CN106498937A - A kind of repeatable with new screw filling pile construction equipment - Google Patents
A kind of repeatable with new screw filling pile construction equipment Download PDFInfo
- Publication number
- CN106498937A CN106498937A CN201611220061.4A CN201611220061A CN106498937A CN 106498937 A CN106498937 A CN 106498937A CN 201611220061 A CN201611220061 A CN 201611220061A CN 106498937 A CN106498937 A CN 106498937A
- Authority
- CN
- China
- Prior art keywords
- outer tube
- repeatable
- construction equipment
- inner prop
- pile construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
Abstract
The present invention proposes a kind of repeatable new screw filling pile construction equipment, including outer tube body (6) and inner prop cylinder (2), outer tube body (6) upper end is provided with outer tube neck ring (5) and enters concrete mouth (3), and lower end is provided with helical blade (8);Inner prop cylinder (2) upper end is provided with suspension hook (1), and lower end is provided with drill bit (9).The outer tube body upper end is provided with outer tube connecting hole (4), is provided with inner prop connecting hole (10), and two ends insertion on the inner prop cylinder.Outer tube body (6), helical blade (8) and drill bit (9) are made using high-carbon steel;Helical blade (8) pitch is less, and screw thread is closeer.Advantage is, solve the collapse hole of the pile foundations such as rotary digging stake, sediment thickness, broken pile, level of ground water high cannot pore-forming and concrete excess a difficult problem.
Description
Technical field
The present invention relates to technical field of civil engineering, and in particular to a kind of repeatable with new screw filling pile construction machine
Tool.
Background technology
At present, make pile foundation and mainly use country-level engineering method -- half screw bored concrete pile technology, but actually used
During, find this complicated geological structure that adaptation southwest is difficult into spiral shell section, this area mountains and rivers, tributary many ground qualitative change
Change big, formation strength is changed greatly, stratum is widely different because of frequently flood alluviation, and unlike North Plain, that is machine-made
Argillic horizon and without obvious supporting course, is very easy to into spiral shell, it is impossible to meet screw rod pile simultaneous techniquess.But can not synchronously
Complete screw rod pile cannot be made.
The soil structure in southwest major part river is back fill course, backfill rock ballast layer, argillic horizon, silty soil layer, powder
Layer of sand, middle layer of sand, slightly close boulder bed, in close sandy gravel, Compact sandy-pebble, severely-weathered shale, middle weathered shale, possess geology multiple
The characteristics of miscellaneous and level of ground water is higher.In prior art, screw rod pile technique possess have be not afraid of subsoil water, mud, drift sand, without heavy
Slag, without broken pile, noiselessness, environmental protection advantage, but the complicated geological of southwest is difficult into spiral shell.
Content of the invention
It is an object of the invention to:For above-mentioned southwest complicated geology and level of ground water higher so that half screw perfusion
Into the problem that spiral shell is difficult, screw rod pile is unstable, the present invention provides a kind of repeating and uses new screw filling pile construction machine pile work method
Tool.
The technical solution used in the present invention is as follows:
A kind of repeatable with new screw filling pile construction equipment, including outer tube body and inner prop cylinder, the outer tube pipe
Body upper end is provided with outer tube neck ring and enters concrete mouth, and lower end is provided with helical blade;The inner prop cylinder upper end is provided with suspension hook, under
End is provided with drill bit.
Further, the outer tube body, helical blade and drill bit are made using high-carbon steel.
Further, the outer tube body upper end is provided with outer tube connecting hole, is provided with inner prop company on the inner prop cylinder
Connect hole, and two ends insertion.
Further, the outer tube connecting hole and inner prop connecting hole orifice position, size are consistent, and are placed with connection
Post.
Further, the connection column length is much larger than outer tube outer tube diameter.
Further, the outer tube body is tubular structure, and the outer tube outer tube diameter is between 400mm-850mm.
Further, the inner prop cylinder is cylinder, and the drill bit is set to taper.
Further, the inner prop cylinder external diameter is consistent with outer tube internal diameter of tube body.
In sum, as a result of above-mentioned technical proposal, the invention has the beneficial effects as follows:
Solve the collapse hole of the pile foundations such as rotary digging stake, sediment thickness, broken pile, level of ground water high cannot pore-forming and concrete excess difficulty
Topic.
Description of the drawings
Fig. 1 is axonometric chart of the present invention;
Fig. 2 is profile of the present invention;
Labelling in figure:1- suspension hooks, 2- inner props, 3- enter concrete mouth, 4- outer tube connecting holes, 5- outer tube neck rings, 6- straightways, 7- spiral shells
Silk section, 8- screw blades, 9- drill bits, 10- inner tube connecting holes, 11- connecting poles.
Specific embodiment
All features disclosed in this specification, in addition to mutually exclusive feature and/or step, can be with any
Mode is combined.
The present invention is elaborated with reference to Fig. 1, Fig. 2.
As shown in Figure 1 and Figure 2, it is axonometric chart of the invention and profile.This construction equipment mainly includes
A kind of repeatable with new screw filling pile construction equipment, including outer tube body 6 and inner prop cylinder 2, the outer tube
6 upper end of body is provided with outer tube neck ring 5 and enters concrete mouth 3, and lower end is provided with helical blade 8;2 upper end of inner prop cylinder is provided with
Suspension hook 1, lower end are provided with drill bit 9.The outer tube body 6, helical blade 8 and drill bit 9 are made using high-carbon steel.Described
6 upper end of outer tube body is provided with outer tube connecting hole 4, is provided with inner prop connecting hole 10, and two ends insertion on the inner prop cylinder 2,
8 pitch of helical blade is less, and screw thread is closeer.
Actually used flow process is as follows:
(1) inner prop 2 is arranged in outer tube 6, makes outer tube connecting hole 4 and inner prop connecting hole 10 align, and by connecting pole 11
It is placed in outer tube connecting hole 4 and inner prop connecting hole 10;
(2) filling pile construction equipment is placed into specified location;
(3) power set are fixed on connecting pole 11, start power set, make to be rotated under construction equipment clockwise direction
Hole is shaped to designated depth;
(4) connecting pole 11 is extracted, inner prop 2 is extracted by suspension hook 1 using crane;
(5) connecting pole 11 is inserted to outer tube connecting hole 4, and power set are fixed on connecting pole 11;
(6) concrete is extruded using the extruding of concrete machine from 6 bottom of outer tube, and rotate counterclockwise carries outer tube 6, keep outer tube 6 and the soil body
Pressure differential, it is impossible to interrupt the output of concrete, persistently output concrete is so as to forming lower end screw-type stake;
(7) after outer tube rising is close to weak soil bottom absolute altitude, it is changed to not rotate from rotation and directly carries, stake pressure injection is completed until upper end,
Form linear type stake and extract outer tube 6.
Wherein, the effect of outer tube neck ring 5 is mainly limiting construction equipment submergence depth, it is to avoid it is excessively loose soil layer occur, causes
The situation that construction equipment infinitely sink.
This construction equipment is strengthened power section, strengthens screw rod rigidity and strength of joint, improvement pile top, can be by the supporting course of stake
Close boulder bed, closely knit boulder bed or middle air slaking rammell in being directly placed into.
In sum, screw rod soil compaction, squeeze gravel and piles set into rock engineering method and solve during former screw rod pile driving construction hardly enters
Close boulder bed, closely knit boulder bed, a difficult problem for middle air slaking lithosphere is cannot be introduced into, and solve close cobble during pile tube can not be entered
The defect of layer, closely knit boulder bed, severely-weathered rammell and middle air slaking rammell.Due to screw rod soil compaction, squeeze gravel engineering method bored concrete pile
It is cast-in-place concrete, and the effectively connection of pile concrete and soil layer makes the calculating sectional area of the collateral resistance of frictional force increase and stake
Increase, its collateral resistance, end resistance are better than pile tube with aobvious.Solve the collapse hole of the pile foundations such as rotary digging stake, sediment thickness, broken pile, subsoil water
Position high cannot pore-forming and concrete excess a difficult problem.
Claims (8)
1. a kind of repeatable with new screw filling pile construction equipment, including outer tube body (6) and inner prop cylinder (2), its feature
It is, outer tube body (6) upper end is provided with outer tube neck ring (5) and enters concrete mouth (3), and lower end is provided with helical blade (8);Institute
State inner prop cylinder (2) upper end and be provided with suspension hook (1), lower end is provided with drill bit (9).
2. according to claim 1 a kind of repeatable with new screw filling pile construction equipment, it is characterised in that described outer
Pipe body (6), helical blade (8) and drill bit (9) are made using high-carbon steel;Helical blade (8) pitch is less, and screw thread is more
Close.
3. according to claim 1 a kind of repeatable with new screw filling pile construction equipment, it is characterised in that described outer
Pipe body upper end is provided with outer tube connecting hole (4), is provided with inner prop connecting hole (10), and two ends insertion on the inner prop cylinder.
4. according to claim 1 a kind of repeatable with new screw filling pile construction equipment, it is characterised in that described outer
Pipe connecting hole (4) and inner prop connecting hole aperture (10) position, size are consistent, and are placed with connecting pole (11).
5. the connecting pole according to claim 1 and claim 4, it is characterised in that connecting pole (11) length is long-range
In outer tube body (6) external diameter.
6. according to claim 1 a kind of repeatable with new screw filling pile construction equipment, it is characterised in that described outer
Pipe body (6) is tubular structure, and the outer tube body (6) external diameter is between 400mm-850mm.
7. according to claim 1 a kind of repeatable with new screw filling pile construction equipment, it is characterised in that described interior
Post cylinder (2) is cylinder, and drill bit (9) are set to taper.
8. according to claim 1 a kind of repeatable with new screw filling pile construction equipment, it is characterised in that described interior
Post cylinder (2) external diameter is consistent with outer tube body (6) internal diameter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611220061.4A CN106498937A (en) | 2016-12-26 | 2016-12-26 | A kind of repeatable with new screw filling pile construction equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611220061.4A CN106498937A (en) | 2016-12-26 | 2016-12-26 | A kind of repeatable with new screw filling pile construction equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106498937A true CN106498937A (en) | 2017-03-15 |
Family
ID=58334178
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611220061.4A Pending CN106498937A (en) | 2016-12-26 | 2016-12-26 | A kind of repeatable with new screw filling pile construction equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106498937A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2057457U (en) * | 1989-02-28 | 1990-05-23 | 陈士华 | Improved rotary driller |
CN1632235A (en) * | 2004-12-31 | 2005-06-29 | 梁毅 | Equipment for static force top press poured piles and construction method thereof |
CN101575852A (en) * | 2008-05-10 | 2009-11-11 | 夏传清 | Construction method of wall-retaining bottom-expanding sinking-pipe cast-in-situ piles |
JP2016132909A (en) * | 2015-01-19 | 2016-07-25 | 千代田ソイルテック株式会社 | Construction device and construction method for on-site constructed pile |
CN206512704U (en) * | 2016-12-26 | 2017-09-22 | 廖梓婷 | One kind is repeatable to use new screw filling pile construction equipment |
-
2016
- 2016-12-26 CN CN201611220061.4A patent/CN106498937A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2057457U (en) * | 1989-02-28 | 1990-05-23 | 陈士华 | Improved rotary driller |
CN1632235A (en) * | 2004-12-31 | 2005-06-29 | 梁毅 | Equipment for static force top press poured piles and construction method thereof |
CN101575852A (en) * | 2008-05-10 | 2009-11-11 | 夏传清 | Construction method of wall-retaining bottom-expanding sinking-pipe cast-in-situ piles |
JP2016132909A (en) * | 2015-01-19 | 2016-07-25 | 千代田ソイルテック株式会社 | Construction device and construction method for on-site constructed pile |
CN206512704U (en) * | 2016-12-26 | 2017-09-22 | 廖梓婷 | One kind is repeatable to use new screw filling pile construction equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101812976B (en) | Adjustable multiple coil extruding and expanding drilling tool | |
CN1995685B (en) | Pile forming mechanism with high-pressure-jet gyro bit and pile forming method | |
CN104988907A (en) | Construction method of concrete pile | |
CN104947660A (en) | Reverse screw spike pile and construction method thereof | |
CN103556628B (en) | Spiral conical soil compaction pile construction method | |
CN103953030B (en) | The compacted castinplace pile of screw thread supination joint bar | |
CN111851479B (en) | Method for constructing immersed tube rammed cast-in-place pile in sand layer or gravel layer | |
CN105649073A (en) | Static root drilling type construction method for planting piles | |
CN106837382A (en) | A kind of subway tunnel country rock pre grouting from the surface reinforcement process | |
CN109183790A (en) | A kind of Screw Pile and its construction tool and construction method | |
CN108756809A (en) | A kind of method for sealing of shield tunnel geological prospecting borehole | |
CN105297710A (en) | High-pressure-jetting cement soil twist drill and reamed reinforced concrete grouting combined pile and manufacturing method | |
CN108221972A (en) | A kind of built pile and its construction method and vertical bearing capacity of single pile computational methods | |
CN206512704U (en) | One kind is repeatable to use new screw filling pile construction equipment | |
CN103556551B (en) | Reinforce the construction method of the dumb-bell shape drilled pile composite foundation structure of embankment widening | |
CN1995689B (en) | Pile forming method of pile forming mechanism with gyro bit | |
CN108842761A (en) | Drilling guiding prefabricated pile post-grouting technology | |
CN102979087B (en) | Construction method for rotary excavation pile | |
CN206721875U (en) | A kind of pressure-bearing type boulder and cobble soil layer enlarging anchor rod | |
CN106481277A (en) | High pressure base expanding and base expanding screw rod drilling equipment and its stake end enlarged footing | |
CN201650154U (en) | Adjustable multi-stage helical extruding type drilling tool | |
CN203514140U (en) | Dumbbell-shaped drilling pile composite foundation structure for reinforcing soft ground under highway embankment | |
CN106498937A (en) | A kind of repeatable with new screw filling pile construction equipment | |
CN200999592Y (en) | Gyroscope drill and piling machine with gyroscope drill | |
CN205314093U (en) | Excavation supporting structure of stake |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170315 |
|
RJ01 | Rejection of invention patent application after publication |