CN106481952A - Support - Google Patents

Support Download PDF

Info

Publication number
CN106481952A
CN106481952A CN201510543594.5A CN201510543594A CN106481952A CN 106481952 A CN106481952 A CN 106481952A CN 201510543594 A CN201510543594 A CN 201510543594A CN 106481952 A CN106481952 A CN 106481952A
Authority
CN
China
Prior art keywords
support
mobile jib
pricker
sleeve connector
support according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510543594.5A
Other languages
Chinese (zh)
Inventor
梅有仁
李守才
董健
马国庆
袁昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Geophysical Research Institute
Original Assignee
China Petroleum and Chemical Corp
Sinopec Geophysical Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Geophysical Research Institute filed Critical China Petroleum and Chemical Corp
Priority to CN201510543594.5A priority Critical patent/CN106481952A/en
Publication of CN106481952A publication Critical patent/CN106481952A/en
Pending legal-status Critical Current

Links

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The invention provides a kind of support, which possesses:The mobile jib of setting, its lower end are inserted in underground;At least three support bars, its upper end are connected on mobile jib, and lower end is against on the ground;Cross bar, its one end are connected on mobile jib by sleeve connector, and the other end is connected on support bar.The there is provided support of invention, even if also can be kept upright for a long time on soil and sandstone ground, and can resist strong wind and heavy rain.In addition, support provided by the present invention easily disassembled become less part, be easy to carry in scout moves in the wild, and install simple, soon can assemble when needing using support.

Description

Support
Technical field
The present invention relates to a kind of support, more particularly to a kind of support for using in the wild.
Background technology
In daily life, for example, require in the crowd such as airport, bank, station, harbour safety coefficient higher Important events, law enforcement agency generally can all put the support that some are made up of the base of dish type and pole, allow people Consciously obtain in a certain order in the fence of support pull-up needed for service, to keep public field Good order and discipline.And in some job sites and paroxysmal occasion, often establish corner and prop up Frame, pull-up safety warning tape, sets up the importance that warning sign informs the place, in order to it is complete to keep the scene intact.? Also it is frequently necessary to be identified each area with sign support in the field work of oil seismic exploration, but The ground for being used to place support is often full of the soil ground for being covered with surface dust, or is covered with sandstone of rubble, difficult Smoothly above-mentioned support is placed on this ground or support can be with the movement of surface dust and rubble Mobile, in addition wild environment often rain heavily have strong wind and, therefore above-mentioned support often by wind to or Washed away by current, it is impossible to meet the needs of scout.
Content of the invention
In view of problem above, the invention provides a kind of support, which possesses:The mobile jib of setting, its lower end insertion In underground;At least three support bars, its upper end are connected on mobile jib, and lower end is against on the ground;Cross bar, its One end is connected on mobile jib by sleeve connector, and the other end is connected on support bar.The lower end insertion ground of mobile jib Under, mobile jib can be fixed by soil, support is prevented with surface dust or the sandstone movement of earth's surface, and energy Enough prevent support from being fallen by wind.
In a preferred embodiment, hole is additionally provided with each support bar, is strengthened pricker and is extended simultaneously through hole Underground is inserted into, is strengthened pricker and is approximately perpendicular to support bar.The reinforcement pricker being inserted in the hole being formed on support bar Each support bar can be securely fixed on ground, strengthen the fixation to support further.Running into In the case of strong wind, the pulling force that pricker be kept a firm hand on underground and produce can be strengthened by each, prevent support tilt.Strengthen Pricker is arranged approximately perpendicular to support bar, be prevented from support be subject to pull up power when, strengthen pricker from support bar Hole in deviate from.
In a preferred embodiment, each longitudinal axis for strengthening pricker intersects at the same point on mobile jib.Many The individual axis for strengthening pricker intersects at a point, and is conducive to strengthening pricker in all directions equably to support force, energy Support is enough made more to consolidate.
In a preferred embodiment, the lower end for strengthening pricker is taper.The lower end of taper is conducive to strengthen pricker Easily where the relatively depth of insertion underground, more preferable fixation is played.
In a preferred embodiment, the upper end of support bar is connected on mobile jib by second sleeve connector.
In a preferred embodiment, sleeve connector possesses the main body of tubular, and mobile jib is inserted in main body, One end of cross bar is hinged on the outer wall of main body.Wherein, sleeve connector can be slided with respect to mobile jib, downwards Sliding sleeve connector away from support bar and mobile jib tie point when, can draw in support bar near mobile jib in order to Carrying Holder.
In a preferred embodiment, the cross bar is perpendicular to the outer of the main body of the sleeve connector Wall.When needing using support, upward sliding sleeve connector until cross bar is perpendicular to mobile jib, now due to pressure Power angle be 90 degree therefore sleeve be not easy slide, support consolidate, when only needing temporarily using support or need Constantly to change support position when, it is not necessary to further fixes sleeve connector could be used that, time saving and energy saving, And using also easily drawing again support bar after terminating in order to carry.
In a preferred embodiment, screw is additionally provided with the main body of sleeve connector, in hole Screw is screwed into so that sleeve connector is fixed on mobile jib.Carry out fixes sleeve connector using screw and be prevented from set Cylinder connector slides, and is conducive to maintaining support to consolidate when needing long-time using support.
In a preferred embodiment, mobile jib includes that lower end is fixed pricker for taper and is connected to the upper end of fixing pricker Marker post, multiple marker posts can join end to end to increase the length of mobile jib.By pricker and marker post will be fixed It is connected mobile jib is formed, mobile jib can be avoided long and be difficult to carry in the wild.
In a preferred embodiment, the foot pad of tabular is connected with the lower end of support bar.The foot pad is increased The lifting surface area of support bar, can prevent support bar not to be absorbed in soil or sandstone.
To sum up, support provided by the present invention, even if also can keep straight for a long time on soil and sandstone ground Vertical, and strong wind and heavy rain can be resisted.In addition, support provided by the present invention easily disassembled become less portion Part, is easy to carry in scout moves in the wild, and installs simply, can when needing using support Soon assemble.
In the present invention, term " lower end " or D score refer to the close ground of the support for being in erectility One end, term " upper end " or " on " one end for referring to away from ground.
Description of the drawings
Hereinafter will be based on embodiment and refer to the attached drawing is being described in more detail to the present invention.Wherein:
Fig. 1 is the schematic diagram of support according to an embodiment of the invention,
Fig. 2 is the stereogram of the sleeve connector of support according to an embodiment of the invention,
Fig. 3 is the stereogram of the foot pad of support according to an embodiment of the invention.
Specific embodiment
Fig. 1 is the schematic diagram of support according to an embodiment of the invention 100.As shown in figure 1, this enforcement The support 100 of example includes that upright trunk 1, its upper end are connected to the support bar 2 on mobile jib 1 and cross bar 3. One end of cross bar 3 is connected on mobile jib 1 by sleeve connector 4, and the other end is connected on support bar 2.? The upper end of strut 2 is connected on mobile jib also by another sleeve connector 4.
Hole 21 is additionally provided with each support bar 2, is strengthened pricker 5 and is inserted underground through each hole 21.Strengthen Pricker 5 is approximately perpendicular to support bar 2 so that strengthens 5 oblique cutting of pricker and enters underground rather than insert underground perpendicular to the ground, So mobile jib 1 is in the case of being blown by high wind, it is necessary to pry open substantial amounts of soil or sandstone could cause mobile jib 1 inclines, and serves more preferable fixed effect.
Preferably, each longitudinal axis for strengthening pricker 5 intersects at the same point on mobile jib.Multiple reinforcement prickers 5 Axis intersects at a point, and is conducive to strengthening pricker in all directions balancedly to support force, can make support more Plus it is firm.No matter support 100 is exerted a force from which direction, strengthen the work that pricker 5 can play center rest 100 With.
In the present embodiment, mobile jib 1 includes mark rod 11 and fixing pricker 12.The lower end of fixing pricker 12 is arranged to Taper is in order to insert in soil.Marker post 11 is hollow bar, shape on the inwall of the lower end of marker post 11 Become to have internal thread, can match with above-mentioned internal thread outer is formed with the outer wall of the upper end of mark rod 11 Screw thread, is coordinated by screw thread and multiple mark rods 11 can join end to end, to increase the height of mobile jib 1.And And external screw thread on the upper end of fixing pricker 12, is formed with, thus fixing pricker 12 can be connected under marker post 11 Side.
This sectional connected mobile jib is conducive to splitting into very long mobile jib when remote way transporting supports 100 are needed Several sections transporting, to facilitate packing and save space.And separate to produce fixing pricker 12 and marker post 11 are more convenient, and can produce fixing pricker 12 and marker post 11 in a different manner.For example with heavier Metal is producing solid fixing pricker 12 to be easier for fixing pricker 12 to ram underground, and uses lighter gold Belong to producing solid marker post 11 to mitigate the weight of 100 entirety of support, while causing support 100 overall Decentralization, more difficult fallen by wind.Any one in fixing pricker 12 and marker post 11 sustains damage When, it is only necessary to replace the part that sustains damage and difference throws away whole mobile jib 1.
Although in the present embodiment, coordinated by screw thread fixing pricker 12 is connected with marker post 11 and by respectively Marker post 11 is connected with each other, but can also be for example clasped using other fit systems.
The screw 42 that sleeve connector 4 includes the main body 41 of tubular and is arranged in the main body 41, in this reality Apply in example, connecting plate 43 is additionally provided with the outer wall of main body 41 for being connected with cross bar 3 or support bar 2. Screw can be screwed in screw 42, sleeve connector 4 is solid against mobile jib 1 by tightening screw It is scheduled at a certain position of mobile jib 1.As shown in figure 1, one end of cross bar 3 is hinged on sleeve connector 4, The other end is hinged on support bar 2, and cross bar 3 is perpendicular to the main body 41 (see Fig. 2) of sleeve connector 4 Outer wall.Now as cross bar 3 is 90 degree with respect to the pressure angle of sleeve connector 4, therefore sleeve connection Part 4 is subject to the power along its longitudinal direction, will not slide in a longitudinal direction, props up only needing temporarily to place Frame 100 (for example has not determined the position of final support 100, still places support 100 in constantly adjustment During place) can also keep support 100 to consolidate even if not being screwed into screw in screw 42, and needing temporarily When packing up support 100, it is only necessary to which slide downward sleeve connector 4 just can draw support bar 2 in mobile jib 1 week in Enclose, be more convenient for transporting support 100.Hereafter after the position for needing to place support 100 is determined, it is only necessary to Screw is screwed in screw 42, so that it may sleeve connector 4 is fixed, so that support 100 is more firm.
In the present embodiment, hole is provided with the connecting plate 43 of sleeve connector 4, while in cross bar 3 Hole is also provided with one end, connecting plate 43 is connected with cross bar 3 through the two holes using bolt.Although at this In embodiment, sleeve connector 4 is connected with cross bar 3 by the hole and bolt that arrange, but can also Take other connected modes such as ball-joint or clamping etc..
Preferably, the other end in support bar 2 is connected with foot pad 6 (see Fig. 3).Although in the present embodiment Foot pad 6 be square plate, but which may also be square plate.Foot pad 6 can increase support bar 2 and ground Contact area, be prevented from support bar 2 and flooded and be prevented from support 100 to sink by soil or sandstone.
Hereinafter, by a specific embodiment, the using method to the support 100 of the present invention is illustrated. In the present embodiment, the other end of the upper end of support bar 2 and cross bar 3 is connected to by sleeve connector 4 respectively On fixing pricker 12.
In selected place, fixing pricker 12 is inserted in soil, and adjusts two sleeve connectors 4 Position after, sleeve connector 4 is fixed on fixing pricker 12 using screw, and in support bar 2 In hole, pricker 5 is strengthened in insertion, and firmly reinforcement pricker 5 is rammed underground using hammer.Subsequently in fixing pricker 12 Upper end connects marker post 11, can also continue the multiple marker posts 11 of connection as needed on marker post 11.Afterwards, Warning mark can be fixed or pull-up warning tape between adjacent support 100 on the top of marker post 11, reach Effect to scene warning, it is also possible to install solar alarming lamp or remote monitoring probe on top, carry out long-range Monitoring.
Although by reference to preferred embodiment, invention has been described, without departing from the scope of the present invention In the case of, various improvement can be carried out to which and can replace part therein with equivalent.Especially, only Otherwise there is structural hazard, the every technical characteristic being previously mentioned in each embodiment all can have been combined in any way Come.Specific embodiment disclosed herein is the invention is not limited in, but including falling within the scope of the appended claims All technical schemes.

Claims (10)

1. a kind of support, possesses:
The mobile jib of setting, its lower end are inserted in underground,
At least three support bars, its upper end are connected on the mobile jib, lower end against on the ground,
Cross bar, its one end are connected on the mobile jib by sleeve connector, and the other end is connected on the support bar.
2. support according to claim 1, it is characterised in that be additionally provided with hole on each described support bar, Strengthen pricker to extend and be inserted into underground through the hole, the reinforcement pricker is approximately perpendicular to the support bar.
3. support according to claim 2, it is characterised in that each longitudinal axis for strengthening pricker intersects at institute State the same point on mobile jib.
4. support according to claim 3, it is characterised in that the lower end of the reinforcement pricker is taper.
5. the support according to any of the above-described claim, it is characterised in that the sleeve connector possesses tubular Main body, the mobile jib is inserted in the main body, and one end of the cross bar is hinged on the outer wall of the main body.
6. support according to claim 5, it is characterised in that the cross bar is perpendicular to the sleeve connector The main body outer wall.
7. support according to claim 6, it is characterised in that in the main body of the sleeve connector Screw is additionally provided with, for screw being screwed in the screw so that the sleeve connector is fixed on the mobile jib.
8. the support according to any one of claim 1 to 4, it is characterised in that the upper end of the support bar It is connected on the mobile jib by second sleeve connector.
9. the support according to any of the above-described claim, it is characterised in that the mobile jib includes lower end for taper Fix pricker and the marker post of the upper end of the fixing pricker is connected to, multiple marker posts can join end to end to increase The length of the mobile jib.
10. the support according to any of the above-described claim, it is characterised in that connect in the lower end of the support bar It is connected to the foot pad of tabular.
CN201510543594.5A 2015-08-28 2015-08-28 Support Pending CN106481952A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510543594.5A CN106481952A (en) 2015-08-28 2015-08-28 Support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510543594.5A CN106481952A (en) 2015-08-28 2015-08-28 Support

Publications (1)

Publication Number Publication Date
CN106481952A true CN106481952A (en) 2017-03-08

Family

ID=58235241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510543594.5A Pending CN106481952A (en) 2015-08-28 2015-08-28 Support

Country Status (1)

Country Link
CN (1) CN106481952A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107063214A (en) * 2017-05-09 2017-08-18 华北理工大学 A kind of Portable practical survey pin
CN108116998A (en) * 2018-02-02 2018-06-05 广西壮族自治区环境监测中心站 A kind of tributary sediment sampling stent
CN110379295A (en) * 2019-07-31 2019-10-25 王升 Signboard support is used in a kind of construction
CN110415624A (en) * 2019-07-24 2019-11-05 南通中发展示器材有限公司 A kind of seat that post stand stability is strong ground type spool
CN114566089A (en) * 2022-03-02 2022-05-31 中煤科工重庆设计研究院(集团)有限公司 Portable water and soil conservation monitoring field signboard and installation method thereof

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2327042Y (en) * 1998-07-02 1999-06-30 吴盈庆 Height-adjustable road warning-sign apparatus
CN2530015Y (en) * 2001-10-30 2003-01-08 张国益 Active garden ladder
CN202215050U (en) * 2011-08-01 2012-05-09 李锦亮 Umbrella-shaped fence
CN202310756U (en) * 2011-11-16 2012-07-11 赵康兵 All-terrain stable type log holding support device
CN103247981A (en) * 2013-05-27 2013-08-14 国家电网公司 Cable head supporting method and special portable multifunctional cable head bracket
CN103392556A (en) * 2013-07-24 2013-11-20 无锡市伟丰印刷机械厂 Nursery stock supporting frame
CN204001977U (en) * 2014-05-30 2014-12-10 国家电网公司 A kind of complete portable secured fence of landform
CN204069978U (en) * 2014-07-31 2015-01-07 江苏苏林园林工程有限公司 A kind of nursery stock bracing frame
CN204377577U (en) * 2015-01-06 2015-06-10 黑龙江生态工程职业学院 The multi-functional sapling fixator that a kind of gardens are special
CN204590753U (en) * 2015-04-13 2015-08-26 国网山东潍坊市寒亭区供电公司 The anti-tilter of a kind of cement pole

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2327042Y (en) * 1998-07-02 1999-06-30 吴盈庆 Height-adjustable road warning-sign apparatus
CN2530015Y (en) * 2001-10-30 2003-01-08 张国益 Active garden ladder
CN202215050U (en) * 2011-08-01 2012-05-09 李锦亮 Umbrella-shaped fence
CN202310756U (en) * 2011-11-16 2012-07-11 赵康兵 All-terrain stable type log holding support device
CN103247981A (en) * 2013-05-27 2013-08-14 国家电网公司 Cable head supporting method and special portable multifunctional cable head bracket
CN103392556A (en) * 2013-07-24 2013-11-20 无锡市伟丰印刷机械厂 Nursery stock supporting frame
CN204001977U (en) * 2014-05-30 2014-12-10 国家电网公司 A kind of complete portable secured fence of landform
CN204069978U (en) * 2014-07-31 2015-01-07 江苏苏林园林工程有限公司 A kind of nursery stock bracing frame
CN204377577U (en) * 2015-01-06 2015-06-10 黑龙江生态工程职业学院 The multi-functional sapling fixator that a kind of gardens are special
CN204590753U (en) * 2015-04-13 2015-08-26 国网山东潍坊市寒亭区供电公司 The anti-tilter of a kind of cement pole

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107063214A (en) * 2017-05-09 2017-08-18 华北理工大学 A kind of Portable practical survey pin
CN108116998A (en) * 2018-02-02 2018-06-05 广西壮族自治区环境监测中心站 A kind of tributary sediment sampling stent
CN110415624A (en) * 2019-07-24 2019-11-05 南通中发展示器材有限公司 A kind of seat that post stand stability is strong ground type spool
CN110415624B (en) * 2019-07-24 2024-03-29 南通中发展示器材有限公司 Strong-stability ground-type scroll for easy-to-draw treasures
CN110379295A (en) * 2019-07-31 2019-10-25 王升 Signboard support is used in a kind of construction
CN114566089A (en) * 2022-03-02 2022-05-31 中煤科工重庆设计研究院(集团)有限公司 Portable water and soil conservation monitoring field signboard and installation method thereof

Similar Documents

Publication Publication Date Title
CN106481952A (en) Support
US5971365A (en) Fence construction
CN210316791U (en) Ground-inserting telescopic pillar for travelling tent
US6887016B1 (en) Mudmat foundation for subsea equipment
CN112909742A (en) Lightning protection device for high-rise building
CN209838448U (en) Supporting device for coal mine tunneling
CN207079900U (en) A kind of construction resists suspension device stubbornly with scaffold soft drawn
CN211046420U (en) Scalable lightning protection fixing device is used to light steel villa
KR200439508Y1 (en) Sunshade connector frame for ginseng plot
CN205024700U (en) Follow -on flexible passive protection net
CN206785093U (en) A kind of orchard anti-theft fence
CN205688959U (en) A kind of foundation ditch guard rail
CN205077486U (en) Pile frame
CN210828466U (en) Multifunctional outdoor enclosure corridor frame facility
CN207022748U (en) A kind of high support frame of stability
CN209938941U (en) Undercarriage and plant protection unmanned aerial vehicle who contains it
CN208379584U (en) A kind of spiral prestressed grouting anchor pole
CN212250083U (en) Supporting device for tunnel construction
CN205607683U (en) Geotechnical engineering sampler
CN110847175A (en) Foundation pile cuts off guide bracket
CN219012029U (en) Protective rope net convenient for ground insertion assembly
CN214460510U (en) Green plant fixing device of bedrock step side slope
CN208907213U (en) A kind of consolidation process device for unfavorable geology section landslide of high slope
CN213742656U (en) Safety device is used in railway engineering construction
CN211819401U (en) Tunnel separated small rack

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170308