CN106486918A - A kind of portable down conductor reset erecting device and method - Google Patents

A kind of portable down conductor reset erecting device and method Download PDF

Info

Publication number
CN106486918A
CN106486918A CN201611159521.7A CN201611159521A CN106486918A CN 106486918 A CN106486918 A CN 106486918A CN 201611159521 A CN201611159521 A CN 201611159521A CN 106486918 A CN106486918 A CN 106486918A
Authority
CN
China
Prior art keywords
shaft tower
down conductor
angle bar
tower angle
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611159521.7A
Other languages
Chinese (zh)
Other versions
CN106486918B (en
Inventor
钟松树
蔡志坚
吴志成
杨昌加
许俊江
罗国档
卢志忠
姚青煌
叶学知
陈永红
尤信约
吕吉伟
徐华杰
林裕生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Quanzhou Power Supply Co of State Grid Fujian Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Quanzhou Power Supply Co of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Fujian Electric Power Co Ltd, Quanzhou Power Supply Co of State Grid Fujian Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611159521.7A priority Critical patent/CN106486918B/en
Publication of CN106486918A publication Critical patent/CN106486918A/en
Application granted granted Critical
Publication of CN106486918B publication Critical patent/CN106486918B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines

Abstract

A kind of portable down conductor reset erecting device, it is installed to shaft tower angle bar for coordinating hoisting mechanism that down conductor resets, including the detachable retaining mechanism holding shaft tower angle bar tightly, this retaining mechanism includes can be used for fixing the girder of hoisting mechanism, it is arranged on the first fastening assembly that girder one end can clasp shaft tower angle bar side edge, it is arranged on the second fastening assembly that the girder other end can clasp shaft tower angle bar opposite side edge, second fastening assembly includes being swingingly hinged on the Button Block of the girder other end in locked position and off-position, the pull bar being hinged on Button Block can swung, it is arranged on the second fastener that shaft tower angle bar opposite side edge can be clasped on pull bar, it is arranged to be rocked to locked position when Button Block from off-position, pull bar retraction can be driven so that the second fastener buckles the edge of shaft tower angle bar.

Description

A kind of portable down conductor reset erecting device and method
Technical field
The present invention relates to a kind of portable down conductor reset erecting device and method.
Background technology
Transmission line of electricity will carry out grounding resistance measurement to transmission line of electricity every year by operation maintenance requirement, if sent out in circuit During raw lightning stroke trip accident, need also exist for carrying out grounding resistance measurement to tripping fault part of path, and in measurement process, with In front construction, because landfill soil mostly loosens the soil, pile up through long, grounded screen is compacted by landfill soil layer by layer, originally foot Enough down conductors are subject to the pressure of upper strata soil, constantly to lower stress, lead to active length to shorten, are untiing clamp nut When moment retracted downward, cause impact to resuming work, serious time handss or other Work tools go to lift down conductor It is difficult to reset.This kind of method needs staff to spend very big strength and time, cause arm to ache, palm red and swollen, with While power, handss are also easily grounded downlead and scratch skin, cause potential safety hazard.
For the problems referred to above, Chinese patent literature CN104201599A discloses a kind of portable down conductor and installs Device, including down conductor lifting member, described down conductor lifting member include one piece lifting mainboard and three pieces auxiliary attached plate with And screw bolt and nut, described lifting mainboard one end is provided with rib, on the lifting mainboard after described rib between be separated with multiple from plate The draw-in groove that body side inwardly opens up, in described auxiliary attached plate, interval offers multiple bolts hole;One piece of auxiliary attached plate lies against and connects On the other ground of ground downlead, another piece of auxiliary attached plate or another two pieces are bolted the auxiliary attached plate of lengthening parallel to ground connection Downlead is supported in the auxiliary attached plate keeping flat, and the rib of lifting mainboard hooks the auxiliary attached plate top of support, lifts mainboard A draw-in groove withhold the bottom of down conductor termination.
Content of the invention
The purpose of the present invention is for the deficiencies in the prior art, and provide that a kind of structure is simple and convenient to operate portable connects Ground downlead reset erecting device and method.
The purpose of the present invention to be realized by following technical solution:
A kind of portable down conductor reset erecting device, installs for coordinating hoisting mechanism that down conductor resets To on shaft tower angle bar it is characterised in that:Including the detachable retaining mechanism holding shaft tower angle bar tightly, this retaining mechanism includes can be used for The girder of fixing hoisting mechanism, it is arranged on girder one end and can clasp the first fastening assembly at shaft tower angle bar side edge, be arranged on The girder other end can clasp the second fastening assembly at shaft tower angle bar opposite side edge, and the second fastening assembly includes can be in locked position Swingingly it is hinged on the Button Block of the girder other end, the pull bar being hinged on Button Block can swung, be arranged on pull bar with off-position On can clasp second fastener at shaft tower angle bar opposite side edge, be arranged to be rocked to locked position when Button Block from off-position, can Drive pull bar retraction so that the second fastener buckles the edge of shaft tower angle bar.
Further, described girder is formed with the T-slot extending along its length, and described hoisting mechanism includes loading T-shaped part in the T-slot handle hinged with T-shaped part, be hinged on can catch on handle down conductor installation portion lifting hook, It is arranged to operation handle to be swung up, lifting can be made to hook the action made from bottom to top, from outside to inside.
Further, described lifting hooks and includes two parallel relative hook bodies, hook body is provided with for by down conductor Installation portion is to the spring of external pressure.
Further, described handle one end forms the spanner structure for operating nut.
Further, described first fastening assembly includes being formed at the screw of girder one end, the regulation being disposed in screw Screw rod, it is rotatably provided on adjusting screw rod and can clasp first fastener at shaft tower angle bar side edge.
Further, present invention additionally comprises the location-plate being arranged on described girder, being locked or swingingly be arranged on Spanner on location-plate, spanner is formed with the location hole being adapted with the nut of down conductor clamping screw.
Further, described location-plate is formed with screw, described spanner is formed with the perforation relative with screw, by wearing The regulating bolt crossing perforation with screw cooperation makes spanner be in be locked or swingable state.
Further, described pull bar is hinged on described Button Block by hinged seat, and hinged seat passes through jointed shaft and described button Seat is hinged, and hinged seat is formed with the installing hole passing through for described pull bar, and described pull bar is formed through the spiro rod section of installing hole, spiral shell Locking nut positioned at installing hole both sides is provided with bar segment.
A kind of down conductor reset installation method, shaft tower angle bar is formed with and installs for clamping screw passes through first Hole, the installation portion of down conductor is formed with the second installing hole that can be relative with the first installing hole, and clamping screw sequentially passes through First, pass through nut check after the second installing hole, comprise the steps:
(1), by the first side edge fastening buckling assembly and shaft tower angle bar, make girder horizontal-extending and with shaft tower angle bar One side in two verticals is positioned opposite;
(2), make Button Block be rocked to off-position, the pull bar of the second fastener assemblies is rocked to and shaft tower angle bar two vertical In another side positioned opposite and horizontal-extending, make the second fastener relative with the opposite side edge of shaft tower angle bar, Button Block swung To locked position, drive pull bar retraction so that the second fastener buckles the edge of shaft tower angle bar;
(3), hoisting mechanism is fixed on girder, and operates hoisting mechanism that the installation portion of down conductor is promoted to peace Holding position, makes the first installing hole of the installation portion of down conductor be through on clamping screw, then unloads hoisting mechanism, operates spiral shell The installation portion of down conductor is locked on shaft tower angle bar female and clamping screw.
