised in that also include that step (7) is cut:In sky In gas, nitrogen or liquid nitrogen three, the lower cutting rock core two ends of any one atmosphere protection, obtain length, width, height respectively Artificial side's rock core for 300mm, 45mm, 45mm.
CN201710010829.3A 2016-12-12 2017-01-06 Mould for preparing artificial square rock core and preparation method of square rock core Active CN106501054B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201621357086 2016-12-12
CN2016213570864 2016-12-12

Publications (2)

Publication Number Publication Date
CN106501054A true CN106501054A (en) 2017-03-15
CN106501054B CN106501054B (en) 2023-08-11

Family

ID=58345190

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201720015746.9U Expired - Fee Related CN206321494U (en) 2016-12-12 2017-01-06 A kind of mould for preparing artificial side's rock core
CN201710010829.3A Active CN106501054B (en) 2016-12-12 2017-01-06 Mould for preparing artificial square rock core and preparation method of square rock core

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201720015746.9U Expired - Fee Related CN206321494U (en) 2016-12-12 2017-01-06 A kind of mould for preparing artificial side's rock core

Country Status (1)

Country Link
CN (2) CN206321494U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107160620A (en) * 2017-05-26 2017-09-15 广东工业大学 A kind of single mode mould for moulded of plastics material
CN109060484A (en) * 2018-10-08 2018-12-21 中国海洋石油集团有限公司 A kind of large scale rock core and preparation method thereof for permeability saturation curve measurement
CN111283935A (en) * 2020-03-09 2020-06-16 东北石油大学 High-efficient artificial rock core epoxy pours device

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206321494U (en) * 2016-12-12 2017-07-11 西南石油大学 A kind of mould for preparing artificial side's rock core

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4892553A (en) * 1988-03-29 1990-01-09 Ipos Gmbh & Co, Kg Artificial foot for a leg prosthesis
CN101280152A (en) * 2008-06-06 2008-10-08 周宝康 Plastic-spraying coating for plastic-spraying of bakelite products and spraying method thereof
CN201696039U (en) * 2010-06-02 2011-01-05 中国石油化工股份有限公司 Automatic filling device for long-pipe sand filling model
CN102052072A (en) * 2010-12-14 2011-05-11 中国海洋石油总公司 Sand-filled pipe device simulating two-dimensional drill core and provided with circular truncated cone shaped cylinder body
CN102628761A (en) * 2012-04-10 2012-08-08 东北石油大学 Artificial long core and preparation method thereof
CN103048178A (en) * 2013-01-22 2013-04-17 中国石油大学(华东) Method for preparing artificial rock core of simulated carbonate rock for acoustics experiment
CN203287234U (en) * 2013-04-25 2013-11-13 湖南中医药大学 Infrared spectrum pressing sheet die
CN104458383A (en) * 2014-12-19 2015-03-25 西南石油大学 Method for making artificial rock core
CN104511847A (en) * 2013-11-19 2015-04-15 东莞金太阳研磨股份有限公司 Method for manufacturing polyester film abrasive belt special for engine crankshaft
CN105176331A (en) * 2015-09-25 2015-12-23 科威嘉粉末涂料(天津)有限公司 Acrylic acid and silicon-aluminum composite high-heat-dissipation powder coating for engine
CN204936069U (en) * 2015-09-17 2016-01-06 惠州市璇瑰精密技术工业有限公司 A kind of injection mold with taper pin
CN105440911A (en) * 2015-12-18 2016-03-30 江苏兰陵高分子材料有限公司 Low temperature crosslinked high molecular composite material used for MDF sheet material, and preparation method thereof
CN105571917A (en) * 2015-12-28 2016-05-11 东北石油大学 Lengthened artificial rock core, and preparation method and preparation device thereof
CN105738179A (en) * 2016-04-18 2016-07-06 西南石油大学 Manufacturing method of low-cost sandstone artificial rock core for experimental teaching
CN205464327U (en) * 2016-01-12 2016-08-17 湖南华曙高科技有限责任公司 Shop's powder device of selectivity laser sintering equipment
CN206321494U (en) * 2016-12-12 2017-07-11 西南石油大学 A kind of mould for preparing artificial side's rock core

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4892553A (en) * 1988-03-29 1990-01-09 Ipos Gmbh & Co, Kg Artificial foot for a leg prosthesis
CN101280152A (en) * 2008-06-06 2008-10-08 周宝康 Plastic-spraying coating for plastic-spraying of bakelite products and spraying method thereof
CN201696039U (en) * 2010-06-02 2011-01-05 中国石油化工股份有限公司 Automatic filling device for long-pipe sand filling model
CN102052072A (en) * 2010-12-14 2011-05-11 中国海洋石油总公司 Sand-filled pipe device simulating two-dimensional drill core and provided with circular truncated cone shaped cylinder body
CN102628761A (en) * 2012-04-10 2012-08-08 东北石油大学 Artificial long core and preparation method thereof
CN103048178A (en) * 2013-01-22 2013-04-17 中国石油大学(华东) Method for preparing artificial rock core of simulated carbonate rock for acoustics experiment
CN203287234U (en) * 2013-04-25 2013-11-13 湖南中医药大学 Infrared spectrum pressing sheet die
CN104511847A (en) * 2013-11-19 2015-04-15 东莞金太阳研磨股份有限公司 Method for manufacturing polyester film abrasive belt special for engine crankshaft
CN104458383A (en) * 2014-12-19 2015-03-25 西南石油大学 Method for making artificial rock core
CN204936069U (en) * 2015-09-17 2016-01-06 惠州市璇瑰精密技术工业有限公司 A kind of injection mold with taper pin
CN105176331A (en) * 2015-09-25 2015-12-23 科威嘉粉末涂料(天津)有限公司 Acrylic acid and silicon-aluminum composite high-heat-dissipation powder coating for engine
CN105440911A (en) * 2015-12-18 2016-03-30 江苏兰陵高分子材料有限公司 Low temperature crosslinked high molecular composite material used for MDF sheet material, and preparation method thereof
CN105571917A (en) * 2015-12-28 2016-05-11 东北石油大学 Lengthened artificial rock core, and preparation method and preparation device thereof
CN205464327U (en) * 2016-01-12 2016-08-17 湖南华曙高科技有限责任公司 Shop's powder device of selectivity laser sintering equipment
CN105738179A (en) * 2016-04-18 2016-07-06 西南石油大学 Manufacturing method of low-cost sandstone artificial rock core for experimental teaching
CN206321494U (en) * 2016-12-12 2017-07-11 西南石油大学 A kind of mould for preparing artificial side's rock core

Non-Patent Citations (7)

* Cited by examiner, † Cited by third party
Title
CHEN HC ET AL: "Enhancement of attrition resistance and cyclic CO2 capture of calcium-based sorbent pellets", 《FUEL PROCESSING TECHNOLOGY》, vol. 116, pages 116 - 122 *
LIN YH ET AL: "Effect of asymmetric cooling system on in-mold roller injection molded part warpage", 《INTERNATIONAL COMMUNICATIONS IN HEAT AND MASS TRANSFER》, vol. 61, pages 111 - 117 *
PANG LIN: "Pore characteristics of the reservoir O1m541(lower Ordovician Majiagou formation) in Northern Jingbian gas field, the Ordos basin", 《NATURAL GAS INDUSTRY》, vol. 28, no. 6, pages 73 - 7 *
王磊: "定向井压裂裂缝扩展规律研究", 《中国优秀硕士学位论文全文数据库 (工程科技Ⅰ辑)》, no. 10, pages 019 - 36 *
薛建强等: "超低渗透油田降压增注体系的研究与应用" *
薛建强等: "超低渗透油田降压增注体系的研究与应用", 《岩性油气藏》, vol. 25, no. 6, pages 107 - 111 *
许园等: "驱替液黏度对多层非均质油藏聚驱吸液剖面返转及驱油效果影响", 《油田化学》, vol. 31, no. 4, pages 549 - 553 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107160620A (en) * 2017-05-26 2017-09-15 广东工业大学 A kind of single mode mould for moulded of plastics material
CN109060484A (en) * 2018-10-08 2018-12-21 中国海洋石油集团有限公司 A kind of large scale rock core and preparation method thereof for permeability saturation curve measurement
CN109060484B (en) * 2018-10-08 2021-06-15 中国海洋石油集团有限公司 Large-size rock core for relative permeability curve determination and preparation method thereof
CN111283935A (en) * 2020-03-09 2020-06-16 东北石油大学 High-efficient artificial rock core epoxy pours device
CN111283935B (en) * 2020-03-09 2021-12-21 东北石油大学 High-efficient artificial rock core epoxy pours device

Also Published As

Publication number Publication date
CN206321494U (en) 2017-07-11
CN106501054B (en) 2023-08-11

Similar Documents

Publication Publication Date Title
CN106501054A (en) A kind of mould for preparing artificial side's rock core and the preparation method of square rock core
CN102628761B (en) Artificial long core and preparation method thereof
US20190204191A1 (en) Method and device for preparing karst caves based on 3d printing technology
CN106596223B (en) Preparation method of rock core for dense conglomerate oil displacement
Dhara et al. Shape forming of ceramics via gelcasting of aqueous particulate slurries
CN109020364A (en) A kind of sandstone analog material and preparation method thereof
CN107063808A (en) A kind of compaction apparatus and drawing method for making rocks sample
CN101871863B (en) Test piece preparation mould special for shearing test and preparation method thereof
KR101458252B1 (en) Cast bodies, castable compositions, and methods for their production
CN109238799B (en) Preparation method of carbonate rock platy rock core with finely characterized crack structure
US6165926A (en) Castable refractory composition and methods of making refractory bodies
CN113434933B (en) Simulation analysis method for cracking of microcapsule in mixing process of asphalt mixture
WO2022083134A1 (en) Rock-like similar material and preparation method therefor
CN101892398A (en) Method for preparing ceramic/aluminum alloy gradient composite material
KR19990001003A (en) Pyrogenic cement mortar or concrete composition, heating element and method of manufacturing the same
Santacruz et al. Aqueous injection moulding of porcelains
CN108275977A (en) A kind of preparation method of polished bricks
CN113149671B (en) Casting molding process of light mullite-alumina hollow sphere-aluminum titanate sagger
ZA200604023B (en) Manufacture of moulded paving elements
CN106495647B (en) The manufacturing method of counterweight can be recycled in a kind of anti-corrosion
CN111396034A (en) Crack type artificial sandstone model and manufacturing method thereof
US5885510A (en) Methods of making refractory bodies
CN115180894A (en) Green brick for repairing ancient building wall and preparation method thereof
CN117164217B (en) Self-flow casting formed hole sealing material for molten tin bath bottom brick, and preparation method and application thereof
CN116358299A (en) Magnesia-chrome brick for RH furnace vacuum chamber and preparation method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant