CN106500950A - A kind of efficient large scale injection piping installation of air intake test - Google Patents
A kind of efficient large scale injection piping installation of air intake test Download PDFInfo
- Publication number
- CN106500950A CN106500950A CN201611092602.XA CN201611092602A CN106500950A CN 106500950 A CN106500950 A CN 106500950A CN 201611092602 A CN201611092602 A CN 201611092602A CN 106500950 A CN106500950 A CN 106500950A
- Authority
- CN
- China
- Prior art keywords
- air intake
- injector
- effusion meter
- stable section
- wind
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01M9/00—Aerodynamic testing; Arrangements in or on wind tunnels
- G01M9/02—Wind tunnels
- G01M9/04—Details
Landscapes
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- General Physics & Mathematics (AREA)
- Aerodynamic Tests, Hydrodynamic Tests, Wind Tunnels, And Water Tanks (AREA)
Abstract
A kind of efficient large scale injection piping installation of air intake test, belongs to wind-tunnel technique field, and the present invention does not reach air intake duct actual flow in order to solve the problems, such as to fully rely on wind-tunnel flowing punching press.After effusion meter, effusion meter, after diffuser, effusion meter, after stable section, flow control valve, regulating valve, after stable section, regulating valve, before diffuser, injector, stable section and injector are sequentially connected with, and be located on same axis, and path is formed, its overall pipeline is arranged on wind-tunnel center.A kind of efficient large scale injection piping installation of air intake test of the invention can produce the air intake duct necessary flow met installed in pipeline front end under the ejector action of high pressure gas, and air intake duct wind tunnel test can be made to realize that big flow is simulated.
Description
Technical field
The present invention relates to a kind of injection piping installation, and in particular to a kind of efficient large scale injection pipeline dress of air intake test
Put, belong to wind-tunnel technique field.
Background technology
Air intake duct directly affects the cooperation of aircraft and engine as stream in aircraft and outflow interface unit, its performance
Performance, air intake duct are designed by aircraft type unit, pay close attention to loss of the air intake duct under design discharge, steady dynamic distortion ginseng
Number, stall margin etc., these parameters are general by wind tunnel test acquisition and checking in the airplane design stage, and air intake duct wind-tunnel is tried
Test, generally the actual stream of air intake duct is not reached flowing punching press using without the independent air intake test mode of electromotor, fully relying on wind-tunnel
Amount, simulating Flow Field In An Inlet, injector is used as a kind of fluid conveying being widely used in the draw inlet road that need to take measures
Device, has more application in terms of simulation Flow Field In An Inlet, and in air intake duct wind tunnel test, injector is arranged in pipeline,
Composition injection pipeline, produces the air intake duct necessary flow met installed in pipeline front end under the ejector action of high pressure gas;Existing
Partial-air admission road test pipe-line system, by pipeline size limitation, flow simulation ability can not meet big flow air intake test
Demand, if the whole wind-tunnel pipe-line system of transformation, will pay larger cost, aspiration will install effusion meter, Flow-rate adjustment in addition
The devices such as valve, circuit design are slightly unreasonable, and line loss will be caused to be increased dramatically.Accordingly, it would be desirable to a kind of wind-tunnel air intake test
Efficiently large scale injection piping installation, to meet air intake duct necessary flow, improves air intake test ability.
Content of the invention
It is an object of the invention to provide a kind of efficient large scale injection piping installation of air intake test, to solve because of air intake duct
Underfed and the problem of big flow simulation test can not be carried out.
A kind of efficient large scale injection piping installation of air intake test includes diffuser, stream after effusion meter, effusion meter
Stable section and injector before diffuser, injector after stable section, regulating valve after stable section, flow control valve, regulating valve after gauge;
Stable section, regulating valve after stable section, flow control valve, regulating valve after diffuser, effusion meter after effusion meter, effusion meter
Before diffuser, injector, stable section and injector are sequentially connected with afterwards, and are located on same axis, and form path, its integral tube
Road is arranged on wind-tunnel center.
Preferably:Effusion meter is connected with wind-tunnel air intake port pipeline.
Preferably:Injector is provided with high pressure connector, and injector is connected with high-pressure air source by high pressure connector.
The present invention is had the effect that compared with existing product:Air intake test simulation of flow field energy can be significantly improved
Power, pipeline suction flow are big, and loss is little, has flow measurement and regulating power concurrently, does not destroy the original air intake duct pipe-line system of wind-tunnel.
Description of the drawings
Fig. 1 is a kind of front view figure of the efficient large scale injection piping installation of air intake test of the present invention;
Fig. 2 is the side view of Fig. 1.
In figure:After 1- effusion meters, 2- effusion meters, after diffuser, 3- effusion meters, stable section, 4- effusion meter regulating valves, 5- are adjusted
Stable section, 8- injectors, 9- high pressure connectors before diffuser, 7- injectors after stable section, 6- regulating valves after valve.
Specific embodiment
The preferred embodiment of the present invention is elaborated below according to accompanying drawing.
As shown in Figure 1 to Figure 2, a kind of efficient large scale injection piping installation of air intake test of the present invention includes flowing
Expand after stable section 5, regulating valve after stable section 3, flow control valve 4, regulating valve after diffuser 2, effusion meter after gauge 1, effusion meter
Stable section 7 and injector 8 before scattered section 6, injector;
Stable after stable section 3, flow control valve 4, regulating valve after diffuser 2, effusion meter after the effusion meter 1, effusion meter
After section 5, regulating valve, before diffuser 6, injector, stable section 7 and injector 8 are sequentially connected with, and are located on same axis, and are formed
Path, its overall pipeline are arranged on wind-tunnel center, and effusion meter 1 is connected on the pipeline of air channel air intake duct part, and injector 8 is connected with
High-pressure air source, high pressure gas expand to form supersonic airstream through injector nozzle, injection air intake duct low-pressure air current, enter after mixing
In wind-tunnel diffuser, and then the purpose for simulating Flow Field In An Inlet is reached, can be to pipeline by effusion meter 1 and flow control valve 4
Interior air-flow flow is measured and regulation.
Further:The efficient large scale injection piping installation of air intake test of the invention substantially increases the examination of air intake duct wind-tunnel
The analog capability of flow field is tested, maximum outside diameter 458mm, maximum analog flow bring up to 3.2kg/s, this device pipe from 1.8kg/s
The optimized modular design of road rectifying part, line loss are little, and induction efficiency improved 0.12 more originally, this piping installation be applied to into
Stable in air flue wind tunnel test, install, it is convenient to dismantle.
Further:Injector 8 is provided with high pressure connector 9, and injector 8 is connected with high-pressure air source by high pressure connector 9.
Present embodiment is the exemplary illustration to this patent, does not limit its protection domain, people in the art
Member can also be locally changed to which, as long as no the spirit beyond this patent, all in the protection domain of this patent.
Claims (3)
1. the efficient large scale injection piping installation of a kind of air intake test, it is characterised in that:After including effusion meter (1), effusion meter
Diffuser after stable section (5), regulating valve after stable section (3), flow control valve (4), regulating valve after diffuser (2), effusion meter
(6), stable section (7) and injector (8) before injector;
Behind effusion meter (1), effusion meter after diffuser (2), effusion meter after stable section (3), flow control valve (4), regulating valve
After stable section (5), regulating valve, before diffuser (6), injector, stable section (7) and injector (8) are sequentially connected with, and are located at same axle
On line, and path is formed, its overall pipeline is arranged on wind-tunnel center.
2. the efficient large scale injection piping installation of a kind of air intake test according to claim 1, it is characterised in that:Flow
Meter (1) is connected with wind-tunnel air intake port pipeline.
3. the efficient large scale injection piping installation of a kind of air intake test according to claim 1 and 2, it is characterised in that:
Injector (8) is provided with high pressure connector (9), and injector (8) is connected with high-pressure air source by high pressure connector (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611092602.XA CN106500950A (en) | 2016-12-02 | 2016-12-02 | A kind of efficient large scale injection piping installation of air intake test |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611092602.XA CN106500950A (en) | 2016-12-02 | 2016-12-02 | A kind of efficient large scale injection piping installation of air intake test |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106500950A true CN106500950A (en) | 2017-03-15 |
Family
ID=58329513
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611092602.XA Pending CN106500950A (en) | 2016-12-02 | 2016-12-02 | A kind of efficient large scale injection piping installation of air intake test |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106500950A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111855132A (en) * | 2020-08-28 | 2020-10-30 | 中国航空工业集团公司沈阳空气动力研究所 | Flutter test safety protection system and method |
CN113945355A (en) * | 2021-09-21 | 2022-01-18 | 中国航空工业集团公司西安飞机设计研究所 | Air inlet duct wind tunnel test simulation system under shock wave |
CN117329740A (en) * | 2023-11-29 | 2024-01-02 | 中国航空工业集团公司金城南京机电液压工程研究中心 | Injection assembly and aircraft thermal management system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103499447A (en) * | 2013-10-09 | 2014-01-08 | 北京动力机械研究所 | Zero mach number testing device applied to turbine engine |
CN104458189A (en) * | 2014-10-17 | 2015-03-25 | 北京航天益森风洞工程技术有限公司 | Process layout method for conventional hypersonic speed wind tunnel |
CN204495535U (en) * | 2015-03-20 | 2015-07-22 | 中国航天空气动力技术研究院 | 1.2 meters of magnitude wind-tunnel represent dynamically injectors |
CN104848904A (en) * | 2015-06-05 | 2015-08-19 | 中国航天空气动力技术研究院 | Air duct flow measuring system |
CN105628331A (en) * | 2015-12-28 | 2016-06-01 | 中国航天空气动力技术研究院 | Energy-saving environment-friendly layout of large-scale routine hypersonic wind tunnel |
CN206192621U (en) * | 2016-12-02 | 2017-05-24 | 中国航空工业集团公司哈尔滨空气动力研究所 | Experimental high -efficient jumbo size of intake duct is drawn and is penetrated piping installation |
-
2016
- 2016-12-02 CN CN201611092602.XA patent/CN106500950A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103499447A (en) * | 2013-10-09 | 2014-01-08 | 北京动力机械研究所 | Zero mach number testing device applied to turbine engine |
CN104458189A (en) * | 2014-10-17 | 2015-03-25 | 北京航天益森风洞工程技术有限公司 | Process layout method for conventional hypersonic speed wind tunnel |
CN204495535U (en) * | 2015-03-20 | 2015-07-22 | 中国航天空气动力技术研究院 | 1.2 meters of magnitude wind-tunnel represent dynamically injectors |
CN104848904A (en) * | 2015-06-05 | 2015-08-19 | 中国航天空气动力技术研究院 | Air duct flow measuring system |
CN105628331A (en) * | 2015-12-28 | 2016-06-01 | 中国航天空气动力技术研究院 | Energy-saving environment-friendly layout of large-scale routine hypersonic wind tunnel |
CN206192621U (en) * | 2016-12-02 | 2017-05-24 | 中国航空工业集团公司哈尔滨空气动力研究所 | Experimental high -efficient jumbo size of intake duct is drawn and is penetrated piping installation |
Non-Patent Citations (3)
Title |
---|
曲方亮 等: "高速风洞引射式进排气动力模拟试验研究", 《流体力学实验与测量》 * |
李周复: "《风洞试验手册》", 31 January 2015, 航空工业出版社 * |
高静 等: "进气道低速特性试验技术研究", 《流体力学实验与测量》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111855132A (en) * | 2020-08-28 | 2020-10-30 | 中国航空工业集团公司沈阳空气动力研究所 | Flutter test safety protection system and method |
CN113945355A (en) * | 2021-09-21 | 2022-01-18 | 中国航空工业集团公司西安飞机设计研究所 | Air inlet duct wind tunnel test simulation system under shock wave |
CN113945355B (en) * | 2021-09-21 | 2024-01-30 | 中国航空工业集团公司西安飞机设计研究所 | Air inlet channel wind tunnel test simulation system under shock wave |
CN117329740A (en) * | 2023-11-29 | 2024-01-02 | 中国航空工业集团公司金城南京机电液压工程研究中心 | Injection assembly and aircraft thermal management system |
CN117329740B (en) * | 2023-11-29 | 2024-01-30 | 中国航空工业集团公司金城南京机电液压工程研究中心 | Injection assembly and aircraft thermal management system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206192621U (en) | Experimental high -efficient jumbo size of intake duct is drawn and is penetrated piping installation | |
CN107505138B (en) | A kind of complicated distortion generator for Compressor Stability test | |
CN102478451A (en) | Active flow control testing unit for air inlet duct of high-speed wind tunnel | |
CN106500950A (en) | A kind of efficient large scale injection piping installation of air intake test | |
EP2541022A3 (en) | Gas turbine inlet heating system | |
CN201637579U (en) | Air supply system of engine air passage flow stabilizing test device | |
CN201047802Y (en) | Valve tester | |
CN104833476A (en) | Low Mach number system of trisonics wind tunnel | |
CN101718636B (en) | Full-height fan flow rate-pressure rise test device and test method | |
PL402286A1 (en) | A system for compressor bleeding expansion, especially for gas turbine engines | |
CN104458190A (en) | Liquid air source energy-saving efficient wind tunnel device and method thereof | |
CN203635048U (en) | Guide device for ventilation air methane oxidation | |
CN107367368A (en) | A kind of high-precision microjet experiment piping installation | |
CN207715443U (en) | A kind of twin-stage low-pressure injection exhaust apparatus | |
US8371162B2 (en) | Apparatus and method for testing a compressor | |
CN202133528U (en) | Active flow control experimental device for high-speed wind tunnel air intake duct | |
CN107874810B (en) | Integrated gas circuit system of pneumatic ballistic type shock wave therapeutic instrument | |
CN105806873B (en) | The cold effect experimental rigs of expansion ratios such as combustion engine turbine blade cooling | |
CN106404405A (en) | Apparatus for injecting tail gas and inflow hot air in vacuum cabin of ramjet | |
CN205146011U (en) | Take static mixer of impeller | |
CN204556341U (en) | A kind of spectrochemical analysis for gases vacuum core sampler | |
CN204286730U (en) | The system of breathing heavily is moved back in a kind of bypass for Compressor test part | |
CN207180984U (en) | A kind of high-precision microjet experiment piping installation | |
CN210029245U (en) | Pneumatic conveying pipeline gas distribution system | |
CN203837751U (en) | Metering system for turbine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170315 |