Described step (3) includes operation spanner makes its location hole be aligned with the first installing hole, by clamping screw from shaft tower angle The back side of ferrum passes through location hole and the first installing hole, and hoisting mechanism is fixed on girder, and operates hoisting mechanism by grounding lead Offline installation portion is promoted to installation site, makes the second installing hole pass through the screw rod of clamping screw, unloads hoisting mechanism, operates spiral shell The installation portion of down conductor is locked on shaft tower angle bar female and clamping screw.
The present invention has the advantages that:
Rapidly erection of main beam can be fixed on shaft tower angle bar by the first fastening assembly and the second fastening assembly, so The installation portion of down conductor just easily can be promoted to installation site by girder by hoisting mechanism, wherein, the second fastening Assembly adopts Button Block, pull bar and the second fastener, is arranged to be rocked to locked position when Button Block from off-position, pull bar can be driven to return Contracting, so that the second fastener buckles the edge of shaft tower angle bar, thus can quickly and easily girder be locked on shaft tower angle bar; Pass through T-slot and T-shaped part between hoisting mechanism and girder to be quickly combined, disassembly efficiency can be improved, and swing handle make its under Being swung up can be so that lifting hooks the action made from bottom to top, from outside to inside, thus the installation portion of down conductor is lifted Coordinate to installation site and with clamping screw.
Brief description
Below in conjunction with the accompanying drawings the present invention is described in further detail.
Fig. 1 is the structural representation of retaining mechanism of the present invention.
Fig. 2 is the structural representation of hoisting mechanism of the present invention.
Fig. 3 is the use state figure of retaining mechanism of the present invention.
Specific embodiment
With reference to shown in Fig. 1, Fig. 2 and Fig. 3, a kind of portable down conductor reset erecting device, include retaining mechanism with Hoisting mechanism.
Retaining mechanism includes can be used for fixing the girder 1 of hoisting mechanism, is arranged on girder 1 one end and can clasp shaft tower angle bar 8 The first of side edge buckles assembly, is arranged on the second fastening group that girder 1 other end can clasp shaft tower angle bar opposite side edge Part, the first fastening assembly includes the screw being formed at girder 1 one end, the adjusting screw rod 22 being disposed in screw, rotatable setting On adjusting screw rod 22 and can clasp first fastener 21 at shaft tower angle bar 8 side edge, the location-plate 31 being arranged on girder 1, Can be locked or swingingly be arranged on the spanner 32 on location-plate 31, spanner 32 is formed with can be with down conductor clamping screw The location hole 321 that 9 nut is adapted, location-plate 321 is formed with screw, and spanner 32 is formed with the perforation relative with screw, Make spanner 32 be in by the regulating bolt 33 through perforation and screw cooperation to be locked or swingable state, handle 6 one end shape Become the spanner structure 61 for operating nut.
Second fastening assembly includes being swingingly hinged on the Button Block of girder 1 other end in locked position and off-position 45th, can in the pull bar 42 that swing is hinged on Button Block 45, be arranged on the of shaft tower angle bar 8 opposite side edge on pull bar 42, can be clasped Two fasteners 41, are arranged to be rocked to locked position when Button Block 45 from off-position, pull bar 42 can be driven to bounce back so that the second fastener The edge of 41 fastening shaft tower angle bar 8, Button Block 45 is hinged on girder 1 by jointed shaft 451, and it is hinged that pull bar 42 passes through hinged seat 44 On Button Block 45, hinged seat 44 is hinged with Button Block 45 by jointed shaft 451, and hinged seat 44 is formed with the installation passing through for pull bar 42 Hole, pull bar 42 is formed through the spiro rod section of installing hole, and spiro rod section is provided with the locking nut 43 positioned at installing hole both sides.
Girder 1 is formed with the T-slot 11 extending along its length, and hoisting mechanism includes loading T-shaped in T-slot 11 Part 5, by jointed shaft 62 handle 6 hinged with T-shaped part 5, be hinged on the lifting that down conductor installation portion can be caught on handle 6 Hook 7;Lifting hooks 7 and includes two parallel relative hook bodies 71, hook be provided with body 71 for by down conductor installation portion to external pressure Spring 72, be arranged to operation handle 6 and be swung up, lifting can be made to hook 7 and make action from bottom to top, from outside to inside.
A kind of down conductor reset installation method, shaft tower angle bar 8 is formed with and installs for clamping screw 9 passes through first Hole 81, the installation portion of down conductor is formed with the second installing hole that can be relative with the first installing hole 81, and clamping screw 9 is worn successively Cross the first installing hole 81, pass through nut check after the second installing hole, comprise the steps:
(1), the first fastener 21 of the first fastening assembly and the side edge of shaft tower angle bar 8 are buckled, so that girder 1 level is prolonged Stretch and positioned opposite with the one side in 8 liang of verticals of shaft tower angle bar;
(2), make Button Block 45 be rocked to off-position, the pull bar 42 of the second fastener assemblies is rocked to and 8 liang of shaft tower angle bar Another side in vertical is positioned opposite and horizontal-extending, makes the second fastener 41 relative with the opposite side edge of shaft tower angle bar 8, will Button Block 45 is rocked to locked position, drives pull bar 42 to bounce back so that the second fastener 41 buckles the edge of shaft tower angle bar;
(3), operation spanner 32 makes its location hole 321 be aligned with the first installing hole 81, by clamping screw 8 from shaft tower angle bar 8 The back side pass through location hole 321 and the first installing hole 81, the T-shaped part 5 of hoisting mechanism is loaded in the T-slot 11 of girder 1, then Operation handle 6 is lifted up, so that the installation portion of down conductor is promoted to installation site, making the installation portion of down conductor First installing hole is through on clamping screw 9, then unloads hoisting mechanism, and operating nut and clamping screw 9 are by down conductor Installation portion is locked on shaft tower angle bar 8.
The above, only presently preferred embodiments of the present invention, therefore the scope that the present invention is implemented can not be limited with this, that is, The equivalence changes made according to scope of the present invention patent and description and modification, all should still belong to what patent of the present invention covered In the range of.

