CN106468174A - Construction Support device in a kind of pipeline - Google Patents

Construction Support device in a kind of pipeline Download PDF

Info

Publication number
CN106468174A
CN106468174A CN201610741295.7A CN201610741295A CN106468174A CN 106468174 A CN106468174 A CN 106468174A CN 201610741295 A CN201610741295 A CN 201610741295A CN 106468174 A CN106468174 A CN 106468174A
Authority
CN
China
Prior art keywords
aluminium alloy
side pipe
rectangle side
pipe
circular arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610741295.7A
Other languages
Chinese (zh)
Inventor
周剑波
高作平
陈明祥
周志勇
谭星舟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUDA JUCHENG STRUCTURE Co Ltd
Original Assignee
WUDA JUCHENG STRUCTURE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUDA JUCHENG STRUCTURE Co Ltd filed Critical WUDA JUCHENG STRUCTURE Co Ltd
Priority to CN201610741295.7A priority Critical patent/CN106468174A/en
Publication of CN106468174A publication Critical patent/CN106468174A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/12Temporary supports for use during building; Accessories

Abstract

Construction Support device in a kind of pipeline, including circular arc supporter(1), described circular arc supporter(1)Both sides are symmetrically arranged with two vertical pull bars(2), described vertical pull bar(2)Between by spending blue bolt(3)It is connected, circular arc supporter(1)Two-port between pass through scalable inner sleeve(4)It is connected.Achieve construction technology in the pipeline of big-diameter pipeline sticking carbon fiber plate so that carbon fiber board reinforce after reach good degree of compaction, and with original structure cooperative bearing, meet engineering demand.

Description

Construction Support device in a kind of pipeline
Technical field
The present invention relates to a kind of support meanss, Construction Support device in more specifically to a kind of pipeline, belong to pipeline Interior technical field of construction.
Background technology
It is sometimes desirable in sheet materials such as inner-walls of duct sticking carbon fiber plate, steel plate, glass epoxies in reinforcing engineering.Due to Carbon fiber board sheet material elastic modelling quantity is high, intensity is big and hardness is big, and the sheet material such as steel plate, glass epoxy broadly falls into high intensity, height firmly Degree sheet material, therefore these sheet materials can not directly lay as carbon cloth and be pasted on inner-walls of duct, and it all needs to fill using supporting Put and fitted tightly on inner-walls of duct.At present, no carbon fiber board is pasted on the suspension device of circular pipe, therefore can not expire Sufficient engineering demand.
Content of the invention
Present invention aims to existing no carbon fiber board is pasted on the suspension device of circular pipe, can not meet work The problems such as journey demand, provide Construction Support device in a kind of pipeline.
For achieving the above object, institute using technical solution is the present invention:Construction Support device in a kind of pipeline, including Circular arc supporter, described circular arc supporter both sides are symmetrically arranged with two vertical pull bars, between described vertical pull bar It is connected by spending blue bolt, be connected by scalable inner sleeve between the two-port of circular arc supporter.
Described circular arc supporter includes the aluminium alloy rectangular top pipe of arc, aluminium alloy rectangle side pipe I and aluminium alloy rectangle Side pipe II, described aluminium alloy rectangle side pipe I and aluminium alloy rectangle side pipe II are symmetricly set on aluminium alloy rectangular top pipe two ends, aluminum It is connected by scalable inner sleeve between alloy rectangle side pipe I and aluminium alloy rectangle side pipe II.
Lead to respectively between described aluminium alloy rectangular top pipe two ends and aluminium alloy rectangle side pipe I and aluminium alloy rectangle side pipe II Cross fixing bolt to be connected.
Described arc aluminium alloy rectangular top pipe, aluminium alloy rectangle side pipe I and aluminium alloy rectangle side pipe II arc minutes Wei 105 degree~115 degree.
Compared with prior art, the invention has the beneficial effects as follows:
With aluminum rectangular tube for main supporting member in the present invention, and carbon is compressed by scalable inner sleeve and vertical pull bar Fibre board, can make carbon fiber board fit tightly on inner-walls of duct it is achieved that pipe in big-diameter pipeline sticking carbon fiber plate Construction technology in road, so that carbon fiber board reaches good degree of compaction and bond effect after reinforcing, and is worked in coordination with original structure Stress, meets engineering demand.
Brief description
Fig. 1 is present configuration schematic diagram.
Fig. 2 is scalable inner sleeve structure schematic diagram in the present invention.
Fig. 3 is A-A profile in Fig. 2.
Fig. 4 is B-B profile in Fig. 2.
In figure, circular arc supporter 1, vertical pull bar 2, spend blue bolt 3, scalable inner sleeve 4, aluminium alloy rectangular top pipe 5, Aluminium alloy rectangle side pipe I 6, aluminium alloy rectangle side pipe II 7, adjustable inner sleeve 8, adjustable nut 9, adjusting screw 10, fixing bolt 11, Fixed latches 12, fixed sleeving steel plate 13.
Specific embodiment
Below in conjunction with brief description and specific embodiment, the present invention is described in further detail.
Referring to Fig. 1 to Fig. 4, Construction Support device in a kind of pipeline, it is to be reinforced in pipe for carbon fiber board When the support meanss that design, to ensure carbon fiber board sticking effect it is adaptable in large-diameter pipeline(Tunnel)Sticking carbon fiber plate, The materials such as steel plate, glass epoxy;It includes circular arc supporter 1.Due to the actual pipeline in scene(Tunnel)Differ and be set to circle, can Certain deformation state can be in(I.e. oval), when carbon fiber board is pasted, this Construction Support device also needs to form corresponding ovality Carbon fiber board can preferably be supported, therefore described circular arc supporter 1 both sides are symmetrically arranged with two vertical pull bars 2, described It is connected by spending blue bolt 3 between vertical pull bar 2;When carbon fiber board is pasted, flower basket bolt 3 fastening can be first adopted to make perpendicular To pull bar 2, circular arc supporter 1 is pulled into certain ovality so that this support means is close to carbon fiber board to reach more preferable support Purpose.It is connected by scalable inner sleeve 4 between the two-port of circular arc supporter 1.
Referring to Fig. 1 to Fig. 4, because most pipe manhole entrance is less than pipe diameter, therefore in the present invention, adopt multistage structure Part(Inspection shaft entrance can be entered)Assembling is carried out;In pipeline, execution conditions are severe simultaneously, and aluminium-alloy pipe is from heavy and light, intensity is high, be easy to Construction, and the convenient production of rectangular tube, therefore make described circular arc supporter 1 include the aluminium alloy rectangular top pipe 5 of arc, aluminium alloy Rectangle side pipe I 6 and aluminium alloy rectangle side pipe II 7;Described aluminium alloy rectangle side pipe I 6 and aluminium alloy rectangle side pipe II 7 symmetrically set Put and pass through scalable inner sleeve between aluminium alloy rectangular top pipe 5 two ends, aluminium alloy rectangle side pipe I 6 and aluminium alloy rectangle side pipe II 7 Cylinder 4 is connected.
Referring to Fig. 1, described aluminium alloy rectangular top pipe 5 two ends and aluminium alloy rectangle side pipe I 6 and aluminium alloy rectangle side pipe II It is connected by fixing bolt 11 respectively between 7.
Referring to Fig. 1, described arc aluminium alloy rectangular top pipe 5, aluminium alloy rectangle side pipe I 6 and aluminium alloy rectangle side pipe II 7 radian is respectively 105 degree~115 degree.
Referring to Fig. 1 to Fig. 2, the present invention, with aluminum rectangular tube for main supporting member, saves arc aluminium alloy squares using three Shape pipe is that aluminium alloy rectangular top pipe 5, aluminium alloy rectangle side pipe I 6 and aluminium alloy rectangle side pipe II 7 are assembled, and by adjustable Save inner sleeve 4 and vertical pull bar 2 to compress carbon fiber board.Job site first has to clear up pipeline (tunnel) inner surface treatment, so The plate of brushing bottom glue, then sticking carbon fiber afterwards, finally installs this Construction Support device again.Before this Construction Support device is installed, first Wrap up this Construction Support device with layer of plastic film, the agent pollution in order to avoid this Construction Support device is stuck.During installation, pacify first Dress aluminium alloy rectangular top pipe 5, then installs aluminium alloy rectangle side pipe I 6 and the aluminium alloy rectangle side pipe II 7 of bottom;Aluminium alloy square It is connected by fixing bolt 11 respectively between shape push pipe 5 two ends and aluminium alloy rectangle side pipe I 6 and aluminium alloy rectangle side pipe II 7, Meanwhile, first do not tighten fixing bolt 11, scalable inner sleeve 4 is then installed, the vertical pull bar 2 of both sides, adjustment flower are finally installed Blue bolt 3 makes support shape coincide with pipeline (tunnel);Re-tighten aluminium alloy rectangular top pipe 5 and aluminium alloy rectangle side pipe I 6 and aluminum Fixing bolt 11 between alloy rectangle side pipe II 7, adjustment scalable inner sleeve 4 length makes it be elongated to maximum, withstands aluminum and closes Golden rectangle side pipe I 6 and aluminium alloy rectangle side pipe II 7, then bolt is headed into seam between scalable inner sleeve 4 and carbon fiber board Gap, you can make carbon fiber board fit tightly on inner-walls of duct so that carbon fiber board reach after reinforcing good closely knit Degree, and with original structure cooperative bearing.Meanwhile, it is to be noted that carbon fiber board must not be damaged in installation process.
Above content is to further describe it is impossible to assert with reference to specific preferred implementation is made for the present invention Being embodied as of the present invention is confined to these explanations.For general technical staff of the technical field of the invention, On the premise of present inventive concept, some simple deduction or replace can also be made, said structure all should be considered as belonging to Protection scope of the present invention.

Claims (4)

1. in a kind of pipeline Construction Support device it is characterised in that:Including circular arc supporter(1), described circular arc supports Body(1)Both sides are symmetrically arranged with two vertical pull bars(2), described vertical pull bar(2)Between by spending blue bolt(3)It is connected Connect, circular arc supporter(1)Two-port between pass through scalable inner sleeve(4)It is connected.
2. in a kind of pipeline according to claim 1 Construction Support device it is characterised in that:Described circular arc supporter (1)Aluminium alloy rectangular top pipe including arc(5), aluminium alloy rectangle side pipe I(6)With aluminium alloy rectangle side pipe II(7), described Aluminium alloy rectangle side pipe I(6)With aluminium alloy rectangle side pipe II(7)It is symmetricly set on aluminium alloy rectangular top pipe(5)Two ends, aluminium alloy Rectangle side pipe I(6)With aluminium alloy rectangle side pipe II(7)Between pass through scalable inner sleeve(4)It is connected.
3. in a kind of pipeline according to claim 2 Construction Support device it is characterised in that:Described aluminium alloy rectangular top Pipe(5)Two ends and aluminium alloy rectangle side pipe I(6)With aluminium alloy rectangle side pipe II(7)Between respectively pass through fixing bolt(11)Phase Connect.
4. in a kind of pipeline according to claim 2 Construction Support device it is characterised in that:Described arc aluminium alloy Rectangular top pipe(5), aluminium alloy rectangle side pipe I(6)With aluminium alloy rectangle side pipe II(7)Radian be respectively 105 degree~115 degree.
CN201610741295.7A 2016-08-26 2016-08-26 Construction Support device in a kind of pipeline Pending CN106468174A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610741295.7A CN106468174A (en) 2016-08-26 2016-08-26 Construction Support device in a kind of pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610741295.7A CN106468174A (en) 2016-08-26 2016-08-26 Construction Support device in a kind of pipeline

Publications (1)

Publication Number Publication Date
CN106468174A true CN106468174A (en) 2017-03-01

Family

ID=58230021

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610741295.7A Pending CN106468174A (en) 2016-08-26 2016-08-26 Construction Support device in a kind of pipeline

Country Status (1)

Country Link
CN (1) CN106468174A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107956492A (en) * 2017-12-22 2018-04-24 同济大学 Fractured zones mountain tunnel steel arch-shelf supporting apparatus
CN111005744A (en) * 2019-12-30 2020-04-14 湖南尚上公路桥梁建设有限公司 Support beam structure of municipal shield tunnel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB387488A (en) * 1932-01-08 1933-02-09 Malcolm Mcalpine Improvements in centring devices for supporting segmental elements in the construction of tunnels and the like
CN1837484A (en) * 2006-04-28 2006-09-27 何开智 Connector unit of steel frame and connection method
CN201835413U (en) * 2010-08-24 2011-05-18 湖北银河建筑工程有限责任公司 Arched corrugated steel roof with enhanced bearing capacity through stay cables
CN202989788U (en) * 2013-01-05 2013-06-12 衡水益通金属制品有限责任公司 Inner supporting member for steel corrugated culvert
CN205977239U (en) * 2016-08-26 2017-02-22 武大巨成结构股份有限公司 Construction strutting arrangement in pipeline

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB387488A (en) * 1932-01-08 1933-02-09 Malcolm Mcalpine Improvements in centring devices for supporting segmental elements in the construction of tunnels and the like
CN1837484A (en) * 2006-04-28 2006-09-27 何开智 Connector unit of steel frame and connection method
CN201835413U (en) * 2010-08-24 2011-05-18 湖北银河建筑工程有限责任公司 Arched corrugated steel roof with enhanced bearing capacity through stay cables
CN202989788U (en) * 2013-01-05 2013-06-12 衡水益通金属制品有限责任公司 Inner supporting member for steel corrugated culvert
CN205977239U (en) * 2016-08-26 2017-02-22 武大巨成结构股份有限公司 Construction strutting arrangement in pipeline

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107956492A (en) * 2017-12-22 2018-04-24 同济大学 Fractured zones mountain tunnel steel arch-shelf supporting apparatus
CN107956492B (en) * 2017-12-22 2023-09-22 同济大学 Temporary supporting device for broken mountain tunnel steel arch frame
CN111005744A (en) * 2019-12-30 2020-04-14 湖南尚上公路桥梁建设有限公司 Support beam structure of municipal shield tunnel
CN111005744B (en) * 2019-12-30 2021-10-19 湖南尚上市政建设开发有限公司 Support beam structure of municipal shield tunnel

Similar Documents

Publication Publication Date Title
CN202017346U (en) Late poured band hanging formwork structure
CN206458909U (en) A kind of antidetonation component of subway suspension and support
CN106468174A (en) Construction Support device in a kind of pipeline
CN205977239U (en) Construction strutting arrangement in pipeline
CN209196287U (en) A kind of roof trusses layer ventilation shaft
CN105937306B (en) A kind of device and method of pre-stress fibre sheet material reinforced column
CN201145097Y (en) Universal suspension bracket
CN207453462U (en) Hang mould support device in cigarette air passage
CN206927478U (en) A kind of detachable simple gantry crane
CN105926949A (en) In-site tensioning system and method for reinforcing slab plate of integral prestress fiber board
CN211665929U (en) Steel structure support frame
CN111733973A (en) Anti-seismic building steel structure of high-rise building and connecting method thereof
CN205804981U (en) The original position tensioning system of integral type pre-stress fibre plate reinforcing slab plate
CN207213532U (en) A kind of adjustable LED display
CN206397164U (en) A kind of fibrous composite prestressed reinforcement tensioning system device
CN205711759U (en) A kind of bridge supporting frame structure
CN201614601U (en) Well lid structure
CN204778486U (en) Adjustable attach wall vaulting pole
CN208235601U (en) A kind of concrete foundation and the reinforced base isolation reinforcement structure in foundation beam junction
CN220925057U (en) Fixing structure for transporting large thin-wall pipe fitting
CN203755167U (en) Assistant mounting device of V-shaped steel pipe frame of tower bridge
CN208719579U (en) A kind of telescopic action bracket
CN207499576U (en) A kind of pre-stressed carbon fiber net bracing means of the existing circular rod of substation
CN203022346U (en) Three-section-head type water stop threaded rod
CN202055146U (en) Connecting structure for screed board accessories

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170301

WD01 Invention patent application deemed withdrawn after publication