CN106498827A - Energy tunnel recombination formula ground temperature energy freeze-proof heating system - Google Patents

Energy tunnel recombination formula ground temperature energy freeze-proof heating system Download PDF

Info

Publication number
CN106498827A
CN106498827A CN201611164935.9A CN201611164935A CN106498827A CN 106498827 A CN106498827 A CN 106498827A CN 201611164935 A CN201611164935 A CN 201611164935A CN 106498827 A CN106498827 A CN 106498827A
Authority
CN
China
Prior art keywords
tunnel
lining
heat
heat exchange
energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611164935.9A
Other languages
Chinese (zh)
Inventor
杜时贵
张国柱
夏才初
雍睿
李玉文
韩常岭
徐坚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Shaoxing
Southeast University
Original Assignee
University of Shaoxing
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Shaoxing, Southeast University filed Critical University of Shaoxing
Priority to CN201611164935.9A priority Critical patent/CN106498827A/en
Publication of CN106498827A publication Critical patent/CN106498827A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/24Methods or arrangements for preventing slipperiness or protecting against influences of the weather
    • E01C11/26Permanently installed heating or blowing devices ; Mounting thereof
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/52Heat recovery pumps, i.e. heat pump based systems or units able to transfer the thermal energy from one area of the premises or part of the facilities to a different one, improving the overall efficiency

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Road Paving Structures (AREA)

Abstract

A kind of energy tunnel recombination formula ground temperature energy freeze-proof heating system,Including tunnel bringing-up section,Heat supplying pipeline is laid in tunnel corresponding with tunnel bringing-up section,Heat supplying pipeline two ends are connected with the second feed pipe and the second return pipe respectively,Second feed pipe and the second return pipe are connected to form heating cycle pipeline with heat pump end,Heat exchanging segment corresponding tunnel in tunnel includes serving as a contrast at the beginning of tunnel、Tunnel double-lining、Tunnel inverted arch and road surface,Upper pavement surface is lining and tunnel double-lining at the beginning of tunnel,Backfill layer is located on tunnel inverted arch,Serving as a contrast and tunnel double-lining between at the beginning of tunnel、Heat exchange layers are respectively provided between tunnel inverted arch and backfill layer,Upper pavement surface、Connected by crossover sub between the heat exchange layers of lower section,First water inlet of heat exchange layers is connected with the first feed pipe,First water return outlet of heat exchange layers is connected with the first return pipe,First feed pipe and the first recovery tube are connected to form recuperated cycle pipeline with heat pump front end.Applicability of the present invention is good, heat exchange efficiency is higher, cost-effective and saves construction period.

Description

Energy tunnel recombination formula ground temperature energy freeze-proof heating system
Technical field
The present invention relates to tunnel surrounding field, especially a kind of energy tunnel recombination formula ground temperature energy freeze-proof heating system, fit The tunnel-liner for educating area for underground water agensis and owing can be extracted with inverted arch bottom country rock ground temperature behind, and to tunnel Road surface and lining cutting are heated.
Background technology
In recent years, as China's transport development is fast-developing, the quantity of tunnel in cold area grows with each passing day, but in tunnel in cold area Freeze injury problem becomes increasingly conspicuous, part newly built tunnels come into operation after soon, just there occurs freeze injury on a large scale, had a strong impact on tunnel Traffic safety.Investigation discovery is carried out to the highway in cold region tunnel that has runed, in tunnel in cold area, has more than 80% all to there is freeze injury now As wherein about 60% occurs the slight freeze injury phenomenon such as percolating water, and about 24% lining concrete peeling, cracking, slump, depression occurs Deng serious cold damage problem.Tunnel in cold area can not chronically solve the frost heave of tunnel in cold area using conventional heater by service at present With the disease problem such as freeze, and have the shortcomings that energy consumption is big, operation cost is high and show using the active heating measure of electrical heating method Shape, is badly in need of the novel anti-freezing heating system of exploitation energy-conserving and environment-protective.
The soil moisture in the earth superficial layer hundreds of meters is in increasing trend with depth, and depth often increases by 100 meter temperature rises High about 3-5 DEG C, about 40-50 DEG C of the ground temperature at 1000 meters of underground is stored in the mountain tunnel country rock of buried depth hundreds of meters huge Ground temperature energy.Can be heated to the tunnel-liner and road surface that are located at hole end using the ground temperature in tunnel surrounding, can Tunnel in cold area freeze injury is solved, tunnel in cold area heat supply " self-sufficient " is realized in also energy-conserving and environment-protective.
The ground temperature being located in the country rock of tunnel-liner behind can be by directly collecting in tunnel surrounding by way of GEOTHERMAL WATER To extract, it is also possible to bury heat-exchange tube between in tunnel double-lining and just serving as a contrast, by the heat transfer cycle medium in pipe and country rock it Between the temperature difference extract tunnel surrounding ground temperature energy.But GEOTHERMAL WATER collection technique is only applicable to the area of rich groundwater, in underground water Cannot then apply in little or without underground water the area of amount.Huge ground temperature energy is also stores in the country rock of inverted arch bottom, due to residing position The difference that puts, the ground temperature in the country rock of inverted arch bottom then can be difficult by collecting GEOTHERMAL WATER acquisition, can be passed through on inverted arch The mode of portion's laying heat exchange pipe extracts geothermal energy, extracts tunnel using the temperature difference between the heat transfer cycle medium and country rock in pipe Road country rock geothermal energy.Although extract the ground temperature energy in tunnel surrounding using heat-exchange tube not limited by underground water development condition, Laying heat-exchange tube increased construction cost, and heat-exchange tube belongs to wire thermal source, and its heat exchange efficiency is very limited.
Content of the invention
In order to overcome existing tunnel country rock GEOTHERMAL WATER collect technology cannot be applied to underground water owe educate and agensis area, And also the ground temperature energy in the country rock of inverted arch bottom cannot be extracted;Though laying heat-exchange tube technology is not limited by underground water development condition System, but heat-exchange tube belongs to wire thermal source, and its exchange capability of heat is limited, and laying heat exchange pipe can increase engineering-built cost etc. A difficult problem, a kind of applicability of present invention offer is good, heat exchange efficiency is higher, cost-effective and energy tunnel that is saving construction period is multiple Box-like ground temperature energy freeze-proof heating system.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of energy tunnel recombination formula ground temperature energy freeze-proof heating system, including tunnel bringing-up section, the tunnel bringing-up section bag Heat supplying pipeline is included, the heat supplying pipeline is laid in tunnel corresponding with the tunnel bringing-up section, the heat supplying pipeline two ends difference It is connected with the second feed pipe and the second return pipe, second feed pipe and the second return pipe are connected to form heat supply with heat pump end Circulation line, the freeze-proof heating system also include tunnel heat exchanging segment, and the corresponding tunnel of the tunnel heat exchanging segment is included at the beginning of tunnel Lining, tunnel double-lining, tunnel inverted arch and road surface, upper pavement surface are lining and tunnel double-lining at the beginning of the tunnel, and the backfill layer is positioned at institute State on tunnel inverted arch, serving as a contrast at the beginning of the tunnel and tunnel double-lining between, between the tunnel inverted arch and backfill layer, be respectively provided with hot friendship Layer is changed, is connected by crossover sub between upper pavement surface, the heat exchange layers of lower section, the first water inlet of the heat exchange layers and One feed pipe is connected, and the first water return outlet of the heat exchange layers connected with the first return pipe, first feed pipe and first time Closed tube is connected to form recuperated cycle pipeline with heat pump front end.
Further, lower waterproof layer is set above the heat exchange layers below road surface, and the heat exchange layers of upper pavement surface are inside and outside to be arranged Upper waterproof layer.
Further, the lower waterproof layer is connected with the bottom surface of the backfill layer;The upper waterproof layer includes the tunnel Injection waterproof layer and the Water -proof Membrane heat exchange layers and tunnel double-lining between and heat exchange layers between is just served as a contrast.When So, it would however also be possible to employ other waterproof types.
Further, sealing cut-off is set in the heat exchange layers, and the heat exchange layers are carried out point by the sealing cut-off Area, each subregion connect to form closed circulation subsystem with respective feed pipe and recovery tube respectively.
Preferably, one end of the sealing cut-off is provided with breach, separates adjacent subregion with sealing jaggy and mutually passes through Logical.
Further, the breach dislocation arrangement of adjacent sealing cut-off.Random length can be obtained by setting up breach quantity Heat exchanger.
In the heat exchange layers, filling seepy material, can form pervious bed.
The backfill layer is light-weight soils insulation backfill layer.
The corresponding tunnel of the tunnel bringing-up section includes tunnel double-lining, and the tunnel double-lining inwall arranges warming plate, described Tunnel bringing-up section includes lining cutting bringing-up section, and the lining cutting bringing-up section is the heat supplying pipeline that lays between tunnel double-lining and warming plate
The corresponding tunnel of the tunnel bringing-up section also includes that road surface, the road surface are located at the top of backfill layer, the tunnel Bringing-up section also includes road-surface heating section, and the road-surface heating section is the heat supplying pipeline that lays between road surface and backfill layer.
The present invention technology design be:In view of existing tunnel surrounding GEOTHERMAL WATER collect technology cannot be applied to underground water owe Development and agensis area, and also the ground temperature energy in the country rock of inverted arch bottom cannot be extracted;Though laying heat-exchange tube technology is not received Underground water development condition is limited, but heat-exchange tube belongs to wire thermal source, and its exchange capability of heat is limited, and laying heat exchange pipe can increase Processing journey construction cost.The present invention proposes a kind of new ground temperature energy extractive technique.The technology is in tunnel-liner behind and inverted arch Top arranges heat exchange layers, is filled with seepy material in heat exchange layers, and heat exchange layers are connected with feed pipe and the backwater seal of tube respectively Connect, form the circulating heat exchange system of closing, the ground temperature energy in tunnel surrounding is extracted by the circulation of fluid in heat exchange layers, through ground Source heat-pump apparatus can be lifted to the ground temperature for extracting, and tunnel-liner and road surface are heated by heat supplying pipeline.Tunnel adds Hot arc is made up of lining cutting bringing-up section and road-surface heating section, and lining cutting bringing-up section includes tunnel double-lining and warming plate, in tunnel double-lining and Heat supplying pipeline is laid between warming plate;Road-surface heating section includes road surface and backfill layer, between road surface and backfill layer lays heat supply Pipeline.
In each subregion of the heat exchange layers, the sealing positioned at both sides separates elongated arrangement, and is located at the cut-off of centre One section of setting breach, separates adjacent subregion with sealing jaggy and is mutually communicated;The breach of sealing cut-off is set to staggeredly cloth Put, set up the heat exchanger that breach quantity can obtain random length.
Beneficial effects of the present invention are mainly manifested in:
(1) present invention can realize tunnel portal section lining cutting and road-surface heating using the ground temperature in tunnel surrounding, with tradition electricity Heating is compared, the technology energy-saving and environment friendly, greatly reduces tunnel operation maintenance cost;
(2) the buried heat exchanger of layer extracts the ground temperature in tunnel surrounding using the heat transfer medium of heat exchange layers internal circulation flow Can, the passive extractive technique for solving traditional collection GEOTHERMAL WATER can be only applied to the tunnel of rich groundwater, educate for owing The difficult problem then not applied to the tunnel without underground water;
(3) layer embedded type heat exchanger belongs to planar thermal source, and the buried heat exchanger of traditional pipe belongs to wire thermal source, so, The buried heat exchanger heat exchange efficiency of layer of the invention is higher;
(4) the buried heat exchanger of layer forms integrated with tunnel structure, and construction technology is simple, need not lay heat exchange pipe, A large amount of construction costs are saved.
Description of the drawings
Fig. 1 is energy tunnel recombination formula ground temperature energy freeze-proof heating system composition figure.
Fig. 2 is heat exchanging segment cross-sectional view.
Fig. 3 is upper pavement surface heat exchange layers plane outspread drawing.
Fig. 4 is heat exchange layers plane outspread drawing below road surface.
Fig. 5 bringing-up section cross-sectional views.
Fig. 6 is heat supplying pipeline plane outspread drawing.
In figure, 1 is to serve as a contrast at the beginning of tunnel;21 are injection waterproof layer;22 Water -proof Membranes;3 is heat exchange layers;4 is tunnel two Lining;5 is warming plate;6 is crossover sub;7 is the first feed pipe;8 is the first return pipe;9 is the first water inlet;10 is first time The mouth of a river;11 separate for sealing;12 are backfill layer;13 is tunnel heat exchanging segment;14 is tunnel bringing-up section;15 is road surface;16 is heat supply Pipe;17 is the second feed pipe;18 is the second return pipe;19 is the second water inlet;20 is the second water return outlet;23 is heat pump;Under 24 Waterproof layer.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings.
With reference to Fig. 1~Fig. 6, a kind of energy tunnel recombination formula ground temperature energy freeze-proof heating system, including tunnel bringing-up section 14, institute Stating tunnel bringing-up section 14 includes that heat supplying pipeline 16, the heat supplying pipeline are laid in tunnel corresponding with the tunnel bringing-up section, institute State heat supplying pipeline two ends to be connected with the second feed pipe 17 and the second return pipe 18 respectively, second feed pipe 17 and the second backwater Pipe 18 is connected to form heating cycle pipeline with 23 end of heat pump, and the freeze-proof heating system also includes tunnel heat exchanging segment 13, described Heat exchanging segment 13 corresponding tunnel in tunnel includes lining 1, tunnel double-lining 4, tunnel inverted arch and road surface 15 at the beginning of tunnel, is institute above road surface 15 Lining 1 and tunnel double-lining 4 at the beginning of tunnel is stated, is backfill layer 12 below road surface, the backfill layer 12 is located on the tunnel inverted arch, in institute State Connected by crossover sub 6 between side, the heat exchange layers 3 of lower section, the first water inlet 9 and first of the heat exchange layers 3 supplies water Pipe 7 is connected, and the first water return outlet 10 of the heat exchange layers 3 is connected with the first return pipe 8, first feed pipe 7 and first time 8 heat pump front end of closed tube connects to form recuperated cycle pipeline.
Further, lower waterproof layer 24, peripheral hardware in the heat exchange layers of upper pavement surface are set above the heat exchange layers below road surface Put waterproof layer.
Further, the lower waterproof layer 23 is connected with the bottom surface of the backfill layer 12;The upper waterproof layer includes described Injection waterproof layer 21 between lining 1 and heat exchange layers 3 and the combined type between the heat exchange layers 3 and tunnel double-lining 4 at the beginning of tunnel Splash guard 22.It is of course also possible to use other waterproof types.
Further, sealing cut-off 11 is set in the heat exchange layers 3, and the sealing separates 11 by the heat exchange layers 3 Subregion is carried out, each subregion connects to form closed circulation subsystem with respective feed pipe and recovery tube respectively.
Preferably, one end of the sealing cut-off 11 is provided with breach, separates adjacent subregion with sealing jaggy mutual Insertion.
Further, the breach dislocation arrangement of adjacent sealing cut-off 11.By set up breach quantity can obtain arbitrarily long The heat exchanger of degree.
In the heat exchange layers 3, filling seepy material, can form pervious bed.
The backfill layer 12 is light-weight soils insulation backfill layer.
Fill in the xoncrete structure of the tunnel double-lining 4 for limiting in High-geotemperature country rock and hole heat transfer between air Phase-change material.
The inwall of the tunnel double-lining 4 arranges warming plate 5.
The corresponding tunnel of the tunnel bringing-up section includes that tunnel double-lining 4,4 inwall of the tunnel double-lining arrange warming plate 5, institute Stating tunnel bringing-up section 14 includes lining cutting bringing-up section, and the lining cutting bringing-up section is the confession that lays between tunnel double-lining 4 and warming plate 5 Pipe line.
The corresponding tunnel of the tunnel bringing-up section also includes that road surface 15, the road surface 15 are located at the top of backfill layer 12, institute Stating tunnel bringing-up section 14 also includes road-surface heating section, and the road-surface heating section is the confession that lays between road surface 15 and backfill layer 12 Pipe line.
The energy tunnel recombination formula ground temperature energy freeze-proof heating system of the present embodiment, the system can be exchanged heat by tunnel surrounding ground temperature Section, heat pump and tunnel bringing-up section composition.Heat exchanging segment is made up of two parts below upper pavement surface and road surface, and upper pavement surface heat exchanging segment has Lining at the beginning of tunnel and two lining compositions, arrange heat exchange layer between lining at the beginning of tunnel and two linings;Below road surface, heat exchanging segment is by inverted arch, backfill layer Constitute with road surface, heat exchange layers are set on inverted arch top, are connected by crossover sub between upper pavement surface, the heat exchange layers of lower section Connect.First water inlet of heat exchange layers is connected with the first feed pipe, and the first water return outlet of heat exchange layers is connected with the first return pipe; First feed pipe and the first return pipe are connected with heat pump front end, and form closing takes thermal cycle pipeline.
Tunnel bringing-up section is made up of lining cutting bringing-up section and road-surface heating section, and lining cutting bringing-up section includes tunnel double-lining and insulation Plate, lays heat supplying pipeline between tunnel double-lining and warming plate;Road-surface heating section includes road surface and backfill layer, in road surface and backfill Heat supplying pipeline is laid between layer.Second water inlet of heat supplying pipeline is connected with the second feed pipe, the second water return outlet of heat supplying pipeline Connect with the second return pipe, the second feed pipe and the second return pipe are connected with heat pump end, form the heating cycle pipeline of closing.
The heat exchange layers of upper pavement surface are inside and outside to arrange upper waterproof layer, arranges injection waterproof just between lining and heat exchange layers Layer, arranges Water -proof Membrane between heat exchange layers and two linings;Heat exchange layers below road surface arrange lower waterproof layer, lower waterproof Layer is located between heat exchange layers and backfill layer.
Sealing cut-off is set in heat exchange layers, subregion is carried out to heat exchange layers using sealing cut-off;In each subregion, it is located at The sealing on both sides separates elongated arrangement, and the cut-off one end for being located at centre arranges breach, separates with sealing jaggy adjacent Subregion is mutually communicated;The breach of sealing cut-off wants interlaced arrangement, sets up the heat exchanger that breach quantity can obtain random length.
The work progress of the energy tunnel recombination formula ground temperature energy freeze-proof heating system of the present embodiment is:
1. sealing cut-off is installed on the inverted arch top of tunnel heat exchanging segment, pours into a mould seepy material, perform the heat friendship below road surface Change layer;Lower waterproof layer is performed on heat exchange layers top, and light-weight soils are filled between road surface and lower waterproof layer;
2. in lining outer surface injection waterproof layer at the beginning of tunnel, sealing cut-off is installed on waterproof layer, and sprays seepy material, apply Do the heat exchange layers of upper pavement surface;
3. crossover sub is installed, the heat exchange layers between connecting inverted arch top and two linings and just serving as a contrast;First feed pipe is installed With the first return pipe, it is connected and sealed with heat exchange layers;
4. light weight earthen backfill layer is flattened, lays heat supplying pipeline, and perform supercrust;
5. in two lining inner surface laying heat supplying pipelines, and warming plate is installed;
6. second feed pipe and the second return pipe are installed, are connected and sealed with heat supplying pipeline;;
7. first feed pipe and the first return pipe of tunnel heat exchanging segment are connected with heat pump front end, form heat exchange sealing circulation Pipeline;Second feed pipe and the second return pipe of tunnel bringing-up section are connected with heat pump end, are formed for heat seal circulation line.

Claims (10)

1. a kind of energy tunnel recombination formula ground temperature energy freeze-proof heating system, including tunnel bringing-up section, the tunnel bringing-up section includes Heat supplying pipeline, the heat supplying pipeline are laid in tunnel corresponding with the tunnel bringing-up section, the heat supplying pipeline two ends respectively with Second feed pipe and the connection of the second return pipe, second feed pipe and the second return pipe are connected to form heat supply and follow with heat pump end Endless tube road, it is characterised in that:The freeze-proof heating system also includes tunnel heat exchanging segment, the corresponding tunnel packet of the tunnel heat exchanging segment Lining at the beginning of tunnel, tunnel double-lining, tunnel inverted arch and road surface is included, upper pavement surface is lining and tunnel double-lining, the backfill at the beginning of the tunnel Layer is located on the tunnel inverted arch, at the beginning of the tunnel between lining and tunnel double-lining, between the tunnel inverted arch and backfill layer Heat exchange layers are set, are connected by crossover sub between upper pavement surface, the heat exchange layers of lower section, the first of the heat exchange layers enter The mouth of a river is connected with the first feed pipe, and the first water return outlet of the heat exchange layers is connected with the first return pipe, first feed pipe It is connected to form recuperated cycle pipeline with heat pump front end with the first recovery tube.
2. energy tunnel recombination formula ground temperature energy freeze-proof heating system as claimed in claim 1, it is characterised in that:Below road surface Lower waterproof layer is set above heat exchange layers, and the heat exchange layers of upper pavement surface are inside and outside to arrange upper waterproof layer.
3. energy tunnel recombination formula ground temperature energy freeze-proof heating system as claimed in claim 2, it is characterised in that:The lower waterproof Layer is connected with the bottom surface of the backfill layer;The upper waterproof layer includes the injection waterproof at the beginning of the tunnel between lining and heat exchange layers Layer and the Water -proof Membrane between the heat exchange layers and tunnel double-lining.
4. the energy tunnel recombination formula ground temperature energy freeze-proof heating system as described in one of claims 1 to 3, it is characterised in that:Institute State, the heat exchange layers are carried out subregion by the sealing cut-off, each subregion respectively with respectively From feed pipe connect to form closed circulation subsystem with recovery tube.
5. energy tunnel recombination formula ground temperature energy freeze-proof heating system as claimed in claim 4, it is characterised in that:The sealing every Disconnected one end is provided with breach, separates adjacent subregion with sealing jaggy and is mutually communicated.
6. energy tunnel recombination formula ground temperature energy freeze-proof heating system as claimed in claim 5, it is characterised in that:Adjacent sealing every Disconnected breach dislocation arrangement.
7. the energy tunnel recombination formula ground temperature energy freeze-proof heating system as described in one of claims 1 to 3, it is characterised in that:Institute State filling seepy material in heat exchange layers.
8. the energy tunnel recombination formula ground temperature energy freeze-proof heating system as described in one of claims 1 to 3, it is characterised in that:Institute It is light-weight soils insulation backfill layer to state backfill layer.
9. the energy tunnel recombination formula ground temperature energy freeze-proof heating system as described in one of claims 1 to 3, it is characterised in that:Institute Stating the corresponding tunnel of tunnel bringing-up section includes tunnel double-lining, and the tunnel double-lining inwall arranges warming plate, the tunnel bringing-up section Including lining cutting bringing-up section, the lining cutting bringing-up section is the heat supplying pipeline that lays between tunnel double-lining and warming plate.
10. energy tunnel recombination formula ground temperature energy freeze-proof heating system as claimed in claim 8, it is characterised in that:The tunnel The corresponding tunnel of bringing-up section also includes that road surface, the road surface are located at the top of backfill layer, and the tunnel bringing-up section also includes road surface Bringing-up section, the road-surface heating section are the heat supplying pipeline that lays between road surface and backfill layer.
CN201611164935.9A 2016-12-16 2016-12-16 Energy tunnel recombination formula ground temperature energy freeze-proof heating system Pending CN106498827A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611164935.9A CN106498827A (en) 2016-12-16 2016-12-16 Energy tunnel recombination formula ground temperature energy freeze-proof heating system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611164935.9A CN106498827A (en) 2016-12-16 2016-12-16 Energy tunnel recombination formula ground temperature energy freeze-proof heating system

Publications (1)

Publication Number Publication Date
CN106498827A true CN106498827A (en) 2017-03-15

Family

ID=58331128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611164935.9A Pending CN106498827A (en) 2016-12-16 2016-12-16 Energy tunnel recombination formula ground temperature energy freeze-proof heating system

Country Status (1)

Country Link
CN (1) CN106498827A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736329A (en) * 2019-02-18 2019-05-10 浙江大学城市学院 A kind of energy foundation pit enclosure structure and construction method of automatic chemoprevention protuberance
CN113153423A (en) * 2021-04-19 2021-07-23 西南交通大学 Large-scale gravity-assisted loop heat pipe anti-freezing system and method for tunnel in alpine region

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006022643A (en) * 2005-09-29 2006-01-26 Eight Consultants Co Ltd Snow melting arrangement
JP2007107288A (en) * 2005-10-14 2007-04-26 Mitsubishi Materials Natural Resources Development Corp Tunnel heat exchange panel and heat exchange system utilizing tunnel heat
KR100801714B1 (en) * 2006-09-25 2008-02-11 조용성 Freezing prevent system of outside road surface of tunnel using heat pipe
CN101672188A (en) * 2009-09-23 2010-03-17 同济大学 Lining heat system used at tunnel portal
CN101672189A (en) * 2009-09-23 2010-03-17 同济大学 Ground source heat pump type heating system used for heat insulating ditch in tunnel
CN102953738A (en) * 2012-11-08 2013-03-06 福州大学 Method and system for automatical antifreezing and thermal insulating of tunnel lining in high and cold areas
CN103090553A (en) * 2013-01-17 2013-05-08 东南大学 Cold region tunnel lining solar energy and ground source heat pump combined heat storage heating system and method
CN103422424A (en) * 2013-06-27 2013-12-04 长沙理工大学 Bridge anti-freezing system for bridge and tunnel connection section
CN206529673U (en) * 2016-12-16 2017-09-29 绍兴文理学院 Energy tunnel recombination formula ground temperature can antifreeze heater

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006022643A (en) * 2005-09-29 2006-01-26 Eight Consultants Co Ltd Snow melting arrangement
JP2007107288A (en) * 2005-10-14 2007-04-26 Mitsubishi Materials Natural Resources Development Corp Tunnel heat exchange panel and heat exchange system utilizing tunnel heat
KR100801714B1 (en) * 2006-09-25 2008-02-11 조용성 Freezing prevent system of outside road surface of tunnel using heat pipe
CN101672188A (en) * 2009-09-23 2010-03-17 同济大学 Lining heat system used at tunnel portal
CN101672189A (en) * 2009-09-23 2010-03-17 同济大学 Ground source heat pump type heating system used for heat insulating ditch in tunnel
CN102953738A (en) * 2012-11-08 2013-03-06 福州大学 Method and system for automatical antifreezing and thermal insulating of tunnel lining in high and cold areas
CN103090553A (en) * 2013-01-17 2013-05-08 东南大学 Cold region tunnel lining solar energy and ground source heat pump combined heat storage heating system and method
CN103422424A (en) * 2013-06-27 2013-12-04 长沙理工大学 Bridge anti-freezing system for bridge and tunnel connection section
CN206529673U (en) * 2016-12-16 2017-09-29 绍兴文理学院 Energy tunnel recombination formula ground temperature can antifreeze heater

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张国柱等: ""利用地温能的隧道加热系统及其施工方法"", 《现代隧道技术》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736329A (en) * 2019-02-18 2019-05-10 浙江大学城市学院 A kind of energy foundation pit enclosure structure and construction method of automatic chemoprevention protuberance
CN109736329B (en) * 2019-02-18 2023-10-20 浙江大学城市学院 Automatic anti-bulge energy foundation pit support structure and construction method
CN113153423A (en) * 2021-04-19 2021-07-23 西南交通大学 Large-scale gravity-assisted loop heat pipe anti-freezing system and method for tunnel in alpine region

Similar Documents

Publication Publication Date Title
CN106595103A (en) Construction method of energy tunnel layer burned geothermal heat exchange system
CN101672188B (en) Lining heat system used at tunnel portal
CN101672189B (en) Ground source heat pump type heating system used for heat insulating ditch in tunnel
CN106437792A (en) Inverted arc layer buried geothermal anti-freezing heating system of energy tunnel
CN206529673U (en) Energy tunnel recombination formula ground temperature can antifreeze heater
CN103088741A (en) Highway bridge pavement deicing and snow melting system based on energy pile and running mode
CN110373970A (en) A kind of overhead road surface underground heat ice-melting structure and its construction method
CN206360714U (en) The buried ground temperature of energy tunnel layer can antifreeze heater
CN106498827A (en) Energy tunnel recombination formula ground temperature energy freeze-proof heating system
CN110319622B (en) High-heat-conductivity ground temperature energy heat exchange tunnel system and construction method thereof
CN202792688U (en) Pipe pile annulus wall embedded type double U-shaped ground source heat pump buried pipe system
CN106437791A (en) Energy source tunnel lining composite type ground warmth anti-freezing heating system
CN106642766A (en) Closed type inner well circulating heat exchange tube
CN206554955U (en) Energy tunnel-liner combined type ground temperature can antifreeze heater
CN206554954U (en) Energy tunnel inverted arch combined type ground temperature can antifreeze heater
CN206545514U (en) The energy tunnel buried ground temperature of inverted arch layer can antifreeze heater
CN206554953U (en) The buried ground temperature of energy tunnel-liner layer can antifreeze heater
CN106522999A (en) Energy tunnel lining layer embedded ground temperature energy heat exchange system
CN206397518U (en) The buried earth temperature energy hot switch of energy tunnel-liner layer
CN206583125U (en) Closed interior well circulating picture-changing heat pipe
CN103088740A (en) Solar energy-ground source heat pump combined heat storage heating system for cold area tunnel pavements
CN106437793A (en) Energy tunnel inverted arch combined type ground temperature energy antifreezing and heating system
CN106500376A (en) The buried earth temperature energy hot exchange system of energy tunnel layer
CN206420175U (en) The buried earth temperature energy hot switch of energy tunnel inverted arch layer
CN206420176U (en) The buried earth temperature energy hot switch of energy tunnel layer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170315