CN106499128B - Building roof stainless steel railing lightning protection construction method based on adhesion type holder - Google Patents

Building roof stainless steel railing lightning protection construction method based on adhesion type holder Download PDF

Info

Publication number
CN106499128B
CN106499128B CN201610912272.8A CN201610912272A CN106499128B CN 106499128 B CN106499128 B CN 106499128B CN 201610912272 A CN201610912272 A CN 201610912272A CN 106499128 B CN106499128 B CN 106499128B
Authority
CN
China
Prior art keywords
stainless steel
railing
lightning protection
bar
downlead
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610912272.8A
Other languages
Chinese (zh)
Other versions
CN106499128A (en
Inventor
王奇维
赵丕毅
程凯
马伟力
王丰
全进学
张昭龙
裴拓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Work San Construction Group Co Ltd Is Built In Shaanxi
Original Assignee
Work San Construction Group Co Ltd Is Built In Shaanxi
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Work San Construction Group Co Ltd Is Built In Shaanxi filed Critical Work San Construction Group Co Ltd Is Built In Shaanxi
Priority to CN201610912272.8A priority Critical patent/CN106499128B/en
Publication of CN106499128A publication Critical patent/CN106499128A/en
Application granted granted Critical
Publication of CN106499128B publication Critical patent/CN106499128B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G13/00Installations of lightning conductors; Fastening thereof to supporting structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The building roof stainless steel railing lightning protection construction method based on adhesion type holder that the invention discloses a kind of, includes the following steps:One, belt supporting frame of taking shelter from the thunder is installed:The upper outside of installed stainless steel railing installs multiple lightning-arrest belt supporting frames on building roof, and belt supporting frame of taking shelter from the thunder is adhesion type holder, and each adhesion type holder is both secured to the upper outside of a railing upright bar;Adhesion type holder be J-shaped holder and its be made of outer lateral connector bar, interior lateral connector bar and arc linkage section, interior lateral connector bar is fixed on by multiple holder shackle members in railing upright bar;Two, lighting proof strip is installed:Lighting proof strip is supported on the outer lateral connector bar of multiple lightning-arrest belt supporting frames;Three, downlead connects:Lightning protection downlead upper end is welded and fixed with lighting proof strip.The method of the present invention step is simple, reasonable design and easy construction, using effect are good, can lightning protection work progress easy, that building roof stainless steel railing is rapidly completed, and construction molding lightning protection device conducts electricity very well.

Description

Building roof stainless steel railing lightning protection construction method based on adhesion type holder
Technical field
The invention belongs to technical field of building construction, stainless more particularly, to a kind of building roof based on adhesion type holder Steel railing lightning protection construction method.
Background technology
The lightning protection device of complete set includes arrester, downlead and earthing or grounding means.Wherein, arrester is for receiving thunder The part of electric current, form have the metal components such as lightning rod, lightning conduction, lighting proof strip;Downlead refers to connection arrester and is filled with ground connection The metallic conductor set, also referred to as lightning protection downlead or lightning-arrest downlead.The downlead of lightning protection device should meet mechanical strength, corrosion resistant Erosion and heat-staple requirement.Currently, when carrying out lightning protection construction to stainless steel railing in building construction process, generally use is to incite somebody to action Downlead is directly overlapped and is welded and fixed with stainless steel railing, and above-mentioned traditional method is primarily present following defect:The first, draw When being attached between the offline railing with stainless steel, due to arc section, wall thickness of stainless steel railing etc., downlead with not Rust steel railing is difficult to meet the requirements in the vertical welding quality connected between transverse direction, directly affects construction molding lightning protection device Monolithic conductive performance;The second, it due to arrester and downlead generally use carbon steel, is welded with stainless steel railing When, the welding quality between stainless steel and carbon steel is extremely difficult to quality requirement, deformation often occurs, pin hole, scuffing, cracks, stings The defects of side, requires the technology of worker more stringent;Generally use argon arc welding in third, welding process, argon arc welding is to people The extent of injury of body is higher, and the ozone content sent out in welding process is higher.
Invention content
In view of the above-mentioned deficiencies in the prior art, the technical problem to be solved by the present invention is that providing a kind of based on attachment The building roof stainless steel railing lightning protection construction method of formula holder, method and step is simple, reasonable design and easy construction, use Effect is good, and energy is easy, the lightning protection work progress of building roof stainless steel railing is rapidly completed, and construction molding lightning protection device It conducts electricity very well.
In order to solve the above technical problems, the technical solution adopted by the present invention is:A kind of building based on adhesion type holder Face stainless steel railing lightning protection construction method, which is characterized in that this approach includes the following steps:
Step 1: lightning-arrest belt supporting frame installation:The upper outside installation of installed stainless steel railing is multiple on building roof Lightning-arrest belt supporting frame, the structure all same of multiple lightning-arrest belt supporting frames and its along stainless steel railing length direction from front to back into Row is laid;
The stainless steel railing in vertically to lay and it include it is multiple be in vertically to the railing upright bar of laying, Duo Gesuo The length direction that railing upright bar is stated along stainless steel railing is laid from front to back;The lightning-arrest belt supporting frame is adhesion type holder, each The adhesion type holder is both secured to the upper outside of a railing upright bar;The adhesion type holder is J-shaped holder, institute J-shaped holder is stated by outer lateral connector bar, the interior lateral connector bar on the inside of outer lateral connector bar and is connected to outer lateral connector bar bottom end Arc linkage section composition between interior lateral connector bar bottom end, the interior lateral connector bar pass through multiple holders from top to bottom laid Shackle member is fixed in a railing upright bar;
Step 2: lighting proof strip is installed:Lighting proof strip is installed above the outside of stainless steel railing described in step 1, and will be kept away Thunder band is supported on the outer lateral connector bar of multiple lightning-arrest belt supporting frames;The lighting proof strip is in horizontal layout and it is along stainless steel column The length direction of bar is laid;
Step 3: downlead connects:Lightning protection downlead upper end is welded and fixed with lighting proof strip described in step 2.
The above-mentioned building roof stainless steel railing lightning protection construction method based on adhesion type holder, it is characterized in that:In step 2 The lighting proof strip is the galvanized steel bar of a diameter of Φ 10mm~Φ 15mm.
The above-mentioned building roof stainless steel railing lightning protection construction method based on adhesion type holder, it is characterized in that:In step 2 Level interval between the lighting proof strip and stainless steel railing is 15cm~25cm, between the lighting proof strip and stainless steel railing Vertical spacing 20cm~30cm.
The above-mentioned building roof stainless steel railing lightning protection construction method based on adhesion type holder, it is characterized in that:In step 1 The adhesion type holder is bent by galvanized steel bar, and the lighting proof strip is located above the outside of multiple adhesion type holders, The lighting proof strip is supported in outer lateral connector bar top, and one is fixed as by clamping part between the lighting proof strip and outer lateral connector bar Body.
The above-mentioned building roof stainless steel railing lightning protection construction method based on adhesion type holder, it is characterized in that:In step 1 Spacing between the two neighboring lightning-arrest belt supporting frame is 55cm~65cm;The height of the lightning-arrest belt supporting frame be 80cm~ The height of 100cm, the stainless steel railing are 110cm~130cm, and the height of the interior lateral connector bar is 20cm~30cm.
The above-mentioned building roof stainless steel railing lightning protection construction method based on adhesion type holder, it is characterized in that:In step 1 Coaxial sleeve is equipped with insulating sleeve on the interior lateral connector bar, and the insulating sleeve is fixed on the outside of railing upright bar;Institute in step 1 It is the first anchor ear in horizontal layout to state holder shackle member, and the insulating sleeve is with its fixed equal cuff of railing upright bar of institute in institute In the hoop for stating the first anchor ear.
The above-mentioned building roof stainless steel railing lightning protection construction method based on adhesion type holder, it is characterized in that:In step 1 The stainless steel railing further includes upper connecting rod, the cross tube right over upper connecting rod, multiple is connected to from front to back It vertical connecting rod between connecting rod and cross tube, the lower connecting rod immediately below upper connecting rod and multiple supports from front to back Vertical supporting bar immediately below lower connecting rod, the upper connecting rod, cross tube and lower connecting rod are laid in same vertical plane Upper and three is in horizontal layout, and vertical supporting bar bottom is fixed on the building roof;
It is attached by first level link between outer lateral connector bar and cross tube described in step 1, described first Horizontal connection frame include a first clamping part being installed on outer lateral connector bar and be connected to the first clamping part and cross tube it Between first level holder, it is described first clamping part and first level holder be laid in same level with cross tube;
It is attached by the second horizontal connection frame between lightning protection downlead and cross tube described in step 3, described second Horizontal connection frame include a second clamping part being installed on lightning protection downlead and be connected to the second clamping part and cross tube it Between the second horizontal stand, it is described second clamping part and the second horizontal stand be laid in same level with cross tube.
The above-mentioned building roof stainless steel railing lightning protection construction method based on adhesion type holder, it is characterized in that:In step 3 After lighting proof strip described in lightning protection downlead upper end and step 2 is welded and fixed, also need by lightning protection downlead lower end with it is described Pre-buried pre-buried downlead, which is welded and fixed, in building roof is integrated;The lightning protection downlead is a diameter of Φ 10mm~Φ 15mm Galvanized steel bar.
The above-mentioned building roof stainless steel railing lightning protection construction method based on adhesion type holder, it is characterized in that:In step 3 The lightning protection downlead is in vertically to laying, and the lightning protection downlead is fixed on one by multiple links from top to bottom laid In a railing upright bar, the structure all same of multiple links and its be in horizontal layout;Each link is equal Part is clamped including a downlead being installed on lightning protection downlead, a upright bar being installed in railing upright bar clamps part and company The connecting bracket being connected between downlead clamping part and upright bar clamping part, the downlead clamp part and are located at outside upright bar clamping part Side.
The above-mentioned building roof stainless steel railing lightning protection construction method based on adhesion type holder, it is characterized in that:It is described draw under Line card piece installing is second anchor ear of the cuff on lightning protection downlead, and it is third of the cuff in railing upright bar that the upright bar, which clamps part, Anchor ear, the connecting bracket are the steel flat support in horizontal layout;Second anchor ear includes that both ends pass through the first fastening bolt The first circular ring shape hoop being fixed as one, the third anchor ear include that both ends are fixed as one by the second fastening bolt The inner end of second circular ring shape hoop, the steel flat support is fastened by the second fastening bolt and the second circular ring shape hoop Be connected as one, the outer end of the steel flat support by the first fastening bolt and the first circular ring shape hoop be fastenedly connected for One.
Compared with the prior art, the present invention has the following advantages:
1, method and step is simple, reasonable design and input construction cost are relatively low.
2, easy construction and difficulty of construction is small, operative skill and technology to construction personnel require relatively low.
3, construction efficiency is high, can lightning protection work progress easy, that building roof stainless steel railing is rapidly completed.
4, used adhesion type supporting structure is simple, reasonable design and processing and fabricating and installation lay it is easy, use effect Fruit is good, easy, quickly can be reliably connected with railing upright bar, and dismantle simplicity, at the same can be provided for lighting proof strip steadily, can By support.In addition, contact site between adhesion type holder and stainless steel railing with carbon fiber high-temperature insulation fireproof casing into Row isolation can effectively ensure lightning protection device and stainless steel railing while ensuring construction molding lightning protection device electric conductivity Using process safety, reliably.
5, lightning protection downlead is fixed easy, and used connecting frame structure is simple, reasonable design and processing and fabricating and installation It lays that easy, using effect is good, easy, quickly lightning protection downlead can be fixed on the outside of railing upright bar, and by lightning protection It is both provided with insulating layer between downlead and downlead clamping part and between lightning protection downlead and the second clamping part, it can be further Lightning protection device and stainless steel railing is effectively ensured uses process safety, reliable.
6, belt supporting frame fixed form of taking shelter from the thunder is easy and connection is reliable, and lightning protection downlead is fixed easy and fixed.
7, using effect is good and practical value is high, for the lightning protection construction problem of roofing stainless steel railing, on stainless steel column The additionally mounted galvanized steel bar of bar apical lateral is directly brought into lightning-arrest as its lighting proof strip, and by the lightning protection downlead that roofing is reserved Row is welded to connect.Also, be reliably connected by adhesion type holder between lighting proof strip and stainless steel railing, adhesion type holder with Contact site between stainless steel railing is isolated with carbon fiber high-temperature insulation fireproof casing, and (is also referred to as embraced by holding card Hoop) it is fixed, and the lightning protection downlead that roofing is reserved directly is welded to connect with lighting proof strip.Thus, the present invention proposes A kind of novel building roof stainless steel railing lightning protection construction method, can effectively solve traditional architecture roofing stainless steel railing lightning protection Number of drawbacks existing for construction method.
In conclusion the method for the present invention step is simple, reasonable design and easy construction, using effect are good, it can be easy, quick The lightning protection work progress of building roof stainless steel railing is completed, and construction molding lightning protection device conducts electricity very well.
Below by drawings and examples, technical scheme of the present invention will be described in further detail.
Description of the drawings
Fig. 1 is the method flow block diagram of the present invention.
Fig. 2 is the planar structure schematic diagram of construction molding lightning protection device of the present invention.
Fig. 2-1 is the schematic view of facade structure of construction molding lightning protection device of the present invention.
Fig. 3 is the use state reference chart of holder shackle member of the present invention.
Fig. 4 is the use state reference chart of link of the present invention.
Fig. 5 is the connection status schematic diagram of the present invention lightning-arrest belt supporting frame and stainless steel railing.
Fig. 6 is the connection status schematic diagram of lightning protection downlead of the present invention and stainless steel railing.
Reference sign:
1-stainless steel railing;1-1-railing upright bar;1-2-upper connecting rod;
1-3-lower connecting rod;1-4-cross tube;The vertical connecting rods of 1-5-;
1-6-vertical supporting bar;2-lighting proof strips;3-lightning-arrest belt supporting frames;
The outer lateral connector bars of 3-1-;The interior lateral connector bars of 3-2-;3-3-arc linkage section;
4-lightning protection downleads;5-insulating sleeves;6-holder shackle members;
7-pre-buried downleads;8-downleads clamp part;The first fastening bolts of 8-1-;
9-upright bars clamp part;The second fastening bolts of 9-1-;10-connecting brackets;
11-the first clamps part;12-first level holders;13-the second clamps part;
14-the second horizontal stand;15-roofing construction sheets;16-connection bolts;
17-fire-proof insulation gaskets.
Specific implementation mode
A kind of building roof stainless steel railing lightning protection construction method based on adhesion type holder as shown in Figure 1, including with Lower step:
Step 1: lightning-arrest belt supporting frame installation:The upper outside installation of installed stainless steel railing 1 is multiple on building roof Lightning-arrest belt supporting frame 3, the structure all same of multiple lightning-arrest belt supporting frames 3 and its along stainless steel railing 1 length direction by it is preceding extremely After laid, refer to Fig. 2 and Fig. 2-1;
The stainless steel railing 1 is more in vertically to laying and its to include multiple be in railing upright bar 1-1 to laying vertically A railing upright bar 1-1 is laid from front to back along the length direction of stainless steel railing 1;As shown in figure 5, the lightning-arrest belt supporting frame 3 be adhesion type holder, and each adhesion type holder is both secured to the upper outside of a railing upright bar 1-1;It is described attached It is J-shaped holder formula holder, and the J-shaped holder is by outer lateral connector bar 3-1, the inside on the inside of outer lateral connector bar 3-1 Connecting rod 3-2 and the arc linkage section 3-3 compositions being connected between the bottom ends outer lateral connector bar 3-1 and the bottom ends interior lateral connector bar 3-2, The interior lateral connector bar 3-2 is fixed on a railing upright bar 1-1 by multiple holder shackle members 6 from top to bottom laid On;
Step 2: lighting proof strip is installed:Lighting proof strip 2 is installed, and will above the outside of stainless steel railing 1 described in step 1 Lighting proof strip 2 is supported on the outer lateral connector bar 3-1 of multiple lightning-arrest belt supporting frames 3;The lighting proof strip 2 is in horizontal layout and its edge The length direction of stainless steel railing 1 is laid;
Step 3: downlead connects:4 upper end of lightning protection downlead is welded and fixed with lighting proof strip 2 described in step 2, Refer to Fig. 6.
In step 3 after the completion of downlead connection, the lightning protection device of construction molding is obtained.The lightning protection device is by lighting proof strip 2 It is formed with the lightning protection downlead 4 being connect with lighting proof strip 2.
In the present embodiment, the outer lateral connector bar 3-1 and interior lateral connector bar 3-2 are in vertically to laying.
In the present embodiment, multiple lightning-arrest belt supporting frames 3 are in uniformly distributed.
Also, the stainless steel railing 1 is in horizontal layout.
When practice of construction, lighting proof strip 2 described in step 2 is the galvanized steel bar of a diameter of Φ 10mm~Φ 15mm.
In the present embodiment, the lighting proof strip 2 is the galvanized steel bar of a diameter of Φ 12mm.It in actual use, can be according to specific It needs, the diameter of 2 used galvanized steel bar of lighting proof strip is adjusted accordingly.
Level interval between lighting proof strip 2 described in step 2 and stainless steel railing 1 is 15cm~25cm, the lighting proof strip Vertical spacing between 2 and stainless steel railing 1 is 20cm~30cm.
Thus, the height that the lighting proof strip 2 is higher by stainless steel railing 1 is 20cm~30cm.
In the present embodiment, level interval between the lighting proof strip 2 and stainless steel railing 1 is 20cm, the lighting proof strip 2 with Vertical spacing between stainless steel railing 1 is 25cm.It, can according to specific needs, to lighting proof strip 2 and stainless steel column when practice of construction The vertical spacing between level interval and lighting proof strip 2 and stainless steel railing 1 between bar 1 adjusts accordingly respectively.
In the present embodiment, adhesion type holder described in step 1 is bent by galvanized steel bar, and the lighting proof strip 2 is located at more Above the outside of a adhesion type holder, the lighting proof strip 2 is supported in the tops outer lateral connector bar 3-1.
In the present embodiment, it is fixed as one between the lighting proof strip 2 and outer lateral connector bar 3-1 by clamping part.
Can also be one by tied silk banding fixed between the lighting proof strip 2 and outer lateral connector bar 3-1 when practice of construction Body.Also, can also the groove placed for lighting proof strip 2 be set on the top of outer lateral connector bar 3-1, the lighting proof strip 2 is installed on In the groove.
Easy for support, the diameter of the used galvanized steel bar of adhesion type holder uses zinc-plated circle more than lighting proof strip 2 The diameter of steel.
When practice of construction, the spacing in step 1 between the two neighboring lightning-arrest belt supporting frame 3 is 55cm~65cm.
In the present embodiment, the height of the lightning-arrest belt supporting frame 3 is 80cm~100cm.
The height of the stainless steel railing 1 is 110cm~130cm, the height of the interior lateral connector bar 3-2 be 20cm~ 30cm.In the present embodiment, the height of the stainless steel railing 1 is 115cm, and the height of the interior lateral connector bar 3-2 is 25cm.
In the present embodiment, coaxial sleeve is equipped with insulating sleeve 5, the insulation sleeve on interior lateral connector bar 3-2 described in step 1 Pipe 5 is fixed on the outside of railing upright bar 1-1.
As shown in figure 3, holder shackle member described in step 16 is the first anchor ear in horizontal layout, the insulating sleeve 5 With its equal cuffs of fixed railing upright bar 1-1 in the hoop of first anchor ear.
In the present embodiment, the insulating sleeve 5 is carbon fiber high-temperature insulation fireproof casing.
Also, the hoop both ends of first anchor ear are fastenedly connected by connecting bolt 16.In the present embodiment, institute It states and nut is housed on the shank of bolt of connection bolt 16, the nuts and bolt club head and first anchor ear of the connection bolt 16 Hoop between pad be equipped with fire-proof insulation gasket 17.
When practice of construction, the insulating sleeve 5 can also use other types of insulating sheath pipe.
In the present embodiment, 4 upper end of lightning protection downlead is welded and fixed with lighting proof strip 2 described in step 2 in step 3 Afterwards, it also needs 4 lower end of lightning protection downlead being welded and fixed with pre-buried downlead 7 pre-buried in the building roof and be integrated.
Wherein, the lightning protection downlead 4 is the galvanized steel bar of a diameter of Φ 10mm~Φ 15mm.
In the present embodiment, diameter and 2 the used galvanized steel bar of lighting proof strip of 4 used galvanized steel bar of the lightning protection downlead Diameter it is identical.
In the present embodiment, lightning protection downlead 4 described in step 3 is in laying, the lightning protection downlead 4 passes through more vertically A link from top to bottom laid is fixed on a railing upright bar 1-1, the structure all same of multiple links And it is in horizontal layout.
Also, easy for connection, the lightning protection downlead 4 is L-shaped, and the upper segment of the lightning protection downlead 4 is turned under Top linkage section is formed after song, the top linkage section is located at 2 lower section of lighting proof strip, and the top linkage section is weldingly fixed on and keeps away On thunder band 2.
As shown in figure 4, each link includes a downlead being installed on lightning protection downlead 4 clamp part 8, One upright bar being installed on railing upright bar 1-1 clamps part 9 and is connected to downlead and clamps between part 8 and upright bar clamping part 9 Connecting bracket 10, the downlead clamp part 8 and are located at 9 outside of upright bar clamping part.
In the present embodiment, a layer insulating is provided between the lightning protection downlead 4 and downlead clamping part 8.
In the present embodiment, as shown in Figure 4 and Figure 6, it is the of cuff on lightning protection downlead 4 that the downlead, which clamps part 8, Two anchor ears, it is third anchor ear of the cuff on railing upright bar 1-1 that the upright bar, which clamps part 9, and the connecting bracket 10 is in level The steel flat support of laying;Second anchor ear includes the first circular ring shape that both ends are fixed as one by the first fastening bolt 8-1 Hoop, the third anchor ear include the second circular ring shape hoop that both ends are fixed as one by the second fastening bolt 9-1, institute The inner end for stating steel flat support is fastenedly connected with the second circular ring shape hoop by the second fastening bolt 9-1 and is integrated, described The outer end of steel flat support is fastenedly connected with the first circular ring shape hoop by the first fastening bolt 8-1 and is integrated.
In the present embodiment, it is respectively arranged with nut on the shank of bolt of the first fastening bolt 8-1 and the second fastening bolt 9-1, Pad is exhausted equipped with fire prevention between the nuts and bolt club head and the first circular ring shape hoop of the first fastening bolt 8-1 Edge gasket 17 pads between the nuts and bolt club head and the second circular ring shape hoop of the second fastening bolt 9-1 Equipped with fire-proof insulation gasket 17.
In the present embodiment, a layer insulating is coated on the outside of the first circular ring shape hoop.
To use process safety, reliable, a layer insulating is coated on the outside of the second circular ring shape hoop.
In the present embodiment, the spacing between neighbouring two links is 20cm~30cm.
, can according to specific needs when practice of construction, the spacing between neighbouring two links carries out respectively Corresponding adjustment.
In the present embodiment, the building roof is roofing construction sheet 15, and the pre-buried downlead 7 is to be embedded in roof structure Downlead in plate 15.
In the present embodiment, as shown in Fig. 2-1, stainless steel railing described in step 11 further includes upper connecting rod 1-2, is located at Cross tube 1-4 right over upper connecting rod 1-2, it is multiple be connected to from front to back it is perpendicular between upper connecting rod 1-2 and cross tube 1-4 Lower connecting rod 1-3 to connecting rod 1-5, immediately below upper connecting rod 1-2 and multiple it is supported in lower connecting rod 1-3 from front to back Vertical supporting the bar 1-6, the upper connecting rod 1-2, cross tube 1-4 and lower connecting rod 1-3 of underface are laid in same vertical On face and three is in horizontal layout, and the bottoms vertical supporting bar 1-6 are fixed on the building roof;
It is attached by first level link between outer lateral connector bar 3-1 and cross tube 1-4 described in step 1, institute First level link is stated to include a first clamping part 11 being installed on outer lateral connector bar 3-1 and be connected to the first clamping part First level holder 12 between 11 and cross tube 1-4, described first clamps part 11 and first level holder 12 and cross tube 1-4 is laid in same level;
It is attached by the second horizontal connection frame between lightning protection downlead 4 described in step 3 and cross tube 1-4, it is described Second horizontal connection frame include a second clamping part 13 being installed on lightning protection downlead 4 and be connected to the second clamping part 13 and The second horizontal stand 14 between cross tube 1-4, described second clamp part 13 and the second horizontal stand 14 with cross tube 1-4 cloth It is located in same level.
In the present embodiment, 12 and second horizontal stand 14 of the first level holder is steel flat support.
In the present embodiment, it is described first clamp part 11 be fourth anchor ear of the cuff on outer lateral connector bar 3-1, the described 4th Anchor ear includes the third circular ring shape hoop that both ends are fixed as one by third fastening bolt, the first level holder 12 Inner end is fixed on cross tube 1-4, and the outer end of the first level holder 12 passes through the third fastening bolt and the third Circular ring shape hoop, which is fastenedly connected, to be integrated;
Described second clamps part 13 as fiveth anchor ear of the cuff on lightning protection downlead 4, and the 5th anchor ear includes both ends The inner end of the 4th circular ring shape hoop being fixed as one by the 4th fastening bolt, second horizontal stand 14 is fixed on On cross bar 1-4, the outer end of second horizontal stand 14 passes through the 4th fastening bolt and the 4th circular ring shape hoop It is fastenedly connected and is integrated.
In actual use, the lightning protection downlead 4 and second clamp part 13 between and outer lateral connector bar 3-1 and first block A layer insulating is both provided between piece installing 11.In the present embodiment, the 4th circular ring shape hoop and the third circular ring shape The outside of hoop is coated with a layer insulating.
As shown in the above, it is used as lighting proof strip 2, lighting proof strip by installing a circle galvanized steel bar on the outside of stainless steel railing It is reliably connected by adhesion type holder between 2 and stainless steel railing 1, between the adhesion type holder and stainless steel railing 1 Contact site (i.e. in lateral connector bar 3-2) on installation carbon fiber high-temperature insulation fireproof casing be isolated, and pass through first Anchor ear is fixed.
In the present embodiment, the lighting proof strip 2 and the material of 4 used galvanized steel bar of lightning protection downlead are carbon steel.
Also, the material of 3 used galvanized steel bar of the lightning-arrest belt supporting frame is carbon steel.
The above is only presently preferred embodiments of the present invention, is not imposed any restrictions to the present invention, every according to the present invention Technical spirit changes any simple modification, change and equivalent structure made by above example, still falls within skill of the present invention In the protection domain of art scheme.

Claims (10)

1. a kind of building roof stainless steel railing lightning protection construction method based on adhesion type holder, which is characterized in that this method packet Include following steps:
Step 1: lightning-arrest belt supporting frame installation:The upper outside installation of installed stainless steel railing (1) is multiple on building roof keeps away Thunder belt supporting frame (3), the structure all same of multiple lightning-arrest belt supporting frames (3) and its along stainless steel railing (1) length direction by Front to back is laid;
The stainless steel railing (1) in vertically to lay and it include it is multiple be in vertically to the railing upright bar (1-1) of laying, it is more A railing upright bar (1-1) is laid from front to back along the length direction of stainless steel railing (1);The lightning-arrest belt supporting frame (3) is Adhesion type holder, each adhesion type holder are both secured to the upper outside of a railing upright bar (1-1);The attachment Formula holder be J-shaped holder, the J-shaped holder by outer lateral connector bar (3-1), be located at outer lateral connector bar (3-1) on the inside of it is interior Lateral connector bar (3-2) and the arc linkage section being connected between the outer lateral connector bar bottom end (3-1) and the bottom end interior lateral connector bar (3-2) (3-3) is formed, and the interior lateral connector bar (3-2) is fixed on an institute by multiple holder shackle members (6) from top to bottom laid It states in railing upright bar (1-1);
Step 2: lighting proof strip is installed:Lighting proof strip (2) is installed, and will above the outside of stainless steel railing (1) described in step 1 Lighting proof strip (2) is supported on the outer lateral connector bar (3-1) of multiple lightning-arrest belt supporting frames (3);The lighting proof strip (2) is in horizontal cloth And if it is laid along the length direction of stainless steel railing (1);
Step 3: downlead connects:Lightning protection downlead (4) upper end and lighting proof strip described in step 2 (2) are welded and fixed.
2. the building roof stainless steel railing lightning protection construction method described in accordance with the claim 1 based on adhesion type holder, special Sign is:Lighting proof strip described in step 2 (2) is the galvanized steel bar of a diameter of Φ 10mm~Φ 15mm.
3. according to the building roof stainless steel railing lightning protection construction method as claimed in claim 1 or 2 based on adhesion type holder, It is characterized in that:Level interval between lighting proof strip described in step 2 (2) and stainless steel railing (1) is 15cm~25cm, described Vertical spacing between lighting proof strip (2) and stainless steel railing (1) is 20cm~30cm.
4. according to the building roof stainless steel railing lightning protection construction method as claimed in claim 1 or 2 based on adhesion type holder, It is characterized in that:Adhesion type holder described in step 1 is bent by galvanized steel bar, and the lighting proof strip (2) is located at multiple described attached Above the outside for formula holder, the lighting proof strip (2) is supported in the top outer lateral connector bar (3-1), the lighting proof strip (2) and outside It is fixed as one between connecting rod (3-1) by clamping part.
5. according to the building roof stainless steel railing lightning protection construction method as claimed in claim 1 or 2 based on adhesion type holder, It is characterized in that:Spacing in step 1 between the two neighboring lightning-arrest belt supporting frame (3) is 55cm~65cm;The lighting proof strip branch The height of frame (3) is 80cm~100cm, and the height of the stainless steel railing (1) is 110cm~130cm, the interior lateral connector bar The height of (3-2) is 20cm~30cm.
6. according to the building roof stainless steel railing lightning protection construction method as claimed in claim 1 or 2 based on adhesion type holder, It is characterized in that:Coaxial sleeve is equipped with insulating sleeve (5) on interior lateral connector bar (3-2) described in step 1, and the insulating sleeve (5) is solid It is scheduled on the outside of railing upright bar (1-1);Holder shackle member described in step 1 (6) is the first anchor ear in horizontal layout, described exhausted Edge casing (5) is with its institute's equal cuff of fixed railing upright bar (1-1) in the hoop of first anchor ear.
7. according to the building roof stainless steel railing lightning protection construction method as claimed in claim 1 or 2 based on adhesion type holder, It is characterized in that:Stainless steel railing described in step 1 (1) further includes upper connecting rod (1-2), is located at right over upper connecting rod (1-2) Cross tube (1-4), multiple vertical connecting rod (1- being connected to from front to back between upper connecting rod (1-2) and cross tube (1-4) 5), it is located at the lower connecting rod (1-3) immediately below upper connecting rod (1-2) and multiple is being supported in lower connecting rod (1-3) from front to back just The vertical supporting bar (1-6) of lower section, the upper connecting rod (1-2), cross tube (1-4) and lower connecting rod (1-3) are laid in together On one vertical plane and three is in horizontal layout, and vertical supporting bar (1-6) bottom is fixed on the building roof;
It is attached by first level link between outer lateral connector bar (3-1) and cross tube (1-4) described in step 1, institute First level link is stated to include a first clamping part (11) being installed on outer lateral connector bar (3-1) and be connected to the first card First level holder (12) between piece installing (11) and cross tube (1-4), described first clamps part (11) and first level holder (12) it is laid in same level with cross tube (1-4);
It is attached by the second horizontal connection frame between lightning protection downlead described in step 3 (4) and cross tube (1-4), it is described Second horizontal connection frame includes a second clamping part (13) being installed on lightning protection downlead (4) and is connected to the second clamping part (13) the second horizontal stand (14) between cross tube (1-4), described second clamps part (13) and the second horizontal stand (14) It is laid in same level with cross tube (1-4).
8. according to the building roof stainless steel railing lightning protection construction method as claimed in claim 1 or 2 based on adhesion type holder, It is characterized in that:After being welded and fixed lighting proof strip (2) described in lightning protection downlead (4) upper end and step 2 in step 3, also Lightning protection downlead (4) lower end need to be welded and fixed with pre-buried downlead (7) pre-buried in the building roof and be integrated;It is described anti- Thunder downlead (4) is the galvanized steel bar of a diameter of Φ 10mm~Φ 15mm.
9. according to the building roof stainless steel railing lightning protection construction method as claimed in claim 1 or 2 based on adhesion type holder, It is characterized in that:Lightning protection downlead described in step 3 (4) is in vertically to laying, and the lightning protection downlead (4) is by multiple by upper Link to lower laying is fixed on a railing upright bar (1-1), the structure all same of multiple links and its It is in horizontal layout;Each link include a downlead being installed on lightning protection downlead (4) clamp part (8), One upright bar being installed in railing upright bar (1-1), which clamps part (9) and is connected to downlead, clamps part (8) and upright bar clamping part (9) connecting bracket (10) between, the downlead clamp part (8) and are located on the outside of upright bar clamping part (9).
10. the building roof stainless steel railing lightning protection construction method based on adhesion type holder according to claim 9, special Sign is:It is second anchor ear of the cuff on lightning protection downlead (4) that the downlead, which clamps part (8), and the upright bar clamps part (9) For third anchor ear of the cuff in railing upright bar (1-1), the connecting bracket (10) is the steel flat support in horizontal layout;It is described Second anchor ear includes the first circular ring shape hoop that both ends are fixed as one by the first fastening bolt (8-1), and the third is embraced Hoop includes the second circular ring shape hoop that both ends are fixed as one by the second fastening bolt (9-1), the steel flat support it is interior End, which is fastenedly connected by the second fastening bolt (9-1) with the second circular ring shape hoop, to be integrated, outside the steel flat support End, which is fastenedly connected by the first fastening bolt (8-1) with the first circular ring shape hoop, to be integrated.
CN201610912272.8A 2016-10-19 2016-10-19 Building roof stainless steel railing lightning protection construction method based on adhesion type holder Expired - Fee Related CN106499128B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610912272.8A CN106499128B (en) 2016-10-19 2016-10-19 Building roof stainless steel railing lightning protection construction method based on adhesion type holder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610912272.8A CN106499128B (en) 2016-10-19 2016-10-19 Building roof stainless steel railing lightning protection construction method based on adhesion type holder

Publications (2)

Publication Number Publication Date
CN106499128A CN106499128A (en) 2017-03-15
CN106499128B true CN106499128B (en) 2018-10-12

Family

ID=58294300

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610912272.8A Expired - Fee Related CN106499128B (en) 2016-10-19 2016-10-19 Building roof stainless steel railing lightning protection construction method based on adhesion type holder

Country Status (1)

Country Link
CN (1) CN106499128B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107123964B (en) * 2017-06-30 2018-08-21 河南省水利勘测设计研究有限公司 Slope ridge lightning rod installation method
CN107893535A (en) * 2017-10-27 2018-04-10 重庆建工第九建设有限公司 Band construction technique is dodged using the bright attaching of collar supports
CN111934270A (en) * 2020-08-04 2020-11-13 舜元建设(集团)有限公司 Construction method of stainless steel tube lightning protection belt
CN112186699B (en) * 2020-09-01 2022-08-16 温州优骏电气科技有限公司 Superconducting lightning protection structure and assembling method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5998033U (en) * 1982-12-22 1984-07-03 大阪避雷針工業株式会社 Mounting brackets for roof-mounted items
CN201340965Y (en) * 2008-12-25 2009-11-04 中建三局第三建设工程有限责任公司 Integrating device of roofing parapet wall metal handrail and ground strip
CN201667487U (en) * 2010-03-23 2010-12-08 陕西建工集团第二建筑工程有限公司 Splint-joining mechanism for lightning protection zones of buildings
CN201868734U (en) * 2010-10-27 2011-06-15 李贵生 Clamp plate type height-adjustable supporting fastener for lightning strap
CN202159860U (en) * 2011-07-15 2012-03-07 陕西建工集团第十一建筑工程有限公司 Simple installation type lightning protection belt support and assembly mould thereof
CN203119425U (en) * 2013-01-28 2013-08-07 东风设计研究院有限公司 Lightning-prevention strip bracket
CN203218711U (en) * 2013-01-23 2013-09-25 驭雷(上海)机电科技有限公司 Lightning protection belt adopting galvanized round aluminum
CN204089134U (en) * 2014-08-20 2015-01-07 江苏扬安集团有限公司 A kind of stainless steel tube lighting proof strip
CN205382641U (en) * 2016-01-19 2016-07-13 张丽 Lightning -arrest support of taking of special white steel of verge tile

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5998033U (en) * 1982-12-22 1984-07-03 大阪避雷針工業株式会社 Mounting brackets for roof-mounted items
CN201340965Y (en) * 2008-12-25 2009-11-04 中建三局第三建设工程有限责任公司 Integrating device of roofing parapet wall metal handrail and ground strip
CN201667487U (en) * 2010-03-23 2010-12-08 陕西建工集团第二建筑工程有限公司 Splint-joining mechanism for lightning protection zones of buildings
CN201868734U (en) * 2010-10-27 2011-06-15 李贵生 Clamp plate type height-adjustable supporting fastener for lightning strap
CN202159860U (en) * 2011-07-15 2012-03-07 陕西建工集团第十一建筑工程有限公司 Simple installation type lightning protection belt support and assembly mould thereof
CN203218711U (en) * 2013-01-23 2013-09-25 驭雷(上海)机电科技有限公司 Lightning protection belt adopting galvanized round aluminum
CN203119425U (en) * 2013-01-28 2013-08-07 东风设计研究院有限公司 Lightning-prevention strip bracket
CN204089134U (en) * 2014-08-20 2015-01-07 江苏扬安集团有限公司 A kind of stainless steel tube lighting proof strip
CN205382641U (en) * 2016-01-19 2016-07-13 张丽 Lightning -arrest support of taking of special white steel of verge tile

Also Published As

Publication number Publication date
CN106499128A (en) 2017-03-15

Similar Documents

Publication Publication Date Title
CN106499128B (en) Building roof stainless steel railing lightning protection construction method based on adhesion type holder
CN201862167U (en) Safety belt hanging stand for overhaul of isolating switch
WO2016023141A1 (en) Process for live replacement of tension hard-tube bus-bar jumper insulator of +/- 800kv ultra-high-voltage dc transmission line
CN105337230A (en) Jumper wire connecting metal fitting for tubular bus bar
CN106450835A (en) Shoe manufacturer high voltage wire landing device
CN204904935U (en) Insulator suitable for mountain area distribution network
CN102097189B (en) Four-link tension string for +/-800KV heavy ice area
CN206250000U (en) A kind of transformer erecting device
CN213898370U (en) T-shaped composite insulating cross arm for distribution network line
CN206401856U (en) A kind of anti-bird backplate and anti-bird cross-arm
CN205665362U (en) Electric test platform of insulating tube
CN104963525A (en) Reinforcing method for existing concrete door rack of transformer station
KR20080039771A (en) High voltage cable supporter
CN108336703A (en) A kind of distribution low-voltage circuit junction box's support device
CN211208698U (en) Novel complete set grounding device for 220kV power transmission line
CN208433741U (en) A kind of combined type lighting proof strip support clamp
CN109994961B (en) Device and method for replacing pole-mounted switch of vertically arranged 10kV overhead line with load
CN212716109U (en) Iron tower cross arm with safety protection
CN206673143U (en) A kind of Multifunction altitude test connection pincers
CN211818470U (en) Cross arm convenient to installation
CN205811278U (en) A kind of simple roof tank lightning protection device
CN210489388U (en) Dry-type transformer side outlet structure convenient to whole transportation
CN220302975U (en) Fixing device for fireproof blocking of subway station
CN213630953U (en) Quick-dismantling type air duct heater of electric heating tube
CN112653007B (en) Adjustable gas communication pipe fixing support and GIS equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181012