CN106499943A - Can monitor in real time pressure and vacuum liquefied natural gas carrier vehicle - Google Patents

Can monitor in real time pressure and vacuum liquefied natural gas carrier vehicle Download PDF

Info

Publication number
CN106499943A
CN106499943A CN201510557954.7A CN201510557954A CN106499943A CN 106499943 A CN106499943 A CN 106499943A CN 201510557954 A CN201510557954 A CN 201510557954A CN 106499943 A CN106499943 A CN 106499943A
Authority
CN
China
Prior art keywords
tank body
pipeline
interior
outer tank
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510557954.7A
Other languages
Chinese (zh)
Inventor
王少宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN HONGHAOYUAN TECHNOLOGY Co Ltd
Original Assignee
TIANJIN HONGHAOYUAN TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN HONGHAOYUAN TECHNOLOGY Co Ltd filed Critical TIANJIN HONGHAOYUAN TECHNOLOGY Co Ltd
Priority to CN201510557954.7A priority Critical patent/CN106499943A/en
Publication of CN106499943A publication Critical patent/CN106499943A/en
Pending legal-status Critical Current

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention discloses a kind of can monitor in real time pressure and vacuum liquefied natural gas carrier vehicle, including locomotive and the LNG storage tank being arranged on locomotive, the LNG storage tank includes three layers of tank body, interior tank body, first outer tank body and second outer tank body are followed successively by from inside to outside, interior tank body is used for storing liquefied natural gas, closed vacuum heat-insulation interlayer is provided between interior tank body and the first outer tank body, is also equipped with closed vacuum heat-insulation interlayer between the first outer tank body and the second outer tank body;Which is provided with two pressure transducers, by pressure condition in two pressure transducer real-time monitoring inner canister bodies, plays a part of dual fail-safe;Two air vents are set, play a part of dual fail-safe;Vacuum detecting and control device is provided with, so as to ensure the vacuum heat-insulation of interlayer, prevents interior tank body thermal stress increase from producing dangerous;Liquid circulation line is provided with, vortex phenomenon is prevented;It is additionally provided with inert gas import.

Description

Can monitor in real time pressure and vacuum liquefied natural gas carrier vehicle
Technical field
The invention belongs to technical field transported safely by liquefied natural gas, relating in particular to one kind can monitor in real time pressure and true The liquefied natural gas carrier vehicle of reciprocal of duty cycle.
Background technology
Natural gas is inflammable and explosive fuel, and natural gas will be liquefied as through ultralow temperature (- 162 DEG C) normal pressure in storage transport Liquefied natural gas LNG (Liquefied Natural Gas), the storage temperature very bottom of LNG and the danger for being susceptible to explode And there is no the certain potential safety hazard of person in its filling and storage transportation, this is just to its storage facilities and means of transport Safe and reliable strict demand is just proposed.
Content of the invention
It is an object of the invention to overcoming the deficiencies in the prior art, there is provided a kind of can monitor in real time pressure and vacuum liquefaction Natural gas transportation car.
The present invention employs the following technical solutions to realize:
A kind of can monitor in real time pressure and vacuum liquefied natural gas carrier vehicle, including locomotive and be arranged on locomotive LNG storage tank, the LNG storage tank include three layers of tank body, are followed successively by interior tank body, the first outer tank body and second from inside to outside Outer tank body, interior tank body are used for storing liquefied natural gas, are provided with closed vacuum heat-insulation between interior tank body and the first outer tank body Interlayer, is also equipped with closed vacuum heat-insulation interlayer between the first outer tank body and the second outer tank body;
Interior tank body is provided with liquid entrance by pipeline, and arranges the first valve on pipeline,
The top of interior tank interior is provided with exhaust apparatus, exhaust apparatus by one-to-two pipeline respectively with air vent and standby Air vent is connected, and is provided with first pressure sensor and second pressure sensor on the main pipeline of one-to-two pipeline, The second valve is provided with the subtube of the one-to-two pipeline being connected with air vent in exhaust apparatus, in exhaust apparatus and standby row Standby second valve is provided with the subtube of the one-to-two pipeline that QI KOU is connected;
The bottom of interior tank interior is provided with noble gases uniform distributor, and noble gases uniform distributor is entered with noble gases Mouth is connected by pipeline, and on the pipeline that noble gases uniform distributor is connected with inert gas import is provided with the 3rd Valve;
Vacuum heat-insulation interlayer between interior tank body and the first outer tank body is provided with vacuumizing and exhausting mouth by pipeline, and in pipeline On be disposed with vacuum degree measurement sensor, the 4th valve and vacuum pump;
Liquid circulation lines, liquid circulation lines are provided with vacuum heat-insulation interlayer between interior tank body and the first outer tank body Circulation import be arranged on the bottom of interior tank body, the loop exit of liquid circulation lines is arranged on the top of interior tank body, liquid The 5th valve and circulating pump are set gradually along circulation import to loop exit on circulating line;
The first pressure sensor, second pressure sensor and vacuum degree measurement sensor respectively be arranged on locomotive driving First pressure on the console of room shows that table, second pressure show that table and vacuum show table electrical connection.
In above-mentioned technical proposal, the left end of the second outer tank body is provided with level gauging pipeline, level gauging pipeline upper Mouth is connected with the top of interior tank body through the second outer tank body with the first outer tank body, and the lower mouth of level gauging pipeline passes through second Outer tank body is connected with the bottom of interior tank body with the first outer tank body, is set gradually along mouth suitable for reading to lower on level gauging pipeline There are the 6th valve, liquidometer and the 7th valve.
The advantages of the present invention are:
By pressure condition in first pressure sensor and second pressure sensor real-time monitoring inner canister body, when pressure is excessive Control the second valve or standby second valve opens (standby second valve is opened when the second valve goes wrong), in internal tank body Portion deflated with reduce the pressure in inner canister body prevent pressure increase and explode;Using first pressure sensor and Two pressure transducers are monitored simultaneously can be prevented from causing potential safety hazard because of one of pressure transducer failure, so as to The effectiveness of pressure monitoring is increased, plays a part of dual fail-safe.Meanwhile, using by air vent and standby air vent and Control its each self-purging second valve and standby second valve group into double-exhaust control system design, equally can prevent because of which In an air vent valve failure and cause potential safety hazard, so as to increased the effectiveness of aerofluxuss, equally play dual fail-safe work With.
(the situation that is especially canned first or there is more air in interior tank body when the canned work of natural gas is carried out Under), noble gases are filled with into inner storage tank by inert gas import and noble gases uniform distributor, and pass through aerofluxuss Air in inner storage tank is discharged by device from air vent, so that the content in the gas in inner canister body reaches safe requirement, Prevent air and natural gas mixing from causing danger.
By the vacuum in vacuum degree measurement sensor real-time monitoring vacuum heat-insulation the interlayer, (vacuum when vacuum declines Insulating sandwich can not possibly be completely closed, and its vacuum slowly can decline under normal circumstances), vacuum pump simultaneously opened by the 4th valve Work carries out evacuation, so as to ensure the vacuum heat-insulation of vacuum heat-insulation interlayer, prevents interior tank body thermal stress increase from producing Dangerous.
The liquefied natural gas of the multiple filling in inner canister body can be made to be sufficiently mixed uniformly by open the circulation pump and the 5th valve, Prevent vortex phenomenon (during LNG Storage, Transport, it may occur that a kind of non-stability phenomenon for being known as being vortexed.Whirlpool Rotation be due to filling new LNG liquid in the low temperature storing tank for have been loaded with LNG, or due to LNG in nitrogen preferential evaporation And it is layered the liquid in storage tank.Each layer liquid after layering is formed each solely under the heating that storage tank perisporium leaks heat Vertical free convection circulation.The circulation makes the density of each layer liquid constantly change, when the density of adjacent two layers liquid near During patibhaga-nimitta etc., two liquid layers will occur strong mixing, and so as to cause overheated liquefied natural gas in storage tank, evaporation is drawn in a large number The accident of sending out).
The first pressure sensor of LNG storage tank, second pressure sensor and vacuum degree measurement sensor respectively be arranged on machine First pressure on car driver's cabin console shows that table, second pressure show that table and vacuum show table electrical connection, so may be used So that the safe condition of driver's convenient real-time monitoring LNG storage tank in driver's cabin in driving procedure.
Description of the drawings
Fig. 1 is the structural representation of the present invention.
Fig. 2 is the structural representation of the LNG storage tank in the present invention.
Fig. 3 is the structural representation of the locomotive driving cabin console in the present invention.
Wherein:1 is locomotive, and 2 is LNG storage tank, and G-1 is interior tank body, and G-2 is the first outer tank body, and G-3 is outside second Tank body, a is exhaust apparatus, and b is noble gases uniform distributor, and K1 is liquid entrance, and K2 is air vent, K2-1 For standby air vent, K3 is inert gas import, and K4 is vacuumizing and exhausting mouth, and L1 is liquid circulation lines, and L2 is liquid Position measurement pipeline, P1 be first pressure sensor, P2 be second pressure sensor, R be vacuum degree measurement sensor, LG For liquidometer, D1 is vacuum pump, and D2 is circulating pump, and V1 is the first valve, and V2 is the second valve, and V2-1 is standby second Valve, V3 are the 3rd valve, and V4 is the 4th valve, and V5 is the 5th valve, and V6 is the 6th valve, and V7 is the 7th valve, and P1-1 is the One pressure display table, P2-1 are that second pressure shows table, and R-1 is that vacuum shows table.
Specific embodiment
Technical scheme is further illustrated with reference to specific embodiment.
As shown in Figure 1, involved in the present invention a kind of can monitor in real time pressure and vacuum liquefied natural gas carrier vehicle Including locomotive 1 and the LNG storage tank 2 being arranged on locomotive;As shown in Figure 2, the LNG storage tank 2 includes three layers Tank body, is followed successively by interior tank body G-1, the first outer tank body G-2 and the second outer tank body G-3 from inside to outside, and interior tank body is used for storing Liquefied natural gas, is provided with closed vacuum heat-insulation interlayer, the first outer tank between interior tank body G-1 and the first outer tank body G-2 Be also equipped with closed vacuum heat-insulation interlayer between body G-2 and the second outer tank body G-3, by two-layer vacuum heat-insulation interlayer come In realizing, the liquefied natural gas of tank interior is heat-insulated with the external world, with avoid liquefied natural gas because temperature raise vaporization cause interior The danger that the pressure of tank body increases and occurs to explode, compares traditional one layer vacuum heat-insulation interlayer, and the present invention has more safety.
Interior tank body G-1 is provided with liquid entrance K1 by pipeline, and arranges the first valve V1 on pipeline, by liquid Import and export K1 and complete the canned and discharging operation to liquefied natural gas, the first valve V1 controls the unlatching of liquid entrance K1 And closed mode.
Top inside interior tank body G-1 is provided with exhaust apparatus a, exhaust apparatus a by one-to-two pipeline respectively with air vent K2 is connected with standby air vent K2-1, and be provided with the main pipeline of one-to-two pipeline first pressure sensor P1 and Second pressure sensor P2, is provided with the subtube of the one-to-two pipeline being connected with air vent K2 in exhaust apparatus a Two valve V2, are provided with standby on the subtube of the one-to-two pipeline being connected with standby air vent K2-1 in exhaust apparatus a Two valve V2-1;Pressure condition in tank body G-1 in first pressure sensor P1 and second pressure sensor P2 real-time monitorings, Control the second valve V2 or standby second valve V2 unlatchings (to open when the second valve V2 goes wrong standby when pressure is excessive With the second valve V2), deflated inside internal tank body G-1 with reduce the pressure in inner canister body prevent pressure increase and occur Blast;Being monitored using first pressure sensor P1 and second pressure sensor P2 simultaneously can prevent because of one of them Pressure transducer failure and cause potential safety hazard, so as to increased the effectiveness of pressure monitoring, play a part of dual fail-safe. Meanwhile, using by air vent K2 and standby air vent K2-1 and controlling its each self-purging second valve V2 and standby The double-exhaust control system design of two valve V2-1 compositions, can equally prevent from causing because of the valve failure of one of air vent Potential safety hazard, so as to increased the effectiveness of aerofluxuss, equally plays dual fail-safe effect.
Bottom inside interior tank body G-1 is provided with noble gases uniform distributor b, noble gases uniform distributor b with lazy Property gas feed K3 is connected by pipeline, and be connected with inert gas import K3 in noble gases uniform distributor b The 3rd valve V3 is provided with pipeline;It is (especially canned first or in interior tank body when the canned work of natural gas is carried out In the case of there is more air), in order to ensure safety, by inert gas import K3 and noble gases uniform distributor B is filled with noble gases into inner storage tank, and discharges the air in inner storage tank from air vent K2 by exhaust apparatus a, with Make the content in the gas in inner canister body reach safe requirement, prevent air and natural gas mixing from causing danger.
Vacuum heat-insulation interlayer between interior tank body G-1 and the first outer tank body G-2 is provided with vacuumizing and exhausting mouth by pipeline K4, and vacuum degree measurement sensor R, the 4th valve V4 and vacuum pump D1 is disposed with pipeline;By vacuum Vacuum in detection sensor R real-time monitoring interlayer, when vacuum declines (interior tank body G-1 and outer tank body G-2 it Between interlayer can not possibly be completely closed, its vacuum slowly can decline under normal circumstances), the 4th valve V4 opens simultaneously vacuum pump D1 work carries out evacuation, so as to ensure the vacuum heat-insulation of interlayer, prevents interior tank body thermal stress increase from producing dangerous.
Liquid circulation lines L1, liquid are provided with vacuum heat-insulation interlayer between interior tank body G-1 and the first outer tank body G-2 The circulation import of body circulation pipeline L1 is arranged on the bottom of interior tank body G-1, and the loop exit of liquid circulation lines L1 is arranged On the top of interior tank body G-1, on liquid circulation lines L1 along circulation import to loop exit set gradually the 5th valve V5 and Circulating pump D2;The liquefied natural gas that multiple filling in inner canister body can be made by open the circulation pump D2 and the 5th valve V5 It is sufficiently mixed uniform, prevents vortex phenomenon (during LNG Storage, Transport, it may occur that a kind of be known as being vortexed Non- stability phenomenon.Vortex is due to filling new LNG liquid in the low temperature storing tank for have been loaded with LNG, or due to LNG In nitrogen preferential evaporation and be layered the liquid in storage tank.Each layer liquid after layering leaks the heating of heat in storage tank perisporium Under, form each independent free convection circulation.The circulation makes the density of each layer liquid constantly change, when adjacent two During the density approximately equal of layer liquid, two liquid layers will occur strong mixing, so as to cause overheated liquefaction day in storage tank So gas evaporates accidents caused in a large number).
The left end of the second outer tank body G-3 is provided with level gauging pipeline L2, the suitable for reading of level gauging pipeline L2 passes through Two outer tank bodies G-3 and the first outer tank body G-2 are connected with the top of interior tank body G-1, the lower mouth of level gauging pipeline L2 It is connected through the second outer tank body G-3 and the first outer tank body G-2 with the bottom of interior tank body G-1, on level gauging pipeline The 6th valve V6, liquidometer LG and the 7th valve V7 are disposed with along mouth suitable for reading to lower;Inner canister is detected by liquidometer LG Internal liquid level.
As shown in figure 3, first pressure sensor P1, the second pressure sensor P2 of LNG storage tank and vacuum degree measurement are passed Sensor R respectively with the first pressure display table P1-1, second pressure display table P2-1 being arranged on locomotive driving cabin console Show that the pressure signal of detection is passed to first pressure display table by table R-1 electrical connections, first pressure sensor P1 with vacuum P1-1 shows that the pressure signal of detection is passed to second pressure display table P2-1 and shows pressure by pressure, second pressure sensor P2 The vacuum signal of detection is passed to vacuum display table R-1 and shows vacuum by power, vacuum display table R-1, so may be used So that the safe condition of driver's convenient real-time monitoring LNG storage tank in driver's cabin in driving procedure.
Exemplary description has been done to the present invention above, it should explanation, in the case of the core without departing from the present invention, Any simple deformation, modification or other skilled in the art can not spend the equivalent of creative work to fall Enter protection scope of the present invention.

Claims (2)

1. a kind of can monitor in real time pressure and vacuum liquefied natural gas carrier vehicle, including locomotive and be arranged on locomotive LNG storage tank, it is characterised in that:The LNG storage tank includes three layers of tank body, be followed successively by from inside to outside interior tank body, first Outer tank body and the second outer tank body, are provided with closed vacuum heat-insulation interlayer, the first outer tank between interior tank body and the first outer tank body Closed vacuum heat-insulation interlayer is also equipped between body and the second outer tank body;
Interior tank body is provided with liquid entrance by pipeline, and arranges the first valve on pipeline;
The top of interior tank interior is provided with exhaust apparatus, exhaust apparatus by one-to-two pipeline respectively with air vent and standby Air vent is connected, and is provided with first pressure sensor and second pressure sensor on the main pipeline of one-to-two pipeline, The second valve is provided with the subtube of the one-to-two pipeline being connected with air vent in exhaust apparatus, in exhaust apparatus and standby row Standby second valve is provided with the subtube of the one-to-two pipeline that QI KOU is connected;
The bottom of interior tank interior is provided with noble gases uniform distributor, and noble gases uniform distributor is entered with noble gases Mouth is connected by pipeline, and on the pipeline that noble gases uniform distributor is connected with inert gas import is provided with the 3rd Valve;
Vacuum heat-insulation interlayer between interior tank body and the first outer tank body is provided with vacuumizing and exhausting mouth by pipeline, and in pipeline On be disposed with vacuum degree measurement sensor, the 4th valve and vacuum pump;
Liquid circulation lines, liquid circulation lines are provided with vacuum heat-insulation interlayer between interior tank body and the first outer tank body Circulation import be arranged on the bottom of interior tank body, the loop exit of liquid circulation lines is arranged on the top of interior tank body, liquid The 5th valve and circulating pump are set gradually along circulation import to loop exit on circulating line;
The first pressure sensor, second pressure sensor and vacuum degree measurement sensor respectively be arranged on locomotive driving First pressure on the console of room shows that table, second pressure show that table and vacuum show table electrical connection.
2. according to claim 1 can monitor in real time pressure and vacuum liquefied natural gas carrier vehicle, its feature exists In:The left end of the second outer tank body is provided with level gauging pipeline, level gauging pipeline suitable for reading pass through the second outer tank body and First outer tank body is connected with the top of interior tank body, and the lower mouth of level gauging pipeline is through the second outer tank body and the first outer tank body Be connected with the bottom of interior tank body, on level gauging pipeline along mouth suitable for reading to lower be disposed with the 6th valve, liquidometer and 7th valve.
CN201510557954.7A 2015-09-06 2015-09-06 Can monitor in real time pressure and vacuum liquefied natural gas carrier vehicle Pending CN106499943A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510557954.7A CN106499943A (en) 2015-09-06 2015-09-06 Can monitor in real time pressure and vacuum liquefied natural gas carrier vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510557954.7A CN106499943A (en) 2015-09-06 2015-09-06 Can monitor in real time pressure and vacuum liquefied natural gas carrier vehicle

Publications (1)

Publication Number Publication Date
CN106499943A true CN106499943A (en) 2017-03-15

Family

ID=58286282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510557954.7A Pending CN106499943A (en) 2015-09-06 2015-09-06 Can monitor in real time pressure and vacuum liquefied natural gas carrier vehicle

Country Status (1)

Country Link
CN (1) CN106499943A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110207005A (en) * 2019-06-30 2019-09-06 河南查瑞特种设备有限公司 A kind of mobile natural gas filling vehicle

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110207005A (en) * 2019-06-30 2019-09-06 河南查瑞特种设备有限公司 A kind of mobile natural gas filling vehicle

Similar Documents

Publication Publication Date Title
CN205026375U (en) Liquefied natural gas transport vechicle with high security
CN106499938A (en) Safety anti-explosive formula liquefied natural gas carrier vehicle
CN104220247B (en) The manufacture method of honeycomb and honeycomb with the honeycomb core being be arranged in parallel with plate surface
CN205026373U (en) But LNG transport vechicle of real time monitoring pressure and vacuum
CN106499939A (en) The explosion-proof LNG of pressure control transports storage tank
CN106499941A (en) Protected against explosion liquefied natural gas carrier vehicle
CN102297749A (en) Comprehensive test device for air tightness and water pressure resistance of mining mobile escape capsule
CN201763380U (en) Movable rescue capsule of mine
EP3938697B1 (en) A fuel tank arrangement in a marine vessel and a method of relieving hydrogen from a liquid hydrogen fuel tank arrangement
CN106499951A (en) A kind of liquefied natural gas carrier vehicle with pressure monitor function
CN103608155A (en) High temperature thermal modification process of wood in a vacuum autoclave
CN106499953A (en) There is the LNG storage devices of pressure monitor and vacuum control function
CN106499943A (en) Can monitor in real time pressure and vacuum liquefied natural gas carrier vehicle
CN107719102A (en) New-energy automobile dual system shares expansion tank
CN106499952A (en) A kind of high security LNG transport vehicle
CN106499942A (en) For storing the storage tank of liquefied natural gas
CN207312324U (en) A kind of anti-leak chemical raw material barrel of self-repair
CN106499944A (en) Liquefied natural gas transport storage tank
CN106499940A (en) A kind of high insulation protected against explosion liquefied natural gas storage tank
CN205026394U (en) LNG transport vechicle with pressure monitoring function
EP1447323B1 (en) Submarine with a tank containing a pressurised liquid gas
CN205026374U (en) Liquefied natural gas transport vechicle
CN205026392U (en) LNG transport vechicle
CN205026376U (en) High thermal -insulated heat preservation protected against explosion liquefied natural gas storage jar
CN206802744U (en) Dewar structure with detection and safeguard protection

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170315