CN106471829A - A kind of cut-in method, device and system - Google Patents

A kind of cut-in method, device and system Download PDF

Info

Publication number
CN106471829A
CN106471829A CN201480080113.5A CN201480080113A CN106471829A CN 106471829 A CN106471829 A CN 106471829A CN 201480080113 A CN201480080113 A CN 201480080113A CN 106471829 A CN106471829 A CN 106471829A
Authority
CN
China
Prior art keywords
network
networks
message
mobile management
request
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201480080113.5A
Other languages
Chinese (zh)
Other versions
CN106471829B (en
Inventor
戚彩霞
陈靖
陈伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Publication of CN106471829A publication Critical patent/CN106471829A/en
Application granted granted Critical
Publication of CN106471829B publication Critical patent/CN106471829B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W8/00Network data management
    • H04W8/02Processing of mobility data, e.g. registration information at HLR [Home Location Register] or VLR [Visitor Location Register]; Transfer of mobility data, e.g. between HLR, VLR or external networks

Abstract

The embodiment of the present invention provides a kind of cut-in method, device and system.The method includes:When the mobile management net element of first network knows that user equipment (UE) request accesses first network, this UE of this mobile management net element acquisition request subscription data in the second network;When this mobile management net element obtains the failure of this subscription data, this mobile management net element sends unsuccessfully configured information to the base station equipment of this first network;Wherein, this failure configured information is used for instruction is not that this UE selects this second network insertion.With it, service stability can be improved.

Description

A kind of cut-in method, device and system Technical field
The present invention relates to communication technical field, more particularly to a kind of cut-in method, device and system.
Background technology
Current 4G (English:Generation) network Development is rapid, in many countries and regions on the basis of 2G or 3G network is deployed with, then disposes 4G networks.Wherein, 2G networks and 3G network can be classified as a class, referred to as 2/3G networks.The user equipment of 2/3G networks and 4G networks is supported also largely to popularize simultaneously.
At the same time under the scene of deployment 2/3G networks and 4G networks, the overlay area of 2/3G networks and 4G networks has overlapping.When above-mentioned user equipment is moved to 2/3G networks and the network overlapped overlay areas of 4G, above-mentioned user equipment may be preferably linked into 4G networks by base station equipment.
Under the scene, above-mentioned user equipment is it is possible that the situation of service disconnection, causes service stability poor, and Consumer's Experience is not good.
The content of the invention
The embodiment of the present invention provides a kind of cut-in method, device and system, to improve service stability.
In a first aspect, the embodiment of the present invention provides a kind of cut-in method, including:When the mobile management net element of first network knows user equipment (UE) request access first network, the subscription data of the mobile management net element acquisition request UE in the second network;When the mobile management net element obtains subscription data failure, the mobile management net element sends failure configured information to the base station equipment of the first network;Wherein, the failure configured information is used to indicate not select second network insertion for the UE.
Exemplary, the failure configured information can be specifically for indicating not select second network insertion for the UE within a period of time.
It is appreciated that, after the base station equipment receives the configured information, the base station equipment will not select the second network insertion for the user equipment again, therefore user equipment network-impacting caused by frequent switching between first network and the second network can be avoided, the stability of business is improved, Consumer's Experience has been ensured.
With reference in a first aspect, in the first possible implementation of first aspect, also include before the subscription data of the mobile management net element acquisition request UE in the second network:The mobile management net element determines that the UE has the ability for accessing second network.
It is appreciated that, prejudge the ability that user equipment has the second network of access, go to obtain the subscription data of the user equipment in the second network again, it can avoid going to obtain user equipment subscription data in the second network for the user equipment without the second network capabilities of access, therefore unnecessary Signalling exchange, the efficiency of lift technique scheme can be saved.
With reference to the first possible implementation of first aspect or first aspect, in second of possible implementation of first aspect, the mobile management net element sends failure configured information to the base station equipment of the first network to be included:The mobile management net element sends the downstream message for carrying the failure configured information to the base station equipment;Wherein, the downstream message includes one or more of following message:RAB assignment messages, Redirection Request message, Direct Transfer message, the request of establishment base station sub-system packet flow context, public identifier message, packet switch handover request message or downstream units data-message.
It is appreciated that can avoid making existing system larger change using these message, be conducive to the landing of the technical scheme of the embodiment of the present invention.
With reference to the first implementation or second of implementation of first aspect, first aspect, in the third implementation of first aspect, the subscription data of the mobile management net element acquisition request UE in the second network includes:The mobile management net element updates the subscription data of location request message come the acquisition request user equipment in the second network by being sent to the home subscriber server of the second network.
With reference to the third implementation of first aspect, in the 4th kind of implementation of first aspect, this method also includes:The mobile management net element receives the renewal position response message of home subscriber server transmission, and obtains the subscription data failure of the user equipment in the second network according to the renewal position response message authentication.
It is appreciated that by whether can successfully obtain the subscription data of user equipment in the second network very can easily determine whether that the user equipment accesses the second network, realizations is upper simply and efficient.
With reference to first aspect or first aspect first to fourth kind of implementation in one kind, in the 5th kind of implementation of first aspect, the first network be 2/3G networks, second network be 4G networks.
With reference in a first aspect, or one kind in first to the 5th kind of implementation of first aspect, in the 6th kind of implementation of first aspect, the mobile management net element knows that user equipment requests access first network can include:The mobile management net element knows that the user equipment requests access first network by receiving the access request that the user equipment is sent.Exemplary, the access request includes attach request or routing region updating is asked.
Second aspect, the embodiment of the present invention provides a kind of mobile management net element apparatus, for first network, including:Request unit, for when knowing user equipment (UE) request access first network, the subscription data of the acquisition request UE in the second network;Transmitting element, for when obtaining the subscription data failure of the user equipment in the second network, failure configured information to be sent to the base station equipment of the first network;Wherein, the failure configured information is used to indicate not select second network insertion for the UE.
With reference to second aspect, in the first implementation of second aspect, the device also includes:Determining unit, for determining that the UE has the ability for accessing second network.
With reference to the first implementation of second aspect or second aspect, the transmitting element carries the downstream message of the failure configured information specifically for sending to the base station equipment in second of implementation of second aspect;Wherein, the downstream message includes one or more of following message:RAB assignment messages, Redirection Request message, Direct Transfer message, the request of establishment base station sub-system packet flow context, public identifier message, packet switch handover request message or downstream units data-message.
With reference to second aspect, or the first implementation or second of implementation of second aspect, in the third implementation of second aspect, the request unit by being sent to home subscriber server specifically for updating the subscription data of location request message come the acquisition request user equipment in the second network.
With reference to the third implementation of second aspect, in the 4th kind of implementation of second aspect, the device also includes:Receiving unit, the renewal position response message for receiving home subscriber server transmission;Confirmation unit, fails for obtaining the subscription data of the user equipment in the second network according to the renewal position response message authentication.
With reference to second aspect, or second aspect the first one kind into the 4th kind of implementation, in the 5th kind of implementation of second aspect, the first network is 2/3G networks, and second network is 4G networks.
With reference to second aspect, or second aspect the first one kind into the 5th kind of implementation, In 6th kind of implementation of two aspects, the device also includes knowing unit, and the access request for being sent by receiving the user equipment knows that the user equipment requests access first network.Exemplary, the access request includes attach request or routing region updating is asked.
The third aspect, the embodiment of the present invention provides a kind of access system, including:A kind of mobile management net element apparatus of the first of above-mentioned second aspect or second aspect into the 5th kind of implementation and the base station equipment.
With reference to the third aspect, in the first implementation of the third aspect, the system also includes the user equipment.
Fourth aspect, the embodiment of the present invention provides a kind of mobile management net element, including communication unit and processing unit, the processing unit is used for the subscription data by the communication unit acquisition request UE in the second network when knowing user equipment (UE) request access first network, when obtaining the subscription data failure of the user equipment in the second network, failure configured information is sent to the base station equipment of the first network by the communication unit;Wherein, the failure configured information is used to indicate not select second network insertion for the UE;Wherein, the first network includes the mobile management net element.
With reference to fourth aspect, in the first possible implementation of fourth aspect, the processing unit is additionally operable to determine that the UE has the ability for accessing second network.
With reference to the first possible implementation of fourth aspect, or fourth aspect, the processing unit carries the downstream message of the failure configured information specifically for being sent by the communication unit to the base station equipment in second of possible implementation of fourth aspect;Wherein, the downstream message includes one or more of following message:RAB assignment messages, Redirection Request message, Direct Transfer message, the request of establishment base station sub-system packet flow context, public identifier message, packet switch handover request message or downstream units data-message.
With reference to fourth aspect, or the first possible implementation of fourth aspect, or in second of possible implementation of fourth aspect, in fourth aspect, the processing unit updates the subscription data of location request message come the acquisition request user equipment in the second network specifically for being sent by the communication unit to the home subscriber server of the second network in the third possible implementation.
With reference to the third possible implementation of fourth aspect, in the 4th kind of possible realization of fourth aspect The processing unit of this in mode is additionally operable to receive the renewal position response message that the home subscriber server is sent by the communication unit, and obtains the subscription data failure of the user equipment in the second network according to the renewal position response message authentication.
With reference to one kind in fourth aspect, or first to fourth kind of possible implementation of fourth aspect, the first network is 2/3G networks in the 5th kind of implementation of fourth aspect, and second network is 4G networks.
With reference to fourth aspect, or the one kind of the first of fourth aspect into the 5th kind of possible implementation, in the 6th kind of implementation of fourth aspect, the processing unit can be also used for knowing that the user equipment requests access first network by the access request that communication unit receives user equipment transmission.Exemplary, the access request can include attach request or routing region updating is asked.
Cut-in method provided in an embodiment of the present invention, device and system, by prejudging whether user equipment allows to access the second network, and indicate that the base station equipment of first network does not select the second network insertion for the user equipment in the case where not allowing access, user equipment network-impacting caused by frequent switching between first network and the second network can be avoided, service stability is improved, Consumer's Experience has been ensured.
In order to make it easy to understand, it is exemplary give it is for reference with the explanation of part concept related to the present invention.It is as follows:
Third generation partner program (English:3rd generation partnership project, abbreviation 3GPP) it is a project for being directed to developing cordless communication network.Generally, the related mechanisms of 3GPP are referred to as 3GPP mechanisms.
Cordless communication network, is a kind of network for providing radio communication function.Cordless communication network can use the different communication technologys, such as CDMA (English:Code division multiple access, abbreviation CDMA), WCDMA (wideband code division multiple access, abbreviation WCDMA), time division multiple acess (English:Time division multiple access, referred to as:TDMA), frequency division multiple access (English:Frequency division multiple access, abbreviation FDMA), OFDM (English:Orthogonal frequency-division multiple access, referred to as:OFDMA), single-carrier frequency division multiple access (English:Single Carrier fDMA, referred to as:SC-FDMA).Network can be divided into according to factors such as the capacity of heterogeneous networks, speed, time delays by 2G (English:Generation) network, 3G network or 4G networks.Typical 2G networks include global system for mobile communications (English:global system for mobile communications/ General packet radio service, referred to as:GSM) network or GPRS (English:General packet radio service, referred to as:GPRS) network, typical 3G network includes UMTS (English:Universal mobile telecommunications system, referred to as:UMTS) network, typical 4G networks include Long Term Evolution (English:Long term evolution, referred to as:LTE) network.Wherein, UMTS network is referred to as universal land radio access web (English sometimes:Universal terrestrial radio access network, referred to as:UTRAN), LTE network is referred to as Evolved UTRAN (English sometimes:Evolved universal terrestrial radio access network, referred to as:E-UTRAN).Generally, 2G networks and 3G network are classified as a class, referred to as 2/3G networks, 4G networks is individually classified as a class.Those skilled in the art are, it should be understood that as the development of technology technical scheme provided in an embodiment of the present invention can be applied equally to other cordless communication networks, such as 4.5G or 5G networks.For sake of simplicity, cordless communication network is referred to as network by the embodiment of the present invention sometimes.For the ease of description, embodiments of the invention are illustrated by taking 2/3G networks and 4G networks as an example.
User equipment (English:User equipment, referred to as:UE) it is a kind of terminal device, can is mobile terminal equipment or immovable terminal device.The equipment is mainly used in receiving or sending business datum.User equipment can be distributed in network, and user equipment has different titles in different networks, for example:Terminal, mobile station, subscriber unit, platform, cell phone, personal digital assistant, radio modem, Wireless Telecom Equipment, handheld device, laptop computer, wireless phone, WLL platform etc..The user equipment can be through wireless access network (Radio Access Network, abbreviation:RAN) communicated with one or more core nets, for example, voice and/or data are exchanged with wireless access network.
Base station (English:Base station, referred to as:BS) equipment, alternatively referred to as base station, are a kind of devices for being deployed in wireless access network to provide radio communication function.The equipment of base station functions is provided for example in 2G networks includes base radio transceiver station (English:Base transceiver station, referred to as:BTS) and base station controller (English:Base station controller, referred to as:The equipment of base station functions is provided in BSC, 3G network includes node B (English abbreviations:NodeB) and radio network controller (English:Radio network controller, referred to as:RNC), the node B (English that the equipment of base station functions includes evolution is provided in 4G networks:Evolved NodeB are referred to as:ENB or eNodeB).
Mobile management net element (English:Mobile management network element, referred to as:MMNE) It is that a kind of core net that is deployed in is used for the device to the management of moving property of UE.For example, in 2/3G networks, mobile management net element includes Serving GPRS Support Node (English:Serving GPRS support node, referred to as:SGSN), in 4G networks, mobile management net element includes mobile management entity (English:Mobility management entity, referred to as:MME).At the same time under the scene of deployment 2/3G networks and 4G networks, the mobile management net element of 2/3G networks and 4G networks can be deployed on same network element, also referred to as the mobile management net element of 2/3G networks and 4G networks is closed and is located on same network element.The network element that the mobile management net element of mobile management net element and 4G networks provided with 2/3G networks will generally be closed is referred to as merging mobile management net element.
Home subscriber server (English:Home subscriber server, referred to as:HSS it is) a kind of device of storage UE subscription data, is typically deployed at core net.Exemplary, HSS can store subscription data of the UE in 4G networks, and be connected with the mobile management net element of 4G networks.
Attaching position register (English:Home location register, referred to as:HLR it is) a kind of device of storage UE subscription data, is typically deployed at core net.Exemplary, HLR can store subscription data of the UE in 2/3G networks, and be connected with the mobile management net element of 2/3G networks.
Wherein, HSS and HLR can be deployed in same equipment, can also be disposed respectively on different devices.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, the required accompanying drawing used in embodiment or description of the prior art will be briefly described below, apparently, drawings in the following description are only some embodiments of the present invention, for those of ordinary skill in the art, without having to pay creative labor, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of group-network construction schematic diagram provided in an embodiment of the present invention;
Fig. 2 is a kind of schematic flow sheet of cut-in method provided in an embodiment of the present invention;
Fig. 3 is a kind of structural representation of mobile management net element provided in an embodiment of the present invention;
Fig. 4 is the structural representation of another mobile management net element provided in an embodiment of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.Based on the embodiment in the present invention, the every other embodiment that those of ordinary skill in the art are obtained under the premise of creative work is not paid belongs to the scope of protection of the invention.
The network architecture and business scenario of description of the embodiment of the present invention are for the technical scheme of the more clear explanation embodiment of the present invention, the restriction for technical scheme provided in an embodiment of the present invention is not constituted, those of ordinary skill in the art understand, with the differentiation and the appearance of new business scene of the network architecture, technical scheme provided in an embodiment of the present invention is equally applicable for similar technical problem.
Illustrated below exemplified by disposing scene of the 2/3G networks with 4G networks simultaneously.
Fig. 1 is a kind of while disposing the network architecture schematic diagram of 2/3G networks and 4G networks.In order to make it easy to understand, the network architecture illustrate only the base station equipment BSC and BTS, the base station equipment RNC of 3G network and NodeB, 4G network of mobile management net element MME, HSS, HLR, 2G network of mobile management net element SGSN, 4G network of 2/3 network base station equipment eNodeB and user equipment (UE).It will be understood by those skilled in the art that the network element and the network architecture in actual deployment can be different.Those skilled in the art should know that the above-mentioned network architecture is only a kind of citing of application scenarios of the embodiment of the present invention, exemplary, can also apply in 2G networks and the concurrently deployed scene of 4G networks, or 3G network and the concurrently deployed scene of 4G networks.
As shown in Figure 1:
SGSN is connected as the mobile management net element of 2/3G networks with the base station equipment BSC and/or RNC of 2/3G networks, and is connected with the HLR of the user contracting data for the 2/3G networks that are stored with.HSS is connected with the mobile management net element MME of 4G networks.Be stored with the user contracting datas of 4G networks in HSS.In the design of the present invention, SGSN and MME are interconnected, and UE 4G network contraction data are inquired about by MME to HSS.In another design of the present invention, SGSN directly interconnects inquiry UE 4G network contraction data with HSS.In another design of the present invention, HLR and HSS is interconnected, and SGSN inquires about UE 4G network contraction data by HLR to HSS.
MME is connected as the mobile management net element of 4G networks with the base station equipment eNodeB of 4G networks, and is connected with the HSS of the subscription data of the user for the 4G networks that are stored with.
It will be understood by those skilled in the art that SGSN and MME can be disposed individually on different devices, it can also close and be located in same equipment, not repeat herein.
UE can support 2/3G networks and 4G networks, that is, support the base station with 2/3G networks, and the base station of 4G networks to carry out radio communication.In actual cordless communication network, there is substantial amounts of UE, be shown here only a UE as example.It will be understood by those skilled in the art that with the development of technology, the base station of 2/3G networks and the base station of 4G networks, may be physically the equipment of separation, can also close and be located in same equipment.
HLR is used for the subscription data for storing the corresponding 2/3G networks of the UE.When the user of the UE carries out business with mobile operator signing 2G networks, the subscription data that the UE corresponds to 2G networks can be stored in HLR, shows that the UE can access 2G networks and carry out business.Equally, when the user of the UE carries out business with mobile operator signing 3G networks, HLR can store the subscription data that the UE corresponds to 3G network.
HSS is used for the subscription data for storing the corresponding 4G networks of the UE.When the user of the UE carries out business with mobile operator signing 4G networks, HSS can store the subscription data that the UE corresponds to 4G networks.Accordingly, for example when the subscription data of 4G networks is not present in HSS, the request of UE access 4G networks can be rejected.
For the ease of narration, UE user 2G, 3G or 4G network of having contracted may also be referred to as the UE and contract 2G, 3G or 4G network.
At the same time under the scene of deployment 2/3G networks and 4G networks, the overlay area of 2/3G networks and 4G networks has overlapping.The UE in an overlapping coverage area, can carry out radio communication with the base station of any one in BTS, NodeB or eNodeB.
Due to 4G network providers with exist soon, in network it is substantial amounts of can support the UE of 2/3G networks and 4G networks, the 2/3G networks but these UE user only may contract with operator, 4G networks of not contracting.After these UE access 2/3G networks, because these UE support 4G networks, the base station equipment of 2/3G networks can preferably be linked into 4G networks for above-mentioned UE.But it is due to that these UE do not contract 4G networks, can be refused to access by 4G networks, these subsequent UE can access 2/3G networks again.Again after access 2/3G networks, these UE can be preferably linked into 4G networks by the base station equipment of 2/3G networks again, cause these UE frequent switchings between 2/3G networks and 4G networks, produce ping-pong phenomenon, and punching is caused to network Hit, cause business unstable.
In order to solve the above problems, it may be considered that when UE accesses 2/3G networks, introduce anticipation mechanism, just prejudge whether UE can access 4G networks when UE accesses 2/3G networks in advance.For example, judge whether UE allows to access 4G networks by the mobile management net element of 2/3G networks when 2/3G networks can be resided in UE, and in the case where the UE does not allow access 4G networks, the base station for notifying 2/3G networks is not the preferred 4G network insertions of the UE, so as to avoid the UE from continuing to switch between 2/3G networks and 4G networks, service stability is improved.In addition, for that can also not set a term of validity for the UE operations for preferably accessing 4G networks, i.e., after more than the term of validity, the base station of 2/3G networks can revert to the UE and preferably access 4G networks again, it is easy to the user of the UE Yi Dan with after operator's signing 4G networks, can preferably access 4G networks.
As one of implementation, can with by whether can successfully obtain the subscription data of the corresponding 4G networks of the UE determine whether the UE access 4G networks.It is exemplary, it may be considered that the subscription data of the corresponding 4G networks of the UE is obtained by SGSN and HSS interaction requests, if obtaining failure, can determine that the UE does not allow to access 4G networks.
According to above-mentioned analysis, in the scheme of the offer of the embodiment of the present invention:
When the mobile management net element of first network knows that user equipment requests access first network, the subscription data of the mobile management net element acquisition request user equipment in the second network;When the mobile management net element obtains subscription data failure, the mobile management net element sends failure configured information to the base station equipment of the first network, and the failure configured information is used to indicate not select second network insertion for the user equipment.
For the technical scheme of the clearer explanation embodiment of the present invention, illustrated below with reference to the network architecture shown in Fig. 1.
Using 4G networks as LTE network in the embodiment of the present invention, 2G networks be GPRS network, 3G network be UMTS network exemplified by illustrate.
Exemplary, Fig. 2 shows a kind of schematic flow sheet of cut-in method.Above-mentioned anticipation mechanism is introduced in cut-in method shown in Fig. 2, in Fig. 2 citing, the UE does not contract 4G networks, therefore in HSS and in the absence of the subscription data of the corresponding 4G networks of the UE.
As shown in Figure 2:101st, UE sends access request by BSC or RNC to SGSN.
Wherein, the access request is used to ask to access the corresponding 2/3G networks of the SGSN.Here, request, which accesses the corresponding 2/3G networks of the SGSN, can do the understanding of broad sense, i.e., it can be appreciated that request continues to reside in the corresponding 2/3G networks of the SGSN.
Exemplary, the access request can include attach request (English:Attach request), or Routing Area Update (English:Routing area update request, abbreviation RAU) request.
Exemplary, the UE performs step 101 after can starting shooting, and can also perform step 101 when needing from other network switchings to 2/3G networks, can also perform step 101 after UE access 2/3G networks.
By step 101, SGSN knows that UE selection 2/3G networks are that its resident network, i.e. SGSN know UE request access 2/3G networks.After step 101, SGSN can perform above-mentioned anticipation mechanism, to determine whether the UE allows to access 4G networks.
Step 103-104 realizes for a kind of of above-mentioned anticipation mechanism.
103rd, SGSN is sent to HSS updates location request message.
Wherein, SGSN by the location update request message come the acquisition request UE 4G networks subscription data.
Exemplary, UE UE ID (Chinese can be included in the more new position request:Mark, English:Identity) to indicate to obtain the subscription data of the corresponding UE of UE ID in 4G networks.
104th, HSS is sent to SGSN updates position response message.
It is exemplary, because the UE does not contract 4G networks, the subscription data of the corresponding 4G networks of the UE will not be carried in the renewal position response.
Optionally, because the UE does not contract 4G networks, configured information can be carried in the renewal position response, for indicating that the subscription data of the corresponding 4G networks of the UE can not be obtained, it is understood that be the subscription data in the absence of the corresponding 4G networks of the UE.Exemplary, the configured information can be realized by result cells, when result cell values are:
DIAMETER_ERROR_USER_UNKNOWN(5001)、
DIAMETER_ERROR_UNKNOWN_EPS_SUBSCRIPTION(5420)、
DIAMETER_ERROR_RAT_NOT_ALLOWED (5421) or
Represent to obtain during DIAMETER_ERROR_ROAMING_NOT_ALLOWED (5004) The subscription data of the corresponding 4G networks of the UE.
According to above-mentioned renewal position response message, SGSN can confirm that the subscription data failure for obtaining UE in 4G networks.
Optionally, SGSN can multiple subscription data of the acquisition request UE in 4G networks, i.e. when SGSN after step 103 is with 104 does not get the subscription data of the corresponding 4G networks of the UE, it can attempt to obtain subscription data of the UE in 4G networks again by step 103 and 104.It can so avoid because other reasonses cause that subscription data of the UE in 4G networks can not be obtained, for example:The reasons such as connection temporarily interruption or HSS overloads between SGSN and HSS.
It is appreciated that in the case where UE does not contract 4G networks, SGSN can be caused to obtain the UE and failed in the subscription data of 4G networks, that is, represent not allowing the UE to access 4G networks.
Optionally, before step 103-104, SGSN can also first determine the ability whether UE has access 4G networks.Exemplary, the MS network capability (English that can be reported according to the UE:Mobile station network capability) evolution in field packet-based core networks ability (English:Evolved packet core capabiltiy) parameter judge the UE whether have access 4G networks ability.For example, the packet-based core networks ability parameter of the evolution of the UE is its ability with access 4G networks of 1 expression, it is its ability without access 4G networks of 0 expression.It is to be appreciated that, for the user equipment of the ability without access 4G networks, the user equipment will not communicate with the base station equipment of 4G networks, therefore not result in the frequently switching between 2/3G networks and 4G networks, it may not be necessary to perform step 103-104.It will be understood by those skilled in the art that for the facility on realizing, even for the user equipment without access 4G network capabilities, step 103-104 can also be performed.
Because SGSN obtains the subscription data failure of the corresponding 4G networks of the UE in step 103-104, it is contemplated that indicating BSC or RNC not by the UE priority access 4G networks, it can so avoid UE is lasting from switching between 2/3G networks and 4G networks, the pressure of network is alleviated, the stability of holding business is also beneficial to.
It is used as a kind of optional implementation, it may be considered that by the mobile management net element of 2/3G networks, i.e. SGSN, sends failure configured information to indicate 2/3G base station equipment no longer by the UE priority access 4G networks.For example:
108th, SGSN sends failure configured information to BSC/RNC.
Wherein, the failure configured information is used to indicate BSC/RNC not by the UE priority access 4G networks.After BSC/RNC receives the failure configured information, BSC/RNC will not select 4G network insertions for the UE.Those skilled in the art are, it should be understood that the statement of information indicated by the failure configured information can have a variety of, such as:Forbid as the UE prioritizing selection 4G network insertions, stop the UE priority access 4G networks, the invention is not limited in this regard.
Those skilled in the art are, it should be understood that SGSN can send the failure configured information to BSC/RNC by downstream message.Wherein, downstream message includes one or more of following citing message.
Exemplary, the mobile management net element of 2/3G networks can pass through RAB assignment request (English:Rab assignment request) message or redirect request (English:Relocation request) message sends the failure configured information to RNC." handover to E-UTRAN shall not be performed " represent the failure configured information wherein it is possible to the value of the E-UTRANservice handover cells in this two message is set to.
Exemplary, the mobile management net element of 2/3G networks can also ask (English by creating base station sub-system packet flow context:Create base station subsystem packet flow context request) message or downstream units data (English:Dl-unitdata) message or packet switch handover request (English:Packet switch handover request) message sends the failure configured information to BSC." network initiated cell change order to E-UTRAN procedure shall be performed " represent the failure configured information wherein it is possible to the value of the service UTRAN COO cells in this three message is set to.
Exemplary, the mobile management net element of 2/3G networks can also pass through Direct Transfer (English:Direct transfer) message, public identifier (English:Common ID) message, the wireless access technology user description mark (English that creates in base station sub-system packet flow context request message, downstream units data-message or packet switch handover request message:Subscriber profile ID for RAT) cell or frequency priority (English:Priority) cell represents the failure configured information.
It is exemplary, the failure configured information can also be represented by newly-increased cell in above-mentioned message.
BSC/RNC is received after the failure configured information, when UE is in 2/3G networks, and BSC/RNC will not be again the preferred 4G network insertions of the UE, therefore UE will not be frequently between 2/3G networks and 4G networks Switching, alleviates ping-pong phenomenon, service stability is improved.
Optionally, BSC/RNC can be responded to the failure configured information afterwards, replied and confirmed response message to SGSN, to notify SGSN to carry out corresponding operation according to the failure configured information.
Exemplary, here indicate no longer to be user equipment selection 4G network insertions it can be appreciated that being no longer that the user equipment selects the 4G network insertions within a period of time, i.e. after this period of time, the base station equipment of 2/3G networks can preferably select 4G network insertions for the UE again.
After step 101, the UE can be resided in 2/3G networks by SGSN according to the request of the UE.For example:
102nd, SGSN performs certification, safety-related flow.
Step 102 is optional step.If desired the step is performed, can be performed before step 103.
105th, SGSN obtains subscription data of the UE in 2/3G networks.
106th, SGSN sends access received message to the UE by BSC/RNC.
Exemplary, it can be attachment received message or routing region updating received message that the access, which receives message,.
Exemplary, this, which receives received message, can be carried at transmission in Direct Transfer message or downstream units data-message.
107th, UE sends access completion message to SGSN by BSC/RNC.
Exemplary, access completion message can be attachment completion message or routing region updating completion message.
So far, UE may reside within 2/3G networks and carry out business.
It will be understood by those skilled in the art that sequential relationship is not present with step 105-107 in step 103,104 and 108.
Optionally, when SGSN successfully obtains subscription data of the UE in 4G networks in step 103-104, SGSN can notify BSC/RNC to be the preferred 4G network insertions of the UE, 4G network insertions can be selected after 2/3G networks again so that the UE is resided in, more preferable network service and Consumer's Experience is obtained.
Optionally, it may be considered that a timer is set on SGSN, in the case that the timer has not timed out, when UE asks access 2/3G networks again, SGSN may not necessarily perform step 103-105, to avoid SGSN frequently carries out insignificant interact with HSS in short time.
Pass through the above-mentioned explanation for cut-in method provided in an embodiment of the present invention, it can be seen that during UE access 2/3G networks, indicate the base station equipment of 2/3G networks not by the preferred 4G network insertions of user equipment without signing 4G networks in advance, the user equipment for avoiding 4G networks of not contracting constantly switches to the frequent switching caused by 4G networks between 4G networks and 2/3G networks by the base station equipment of 2/3G networks, reduce the impact caused to network, the stability of business is improved, Consumer's Experience is enhanced.
It should be noted that 2/3G networks and 4G networks are only a kind of citing in the embodiment of the present invention, restriction of the embodiment of the present invention for cordless communication network is not constituted.
In order to realize cut-in method provided in an embodiment of the present invention, it is necessary to be modified to the mobile management net element of existing 2/3G networks, the technical scheme of above-mentioned embodiment illustrated in fig. 2 is achieved.
As shown in figure 3, the embodiment of the present invention provides a kind of mobile management net element apparatus, for first network, request unit 201 and transmitting element 202 can be included.
Wherein:
Request unit 201 can be used for when knowing that user equipment requests access first network, the subscription data of the acquisition request user equipment in the second network.
Those skilled in the art are, it should be understood that the mobile management net element is used for first network it can be appreciated that the mobile management net element belongs to the first network, or first network includes the mobile management net element.
Exemplary, the mobile management net element can be the SGSN in embodiment illustrated in fig. 2, the first network can be the 2/3G networks in embodiment illustrated in fig. 2, second network can be the 4G networks in embodiment illustrated in fig. 2, and the subscription data can be subscription data of the UE in 4G networks in embodiment illustrated in fig. 2.
Exemplary, how the mobile management net element knows that user equipment requests access first network, may refer to the associated description of step 101 in embodiment illustrated in fig. 2.
Transmitting element 202 can be used for, when obtaining subscription data failure, failure configured information being sent to the base station equipment of the first network;Wherein, the failure configured information is used to indicate not select second network insertion for the user equipment.
Exemplary, the failure configured information may be referred to the failure configured information in embodiment illustrated in fig. 2, The base station equipment of the first network can be BSC or RNC in embodiment illustrated in fig. 2.
Optionally, the mobile management net element can also include determining unit 203.Wherein it is determined that unit 203 is used to determine that the user equipment has the ability for accessing second network.It is exemplary, the ability whether user equipment has the second network of access can be judged according to the packet-based core networks ability parameter of the evolution in the MS network capability field of user equipment to report.Particular content may be referred to the related content in embodiment illustrated in fig. 2.It is appreciated that first judging the ability whether user equipment has the second network of access, follow-up unnecessary Signalling exchange can be avoided by performing the anticipation mechanism of the embodiment of the present invention again when the user equipment, which has, accesses second network capabilities.
Specifically, transmitting element 202 can be used for sending the downstream message for carrying the failure configured information to the base station equipment.Wherein, the downstream message includes one or more of following message:RAB assignment messages, Redirection Request message, Direct Transfer message, the request of establishment base station sub-system packet flow context, public identifier message, packet switch handover request message or downstream units data-message.
Wherein, the correlation of above-mentioned downstream message illustrates the content on step 108 in embodiment shown in Figure 2.
Specifically, request unit 201 can be used for obtaining the subscription data of the user equipment in the second network by sending renewal location request message to the home subscriber server of the second network.Exemplary, the related description that location request message is updated on being sent to home subscriber server refer to the related description of step 103 in embodiment illustrated in fig. 2.
Optionally, the mobile management net element can also include receiving unit 204, and confirmation unit 205.Wherein, the receiving unit 204 can be used for receiving the renewal position response message that the home subscriber server is sent;The confirmation unit 205 can be used for obtaining the subscription data failure of the user equipment in the second network according to the renewal position response message authentication.The related content of step 104, is not repeated herein in related explanation embodiment shown in Figure 2.
Exemplary, the mobile management net element can also include knowing unit 206.Wherein, the access request that knowing unit 206 is used to send by receiving the user equipment knows that the user equipment requests access the first network.
Mobile management net element apparatus shown in Fig. 3 realizes that the process of cut-in method provided in an embodiment of the present invention can With the embodiment with reference to shown in Fig. 2, do not repeat herein.
Pass through the mobile management net element apparatus shown in Fig. 3, user equipment can be caused when accessing first network, prejudging out the user equipment does not allow to access the second network, so as to first network of giving advance notice base station equipment not by the user equipment preferably the second network insertion, avoid user equipment frequent switching between first network and the second network, the impact of network is reduced, the stability of business is improved, the experience of user has been ensured.
Another embodiment is used as, it may be considered that the processing unit and communication unit of mobile management net element are strengthened, to realize the technical scheme in embodiment illustrated in fig. 2.As shown in figure 4, the mobile management net element is used for first network, including processing unit 301 and communication unit 302.
Wherein:
Processing unit 301, for the subscription data when knowing that user equipment requests access first network by the acquisition request of communication unit 302 user equipment in the second network, when obtaining subscription data failure, failure configured information is sent to the base station equipment of the first network by the communication unit 302;Wherein, the failure configured information is used to indicate not select second network insertion for the user equipment.Those skilled in the art are, it should be understood that the mobile management net element is used for first network it can be appreciated that the mobile management net element belongs to the first network, or first network includes the mobile management net element.
Exemplary, the mobile management net element can be the SGSN in embodiment illustrated in fig. 2, the first network can be the 2/3G networks in embodiment illustrated in fig. 2, second network can be the 4G networks in embodiment illustrated in fig. 2, the base station equipment of the first network can be BSC or RNC in embodiment illustrated in fig. 2, and the failure configured information can be the failure configured information in embodiment illustrated in fig. 2.
Exemplary, how the mobile management net element knows that user equipment requests access first network, may refer to the associated description of step 101 in embodiment illustrated in fig. 2.
Optionally, the processing unit 301 is additionally operable to determine that the user equipment has the ability for accessing second network.It is exemplary, the ability whether user equipment has the second network of access can be judged according to the packet-based core networks ability parameter of the evolution in the MS network capability field of user equipment to report.Particular content may be referred to the related content in embodiment illustrated in fig. 2.It is appreciated that first judging the ability whether user equipment has the second network of access, performed again when the user equipment, which has, accesses second network capabilities of the invention real Follow-up unnecessary Signalling exchange can be avoided by applying the anticipation mechanism of example.
Specifically, the processing unit 301 can carry the downstream message of the failure configured information to the base station equipment specifically for being sent by the communication unit 302;Wherein, the downstream message includes one or more of following message:RAB assignment messages, Redirection Request message, Direct Transfer message, the request of establishment base station sub-system packet flow context, public identifier message, packet switch handover request message or downstream units data-message.Wherein, the correlation of above-mentioned downstream message illustrates the content on step 108 in embodiment shown in Figure 2.
Specifically, the processing unit 301 can update the subscription data of location request message come the acquisition request user equipment in the second network specifically for being sent by the communication unit 302 to home subscriber server.Exemplary, the related description that location request message is updated on being sent to home subscriber server refer to the related description of step 103 in embodiment illustrated in fig. 2.
Optionally, the processing unit 301 can be also used for receiving the renewal position response message that the home subscriber server is sent by the communication unit 302, and obtain the subscription data failure of the user equipment in the second network according to the renewal position response message authentication.The related content of step 104, is not repeated herein in related explanation embodiment shown in Figure 2.
Optionally, the processing unit 301 can be also used for receiving the access request of user equipment transmission to know that the user equipment requests access the first network by communication unit 302.
Mobile management net element shown in Fig. 4 realizes that the process of cut-in method provided in an embodiment of the present invention may be referred to the embodiment shown in Fig. 2, does not repeat herein.
Pass through the mobile management net element shown in Fig. 4, user equipment can be caused when accessing first network, prejudging out the user equipment does not allow to access the second network, so as to first network of giving advance notice base station equipment not by the user equipment preferably the second network insertion, avoid user equipment frequent switching between first network and the second network, the impact of network is reduced, the stability of business is improved, the experience of user has been ensured.
As another embodiment, processing unit 301 it is contemplated that being realized by dedicated processes chip, process circuit, processor or general-purpose chip.Communication unit 302 by transmission circuit or the special chip of transmitting-receiving it is contemplated that realized.
It is used as another implementation, it may be considered that mobile management net element provided in an embodiment of the present invention is realized using the mode of all-purpose computer.For example, by the request unit 201 realized in embodiment illustrated in fig. 3 and the storage of the program code of the function of transmitting element 202 in memory, processor realizes the function of request unit 201 and transmitting element 202 by performing the code in memory.For another example by the processing unit 301 realized in embodiment illustrated in fig. 4 and the storage of the program code of the function of communication unit 302 in memory, processor realizes the function of processing unit 301 and communication unit 302 by performing the code in memory.
It is appreciated that above-mentioned implementation is a kind of citing, in specific implementation process, there can also be other implementations, not be limited herein.
It will be understood by those skilled in the art that from system perspective, Fig. 3 or the mobile management net element shown in Fig. 4 can constitute a kind of access system realize the technical scheme in embodiment illustrated in fig. 2 with the base station equipment of first network;Wherein, the system can also include user equipment.The system can avoid producing user equipment ping-pong phenomenon caused by frequent switching between first network and the second networking, therefore can reduce the impact to network, lift the stability of business, and ensure Consumer's Experience.
It will be understood to those skilled in the art that system and network are often used alternatingly, such as:LTE system is referred to as LTE network, and UMTS system is properly termed as UMTS network, and gprs system is properly termed as GPRS network.
It will be appreciated by those skilled in the art that information can use any technical method (technology techniques) to represent, such as:Information can be data (data), instruction (instructions), order (command), information (information), signal (signal), bit (bit), symbol (symbol) etc.;Technical method can include representing by voltage, electric current, electromagnetic wave, magnetic field or magnetic grain (magnetic particles) or light field or light bead (optical particles).
Art technology is any it will also be appreciated that the various illustrative components, blocks (illustrative logical block) and step (step) that the embodiment of the present invention is listed can be realized by the combination of electronic hardware, computer software, or both.Such function is that the design requirement depending on specific application and whole system is realized by hardware or software.Those skilled in the art can use various methods to realize described function for every kind of specific application, but this realization is understood not to the scope beyond protection of the embodiment of the present invention.
Various illustrative logic units and circuit described in the embodiment of the present invention can pass through general processor, digital signal processor, application specific integrated circuit (ASIC), field programmable gate array (FPGA) or other programmable logic devices, discrete gate or transistor logic, discrete hardware components, or any of the above described combination design come the function described by realizing or operate.General processor can be microprocessor, and alternatively, the general processor can also be any traditional processor, controller, microcontroller or state machine.Processor can also be realized by the combination of computing device, such as digital signal processor and microprocessor, multi-microprocessor, and one or more microprocessors combine a Digital Signal Processor Core, or any other like configuration is realized.
The step of method described in the embodiment of the present invention or algorithm, can be directly embedded into hardware, the software unit of computing device or the combination of both.Software unit can be stored in RAM memory, flash memory, ROM memory, eprom memory, eeprom memory, register, hard disk, moveable magnetic disc, CD-ROM or this area in other any form of storage media.Exemplarily, storage medium can be connected with processor, to allow processor to read information from storage medium, it is possible to deposit write information to storage medium.Alternatively, storage medium can also be integrated into processor.Processor and storage medium can be arranged in ASIC, and ASIC can be arranged in UE.Alternatively, processor and storage medium can also be arranged in the different parts in UE.
In one or more exemplary designs, the above-mentioned functions described by the embodiment of the present invention can be realized in hardware, software, firmware or any combination of this three.If realized in software, these functions can be stored on the medium with computer-readable, or are transmitted in one or more instructions or code form on the medium of computer-readable.Computer readable medium includes computer storage medium and is easy to so that allowing computer program to be transferred to other local telecommunication medias from a place.It can be that any general or special computer can be with the useable medium of access to store medium.For example, such computer readable media can include but is not limited to RAM, ROM, EEPROM, CD-ROM or other optical disc storage, disk storage or other magnetic storage devices, or it is other it is any can be used for carrying store with instruct or data structure and other program codes that form can be read by general or special computer or general or special processor medium.In addition, any connection can be properly termed computer readable medium, if for example, software be from web-site, server or other remote resources by a coaxial cable, optical fiber computer, twisted-pair feeder, Digital Subscriber Line (DSL) or with it is for example infrared, The wireless way for transmitting such as wireless and microwave are also contained in defined computer readable medium.Described disk (disk) and disk (disc) include Zip disk, radium-shine disk, CD, DVD, floppy disk and Blu-ray Disc, and disk is generally with magnetic duplication data, and disk generally carries out optical reproduction data with laser.Combinations of the above can also be included in computer readable medium.
The foregoing description of description of the invention can cause art technology is any can utilize or realize present disclosure, any modification based on disclosure is all considered as this area it will be apparent that basic principle described in the invention may apply to the inventive nature and scope without departing from the present invention in other deformations.Therefore, content disclosed in this invention is not limited solely to described embodiment and design, can be extended to the maximum magnitude consistent with disclosed new feature with principle of the present invention.

Claims (16)

  1. A kind of cut-in method, including:
    When the mobile management net element of first network knows user equipment (UE) request access first network, the subscription data of UE in the second network described in the mobile management net element acquisition request;
    When the mobile management net element obtains the subscription data failure, the mobile management net element sends failure configured information to the base station equipment of the first network;Wherein, the failure configured information is used to indicate not select second network insertion for the UE.
  2. According to the method described in claim 1, it is characterised in that also include before the subscription data of UE in the second network described in the mobile management net element acquisition request:
    The mobile management net element determines that the UE has the ability for accessing second network.
  3. Method according to claim 1 or 2, it is characterised in that the mobile management net element sends failure configured information to the base station equipment of the first network to be included:
    The mobile management net element, which is sent, carries the downstream message of the failure configured information to the base station equipment;Wherein, the downstream message includes one or more of following message:RAB assignment messages, Redirection Request message, Direct Transfer message, the request of establishment base station sub-system packet flow context, public identifier message, packet switch handover request message or downstream units data-message.
  4. Method according to claim any one of 1-3, it is characterised in that the subscription data of UE in the second network includes described in the mobile management net element acquisition request:
    The mobile management net element updates location request message come subscription data described in acquisition request by being sent to the home subscriber server of second network.
  5. Method according to claim 4, in addition to:
    The mobile management net element receives the renewal position response message that the home subscriber server is sent;The mobile management net element obtains the subscription data according to the renewal position response message authentication and failed.
  6. Method according to claim any one of 1-5, it is characterised in that the first network is 2/3G networks, second network is 4G networks.
  7. Method according to claim any one of 1-6, it is characterised in that the mobile management net element of the first network knows that UE request access first networks include:
    The mobile management net element knows that the UE requests access the first network by receiving the access request that the UE is sent.
  8. A kind of mobile management net element apparatus, for first network, including:
    Request unit, for when know user equipment (UE) request access first network when, the subscription data of UE in the second network described in acquisition request;
    Transmitting element, for when obtaining the subscription data failure, failure configured information to be sent to the base station equipment of the first network;Wherein, the failure configured information is used to indicate not select second network insertion for the UE.
  9. Device according to claim 8, in addition to:
    Determining unit, for determining that the UE has the ability for accessing second network.
  10. Device according to claim 8 or claim 9, it is characterised in that the transmitting element carries the downstream message of the failure configured information specifically for sending to the base station equipment;Wherein, the downstream message includes one or more of following message:RAB assignment messages, Redirection Request message, Direct Transfer message, the request of establishment base station sub-system packet flow context, public identifier message, packet switch handover request message or downstream units data-message.
  11. Device according to claim any one of 8-10, it is characterised in that the request unit by being sent to the home subscriber server of second network specifically for updating location request message come acquisition request The subscription data.
  12. Device according to claim 11, in addition to:
    Receiving unit, for receiving the renewal position response message that the home subscriber server is sent;
    Confirmation unit, fails for obtaining the subscription data with confirmation according to the renewal position response message.
  13. Device according to claim any one of 8-12, it is characterised in that the first network is 2/3G networks, second network is 4G networks.
  14. Device according to claim any one of 8-13, in addition to:
    Know unit, the access request for being sent by receiving the UE knows that the UE requests access the first network.
  15. A kind of access system, it is characterised in that including:
    Device as described in claim any one of 8-13;With
    The base station equipment.
  16. System according to claim 15, it is characterised in that also include:
    The UE.
CN201480080113.5A 2014-12-31 2014-12-31 Access method, device and system Active CN106471829B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2014/095992 WO2016106722A1 (en) 2014-12-31 2014-12-31 Access method, apparatus and system

Publications (2)

Publication Number Publication Date
CN106471829A true CN106471829A (en) 2017-03-01
CN106471829B CN106471829B (en) 2020-01-17

Family

ID=56283994

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201480080113.5A Active CN106471829B (en) 2014-12-31 2014-12-31 Access method, device and system

Country Status (2)

Country Link
CN (1) CN106471829B (en)
WO (1) WO2016106722A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112425250A (en) * 2019-01-21 2021-02-26 Oppo广东移动通信有限公司 Session establishing method, terminal equipment and network equipment
CN113286327A (en) * 2019-01-16 2021-08-20 Oppo广东移动通信有限公司 Method for authorizing service, terminal equipment and network equipment

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020211011A1 (en) * 2019-04-17 2020-10-22 Qualcomm Incorporated Methods and apparatus to facilitate fast data transfer resumption after long tune-away gap for msim devices
CN113099402A (en) * 2019-12-23 2021-07-09 中兴通讯股份有限公司 Network access method of terminal equipment, electronic equipment and storage medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1705401A (en) * 2004-06-01 2005-12-07 华为技术有限公司 A switching method between systems
CN101511076A (en) * 2008-07-29 2009-08-19 华为技术有限公司 Management method, device and system for user access network
CN101998333A (en) * 2009-08-17 2011-03-30 中兴通讯股份有限公司 Method for transmitting urgent instruction as well as method and system for processing urgent attachment
CN102595525A (en) * 2008-04-28 2012-07-18 华为技术有限公司 Method, system and device for keeping continuity of user service
CN102984686A (en) * 2012-12-26 2013-03-20 华为技术有限公司 Communication service method, dynamic signing server and mobile management network element
WO2014163561A1 (en) * 2013-04-04 2014-10-09 Telefonaktiebolaget L M Ericsson (Publ) Methods, radio network node and mobile station, for supporting inter-rat handover

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100466572C (en) * 2006-02-22 2009-03-04 华为技术有限公司 Equal access and initial route filtering method for packet network
CN101489176A (en) * 2009-02-25 2009-07-22 北京交通大学 Method for implementing caller priority in voice group call service

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1705401A (en) * 2004-06-01 2005-12-07 华为技术有限公司 A switching method between systems
CN102595525A (en) * 2008-04-28 2012-07-18 华为技术有限公司 Method, system and device for keeping continuity of user service
CN101511076A (en) * 2008-07-29 2009-08-19 华为技术有限公司 Management method, device and system for user access network
CN101998333A (en) * 2009-08-17 2011-03-30 中兴通讯股份有限公司 Method for transmitting urgent instruction as well as method and system for processing urgent attachment
CN102984686A (en) * 2012-12-26 2013-03-20 华为技术有限公司 Communication service method, dynamic signing server and mobile management network element
WO2014163561A1 (en) * 2013-04-04 2014-10-09 Telefonaktiebolaget L M Ericsson (Publ) Methods, radio network node and mobile station, for supporting inter-rat handover

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113286327A (en) * 2019-01-16 2021-08-20 Oppo广东移动通信有限公司 Method for authorizing service, terminal equipment and network equipment
CN113286327B (en) * 2019-01-16 2023-03-21 Oppo广东移动通信有限公司 Method for authorizing service, terminal equipment and network equipment
CN112425250A (en) * 2019-01-21 2021-02-26 Oppo广东移动通信有限公司 Session establishing method, terminal equipment and network equipment
CN112425250B (en) * 2019-01-21 2023-03-14 Oppo广东移动通信有限公司 Session establishment method, terminal device and network device

Also Published As

Publication number Publication date
CN106471829B (en) 2020-01-17
WO2016106722A1 (en) 2016-07-07

Similar Documents

Publication Publication Date Title
US10555161B2 (en) Method for determining target, network element, and system for determining target
CN102076038B (en) Method and device for implementing oop initialization prearranged assignment (LIPA) connection switching preparation process
KR20200003195A (en) Method for registering a terminal in a wireless communication system and apparatus therefor
US20230040440A1 (en) Session setup and handover method and device thereof
CN112586036A (en) Selective switching or redirection based on interface availability
EP3627894B1 (en) Handover method, computer readable storage medium, hardware apparatus, system and communication system
US10165319B2 (en) Access method, apparatus, and access system
CN112929936B (en) Cell switching method and device, storage medium, user equipment and base station equipment
KR20220079935A (en) Data transmission method, communication device, and communication system
US9479970B2 (en) Bearer switching method, home NodeB gateway, and home NodeB
US9357454B2 (en) Methods, user equipment and base station for supporting update of neighbour cell relations in a cellular communications network
US11240711B2 (en) Policy control method and system, network element, and storage medium
CN103338489B (en) Inter-system switching method, device and network system
US20220330117A1 (en) Re-mapping network slices for supporting service continuity
CN106471829A (en) A kind of cut-in method, device and system
CN104869599B (en) Method and device for changing master cell of slave base station
EP2205022B1 (en) Method and apparatus for providing a handover indication in a cellular wireless network
EP3780731A1 (en) Method and device for cell handover
EP3793255A1 (en) Measurement control method, ue, network apparatus, and computer storage medium
WO2016176816A1 (en) Method, network device and system for circuit switched fallback
CN104219656A (en) Service control method for machine type communication equipment, related devices and service control systems
JP6473171B2 (en) Indication of IMEISV via MAP for inter-MSC handover
CN104380798A (en) Method, device and system for network handover
CN106031212B (en) Method, node, computer program and computer program product for adapting a radio cooperation scheme
WO2012040918A1 (en) Method, apparatus and system for selecting target radio access technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant