CN106480250A - The assembly and disassembly methods of blast branch pipe of blast furnace equipment - Google Patents

The assembly and disassembly methods of blast branch pipe of blast furnace equipment Download PDF

Info

Publication number
CN106480250A
CN106480250A CN201510547935.6A CN201510547935A CN106480250A CN 106480250 A CN106480250 A CN 106480250A CN 201510547935 A CN201510547935 A CN 201510547935A CN 106480250 A CN106480250 A CN 106480250A
Authority
CN
China
Prior art keywords
air port
middle set
blast
blast furnace
gib head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510547935.6A
Other languages
Chinese (zh)
Other versions
CN106480250B (en
Inventor
高勇超
孙钱达
刘杰
舒亚魁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Baosteel Technology Services Co Ltd
Original Assignee
MCC Baosteel Technology Services Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Baosteel Technology Services Co Ltd filed Critical MCC Baosteel Technology Services Co Ltd
Priority to CN201510547935.6A priority Critical patent/CN106480250B/en
Publication of CN106480250A publication Critical patent/CN106480250A/en
Application granted granted Critical
Publication of CN106480250B publication Critical patent/CN106480250B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

The present invention provides a kind of assembly and disassembly methods of blast branch pipe of blast furnace equipment, during belly pipe partial dismantling, removes bottom pull bar, belly pipe bearing pin, belly pipe successively, and is placed in predeterminable area to after all belly pipe numberings removed;Air port part and middle set are partly all dismounted using vehicular hydraulic drawbench, during the partial dismantling of air port, after gib head stretches into the through hole in the middle of air port, strut pull bar and open gib head, make gib head hook air port head, air port is pulled out by drawing cylinder action;During middle set partial dismantling, after gib head passes through middle set end face, strut pull bar and open gib head, make gib head catch on middle set end face, drawing cylinder action makes middle set and big inner room produce and loosen, and is carried away middle set by fork truck.The efficiency of construction that the present invention can lift the dismounting of blast branch pipe of blast furnace equipment, change, reduces blast furnace because overhauling construction and the time of damping down, also improves the installation quality of belly pipe, air port and middle complete equipment, it is to avoid blowpipe equipment sealing surface leaks simultaneously.

Description

The assembly and disassembly methods of blast branch pipe of blast furnace equipment
Technical field
The present invention relates to the plant maintenance of large blast furnace;
More particularly, to a kind of assembly and disassembly methods of blast branch pipe of blast furnace equipment.
Background technology
Refering to shown in Fig. 1, blast branch pipe of blast furnace equipment is mainly made up of blow-through tube portion, air port part, middle set part etc., main Acting on is to be blown into inside blast furnace by the hot blast in bustle pipe, and general large blast furnace has 40 sets about blowpipe equipment works simultaneously Make.Up to 1400 DEG C of the hot blast temperature sent in bustle pipe, first passes through blow-through tube portion, then is partially into height by air port Furnace body, under the operating mode of long-term continuous high temperature, air port part and middle set part, it is possible that the situation of scaling loss, now just need The air port part of blast furnace, middle set part are carried out changing construction.
Change air port part and middle set part, blow-through tube portion, complex procedures must be first removed in construction.And due to air port part, The equipment self-weight of middle set part is big, locus are little, and air port part is extremely difficult with the Demolition Construction of middle set part.Air port part All sealing is contacted by face between blow-through tube portion, middle set part, installation quality has high demands.
Content of the invention
The technical problem to be solved is aiming at the air port part of current blast furnace, the replacing constructional difficulties of middle set part, There is provided a kind of assembly and disassembly methods of blast branch pipe of blast furnace equipment, in order to the above-mentioned difficult problem overcoming prior art to exist.
For achieving the above object and other related purposes, the present invention provides a kind of assembly and disassembly methods of blast branch pipe of blast furnace equipment, described Blast branch pipe of blast furnace equipment at least includes blow-through tube portion, air port part and middle set part, during belly pipe partial dismantling, tears open successively Except bottom pull bar, belly pipe bearing pin, belly pipe, and it is placed in predeterminable area to after all belly pipe numberings removed;
Air port part and middle set are partly all dismounted using vehicular hydraulic drawbench, and described vehicular hydraulic drawbench includes a base, Described base is provided with a slide block, and described slide block is slidably connected with described base, and described slide block is connected with drawing oil cylinder, described draws Pull out oil cylinder to be fixed on described base, the front end of described slide block is hinged with two pull bars with eave tile, and described slide block is provided with a support Open oil cylinder, described strut oil cylinder and strut bar with one be connected, the described bar that struts is located between described two pull bars, and the described bar that struts leads to Cross two poles to be connected with the middle part of described two pull bars respectively, the two ends of described pole are hinged with described bar, the pull bar of strutting respectively, The front end of described base forms a bracing frame;
During the partial dismantling of air port, after gib head stretches into the through hole in the middle of air port, strut pull bar and open gib head, make gib head hook air port head Portion, air port is pulled out by drawing cylinder action;
During middle set partial dismantling, after gib head passes through middle set end face, strut pull bar and open gib head, make gib head catch on middle set end face, draw Pulling out cylinder action makes middle set loosen with big inner room generation, is carried away middle set by fork truck.
Further, remove belly pipe bearing pin before, by fork truck fork arm pass through belly pipe below baffle plate in the hole, and on lift to stress Position.
Further, the adpting flange between each several part all carries out compression installation using flange face auxiliary mould, and described flange face is auxiliary Assistant engineer's dress includes the hydraulic clamp clamp of at least two C-shapeds, and hydraulic clamp clamp are arranged on the upper end of a support bar, support bar Lower end be connected with a hoistable platform by omnidirectional mechanism, hydraulic clamp clamp be respectively arranged at two ends with fixing backing plate and clamping cylinder, Described clamping cylinder is connected with Hydraulic Station.
Further, using bore gauge, the gap between flange face is measured, spacing is between 6 ± 1mm.
Further, it is provided with gasket seal between flange face, measure pad outer rim to the distance at flange face edge using Steel Ruler, Distance is between 110 ± 2.5mm or 60 ± 2.5mm.
Further, flange face gap and pads placement all detect qualified after, leak detection of fetching water is carried out to sealing surface.
Further, also include the cleaning of the sealing surface to each several part, using edge of a knife cloth by sealing surface wiped clean, to sealing surface Depression in the surface or projection, are smoothed using sand papering.
Further, when air port part is installed, air port is hit 2-3 minute using blow cylinder and is carried out pretension, and is surveyed using clearance gauge Whether amount air port sealing surface gap is qualified, if air port installation is not in place, is hit again, until qualified.
Further, when middle set part is installed, it is welded and fixed with the band iron of thickness 6mm between middle set and big set.
By above technical scheme, the present invention has following technique effect compared to prior art:The present invention can lift blast furnace and send The efficiency of construction that wind props up tube apparatus dismounting, changes, reduces blast furnace because overhauling construction and the time of damping down, also improves blow-through simultaneously The installation quality of pipe, air port and middle complete equipment, it is to avoid blowpipe equipment sealing surface leaks.
Brief description
Fig. 1 is shown as the structural representation of blowpipe equipment;
Fig. 2 is shown as method of the present invention flow chart;
What Fig. 3 was shown as blow-through tube portion puts predeterminable area schematic diagram;
Fig. 4 is shown as the schematic view of the mounting position of pad;
Fig. 5 is shown as the structural representation of vehicular hydraulic drawbench;
Fig. 6 is shown as the structural representation of flange face auxiliary mould.
Component label instructions:
1 blow-through tube portion
Part is covered in 2
3 air port parts
4 cover greatly
Specific embodiment
Hereinafter embodiments of the present invention are illustrated by particular specific embodiment, those skilled in the art can be taken off by this specification The content of dew understands other advantages and effect of the present invention easily.
Refer to Fig. 1 to Fig. 6.It should be clear that structure depicted in this specification institute accompanying drawings, ratio, size etc., all only in order to Content disclosed in cooperation description, so that those skilled in the art understands and reads, being not limited to the present invention can implement Qualificationss, therefore do not have technical essential meaning, the adjustment of the modification of any structure, the change of proportionate relationship or size, Under not affecting present invention effect that can be generated by and the purpose that can reach, all should still fall in disclosed technology contents Obtain in the range of covering.Meanwhile, in this specification cited as " on ", D score, "left", "right", " in Between " and " one " etc. term, be merely convenient to describe understands, and is not used to limit the enforceable scope of the present invention, its phase Relation is altered or modified, under no essence change technology contents, when being also considered as the enforceable category of the present invention.
Refering to shown in Fig. 2, it is described in further detail below in conjunction with method of the present invention flow chart:
The replacing of blow-through tube portion:
During belly pipe partial dismantling, need to remove bottom pull bar, belly pipe bearing pin, belly pipe successively.
Bottom pull bar one end is connected with blast-furnace body by hinge, and pull bar can be rotated with around hinge.The other end passes through screw-pressing Mode fixes belly pipe.When removing bottom railing, by handle rotate counterclockwise, after screw bolt loosening, pull bar is taken off.Pull bar tail Portion is hexagon bolt, can coordinate the sleeve-board construction of 36mm using pneumatic impact spanner, lift work efficiency.
Before starting to remove belly pipe bearing pin, first that fork truck is in place.Fork truck fork arm passes through the baffle plate in the hole below belly pipe, and upper lift To forced position.After fork truck is in place, start to remove belly pipe bearing pin.Every belly pipe passes through lock clasp flange face.During construction, Hit wedge using hand hammer and remove belly pipe flange face bearing pin, for cannot be cut off using gas cutting by hitting the bearing pin removed.Tear open Under bearing pin, wedge is placed in Special collecting box.
When belly pipe is removed, first disconnect cooling water pipe.Cooling water pipe is located at blow-through tube head, passes through quickly to connect using metal hose Head connects.Before removing cooling water pipe, confirm that cooling water valve has been switched off.Metal hose must be broken after closing by cooling water immediately Open, and using fork truck, belly pipe is transported burner hearth, it may occur that steam after otherwise remaining cooling water is heated in belly pipe Spray the danger hurted sb.'s feelings.Then have bad luck belly pipe using fork truck.During periodical repair, need all to remove belly pipe, and compiled Number, determine the need for changing according to inspection result.It is placed in regulation refering to the belly pipe shown in Fig. 3, pulled down as requested Predeterminable area, not affect being normally carried out of construction.
It is provided with gasket seal, when changing pad, first to short above belly pipe head seal face, flange face and belly pipe between flange Pipe flange face is cleared up, and the old pad of flange face surfaces stick, fluid sealant, impurity etc. are removed, and flange face surface smooths no The defects such as pit, projection, burr.The groove installing pad is had on belly pipe flange face, gasket seal must be placed in groove Interior, and fluid sealant is smeared on pad.Pad has two kinds, and inner ring is asbestos washer, and outer ring is metal jacketed gasket, wherein stone Cotton pad piece does not need to smear fluid sealant.For avoiding fluid sealant to harden, sealing effectiveness is led to decline, smearing sealing glue process should not mistake Early, should control in a pre-installation within 15 minutes.
Before belly pipe returns dress, to the belly pipe numbering, the cleaning situation in head seal face and the afterbody flange face pad that prepare installation Installation situation is confirmed.When returning dress, using forklift transport belly pipe, by blow-through tube head be aligned air port contact surface, then will be straight Lift on blowpipe afterbody flange face, make upper and lower flange face pin shaft hole be aligned, subsequently just can be with mounting pin axle.
Bearing pin is installed, and after being directed at the pin shaft hole of belly pipe flange face using fork truck, bearing pin is penetrated in the hole, inserts wedge, enter Row pretension.Bearing pin, by the way of diagonal installation, after installing all bearing pins, measures pad to flange face edge using Steel Ruler Distance.Refering to shown in Fig. 4, belly pipe pads placement criterion of acceptability is:A=110 ± 2.5mm, B=60 ± 2.5mm.Detection is closed After lattice, it is subsequently mounted pull bar.
Pull bar is installed, and the effect of pull bar is the contact situation of the sealing surface between adjustment blow-through tube head and air port, and pull bar is installed After the completion of, first carry out pretension, then fork truck is withdrawn.Meanwhile, urgent, flange face stress is carried out using diagonal order to wedge Uniformly.
Installation quality detects:Carry out flange face gap detection first, using bore gauge, belly pipe upper and lower flange face gap is surveyed Amount, spacing should be between 6 ± 1mm.As being unsatisfactory for this standard, it is adjusted using flange face auxiliary mould.Refering to shown in Fig. 6, Described flange face auxiliary mould includes the hydraulic clamp clamp of at least two C-shapeds, and hydraulic clamp clamp are arranged on a support bar Upper end, the lower end of support bar is connected with a hoistable platform by omnidirectional mechanism, and pad is fixed in being respectively arranged at two ends with of hydraulic clamp clamp Plate and clamping cylinder, described clamping cylinder is connected with Hydraulic Station.The clamp of flange face butt joint auxiliary device are blocked upper flange surface, Open Hydraulic Station, jacking cylinder holds out against simultaneously, and belly pipe flange face gap is adjusted to critical field.Each hydraulic clamp card Pincers are all arranged on the upper end of a support bar, connect hydraulic pressure grip wrench and support bar with a movable spring.Described movable bullet Spring is the no guide spring having certain bending stiffness, can bend so that clamping device operationally allows to different directions Work surface has certain angle, so that movable spring can be individually tilted in allowed band, so that elevating mechanism and flange docking The chassis of auxiliary device still keeps level, so also allow for shrink, adjustment support bar more stable in order to work.Lifting is flat The bottom of platform is provided with hoist cylinder, and hoist cylinder is connected with Hydraulic Station and is arranged on the front of Hydraulic Station, and hoist cylinder promotes and rises descending branch The rough adjustment of flange butt joint auxiliary device height realized by hoistable platform on frame.
The replacing of air port part:
Push rod is removed, and air port push rod is located in the big-and-middle set in air port, and one end withstands on air port six-o ' clock position, and the other end passes through screw top Tightly.Before removing push rod, first fastening screw is unclamped, you can take out push rod.
Air port drawing, vehicular hydraulic drawbench is provided simultaneously with vehicle-mounted and hydraulic drawing function, refering to shown in Fig. 5, vehicular Hydraulic drawbench includes a base, and described base is provided with a slide block, and described slide block is slidably connected with described base, described slide block It is connected with drawing oil cylinder, described drawing oil cylinder is fixed on described base, the front end of described slide block is cut with scissors with two pull bars with eave tile Connect, described slide block is provided with one and struts oil cylinder, described strut oil cylinder and strut bar with one be connected, described strut bar be located at described two Between pull bar, the described bar that struts is connected with the middle part of described two pull bars respectively by two poles, and the two ends of described pole are respectively Hinged with described bar, the pull bar of strutting, the front end of described base forms a bracing frame.First air port drawbench gib head is aligned in air port Air port drawbench is subsequently slowly driven towards tuyere position by the through hole of the heart, when gib head is soon close to air port, adjustment gib head height, Gib head is enable smoothly to inject the through hole in the middle of air port.After gib head is fully inserted into the through hole in the middle of air port, gib head is opened in lifting, Gib head is made to hook air port head.After air port drawbench is in place, start fitting machine pull-out air port.Air port drawbench is by hydraulic coupling Pull-out air port, in fact it could happen that the phenomenon of gib head slippage during the pull-out of air port, now it is accomplished by readjusting gib head position. It is necessary to first close air port cooling water valve after air port pulls loose, and disconnect the joint of air port cooling water flexible pipe.Cooling water flexible pipe joint Connected by snap joint it is necessary to first disconnect water inlet pipe, then disconnect return pipe.Subsequently using air port drawbench, air port is drawn completely Go out.
Air port is had bad luck, and using the electric block around stove, the old air port pulling out is placed in the region that tuyere platform is specified, and generally needs Cooling water pipe with regard to air port is pulled down, and is installed on fresh wind port the use that reuses.When installing air port cooling water pipe, note rubber The installation of leather packing ring must put in place, prevents cooling water pipe leak.
Air port sealing surface confirms, the form that air port sealing surface is contacted with copper face for copper, before fresh wind port prepares to install, needs to wind Mouth sealing surface is cleared up and is confirmed.When tuyere body sealing surface confirms, first using edge of a knife cloth, tuyere body sealing surface is wiped Only, the defect such as the pit deeper to sealing surface surface, projection, burr, is smoothed using sand papering.Middle set inner sealing surface is really Recognize and carry out after the completion of the stifled mud of production operation personnel, clear thorax, equally use edge of a knife cloth wiped clean sealing surface surface it is ensured that nothing is big The impurity such as granule slag.
Air port loads, and fresh wind port is loaded into position during loading, noting cooling water pipe on the fitting machine of air port.Water inlet pipe is 12 O'clock direction, return pipe is in 9 o'clock direction, and will pass in and out water tube hose colligation firmly with iron wire, prevents extruding in installation process Water pipe.
Air port is installed, and chain-drive section be aligned Zhong Tao center is installed in air port, air port fitting machine subsequently slowly drives towards the position of air port installation Put, when air port is soon close to middle set, the height of adjustment fresh wind port, in so that fresh wind port is aligned, the center of set, can smoothly load In middle set.Meanwhile, air port installation chain-drive section is locked by bearing pin with furnace shell, manipulation air port fitting machine, slowly air port is pushed To installation site.Connect cooling water pipe.After the cooling water pipe in air port is connected, open cooling water valve immediately, so that cooling water is followed Ring, prevents air port from burning out.Meanwhile, confirm that cooling water water inlet pipe and water outlet pipe connects correctly, joint no drainage.Cooling water starts After circulation, start air port is installed.Air port fitting machine holds out against air port by the way of blow cylinder strike, first connects compressed air hose, After air port reaches installation site, open compressed air, hit 2-3 minute.The position that subsequently measurement air port is installed, and use Whether clearance gauge measurement air port sealing surface gap is qualified, if air port installation is not in place, is again turned on compressed air and is hit, directly Extremely qualified.
Air port push rod is installed, and after air port is installed in place, push rod is put into installation site, and afterbody bolt is held out against.
Middle set part is changed
Puller bolt is removed, and middle set puller bolt is evenly distributed on the big set inwall in middle set outside, and its effect is to prevent from dismantling air port When in set loosen.Using burning torch, it is cut from root.
Pressing plate cuts off, and for the sealing of set and big inner room in ensureing, needs middle set and big set inwall typically in installing after covering Between with steel plate welding and full weld, using burning torch, the steel plate originally being welded is cut off.
After vehicular hydraulic drawbench is in place, it is mounted to fork truck, fork truck fork arm passes through middle set drawbench bottom baffle in the hole, And on lift to forced position.Start fork truck to middle set position, adjustment pull bar center is basically identical with Zhong Tao center, little after centering Car is pinned with blast-furnace body.Fluid pressure drive device makes pull bar stretch into middle set (now pull bar is in contraction state), treats that pull bar gib head is stretched Going out middle set end face rear distraction pull bar makes pull bar gib head catch on middle set end face.Hydraulic means drives pull bar so that dolly is propped up toward post-tensioning simultaneously Frame is adjacent to big set flange face, and hydraulic means pressure gradually rises, just so that middle set is produced with big set after reaching certain pulling force Loosen, that is, middle set " pulling loose ".After middle set " pulling loose ", jacket water pipe in disconnection, carried using chain block and blast furnace Electric block in cover and hang out to fork truck, by fork truck, middle set is carried away
Remove cooling water pipe.Cooling water pipe is located at middle set head, by hose connection.Before removing cooling water pipe, contact produces really Recognize cooling water valve to have been switched off.Middle set is had bad luck.During periodical repair, the middle set under removing needs to put according to fixationization management requirement In the position of regulation, and do not affect being normally carried out of other constructions.
Middle set loads, and using electric block around stove, newly middle set is lifted on middle set fitting machine, then by fitting machine Integral lifting To installation site.Ensure that fitting machine center is basically identical with Zhong Tao center, promote fitting machine dolly after centering, middle set is seated to Installation site, finally exits fitting machine.
Middle set install, by the cooling water pipe removed before recover connect, and in time contact production open cooling water valve it is ensured that in Cooling water Efficient Cycle in set.
Set, big set faying face gap in adjustment.After middle jacket water pipe connects, again fitting machine is pushed into installation site, then Fitting machine leading portion is connected with blast-furnace body pinning, starts hydraulic means, middle set is slowly compacted to gap and meets requirement, Backed off after random fitting machine.Fill in that faying face depth not can exceed that faying face with 0.1mm clearance gauge 50%.
Middle set puller bolt and pressing plate are installed, after middle set is installed in place, middle set is solid with the welding of thickness t=6mm band iron with big inner room Fixed.Welding slag, the full uniform No leakage of weld seam is removed after welding.Puller bolt recovers.After pressing plate welding finishes, middle set is pushed up Tight bolt recovers, and puller bolt is fastened to till withstanding middle set.
Above-described embodiment only principle of the illustrative present invention and its effect, not for the restriction present invention.Any it is familiar with this skill The personage of art all can carry out modifications and changes without prejudice under the spirit and the scope of the present invention to above-described embodiment.Therefore, such as Those of ordinary skill in the art completed under without departing from disclosed spirit and technological thought all etc. Effect modifications and changes, must be covered by the claim of the present invention.

Claims (9)

1. a kind of assembly and disassembly methods of blast branch pipe of blast furnace equipment, described blast branch pipe of blast furnace equipment at least includes blow-through tube portion, air port Part and middle set part it is characterised in that:
During belly pipe partial dismantling, remove bottom pull bar, belly pipe bearing pin, belly pipe successively, and all straight to remove It is placed in predeterminable area after blowpipe numbering;
Air port part and middle set are partly all dismounted using vehicular hydraulic drawbench, and described vehicular hydraulic drawbench includes one Base, described base is provided with a slide block, and described slide block is slidably connected with described base, and described slide block is with drawing oil cylinder even Connect, described drawing oil cylinder is fixed on described base, the front end of described slide block is hinged with two pull bars with eave tile, described Slide block is provided with one and struts oil cylinder, described strut oil cylinder and strut bar with one be connected, the described bar that struts is located at described two pull bars Between, the described bar that struts is connected with the middle part of described two pull bars respectively by two poles, and the two ends of described pole are respectively Hinged with described bar, the pull bar of strutting, the front end of described base forms a bracing frame;
During the partial dismantling of air port, after gib head stretches into the through hole in the middle of air port, strut pull bar and open gib head, make gib head hook wind Oral portion, air port is pulled out by drawing cylinder action;
During middle set partial dismantling, after gib head passes through middle set end face, strut pull bar and open gib head, make gib head catch on middle set end face, It is loosening that drawing cylinder action makes middle set and big inner room produce, and is carried away middle set by fork truck.
2. before the assembly and disassembly methods of blast branch pipe of blast furnace equipment according to claim 1 are it is characterised in that remove belly pipe bearing pin, By fork truck fork arm pass through belly pipe below baffle plate in the hole, and on lift to forced position.
3. the assembly and disassembly methods of blast branch pipe of blast furnace equipment according to claim 1 are it is characterised in that connection between each several part Flange all carries out compression using flange face auxiliary mould and installs, and described flange face auxiliary mould includes the liquid of at least two C-shapeds Pressure grip wrench, hydraulic clamp clamp are arranged on the upper end of a support bar, and omnidirectional mechanism and is passed through in the lower end of support bar Hoistable platform connect, hydraulic clamp clamp be respectively arranged at two ends with fixing backing plate and clamping cylinder, described clamping cylinder and liquid Pressure station is connected.
4. the assembly and disassembly methods of blast branch pipe of blast furnace equipment according to claim 3 are it is characterised in that use bore gauge to flange Gap between face measures, and spacing is between 6 ± 1mm.
5. the assembly and disassembly methods of blast branch pipe of blast furnace equipment according to claim 4 are it is characterised in that be provided with close between flange face Gasket, measures pad outer rim to the distance at flange face edge using Steel Ruler, distance is in 110 ± 2.5mm or 60 ± 2.5mm Between.
6. the assembly and disassembly methods of blast branch pipe of blast furnace equipment according to claim 5 are it is characterised in that flange face gap and pad Position all detect qualified after, leak detection of fetching water is carried out to sealing surface.
7. the assembly and disassembly methods of blast branch pipe of blast furnace equipment according to claim 1 are it is characterised in that also include to each several part The cleaning of sealing surface, using edge of a knife cloth by sealing surface wiped clean, to sealing surface depression in the surface or projection, using sand paper Polishing is smooth.
8. blast branch pipe of blast furnace equipment according to claim 1 assembly and disassembly methods it is characterised in that air port part install when, Whether air port is hit 2-3 minute using blow cylinder and is carried out pretension, and qualified using clearance gauge measurement air port sealing surface gap, If air port installation is not in place, hit again, until qualified.
9. blast branch pipe of blast furnace equipment according to claim 1 assembly and disassembly methods it is characterised in that middle set part install when, It is welded and fixed with the band iron of thickness 6mm between middle set and big set.
CN201510547935.6A 2015-08-31 2015-08-31 The assembly and disassembly methods of blast branch pipe of blast furnace equipment Active CN106480250B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510547935.6A CN106480250B (en) 2015-08-31 2015-08-31 The assembly and disassembly methods of blast branch pipe of blast furnace equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510547935.6A CN106480250B (en) 2015-08-31 2015-08-31 The assembly and disassembly methods of blast branch pipe of blast furnace equipment

Publications (2)

Publication Number Publication Date
CN106480250A true CN106480250A (en) 2017-03-08
CN106480250B CN106480250B (en) 2018-08-28

Family

ID=58235309

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510547935.6A Active CN106480250B (en) 2015-08-31 2015-08-31 The assembly and disassembly methods of blast branch pipe of blast furnace equipment

Country Status (1)

Country Link
CN (1) CN106480250B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110643769A (en) * 2019-10-09 2020-01-03 中冶宝钢技术服务有限公司 Blast furnace air supply branch pipe belly pipe inclined pin pressing device and pressing method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010053747A (en) * 1999-12-01 2001-07-02 이구택 Dismantlement apparatus of tuyere in the blast furnace
CN201793604U (en) * 2010-09-21 2011-04-13 中冶宝钢技术服务有限公司 Large-scale blast furnace mid-sleeve drawing device
CN202846128U (en) * 2012-08-30 2013-04-03 中冶宝钢技术服务有限公司 Flange docking auxiliary device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010053747A (en) * 1999-12-01 2001-07-02 이구택 Dismantlement apparatus of tuyere in the blast furnace
CN201793604U (en) * 2010-09-21 2011-04-13 中冶宝钢技术服务有限公司 Large-scale blast furnace mid-sleeve drawing device
CN202846128U (en) * 2012-08-30 2013-04-03 中冶宝钢技术服务有限公司 Flange docking auxiliary device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110643769A (en) * 2019-10-09 2020-01-03 中冶宝钢技术服务有限公司 Blast furnace air supply branch pipe belly pipe inclined pin pressing device and pressing method

Also Published As

Publication number Publication date
CN106480250B (en) 2018-08-28

Similar Documents

Publication Publication Date Title
CN105369002B (en) A kind of hot air furnace hot air branch pipe repairing inner liner frock and its method for repairing and mending
CN102927363A (en) Construction method for extracting blind plate under coal gas
CN107699650A (en) A kind of installation method of blast furnace cooling stave
CN106480250A (en) The assembly and disassembly methods of blast branch pipe of blast furnace equipment
CN111822935B (en) Electric dust removal ash bucket overhauling process
CN107699254B (en) Maintenance process of coke oven ascending pipe
CN108015519B (en) The drawing process covered in blast furnace
CN209039513U (en) Trolley is used in a kind of dismounting of blast-furnace tuyere belly pipe
CN214142425U (en) Blast furnace hot blast valve quick replacement auxiliary device
CN106319119A (en) Automatic replacer of tuyere small sleeve
CN212669731U (en) Device for dismounting blast furnace blowpipe
CN109055638A (en) A kind of method of last furnace shell and cooled bottom water crossed construction
CN208038480U (en) A kind of trolley for replacing blast furnace front tapping machine rock drill
CN111635971A (en) Device for dismounting blast furnace blowpipe
CN216501260U (en) Vertical scarfing cinder of oxygen rifle and maintenance device
CN108977603B (en) Repairing method for iron notch frame burn-through of iron-making blast furnace
CN113832275B (en) Method for replacing whole circle of blast furnace copper cooling wall without entering people
CN107267708A (en) The replacing options of converter alloy rotating disk tremie pipe
CN104164523A (en) Tool for quick disassembly and assembly of blast furnace blowpipe and tight beating of tapered wedges and use method thereof
CN108213756A (en) A kind of method that converter shell is repaired online with seam flange cracking
CN110564430A (en) Coke oven fixing cup maintenance auxiliary tool and maintenance method based on auxiliary tool
CN204848742U (en) Coke oven crude gas cutting device
CN209273350U (en) A kind of power station unit inlet valve connecting lever demounting tool
CN218262581U (en) Repairing device for tap hole of metal mixer
CN220218416U (en) Accumulator maintenance tool

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant