CN106477306A - Cassette bogey, liquid crystal panel production system and its cassette transport method - Google Patents

Cassette bogey, liquid crystal panel production system and its cassette transport method Download PDF

Info

Publication number
CN106477306A
CN106477306A CN201611092543.6A CN201611092543A CN106477306A CN 106477306 A CN106477306 A CN 106477306A CN 201611092543 A CN201611092543 A CN 201611092543A CN 106477306 A CN106477306 A CN 106477306A
Authority
CN
China
Prior art keywords
cassette
supply
port
conveyer
glass
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611092543.6A
Other languages
Chinese (zh)
Other versions
CN106477306B (en
Inventor
胡堂林
曲迎娣
王宏亮
张丽
张磊
高晓芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tunghsu Group Co Ltd
Tunghsu Technology Group Co Ltd
Wuhu Dongxu Optoelectronic Technology Co Ltd
Original Assignee
Dong Xu (kunshan) Display Material Co Ltd
Tunghsu Group Co Ltd
Tunghsu Technology Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dong Xu (kunshan) Display Material Co Ltd, Tunghsu Group Co Ltd, Tunghsu Technology Group Co Ltd filed Critical Dong Xu (kunshan) Display Material Co Ltd
Priority to CN201611092543.6A priority Critical patent/CN106477306B/en
Publication of CN106477306A publication Critical patent/CN106477306A/en
Application granted granted Critical
Publication of CN106477306B publication Critical patent/CN106477306B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G47/00Article or material-handling devices associated with conveyors; Methods employing such devices
    • B65G47/74Feeding, transfer, or discharging devices of particular kinds or types
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G49/00Conveying systems characterised by their application for specified purposes not otherwise provided for
    • B65G49/05Conveying systems characterised by their application for specified purposes not otherwise provided for for fragile or damageable materials or articles
    • B65G49/06Conveying systems characterised by their application for specified purposes not otherwise provided for for fragile or damageable materials or articles for fragile sheets, e.g. glass

Abstract

The present invention relates to field of liquid crystal panel manufacture, discloses a kind of cassette bogey, liquid crystal panel production system and its cassette transport method.The cassette bogey includes:Conveyer (3), the conveyer includes that the conveyer can move cassette between the supply port and the receiving port for being loaded into being loaded into port, taking out port, the receiving port for the supply port to process equipment supply glass and for receiving the glass of process equipment output for take out cassette for cassette;Power unit, the power unit are used for driving the conveyer to run, can move the cassette for being positioned over the conveyer;Control unit, described control unit can control the conveyer according to the state of the cassette for being positioned over the conveyer.Cassette bogey provided in the present invention can reduce the damage in handling process to glass, mitigate the load of storage silo, effectively improve production efficiency.

Description

Cassette bogey, liquid crystal panel production system and its cassette transport method
Technical field
A kind of the present invention relates to field of liquid crystal panel manufacture, in particular it relates to cassette bogey, liquid crystal panel production system System and its cassette transport method.
Background technology
As the continuous development of lcd technology, the application of LCDs are more and more extensive, liquid crystal panel is liquid crystal The important component part of display screen.
In liquid crystal panel manufacturing, glass substrate is generally deposited using cassette, and cassette deposits in storage facilities In, during production operation, real cassette and the unloaded glass base of glass substrate is will be loaded with by equipment such as mechanical arms The empty cartridge of plate is transported from storage facilities respectively to substrate feeding device and the substrate reception device of liquid crystal panel manufacturing equipment.
In tradition, it is the non-interruptible supply for ensureing glass substrate, substrate feeding device generally includes two sets and is used alternatingly Feed unit, by mechanical arm respectively to two feed unit reality cassettes, one of feed unit is first to liquid crystal panel Manufacturing equipment supplies glass substrate, and after cassette becomes empty cartridge in fact, another feed unit starts to set to liquid crystal panel manufacture To glass substrate, mechanical arm transports empty cartridge to storage facilities and brings up to again new real cassette available, and so circulation is made Industry.Substrate reception device equally includes two sets of receiving units being used alternatingly, its mode being used alternatingly and substrate feeding device Similar, will not be described here.
Aforesaid substrate feedway and substrate reception device need to be respectively provided with each feed unit and receiving unit Elevating mechanism, detent mechanism etc., and due to cannot cause two feed units of substrate feeding device all with liquid crystal panel system The glass inlet port end alignment of manufacturing apparatus, accordingly, it would be desirable to arrange cross drive equipment to will be unable to the glass with liquid crystal panel manufacturing equipment Glass substrate at the feed unit of glass arrival end alignment is sent to glass inlet port end, and in the same manner, substrate reception device is also required to set Cross drive equipment is put, causes its complex structure, take up room big and relatively costly.Additionally, the manufacture in face glass is held Weight, needs repeatedly conveyance cassette (product needed of one cassette of production transports 4 cassettes), and workload is big, and transports in cassette During easily cause the damage of glass substrate or face glass.
Thus, it is desirable to have a kind of cassette bogey can overcome or at least mitigate the drawbacks described above of prior art.
Content of the invention
It is an object of the invention to provide a kind of cassette bogey, the cassette bogey can improve glass processing apparatus Operational efficiency.
To achieve these goals, the present invention provides a kind of cassette bogey, and the cassette bogey includes:Transmission Device, the conveyer include for be loaded into cassette be loaded into port, for taking out the taking-up port of cassette, for technique The supply port of equipment supply glass and the receiving port for receiving the glass of process equipment output, the conveyer can Mobile cassette between the supply port and the receiving port;Power unit, the power unit are used for driving the biography Plant running is sent, so that the cassette for being positioned over the conveyer can be moved;Control unit, described control unit can be according to putting The state for being placed in the cassette of the conveyer controls the conveyer.
Preferably, the loading port, the supply port, the receiving port and the taking-up port are along the transmission The direction of transfer of device is sequentially arranged, and the conveyer can move institute between the loading port and the taking-up port State cassette.
Preferably, the conveyer includes that the direction of transfer along the conveyer is being sequentially arranged with the loading end Receiver section that the supply section that is aligned with the supply port of loading section of mouthful alignment is aligned with the receiving port and with institute The taking-up section for taking out port alignment is stated, wherein, the loading section and the supply section are divided with the receiver section and the taking-up section Other independent operating.
Preferably, the conveyer includes the wait section between the supply section and the receiver section, the load Enter section, the supply section, the wait section, the receiver section and the taking-up section independently to run.
Preferably, the conveyer includes to take out port corresponding to the middle part of the supply section.
Preferably, the cassette bogey includes the positioner for positioning the cassette.
Preferably, the conveyer is roller transmissioning device.
By technique scheme, the cassette bogey provided in the present invention can be in the receiving for supplying glass After the supply cassette for having glass substrate becomes empty cartridge, directly the empty cartridge is sent at receiving port next as cassette is received Glass is received, supply port is in and new supply cassette continuation supply is put into, after the reception cassette at receiving port receives full glass Take out through taking out port, reduce the carrying number of times of cassette during the working process of glass, the operational efficiency of equipment is improved, And the damage for avoiding in handling process to glass, mitigate the load of storage silo, effectively improve production efficiency.
It is a further object to provide a kind of liquid crystal panel production system, to improve liquid crystal panel production system Operational efficiency.
To achieve these goals, the present invention provides a kind of liquid crystal panel production system, including:Cassette, the cassette have For accommodating the accommodating chamber of glass substrate;Storage warehouse, the storage warehouse can store the cassette;Process equipment, the process equipment For processing the glass substrate, the process equipment has glass inlet port end and glass exit end;According to card mentioned above Casing loading device, the supply port of the conveyer of the cassette bogey are aligned with the glass inlet port end, the reception Port is aligned with the glass exit end;Handling device, the Handling device be used for the conveyer and the storage warehouse it Between transport the cassette.
Preferably, the glass producing system is included for transmitting the glass substrate in the cassette at the supply port To the first roller transfer device at the glass inlet port end, and for the glass substrate at the glass exit end to be sent to The second roller transfer device in cassette at the receiving port.
Preferably, the liquid crystal panel production system includes:Supply cassette lowering or hoisting gear, the supply cassette lowering or hoisting gear bag Supply cassette support and the supply elevating mechanism for moving the supply cassette support is included, the supply cassette support has just Beginning position and complete position, wherein, in the position that completes of the supply cassette support, the supporting surface of the supply cassette support with The transmission plane of the conveyer is concordant;And cassette lowering or hoisting gear is received, the reception cassette lowering or hoisting gear includes to receive cassette Support and for moving the reception elevating mechanism for receiving cassette support, the reception cassette support has initial position and complete Become position, wherein, in the position that completes for receiving cassette support, the placed side of the reception cassette support is filled with the transmission The transmission plane that puts is concordant.
A kind of cassette transport method according to mentioned above liquid crystal panel production system is also provided according to the present invention, described Cassette have accommodate the real cassette state of glass and do not accommodate the empty cartridge state of glass, the cassette transport method include with Lower step:The first step, transports the supply cassette in real cassette state and is in sky from the storage warehouse to the conveyer The reception cassette of cassette state, and the supply cassette is aligned with the supply port, the reception cassette is connect with described Receiving end mouth is aligned;Second step, when the supply cassette switches to empty cartridge state, by the supply cassette from the supply side Remove at mouthful, at the supply port, place new supply cassette;3rd step, when the reception cassette switches to real cassette shape During state, the reception cassette is removed from the receiving port and transported to the storage warehouse, is put at the receiving port Put new reception cassette.
Preferably, in the second step, when the reception cassette needs to change, the institute of empty cartridge state will be switched to State supply cassette and be moved to the conveyer downstream;When the reception cassette need not be changed, empty cartridge shape will be switched to The supply cassette of state is transported to storage warehouse.
Preferably, in the first step, two are transported in real cassette shape from the storage warehouse to the conveyer The supply cassette of state and two reception cassettes in empty cartridge state, and cause one of them supply cassette and the confession To port be aligned in job state, another described supply cassette be waited for, one of them described reception cassette with The receiving port is aligned in job state, and another described supply cassette is waited for.
Other features and advantages of the present invention will be described in detail in subsequent specific embodiment part.
Description of the drawings
Accompanying drawing is used to provide a further understanding of the present invention, and constitutes the part of specification, with following tool Body embodiment is used for explaining the present invention together, but is not construed as limiting the invention.In the accompanying drawings:
Fig. 1 is the schematic diagram of the liquid crystal panel production system according to one embodiment of the present invention.
Description of reference numerals
1 process equipment;11 glass inlet port ends;
12 glass exit ends;2 storage warehouses;
3 conveyers;31 are loaded into section;
32 supply sections;33 wait section;
34 receiver sections;35 take out section;
4 first roller transfer devices;5 second roller transfer devices;
6 glass substrates.
Specific embodiment
The specific embodiment of the present invention is described in detail below in conjunction with accompanying drawing.It should be appreciated that this place is retouched The specific embodiment that states is merely to illustrate and explains the present invention, is not limited to the present invention.
According to an aspect of the present invention, a kind of cassette bogey is provided, and the cassette bogey includes:Transmission dress Put 3, conveyer 3 include for be loaded into cassette be loaded into port, for taking out the taking-up port of cassette, for process equipment The supply port of supply glass and the receiving port for receiving the glass of process equipment output, conveyer 3 can be described Mobile cassette between supply port and the receiving port;Power unit, the power unit are transported for drive transmission unit 3 OK, so that the cassette for being positioned over conveyer 3 can be moved;Control unit, described control unit can be filled according to transmission is positioned over Put the state control conveyer 3 of 3 cassette.
Cassette bogey provided in the present invention can be in the supply for accommodating glass substrate for supplying glass After cassette becomes empty cartridge, directly the empty cartridge is sent at receiving port and glass, supply side is received as cassette is received Mouth is in and is put into new supply cassette continuation supply, after the full glass of the reception cassette receipts at receiving port through taking out port taking-up is Can, reduce the carrying number of times of cassette during the working process of glass, the operational efficiency of equipment is improved, and is reduced in handling process Damage to glass, mitigates the load of storage silo, effectively improves production efficiency.
Specifically, above-mentioned cassette bogey can be applicable to liquid crystal panel production system or other needs reciprocal conveyance card When in the production system of casket, become empty when the glass being loaded with the supply cassette of pending glass at supply port flows out During cassette, you can the direction of transfer along conveyer 3 is transmitted towards the direction of receiving port, and is placed at supply port new Supply cassette, receives the direction of transfer after cassette receives full glass along conveyer 3 and is sent to taking-up port, and through Handling device Storage warehouse 2 is carried to, can be directly used as receiving cassette through the empty cartridge that glass inlet port end 11 sends out, a card is produced with this Cassette of the casket finished product needed in the case of 1 normal operation of process equipment carries number of times for twice, reduces the conveyance time of cassette And number of times, effectively improve production efficiency.
Wherein, the arrangement of the loading port, supply port, receiving port and taking-up port can be according to actual needs Arbitrarily appropriate arrangement is carried out, use demand is disclosure satisfy that, for example, be loaded onto port and supply port is integrated in a position Put, receiving port and take out port and be integrated in a position, or supply port and port arrangements are taken out the two of conveyer At end, be loaded into port and port arrangements taken out at middle part of conveyer etc., and the type of conveyer is also dependent on port The actual conditions such as arrangement carry out arbitrarily appropriate selection.
Preferably, referring to Fig. 1, the loading port, the supply port, the receiving port and taking-up port edge The direction of transfer of conveyer 3 is sequentially arranged, and conveyer 3 can be moved between the loading port and the taking-up port The cassette so that the cassette for being loaded into conveyer 3 through being loaded into port is moved along the direction of transfer of conveyer 3, each port It is sequentially arranged so that the transmission route of cassette is more smoothly, reduces the fault in cassette transmission process.
Wherein, when cassette bogey just starts operation, it is appropriate that user can be placed according to actual needs on conveyer 3 The cassette of quantity, for example, first, is loaded into the empty cartridge for receiving glass through being loaded into port, and by the empty cartridge be moved to Receiving port is aligned;Then, the real cassette for supplying glass is loaded into through being loaded into port, and cause the real cassette right with supply Standard, finally, when the empty cartridge completes to be moved to taking-up port after glass is received again, complete a card through taking out by port is taken out The process of the finished product of casket.Additionally, in the case that the glass treatment cycle of process equipment allows, can not also be pre-placed empty calorie Casket, enters and places real cassette, is sent to the position being aligned with receiving port again and receives glass after real cassette becomes empty cartridge ?.
Preferably, user can be in one supply cassette of loading port pre-placing, with the supply at supply port Cassette completes to supply the supply cassette that more can renew in time after becoming empty cartridge.
The type and structure of conveyer 3 can carry out appropriate selection according to actual needs, and for example, conveyer 3 is overall Be formed as the band conveyer extended along direction of transfer, roller transmissioning device, a chain transmission device etc..
Process equipment just brought into operation or the operation that closes to an end stage, the cassette at supply port and receiving port is more Change demand different, it is therefore preferred that conveyer 3 includes that the direction of transfer along conveyer 3 is being sequentially arranged with the loading The receiver section 34 that the supply section 32 that the loading section 31 of port alignment is aligned with the supply port is aligned with the receiving port And the taking-up section 35 being aligned with the taking-up port, wherein, section 31 and supply section 32 is loaded into receiver section 34 and taking-up section 35 Independently run, transmission dress is adjusted flexibly so that demand can be changed for specific cassette at supply port and receiving port The transmission that puts.
As the cassette supplied between section and receiver section changes speed difference, cassette is may result on conveyer 3 Pile up or the cassette of receiver section cannot be supplied in time, user can supply section and receiver section be respectively provided with auxiliary port or The normal operation of process equipment is ensured by other appropriate modes.Preferably, conveyer 3 include positioned at described supply section and Wait section 33 between the receiver section, is loaded into section 31, supply section 32, waits section 33, receiver section 34 and take out section 35 respectively solely Vertical operation, user can wait the multiple standby cassettes of arrangement at section 33, to avoid receiver section 34 from lacking cassette, at supply section 32 Unnecessary cassette is also can transmit to waiting section 33 in stand-by state, without the need for moving into repeatedly or taking out of cassette, improves transmission dress Put 3 operational efficiency.
Referring to Fig. 1, conveyer 3 includes to take out port corresponding to the middle part of supply section 32, with receiver section 34 without the need for supplying The cassette for completing glass supply at supply section 32 is directly taken out empty cartridge to when, it is to avoid pile up cassette impact conveyer 3 Normal operation.Wherein, user can transport the cassette for taking out port taking-up from middle part to arbitrarily suitably according to actual needs Position, in the shown embodiment, take out the cassette that takes out port from middle part and transport and stored to storage warehouse 2, needing Taken out of from storage warehouse 2 again during use.
Additionally, in case of need, also can wait section 33, be loaded into section 31, supply section 32, wait section 33, receiver section 34 and take out section 35 and be respectively provided with and corresponding pick and place port so that the card in 3 running of conveyer, on conveyer 3 The quantity adjustment of casket is more flexibly, conveniently.
Preferably, the cassette bogey includes the positioner for positioning the cassette, and cassette is accurately fixed Position is in position so that cassette can smoothly receive glass or smoothly take out glass from cassette, the cassette Positioner can carry out appropriate selection, for example, position sensor or interface arrangment etc. according to actual needs.
The type of conveyer 3 can carry out appropriate selection according to actual needs, it is preferable that conveyer 3 is passed for roller Device is sent, roller transmissioning device is applied widely, simple structure and economic and practical, also there is higher flexibility, can achieve each The independent driving of individual roller, roller transmissioning device also can be divided into arbitrarily appropriate independent operating area according to actual needs.
According to another aspect of the present invention, a kind of liquid crystal panel production system is provided, including:Cassette, the cassette have For accommodating the accommodating chamber of glass substrate 6;Storage warehouse 2, the storage warehouse 2 can store the cassette;Process equipment 1, the technique Equipment 1 is used for processing glass substrate 6, and process equipment 1 is with glass inlet port end 11 and glass exit end 12;According to mentioned above Cassette bogey, the supply port of the conveyer 3 of the cassette bogey are aligned with glass inlet port end 11, the reception Port is aligned with glass exit end 12;Handling device, the Handling device are used for transporting institute between conveyer 3 and storage warehouse 2 State cassette.
Above-mentioned liquid crystal panel production system in the production process of liquid crystal panel can communicated device 3 by supply port at Complete glass supply and become the cassette of empty cartridge to be conveyed directly at receiving port, export through glass exit end 12 for receiving The glass for processing is completed, reduces the carrying number of times of cassette in the process of liquid crystal panel, improve liquid crystal panel production system Operational efficiency, and the damage in handling process to glass is avoided, mitigate the load of storage silo, effectively improve production efficiency.
Handling device is used for the cassette for being loaded into port conveyance receiving glass to be handled to conveyer 3 and will take out After the accommodating of port is processed, the cassette of glass substrate is transported to storage warehouse 2, and the type of the Handling device can be according to actual need Arbitrarily appropriate selection is carried out, the carrying of cassette can be carried out.
Glass substrate transmission between supply port and glass inlet port end 11, receiving port and glass exit end 12 can pass through Directly dock the glass delivery that two ports are realized therebetween, also can in the appropriate transmission equipment of the two set of time so that The glass substrate transmission obtained between port is more convenient.Preferably, the glass producing system is included for by the supply side The glass substrate 6 in cassette at mouthful is sent to the first roller transfer device 4 at glass inlet port end 11, is transferred by the first roller Device 4 stably transmits the glass substrate 6 in the cassette at supply port to glass inlet port end 11, and is used for glass exit The second roller transfer device 5 that the glass substrate 6 at 12 is sent in the cassette at the receiving port is held, by the second roller Transfer device 5 stably transmits the glass substrate 6 at glass exit end 12 in the cassette to receiving port.First roller is transferred The structure and type of device 4 and the second roller transfer device 5 can carry out appropriate selection according to actual needs, can realize glass The stable, reliable of substrate 6 is transferred.
Generally glass substrate along cassette short transverse successively arranged for interval in cassette, as glass substrate is constantly taken Go out, need the position of cassette or glass substrate fetching device to be adjusted can smoothly take out or glass substrate is put into, concrete tune Perfect square formula and adjustment cassette still adjust glass substrate fetching device and can carry out appropriate selection according to actual needs, additionally, User also can report glass substrate with glass substrate fetching device by using making a return journey from the self-adjusting cassette of belt lifting mechanism It is aligned in real time.
Preferably, the liquid crystal panel production system includes:Supply cassette lowering or hoisting gear, the supply cassette lowering or hoisting gear bag Supply cassette support and the supply elevating mechanism for moving the supply cassette support is included, the supply cassette support has just Beginning position and complete position, wherein, in the position that completes of the supply cassette support, the supporting surface of the supply cassette support with The transmission plane of the conveyer 3 is concordant;And cassette lowering or hoisting gear is received, the reception cassette lowering or hoisting gear includes to receive cassette Support and for moving the reception elevating mechanism for receiving cassette support, the reception cassette support has initial position and complete Become position, wherein, in the position that completes for receiving cassette support, the placed side of the reception cassette support is filled with the transmission Put 3 transmission plane concordant.Supply cassette lowering or hoisting gear and reception cassette lowering or hoisting gear arrangement simplicity, will not be to 3 He of conveyer The structure of process equipment 1 produces impact, supply cassette and receives after cassette fulfils assignment its corresponding supply cassette support and connects The placed side for receiving cassette support is concordant with conveyer 3 so that the cassette after fulfiling assignment continues to transmit on conveyer 3.
Further, since the conveyer 3 of the cassette carrying device can be along direction of transfer by supply port or receiving port The cassette of upstream is sent to the position being aligned with port, it is only necessary to arrange a set of cassette positioning dress at supply port or receiving port Put non-interruptible supply or the reception that glass substrate is can achieve with cassette lowering or hoisting gear, simplify the knot of liquid crystal panel production system Structure.
It is arbitrarily appropriate that the structure of supply cassette lowering or hoisting gear and reception cassette lowering or hoisting gear can be carried out according to actual needs Select, the lifting of cassette can be realized.It is further preferred that supply cassette support and reception cassette support include to press from both sides The clamping device of tight cassette, directly can directly clamp cassette and then with supply by supplying cassette support or reception cassette support Cassette support receives the movement of cassette support and moves cassette, without the need for cassette is carried to supply cassette by haulage equipment again Support or reception, simplify the supplying step of cassette.
According to another aspect of the present invention, provide a kind of cassette according to liquid crystal panel production system mentioned above to remove Delivery method, the cassette with accommodating the real cassette state of glass and not accommodating the empty cartridge state of glass, remove by the cassette Delivery method is comprised the following steps:
The first step, transports the supply cassette in real cassette state and is in empty cartridge shape from storage warehouse 2 to conveyer 3 The reception cassette of state, and the supply cassette be directed at the supply port, described receives cassette and the receiving port Alignment;
Second step, when the supply cassette switches to empty cartridge state, by the supply cassette from the supply port Place removes, and places new supply cassette at the supply port;
3rd step, when the reception cassette switches to real cassette state, by the reception cassette from the receiving port Place removes and transports to storage warehouse 2, places new reception cassette at the receiving port.
The conveyance direction of above-mentioned cassette can realize the recycling of cassette, reduce cassette in liquid crystal panel production process Carry number of times.
And in the cassette transport method that the application is provided, when the glass being loaded with the supply cassette of pending glass flows out When becoming empty cartridge, you can transmit to the direction of transfer along conveyer 3 towards the direction at glass exit end 12, reduce cassette Conveyance number of times, receives the direction of transfer after cassette receives full glass along conveyer 3 and is sent to taking-up port, and through Handling device Storage warehouse 2 is carried to, can be directly used as receiving cassette through the empty cartridge that glass inlet port end 11 sends out, a card is produced with this Carrying number of times of the casket finished product liquid crystal panel needed in the case of normal operation is only twice (for cassette needed in the art Carry the half of number of times), the cassette conveyance time is substantially reduced, production efficiency is effectively improved, and is reduced to glass during conveyance The damage of glass, improves yield rate.
Just started operation in liquid crystal panel production system, close to an end operation or other in particular cases, glass inlet port end 11 is different with the glass substrate at glass exit end 12 conveying situation, and the replacement frequency for supplying cassette and receiving cassette is also different, makes The replacing for becoming to supply cassette and the replacing for receiving cassette cannot be engaged togather well.Preferably, in the second step, when When the reception cassette needs to change, the supply cassette for switching to empty cartridge state is moved to 3 downstream of conveyer;When When the reception cassette need not be changed, the supply cassette for switching to empty cartridge state is transported to storage warehouse.User Can according to the practical operation situation of process equipment 1 select by the supply cassette for becoming empty cartridge be sent to conveyer downstream or Person is carried to storage warehouse 2, to adapt to the different operating modes of process equipment.
Preferably, in the first step, two confessions in real cassette state are transported from storage warehouse 2 to conveyer 3 To cassette and two reception cassettes in empty cartridge state, and cause one of them supply cassette and the supply port In job state, another described supply cassette is waited for alignment, and one of them described reception cassette is connect with described Receiving end mouth is aligned in job state, and another described supply cassette is waited for, to ensure that process equipment 1 can be continuous Operation, it is to avoid time interval when cassette is changed causes the interruption of the production process of process equipment 1.
The preferred embodiment of the present invention is described in detail above in association with accompanying drawing, but, the present invention is not limited to above-mentioned reality The detail in mode is applied, in the range of the technology design of the present invention, multiple letters can be carried out to technical scheme Monotropic type, these simple variant belong to protection scope of the present invention.
It is further to note that each particular technique feature described in above-mentioned specific embodiment, in not lance In the case of shield, can be combined by any suitable means, in order to avoid unnecessary repetition, the present invention to various can The combination of energy is no longer separately illustrated.
Additionally, can also be combined between a variety of embodiments of the present invention, as long as which is without prejudice to this The thought of invention, its should equally be considered as content disclosed in this invention.

Claims (13)

1. a kind of cassette bogey, it is characterised in that the cassette bogey includes:
Conveyer (3), conveyer (3) include for be loaded into cassette be loaded into port, for taking out the taking-up of cassette Port, the receiving port for the supply port to process equipment supply glass and for receiving the glass of process equipment output, Conveyer (3) can move cassette between the supply port and the receiving port;
Power unit, the power unit are used for driving the conveyer (3) to run, and are positioned over the transmission moving The cassette of device (3);
Control unit, described control unit can control the biography according to the state of the cassette for being positioned over the conveyer (3) Send device (3).
2. cassette bogey according to claim 1, it is characterised in that the loading port, the supply port, institute State receiving port and the taking-up port is sequentially arranged along the direction of transfer of the conveyer (3), conveyer (3) energy Enough movement cassettes between the loading port and the taking-up port.
3. cassette bogey according to claim 2, it is characterised in that conveyer (3) are included along the biography The loading section (31) being aligned with the loading port for sending the direction of transfer of device (3) to be sequentially arranged and the supply port pair The taking-up section that accurate supply section (32) is aligned with the receiver section (34) that the receiving port is aligned and with the taking-up port (35), wherein, loading section (31) and supply section (32) and the receiver section (34) and taking-up section (35) difference Independent operating.
4. cassette bogey according to claim 3, it is characterised in that conveyer (3) are included positioned at described Wait section (33) between supply section and the receiver section, loading section (31), supply section (32), the wait section (33), described receiver section (34) and described taking-up section (35) is independently run.
5. cassette bogey according to claim 3, it is characterised in that conveyer (3) are included corresponding to institute Port is taken out at the middle part for stating supply section (32).
6. the cassette bogey according to any one in claim 1-5, it is characterised in that the cassette bogey Including the positioner for positioning the cassette.
7. the cassette bogey according to any one in claim 1-5, it is characterised in that conveyer (3) For roller transmissioning device.
8. a kind of liquid crystal panel production system, it is characterised in that include:
Cassette, the cassette have the accommodating chamber for accommodating glass substrate (6);
Storage warehouse (2), the storage warehouse (2) can store the cassette;
Process equipment (1), the process equipment (1) are used for processing the glass substrate (6), and process equipment (1) is with glass Arrival end (11) and glass exit end (12);
Cassette bogey according to any one in claim 1-7, the conveyer (3) of the cassette bogey Supply port be aligned with glass inlet port end (11), the receiving port is aligned with glass exit end (12);
Handling device, the Handling device are used for transporting the cassette between the conveyer (3) and the storage warehouse (2).
9. liquid crystal panel production system according to claim 8, it is characterised in that the glass producing system include for Glass substrate (6) in cassette at the supply port is sent to the first roller transfer dress of glass inlet port end (11) Put (4), and for the glass substrate (6) at glass exit end (12) place is sent in the cassette at the receiving port The second roller transfer device (5).
10. liquid crystal panel production system according to claim 8, it is characterised in that the liquid crystal panel production system bag Include:
Supply cassette lowering or hoisting gear, the supply cassette lowering or hoisting gear include to supply cassette support and for moving the supply cassette The supply elevating mechanism of support, the supply cassette support have initial position and complete position, wherein, in the supply cassette Support complete position, the supporting surface of the supply cassette support is concordant with the transmission plane of the conveyer (3);And
Cassette lowering or hoisting gear is received, the reception cassette lowering or hoisting gear includes to receive cassette support and for moving the reception cassette The reception elevating mechanism of support, the reception cassette support have initial position and complete position, wherein, in the reception cassette Support complete position, the placed side of the reception cassette support is concordant with the transmission plane of the conveyer (3).
The cassette transport method of the 11. liquid crystal panel production systems according to any one in claim 8-10, the card Casket has and accommodates the real cassette state of glass and do not accommodate the empty cartridge state of glass, it is characterised in that the cassette is transported Method is comprised the following steps:
The first step, transports the supply cassette in real cassette state and is in from the storage warehouse (2) to the conveyer (3) The reception cassette of empty cartridge state, and cause described supply cassette be directed at the supply port, described receive cassette with described Receiving port is aligned;
Second step, when the supply cassette switches to empty cartridge state, the supply cassette is moved from the supply port Open, at the supply port, place new supply cassette;
3rd step, when the reception cassette switches to real cassette state, the reception cassette is moved from the receiving port Open and transport to the storage warehouse (2), at the receiving port, place new reception cassette.
12. cassette transport methods according to claim 11, it is characterised in that in the second step, when the reception When cassette needs to change, the supply cassette for switching to empty cartridge state is moved to the conveyer (3) downstream;Work as institute Reception cassette is stated when need not change, the supply cassette for switching to empty cartridge state is transported to storage warehouse.
The 13. cassette transport methods according to claim 11 or 12, it is characterised in that in the first step, from described Storage warehouse (2) is in empty cartridge shape to two supply cassettes in real cassette state of the conveyer (3) conveyance and two The reception cassette of state, and one of them described supply cassette is aligned in job state with the supply port, another The supply cassette is waited for, and one of them described reception cassette is aligned in job state with the receiving port, Another described supply cassette is waited for.
CN201611092543.6A 2016-12-01 2016-12-01 Cassette bogey, liquid crystal display panel production system and its cassette transport method Active CN106477306B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611092543.6A CN106477306B (en) 2016-12-01 2016-12-01 Cassette bogey, liquid crystal display panel production system and its cassette transport method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611092543.6A CN106477306B (en) 2016-12-01 2016-12-01 Cassette bogey, liquid crystal display panel production system and its cassette transport method

Publications (2)

Publication Number Publication Date
CN106477306A true CN106477306A (en) 2017-03-08
CN106477306B CN106477306B (en) 2019-11-01

Family

ID=58274797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611092543.6A Active CN106477306B (en) 2016-12-01 2016-12-01 Cassette bogey, liquid crystal display panel production system and its cassette transport method

Country Status (1)

Country Link
CN (1) CN106477306B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109308041A (en) * 2017-07-26 2019-02-05 合肥欣奕华智能机器有限公司 A kind of control system, haulage equipment and the production line of display base plate haulage equipment
CN109607024A (en) * 2019-01-09 2019-04-12 惠科股份有限公司 Cassette handling system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010245250A (en) * 2009-04-06 2010-10-28 Ihi Corp Substrate-sorting device
CN102642702A (en) * 2012-04-27 2012-08-22 珠海格力电器股份有限公司 Air conditioner outer unit transport system
CN102969258A (en) * 2011-08-31 2013-03-13 细美事有限公司 Substrate processing device and substrate conveying device
CN105668233A (en) * 2014-11-19 2016-06-15 日东电工株式会社 Buffering equipment
CN105752687A (en) * 2016-04-26 2016-07-13 东旭(昆山)显示材料有限公司 Conveying device and processing system
CN206327877U (en) * 2016-12-01 2017-07-14 东旭(昆山)显示材料有限公司 Cassette bogey and liquid crystal panel production system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010245250A (en) * 2009-04-06 2010-10-28 Ihi Corp Substrate-sorting device
CN102969258A (en) * 2011-08-31 2013-03-13 细美事有限公司 Substrate processing device and substrate conveying device
CN102642702A (en) * 2012-04-27 2012-08-22 珠海格力电器股份有限公司 Air conditioner outer unit transport system
CN105668233A (en) * 2014-11-19 2016-06-15 日东电工株式会社 Buffering equipment
CN105752687A (en) * 2016-04-26 2016-07-13 东旭(昆山)显示材料有限公司 Conveying device and processing system
CN206327877U (en) * 2016-12-01 2017-07-14 东旭(昆山)显示材料有限公司 Cassette bogey and liquid crystal panel production system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109308041A (en) * 2017-07-26 2019-02-05 合肥欣奕华智能机器有限公司 A kind of control system, haulage equipment and the production line of display base plate haulage equipment
CN109607024A (en) * 2019-01-09 2019-04-12 惠科股份有限公司 Cassette handling system

Also Published As

Publication number Publication date
CN106477306B (en) 2019-11-01

Similar Documents

Publication Publication Date Title
CN206327877U (en) Cassette bogey and liquid crystal panel production system
JP2017154966A (en) Substrate parting device and substrate conveying method of substrate parting device
WO2020098560A1 (en) Flower basket internal circulation device
CN207973212U (en) A kind of binary channels send trigger
CN106586541B (en) A kind of circuit board substrate crawl rotary conveying mechanism
CN101971362A (en) Positioning device to position one or more electronic circuit boards, in particular for photovoltaic cells, in a metal-deposition unit
JP2012059798A (en) Component mounting apparatus
CN106477306A (en) Cassette bogey, liquid crystal panel production system and its cassette transport method
CN104801970A (en) Robot automatic auxiliary material pasting assembly line
KR20160093043A (en) Electronic Device Handler
CN105752687A (en) Conveying device and processing system
KR101374670B1 (en) Apparatus for transferring cassette
CN210854138U (en) Double-layer conveying and conveying device
CN102593030A (en) Apparatus for transporting substrates for bonding
WO1996015965A1 (en) Carrier device
CN208821129U (en) The anti-welding automatic production line of printed wiring board
CN112645007A (en) Feeding equipment
CN214933779U (en) Automatic feeding and discharging system for multi-cavity plasma treatment
CN208868963U (en) Gaily decorated basket automatic loading and unloading device
JP2808271B2 (en) Simultaneous screen printing method for multiple groups of works and screen printing machine
US8905109B2 (en) Apparatus for bonding substrates to each other
CN214477369U (en) Wafer loader and photoetching machine
CN109132536A (en) Pallet conveying pipeline
CN217514107U (en) Automatic grouting production line for silicon carbide honeycomb ceramics
CN112960378A (en) Automatic feeding and discharging system for multi-cavity plasma treatment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20200407

Granted publication date: 20191101

PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20200609

Granted publication date: 20191101

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230522

Address after: 241000 No.36 weier'er Road, Wanchun street, Wuhu Economic and Technological Development Zone, Anhui Province

Patentee after: WUHU TUNGHSU PHOTOELECTRIC SCIENCE AND TECHNOLOGY Co.,Ltd.

Patentee after: TUNGHSU GROUP Co.,Ltd.

Patentee after: TUNGHSU TECHNOLOGY GROUP Co.,Ltd.

Address before: Room 1517, Building 1 (International Building), No. 167 Qianjin Middle Road, Development Zone, Kunshan City, Suzhou City, Jiangsu Province, 215300

Patentee before: DONGXU (KUNSHAN) DISPLAY MATERIAL Co.,Ltd.

Patentee before: TUNGHSU GROUP Co.,Ltd.

Patentee before: TUNGHSU TECHNOLOGY GROUP Co.,Ltd.