Claims (9)

1. a kind of portable down conductor reset erecting device, is installed to for coordinating hoisting mechanism that down conductor resets On shaft tower angle bar it is characterised in that:Including the detachable retaining mechanism holding shaft tower angle bar tightly, this retaining mechanism includes can be used for admittedly Determine hoisting mechanism girder, be arranged on girder one end can clasp shaft tower angle bar side edge first fastening assembly, be arranged on master The beam other end can clasp the second fastening assembly at shaft tower angle bar opposite side edge, the second fastening assembly include can in locked position and Off-position is swingingly hinged on the Button Block of the girder other end, can swing the pull bar being hinged on Button Block, be arranged on pull bar Second fastener at shaft tower angle bar opposite side edge can be clasped, be arranged to be rocked to locked position when Button Block from off-position, can carry Dynamic pull bar retraction is so that the second fastener buckles the edge of shaft tower angle bar.
2. a kind of portable down conductor reset erecting device according to claim 1 it is characterised in that:Described girder It is formed with the T-slot extending along its length, described hoisting mechanism includes loading the T-shaped part in T-slot and T-shaped part hinge The handle that connects, it is hinged on and the lifting of down conductor installation portion can be caught on handle hooks, be arranged to operation handle and be swung up, can Lifting is made to hook the action made from bottom to top, from outside to inside.
3. a kind of portable down conductor reset erecting device according to claim 2 it is characterised in that:Described lifting Hook and include two parallel relative hook bodies, hook body is provided with for by spring from down conductor installation portion to external pressure.
4. a kind of portable down conductor reset erecting device according to claim 1 or 2 or 3 or 4, its feature exists In:Described first fastening assembly includes the screw being formed at girder one end, the adjusting screw rod being disposed in screw, rotatable setting On adjusting screw rod and first fastener at shaft tower angle bar side edge can be clasped.
5. a kind of portable down conductor reset erecting device according to claim 1 or 2 or 3 or 4, its feature exists In:The location-plate that also includes being arranged on described girder, can be locked or swingingly be arranged on the spanner on location-plate, on spanner It is formed with the location hole being adapted with the nut of down conductor clamping screw.
6. a kind of portable down conductor reset erecting device according to claim 1 or 2 or 3 or 4, its feature exists In:Screw is formed with described location-plate, described spanner is formed with the perforation relative with screw, by joining through perforation with screw The regulating bolt closed makes spanner be in be locked or swingable state.
7. a kind of portable down conductor reset erecting device according to claim 1 or 2 or 3 or 4, its feature exists In:Described pull bar is hinged on described Button Block by hinged seat, and hinged seat is hinged with described Button Block by jointed shaft, hinged seat shape Become to have the installing hole passing through for described pull bar, described pull bar is formed through the spiro rod section of installing hole, and spiro rod section is provided with position Locking nut in installing hole both sides.
8. a kind of down conductor reset installation method, shaft tower angle bar is formed with the first installing hole passing through for clamping screw, The installation portion of down conductor is formed with the second installing hole that can be relative with the first installing hole, clamping screw sequentially passes through first, Pass through nut check after second installing hole, comprise the steps:
(1), first is buckled assembly and the side edge of shaft tower angle bar buckles, make girder horizontal-extending and hang down with shaft tower angle bar two One side in facing directly is positioned opposite;
(2), make Button Block be rocked to off-position, by the pull bar of the second fastener assemblies be rocked to shaft tower angle bar two vertical in Another side is positioned opposite and horizontal-extending, makes the second fastener relative with the opposite side edge of shaft tower angle bar, Button Block is rocked to lock Tight position, drives pull bar retraction so that the second fastener buckles the edge of shaft tower angle bar;
(3), hoisting mechanism is fixed on girder, and operates hoisting mechanism that the installation portion of down conductor is promoted to installation position Put, so that the first installing hole of the installation portion of down conductor is through on clamping screw, then unload hoisting mechanism, operating nut and The installation portion of down conductor is locked on shaft tower angle bar clamping screw.
9. a kind of down conductor reset installation method according to claim 9 it is characterised in that:Described step (3) bag Including operation spanner makes its location hole be aligned with the first installing hole, by clamping screw from the back side of shaft tower angle bar through location hole and the One installing hole, the T-shaped part of hoisting mechanism is buckled in the T-slot of girder and moves to appropriate location, and operation handle is put upwards Dynamic, the installation portion of down conductor is lifted from bottom to top and is pressed into from outside to inside, make the second installing hole pass through clamping screw Screw rod, unloads hoisting mechanism, and the installation portion of down conductor is locked on shaft tower angle bar for operating nut and clamping screw.
CN201611159521.7A 2016-12-15 2016-12-15 A kind of portable down conductor resets mounting device and method Active CN106486918B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611159521.7A CN106486918B (en) 2016-12-15 2016-12-15 A kind of portable down conductor resets mounting device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611159521.7A CN106486918B (en) 2016-12-15 2016-12-15 A kind of portable down conductor resets mounting device and method

Publications (2)

Publication Number Publication Date
CN106486918A true CN106486918A (en) 2017-03-08
CN106486918B CN106486918B (en) 2019-05-24

Family

ID=58285628

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611159521.7A Active CN106486918B (en) 2016-12-15 2016-12-15 A kind of portable down conductor resets mounting device and method

Country Status (1)

Country Link
CN (1) CN106486918B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107420716A (en) * 2017-05-25 2017-12-01 王敏 Angle steel quickly fixes theft-prevention supporter and its application method
CN116646746A (en) * 2023-07-26 2023-08-25 江苏昊天龙集团有限公司 Communication tower ground connection downlead structure and communication tower

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000287322A (en) * 1999-03-31 2000-10-13 Tokyo Denki Komusho Co Ltd Device raising for of grounding pin for working
CN203951100U (en) * 2014-07-24 2014-11-19 国家电网公司 Portable down conductor lifting device
CN204454477U (en) * 2015-03-20 2015-07-08 国网山西省电力公司晋城供电公司 A kind of down conductor hoisting tool
CN206480978U (en) * 2016-12-15 2017-09-08 国网福建省电力有限公司 A kind of down conductor resets erecting device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000287322A (en) * 1999-03-31 2000-10-13 Tokyo Denki Komusho Co Ltd Device raising for of grounding pin for working
CN203951100U (en) * 2014-07-24 2014-11-19 国家电网公司 Portable down conductor lifting device
CN204454477U (en) * 2015-03-20 2015-07-08 国网山西省电力公司晋城供电公司 A kind of down conductor hoisting tool
CN206480978U (en) * 2016-12-15 2017-09-08 国网福建省电力有限公司 A kind of down conductor resets erecting device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107420716A (en) * 2017-05-25 2017-12-01 王敏 Angle steel quickly fixes theft-prevention supporter and its application method
CN116646746A (en) * 2023-07-26 2023-08-25 江苏昊天龙集团有限公司 Communication tower ground connection downlead structure and communication tower
CN116646746B (en) * 2023-07-26 2023-10-10 江苏昊天龙集团有限公司 Communication tower ground connection downlead structure and communication tower

Also Published As

Publication number Publication date
CN106486918B (en) 2019-05-24

Similar Documents

Publication Publication Date Title
CN205953338U (en) Novel nimble hoist and mount of cement pipe material supporting device
CN207339085U (en) A kind of insulation column for being used to replace rod insulator
CN106486918A (en) A kind of portable down conductor reset erecting device and method
CN206498132U (en) A kind of down conductor hoisting mechanism
CN206480978U (en) A kind of down conductor resets erecting device
CN204793847U (en) Frame is strideed across to portable unwrapping wire
CN107338965A (en) The discharging of modularization ready-package and outer protection integrated system for assembled architecture
CN105643844B (en) A kind of castor of fast demountable
CN109898827A (en) A kind of protective device for building scaffold
CN202399005U (en) Pin puller
CN201559154U (en) Bolt puller
CN210917735U (en) Supporting jig frame structure for large-span prestressed inhaul cable structure
CN102213102B (en) Method for righting toppled brackets of large-inclined-angle working surface
CN203009493U (en) Fast connecting device of longitudinal beam and landing leg
CN207046648U (en) A kind of construction boost container
CN204661174U (en) A kind of hydraulically extensible boom device of climbing type tower machine
CN207194435U (en) A kind of construction fixed installation sector
CN219341476U (en) Local earthing pole recovery unit
CN205117384U (en) A overhaul device that is used for adopting greatly high hydraulic support back timber
CN206110328U (en) Steel construction interlayer
CN209407873U (en) Flap nut tightening device
CN209579988U (en) A kind of concrete component removing device
CN104338578B (en) A kind of rubber rubber powder pulverizer of band emergency stop device
CN104890877B (en) A kind of ladder hanging rack structure
CN203905520U (en) Boiler externally-raised safety net

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant