CN106485601A - Substation field operating standard modularization editing system and method - Google Patents
Substation field operating standard modularization editing system and method Download PDFInfo
- Publication number
- CN106485601A CN106485601A CN201610905497.0A CN201610905497A CN106485601A CN 106485601 A CN106485601 A CN 106485601A CN 201610905497 A CN201610905497 A CN 201610905497A CN 106485601 A CN106485601 A CN 106485601A
- Authority
- CN
- China
- Prior art keywords
- code
- standardization
- equipment
- standardization procedures
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 81
- 238000012795 verification Methods 0.000 claims abstract description 24
- 238000012423 maintenance Methods 0.000 claims abstract description 14
- 239000000284 extract Substances 0.000 claims abstract description 6
- 238000007726 management method Methods 0.000 claims description 16
- 230000003319 supportive effect Effects 0.000 claims description 8
- 238000012550 audit Methods 0.000 claims description 6
- 238000011161 development Methods 0.000 claims description 5
- 230000008859 change Effects 0.000 claims description 4
- 238000003780 insertion Methods 0.000 claims description 4
- 230000037431 insertion Effects 0.000 claims description 4
- 238000012800 visualization Methods 0.000 claims description 4
- 230000000007 visual effect Effects 0.000 claims description 3
- 230000001105 regulatory effect Effects 0.000 claims description 2
- 230000008569 process Effects 0.000 abstract description 7
- 230000008901 benefit Effects 0.000 abstract description 4
- 230000004069 differentiation Effects 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 description 14
- 230000006870 function Effects 0.000 description 8
- 230000003993 interaction Effects 0.000 description 5
- 238000004891 communication Methods 0.000 description 4
- 238000013461 design Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 230000006872 improvement Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 230000009466 transformation Effects 0.000 description 3
- 238000012937 correction Methods 0.000 description 2
- 238000011160 research Methods 0.000 description 2
- 238000007711 solidification Methods 0.000 description 2
- 230000008023 solidification Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000013480 data collection Methods 0.000 description 1
- 238000013499 data model Methods 0.000 description 1
- 238000013500 data storage Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000004540 process dynamic Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000002459 sustained effect Effects 0.000 description 1
- 230000009885 systemic effect Effects 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention provides a kind of substation field operating standard modularization editing system and method, and substation field operating standard modularization editing system includes:Database maintenance unit, protocol data modular unit, protocol data write unit, live operating standard Standardisation Cell, standardization procedures examination & verification unit and standardization procedures release unit.Advantage is:Present invention achieves modularization, standardization and the visualized operation of control process is write, examined to substation field operating standard content, the problems such as legacy procedures content repeats, differentiation is big, extracts standard, description are many, explanation is many, specific aim is not strong, information can not be shared, management difficulty is big is solved, and the code for efficiency high is write with code, finally giving realizes standardization and normalized advantage.
Description
Technical field
The invention belongs to code editing technique field, and in particular to a kind of substation field operating standard modularization editor system
System and method.
Background technology
Electrical network relevant enterprise is usually needed for on-site actual situations, writes substation field operating standard.However, mesh
Before, writer is mainly write to live operating standard using empirical data, write, audit, ratifying, using in code,
During management, problems with is primarily present:Due to being related to the various equipment of quantity in live operating standard, therefore, for
Different live operating standards, usually occurs that device type is identical but code performance content difference is larger, Different field operation rule
Between journey content repeat, between Different field operating standard in provision disunity, same scene operating standard content repeat and
The contents such as code managerial confusion, so as to directly affect the performance of code function and effect.Also there is live operating standard write
The low problem of efficiency.
Content of the invention
For the defect that prior art is present, the present invention provides a kind of substation field operating standard modularization editing system
And method, can effectively solving the problems referred to above.
The technical solution used in the present invention is as follows:
The present invention provides a kind of substation field operating standard modularization editing system, including:
Database maintenance unit, carries out maintenance management for the basic data related to code;Wherein, the code is related
Basic data include transformer substation foundation parameter and Equipment Foundations parameter;
Protocol data modular unit, for being safeguarded to code module data and being solidified management, by the code mould
Block number forms standardization procedures model according to being packaged together by self-defined tree directory structure;Wherein, the self-defined tree-like mesh
Directory structures is configured by keeper, and catalogue level supports unlimited level, and can enter edlin for the content of each catalogue;Institute
Stating code module data includes that front cover, foreword, the scope of application, normative reference, supportive file, general provisions and equipment are attached
Record;
Protocol data writes unit, for transferring the standardization procedures model that the protocol data modular unit is obtained,
According to substation field physical device, the included equipment of code is chosen in the facility inventory of the standardization procedures model, can
Write depending on change and obtain preliminary code;
Live operating standard Standardisation Cell, is carried out for writing the preliminary code that unit is programmed into the protocol data
Normalizing operation, so as to obtain standardization procedures;
Wherein, the preliminary code that unit is programmed into is write to the protocol data and is standardized operation, specially:According to
The order of front cover, catalogue, foreword, the scope of application, normative reference, supportive file, general provisions and equipment annex, is based on
WEBOFFICE control, carries out visual edit to each code key element successively, ultimately forms standardization procedures;
Standardization procedures audit unit, for auditing to the standardization procedures;
Standardization procedures release unit, for issuing to the standardization procedures by auditing.
Preferably, the Equipment Foundations parameter includes:Device name, unit type, equipment manufacturer, equipment pressure regulation side
Formula and putting equipment in service date;
The database maintenance unit specifically for:To code, related basic data is increased, changed and is deleted.
Preferably, the equipment annex is made up of several facility inventories;The content of each facility inventory includes:Equipment base
Plinth information, equipment operation regulation and points for attention, unit exception treatment measures;
Wherein, the Equipment Foundations information is obtained by the Equipment Foundations parameter for calling the database maintenance unit to be stored
?.
Preferably, the content of each facility inventory can enter edlin.
Preferably, the substation field operating standard modularization editing system adopts J2EE technological development.
The present invention also provides a kind of substation field operating standard modularization edit methods, comprises the following steps:
Step 1, keeper's basic data related to code carry out standardization definition;Meanwhile, keeper is to each code
Related basic data carries out attended operation, the typing mode of the related basic data of each code self-defined;The typing side
Formula includes data form and data area;
Step 2, the self-defined bibliographic structure of keeper, code module data is encapsulated into one by self-defined tree directory structure
Rise, form standardization procedures model;Wherein, when some catalogue in self-defined tree directory structure is clicked, it is based on
WEBOFFICE control, in software interface indicating template editing interface, edit model interface includes:Start (font, paragraph, sample
Formula, editor), insertion (page, form, illustration, application program, media, link, headerfooter, text, symbol), design (document
Form), page layout (paragraph, arrangement), quote (catalogue, footnote, quotation and bibliography, note, index), check (check and correction, language
Speech, annotation, revision, change) etc. module;
Step 3, code writer extract protocol information key element from normalized standardization procedures model;Then,
The information element that code writer is extracted is initialized according to standardization procedures model, obtains preliminary code;
Step 4, preliminary code described in code writer's online editing, so as to obtain writing the standardization rule after improving
Journey;
The standardization procedures are sent to auditor by step 5, code writer;
Step 6, the auditor are audited to the standardization procedures, if examination & verification does not pass through, to the rule
Journey writer sends the unsanctioned notification message of examination & verification;The code writer receive examination & verification unsanctioned notify disappear
After breath, the standardization procedures are further supplemented perfect, be then then forwarded to the auditor;So repeatedly,
Until examination & verification passes through;After examination & verification passes through, execution step 7;
The standardization procedures that examination & verification passes through are sent to authorizing officer by step 7, the auditor, the authorizing officer couple
Standardization procedures carry out examination & verification approval and judge, if not by approval, to the auditor and the code writer
The notification message not by approval is sent, is then back to step 5;If by approval, execution step 8;
Step 8, the standardization procedures that approves is issued and is used.
The substation field operating standard modularization editing system that the present invention is provided and method have advantages below:
Present invention achieves substation field operating standard content write, examine control process modularization, standardization with
And visualized operation, solve that legacy procedures contents repeats, differentiation is big, extracts standard, description is many, explanation is many,
The problems such as specific aim is not strong, information can not be shared, management difficulty is big, the code reality for write efficiency high with code, finally giving
Now standardization and normalized advantage.
Description of the drawings
The structural representation of the substation field operating standard modularization editing system that Fig. 1 is provided for the present invention;
The schematic flow sheet of the substation field operating standard modularization edit methods that Fig. 2 is provided for the present invention.
Specific embodiment
In order that technical problem solved by the invention, technical scheme and beneficial effect become more apparent, below in conjunction with
Drawings and Examples, the present invention will be described in further detail.It should be appreciated that specific embodiment described herein only in order to
The present invention is explained, is not intended to limit the present invention.
The present invention provides a kind of substation field operating standard modularization editing system, including:
(1) database maintenance unit
Foundation《Substation field operating standard writes directive/guide (trying)》、《Yunnan Power Grid Company's substation field operation rule
Journey writes template》, served as theme with substation equipment classification, protocol information key element of analyzing and researching, software model is write in code
On the basis of, with technology such as computer language, communication network, man-machine interactions, develop protocol data collecting function module, the module
Should realize tieing up the basic data of " Substation parameters ", " device parameter ", " device data dictionary ", " visualization picture library " etc.
Pillar is managed, and is that protocol data modularization lays the foundation.
Specifically, database maintenance unit, carries out maintenance management for the basic data related to code, for example, to rule
The basic data of Cheng Xiangguan such as is increased, changed and is deleted at the operation;Wherein, the related basic data of the code includes power transformation
Stand underlying parameter and Equipment Foundations parameter;Equipment Foundations parameter is included but is not limited to:Device name, unit type, equipment production
Producer, equipment voltage regulating mode and putting equipment in service date.For example, device name is:Transformer, breaker, disconnecting switch etc..
(2) protocol data modular unit
Data message demand is carried according to code, in line with simple, practical, flexible principle, with computer language, man-machine
The technology such as interaction, research and develop protocol data modular unit, data " front cover " that the module should be realized carrying code,
The module data of " catalogue ", " foreword ", " scope of application ", " normative reference ", " supportive file ", " general provisions " etc. is carried out
Safeguard, solidification management, be protocol data initialization, write and lay the foundation.Code masterplate is arranged and is configured by keeper, masterplate
Setting can customize bibliographic structure, catalogue level supports unlimited level, and can enter edlin for the content of each catalogue.
Specifically, protocol data modular unit, for being safeguarded to code module data and being solidified management, will be described
Code module data is packaged together by self-defined tree directory structure, forms standardization procedures model;Wherein, described self-defined
Tree directory structure is configured by keeper, and catalogue level supports unlimited level, and can carry out for the content of each catalogue
Editor;The code module data includes front cover, catalogue, foreword, the scope of application, normative reference, supportive file, total
Then and equipment annex;Wherein, equipment annex is made up of several facility inventories;The content of each facility inventory can be compiled
Volume, for example, can be inserted into self-defined form or the insertion equipment custom parameter of device parameter.The content bag of each facility inventory
Include:Equipment Foundations information, equipment operation regulation and points for attention, unit exception treatment measures.In addition, Equipment Foundations information passes through
The Equipment Foundations gain of parameter for calling the database maintenance unit to be stored.
(3) protocol data writes unit
For the specification of protocol data information operating, unification, shared, while there is compatibility, with computer language, net
The technology such as network communication, man-machine interaction, research and develop with editing interfaces such as editor, modification, solidifications, can convenient, sweetly disposition text
Word, picture, form, formula etc., realize the functional module that protocol data is remotely transferred, used, and the module should realize that " code is initial
Change ", the functions of modules of " facility information " etc., writer according to substation field physical device determine the included equipment of code,
Device-dependent message, and then protocol data needed for determining, and write.
Specifically, protocol data writes unit, for transferring the standardization rule that the protocol data modular unit is obtained
Journey model, according to substation field physical device, chooses code in the facility inventory of the standardization procedures model and is included
Equipment, visualization are write and obtain preliminary code.
(4) live operating standard Standardisation Cell
According to conventional thought mode and writing custom, according to the front cover → catalogue → scope of application → normative reference and supportive
File → text → annex order, using software is write, enters edlin to each key element of code one by one, ultimately forms complete, standard
Code.For example, front cover editing link, writer are logged in and write software systems, select " front cover " in tree directory structure
Option, in the front cover editing interface for occurring, input " electric pressure ", " power transformation station name ", you can generate substation field fortune
Professional etiquette journey front cover.
Specifically, live operating standard Standardisation Cell, preliminary for write to the protocol data that unit is programmed into
Code is standardized operation, so as to obtain standardization procedures;
Wherein, the preliminary code that unit is programmed into is write to the protocol data and is standardized operation, specially:According to
The order of front cover, catalogue, foreword, the scope of application, normative reference, supportive file, general provisions and equipment annex, is based on
WEBOFFICE control, carries out visual edit to each code key element successively, ultimately forms standardization procedures.
(5) standardization procedures examination & verification unit and standardization procedures release unit
Standardization procedures audit unit, for auditing to the standardization procedures;
Standardization procedures release unit, for issuing to the standardization procedures by auditing.
The process of designing and developing of substation field operating standard modularization editing system is:
(1) demand
On the basis of code writes software model, with technology such as computer language, communication network, man-machine interactions, grind
Study carefully exploitation with on-line operation function, and simply, flexible system data acquisition functional module;With science, powerful editor
Functional module;Examination & verification with hommization, approval functional module;With practical, the language function module of specification and easily
Account management function module write software, make it for huge information data to enclose fresh and alive life and intelligence.Final realization
Integrate editor, solidify, transfer, the substation field operating standard modularization editing system of application function.
(2) design of substation field operating standard modularization editing system and framework
After determining demand and prototype interface, in conjunction with the utilization of the technology such as computer language, communication network, man-machine interaction,
Software systems should with strange land real-time query, the dispersed placement of Business Processing such as browse;Operation expanding is convenient;Data synchronization updating
Safeguard simple;The strong function of sharing.System architecture adopts B/S structure, i.e. Browser/Server (browser/server) is tied
Structure mode development, B/S structure are realized needing originally complex proprietary software ability using constantly ripe and popular browser technology
The power of realization, and development cost has been saved, it is a kind of brand-new software system construction technology, and application software at present
First-selected architecture.And the ripe application of JAVA technology, make the utilization of B/S system architecture more extensive.Under this configuration,
User interface is realized by WWW browser completely, and a part of the affair logic is realized in front end, and major affairs logic is in server end
Realize, form so-called 3-tier structure.
(3) technological means of systemic software development
Open, information professional standard can be become technology is selected, easily carries out the liter of the integrated and system between system
Level, is that the sustained improvement of system administration provides technical support.While it is also contemplated that:The standard package of exploitation, can be moved well
Plant different platform;Application software can be quickly assembled in system information platform, and is easy to extension.Based on the above demand, it is
System software development can adopt J2EE technology, and J2EE is a set of entirely different Technical Architecture in traditional application and development, comprising perhaps
Multicompartment, can mainly simplify, the exploitation of specification application system and deployment, and then improve portable, safety with again with being worth, and adopt
After J2EE technology, between various components, service architecture and the hierarchy of skill, all there are common standard and specification, allow various following
Between the different platform of J2EE framework, with good compatibility, system can be in several operation systems, hardware and main flow
Between run on the part server middleware such as such as WEBLOGIC, Tomcat, JBOSS, J2EE component be assembled in a J2EE should
With in, with fixing form and observe J2EE specification, which is managed by J2EE server.Can be with the growth of application
By increasing service ability using load-balancing technique, the information products that solution rear end uses each other cannot be compatible, enterprise
The internal or external awkward situation for being difficult to intercommunication.
Data base management system (DBMS) is core and the element task of information system, the data storage of DBMS, process energy
The factor such as power and stability, reliability, ease of manageability, directly affects the normal operation of whole system.In view of power train
Tradition and the excellent properties of Oracle that system is used to Oracle, database is using oracle11g as main database shape
Formula.
Meet custom to meet web page display, operation, vision, the exploitation of system foreground[background is main using ripe at present
The technology such as Html+Css+Jquery, and integrated WEBOFFICE control meets the various demands of document.
Functional characteristics according to substation field operating standard management system, maintenance requirement formulate substation field operation rule
Thread management method, to Data Collection → write → audit → ratify → with etc. a series of flow processs realize overall process dynamic management,
So as to form substation field operating standard modularization edit methods, with reference to Fig. 2, comprise the following steps:
Step 1, keeper's basic data related to code carry out standardization definition;Meanwhile, keeper is to each code
Related basic data carries out attended operation, the typing mode of the related basic data of each code self-defined;The typing side
Formula includes data form and data area;So as to the convenient data form of specification writer and data model when code is write
Enclose.This step be Fig. 2 in 1..
Step 2, the self-defined bibliographic structure of keeper, code module data is encapsulated into one by self-defined tree directory structure
Rise, form standardization procedures model;Wherein, when some catalogue in self-defined tree directory structure is clicked, it is based on
WEBOFFICE control, is the edit model effect of What You See Is What You Get on the right side of software interface, indicating template editing interface, mould
Plate editing interface includes:Start (font, paragraph, pattern, editor), insertion (page, form, illustration, application program, media, chain
Connect, headerfooter, text, symbol), design (document format), page layout (paragraph, arrangement), quote (catalogue, footnote, quotation
With bibliography, note, index), check modules such as (check and correction, language, annotation, revision, changes), can be attached with content of edit part
Plus explanation picture, enrich the Visualization of document and effect represents.This step be Fig. 2 in 2..
Step 3, code writer extract protocol information key element from normalized standardization procedures model;Then,
The information element that code writer is extracted is initialized according to standardization procedures model, obtains preliminary code;This step
For in Fig. 2 3. 4..
Step 4, preliminary code described in code writer's online editing, so as to obtain writing the standardization rule after improving
Journey;This step be Fig. 2 in 5..
The standardization procedures are sent to auditor by step 5, code writer;This step be Fig. 2 in 6..
Step 6, the auditor are audited to the standardization procedures, if examination & verification does not pass through, to the rule
Journey writer sends the unsanctioned notification message of examination & verification;The code writer receive examination & verification unsanctioned notify disappear
After breath, the standardization procedures are further supplemented perfect, be then then forwarded to the auditor;So repeatedly,
Until examination & verification passes through;After examination & verification passes through, execution step 7;This step be Fig. 2 in 7. 8. 9..
The standardization procedures that examination & verification passes through are sent to authorizing officer by step 7, the auditor, the authorizing officer couple
Standardization procedures carry out examination & verification approval and judge, if not by approval, to the auditor and the code writer
The notification message not by approval is sent, is then back to step 5;If by approval, execution step 8;This step is in Fig. 2
10..
Step 8, the standardization procedures that approves is issued and is used.This step is in Fig. 2.
As Qujing power supply administration 220kV Hongqiao substation field operating standard content page about 330 totally 14 ten thousand word, so huge
Workload is only needed the live operating standard content of 7 working days i.e. editable performance specification by 1 people of the inventive method, if taking
Traditional-handwork does rule needs 60 working days just complete.
For writing personnel at different levels, audit that code is evidence-based, writing for code meets standardization, Standardization Requirement, really
Guarantor's body and equipment safety, are organized by Yunnan Power Grid Company, have been write my company's substation field operating standard current and are write and have led
Then.The directive/guide includes company's productive technology management standards system.At the same time, Qujing power supply administration is with substation field operation rule
Journey modularization editor's new method, has write Qujing power supply administration and has administered 79 transformer stations《Substation field operating standard》, and under
Reach the utilization of each teams and groups.
As can be seen here, the present invention is provided substation field operating standard modularization editing system and method, realize power transformation
The modularization visualized operation of control process is write, examine to live operating standard content of standing, specification document and carrying number
According to, reducing code and difficulty is write, the document specification that writes out, provision are unified, and reduce redundant content, simplify examination & approval issue
Flow process, improves enterprise management efficiency.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should
Depending on protection scope of the present invention.
Claims (6)
1. a kind of substation field operating standard modularization editing system, it is characterised in that include:
Database maintenance unit, carries out maintenance management for the basic data related to code;Wherein, the related base of the code
Plinth data include transformer substation foundation parameter and Equipment Foundations parameter;
Protocol data modular unit, for being safeguarded to code module data and being solidified management, by the code number of modules
According to being packaged together by self-defined tree directory structure, standardization procedures model is formed;Wherein, the self-defined directory tree knot
Structure is configured by keeper, and catalogue level supports unlimited level, and can enter edlin for the content of each catalogue;The rule
Journey module data includes front cover, foreword, the scope of application, normative reference, supportive file, general provisions and equipment annex;
Protocol data writes unit, for transferring the standardization procedures model that the protocol data modular unit is obtained, according to
Substation field physical device, chooses the included equipment of code, visualization in the facility inventory of the standardization procedures model
Write and obtain preliminary code;
Live operating standard Standardisation Cell, carries out standard for writing the preliminary code that unit is programmed into the protocol data
Change operation, so as to obtain standardization procedures;
Wherein, the preliminary code that unit is programmed into is write to the protocol data and is standardized operation, specially:According to envelope
The order of face, catalogue, foreword, the scope of application, normative reference, supportive file, general provisions and equipment annex, is based on
WEBOFFICE control, carries out visual edit to each code key element successively, ultimately forms standardization procedures;
Standardization procedures audit unit, for auditing to the standardization procedures;
Standardization procedures release unit, for issuing to the standardization procedures by auditing.
2. substation field operating standard modularization editing system according to claim 1, it is characterised in that the equipment
Underlying parameter includes:Device name, unit type, equipment manufacturer, equipment voltage regulating mode and putting equipment in service date;
The database maintenance unit specifically for:To code, related basic data is increased, changed and is deleted.
3. substation field operating standard modularization editing system according to claim 1, it is characterised in that the equipment
Annex is made up of several facility inventories;The content of each facility inventory includes:Equipment Foundations information, equipment operation regulation and note
Meaning item, unit exception treatment measures;
Wherein, the Equipment Foundations information is by calling the Equipment Foundations gain of parameter stored by the database maintenance unit.
4. substation field operating standard modularization editing system according to claim 3, it is characterised in that each equipment
The content of catalogue can enter edlin.
5. the substation field operating standard modularization editing system according to any one of claim 1-4, it is characterised in that
The substation field operating standard modularization editing system adopts J2EE technological development.
6. a kind of substation field operating standard modularization edit methods, it is characterised in that comprise the following steps:
Step 1, keeper's basic data related to code carry out standardization definition;Meanwhile, keeper is related to each code
Basic data carry out attended operation, the typing mode of the related basic data of each code self-defined;The typing mode bag
Include data form and data area;
Step 2, the self-defined bibliographic structure of keeper, code module data is packaged together by self-defined tree directory structure,
Form standardization procedures model;Wherein, when some catalogue in self-defined tree directory structure is clicked, it is based on
WEBOFFICE control, in software interface indicating template editing interface, edit model interface includes:Start module, insertion module,
Module, page layout module is designed, is quoted module and checks module;
Step 3, code writer extract protocol information key element from normalized standardization procedures model;Then, will rule
The information element that journey writer extracts is initialized according to standardization procedures model, obtains preliminary code;
Step 4, preliminary code described in code writer's online editing, so as to obtain writing the standardization procedures after improving;
The standardization procedures are sent to auditor by step 5, code writer;
Step 6, the auditor are audited to the standardization procedures, if examination & verification does not pass through, are compiled to the code
Write personnel and send the unsanctioned notification message of examination & verification;The code writer is receiving the unsanctioned notification message of examination & verification
Afterwards, the standardization procedures are further supplemented perfect, is then then forwarded to the auditor;So repeatedly, directly
Pass through to examination & verification;After examination & verification passes through, execution step 7;
The standardization procedures that examination & verification passes through are sent to authorizing officer by step 7, the auditor, and the authorizing officer is to standard
Changing code carries out examination & verification approval judgement, if by approval, sent to the auditor and the code writer
Not by the notification message of approval, step 5 is then back to;If by approval, execution step 8;
Step 8, the standardization procedures that approves is issued and is used.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610905497.0A CN106485601A (en) | 2016-10-18 | 2016-10-18 | Substation field operating standard modularization editing system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610905497.0A CN106485601A (en) | 2016-10-18 | 2016-10-18 | Substation field operating standard modularization editing system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106485601A true CN106485601A (en) | 2017-03-08 |
Family
ID=58270894
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610905497.0A Pending CN106485601A (en) | 2016-10-18 | 2016-10-18 | Substation field operating standard modularization editing system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106485601A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110414924A (en) * | 2019-07-02 | 2019-11-05 | 大唐淮北发电厂 | A kind of intelligent and safe production monitoring card generation system and method |
WO2021249102A1 (en) * | 2020-06-08 | 2021-12-16 | 国电南瑞科技股份有限公司 | Power grid multi-state graph closed-loop management method and system |
CN114609984A (en) * | 2022-03-10 | 2022-06-10 | 清华大学 | Automatic evaluation system and method for execution condition of nuclear power plant operation regulation |
-
2016
- 2016-10-18 CN CN201610905497.0A patent/CN106485601A/en active Pending
Non-Patent Citations (1)
Title |
---|
田大军等: "基于Office.Interop命名空间与WebOffice组件的在线论文编辑系统", 《网络新媒体技术》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110414924A (en) * | 2019-07-02 | 2019-11-05 | 大唐淮北发电厂 | A kind of intelligent and safe production monitoring card generation system and method |
WO2021249102A1 (en) * | 2020-06-08 | 2021-12-16 | 国电南瑞科技股份有限公司 | Power grid multi-state graph closed-loop management method and system |
CN114609984A (en) * | 2022-03-10 | 2022-06-10 | 清华大学 | Automatic evaluation system and method for execution condition of nuclear power plant operation regulation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105914892B (en) | A kind of secondary maintenance peace arranges bill system and its implementation | |
CN107357942A (en) | A kind of source code auxiliary Core Generator and its generation method | |
CN107729005A (en) | A kind of visualization business interface Dynamic Configuration based on H5 | |
CN108647330A (en) | A kind of 3D lightweight conversion methods based on BIM model files | |
CN104317864B (en) | A method of the information model automatic identification based on IEC61850 logical nodes | |
CN105404757B (en) | A kind of method of calibration of intelligent substation SCD file standardization level | |
CN107818148A (en) | Self-service query and statistical analysis method based on natural language processing | |
CN106485601A (en) | Substation field operating standard modularization editing system and method | |
CN105976262B (en) | A kind of electric network model version sharing method based on plant stand granularity | |
CN105426350B (en) | The method that voltage class, interval and IED information are extracted in SCD file | |
CN105469188A (en) | Distribution network planning data online intelligent analysis system and distribution network planning data online intelligent analysis method | |
CN107492278B (en) | More supervisory control simulation implementation methods and analogue system for grid simulation training system | |
CN107767122A (en) | A kind of electric operation ticket method of calibration | |
CN104268163B (en) | A kind of realization method and system of webmaster network element configuration interface | |
CN103544338B (en) | A kind of technique information modeling method assembling instruction issue towards three-dimensional | |
CN104484271B (en) | A kind of method of calibration of integrated business platform reduced model | |
CN109697059A (en) | A kind of power distribution network data three-dimensional visual system architecture based on virtual reality | |
CN110298628A (en) | A kind of digitlization examination platform prototype system framework | |
CN107943515A (en) | A kind of method and apparatus of cloud management platform management service orchestration template | |
CN107203503A (en) | A kind of method of real-time monitoring form applied to SVG interfaces | |
CN102866985A (en) | Data formatting device and method for on-line analytical processing system | |
CN110175769A (en) | It is a kind of based on the assets value evaluation method of micro services framework, apparatus and system | |
CN109522045B (en) | A kind of secondary system of intelligent substation quickly configuration method based on information flow chart | |
CN103679324A (en) | A method for realizing an electric power company standardization application map | |
CN107451188A (en) | A kind of dissemination method and system of power grid regulation model data multistage combination of nodes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170308 |
|