CN106443431A - 一种用于超/特高压断路器开合并联电抗器负载的试验回路及方法 - Google Patents
一种用于超/特高压断路器开合并联电抗器负载的试验回路及方法 Download PDFInfo
- Publication number
- CN106443431A CN106443431A CN201610794896.4A CN201610794896A CN106443431A CN 106443431 A CN106443431 A CN 106443431A CN 201610794896 A CN201610794896 A CN 201610794896A CN 106443431 A CN106443431 A CN 106443431A
- Authority
- CN
- China
- Prior art keywords
- voltage
- test
- transformer
- high voltage
- load
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/327—Testing of circuit interrupters, switches or circuit-breakers
- G01R31/3271—Testing of circuit interrupters, switches or circuit-breakers of high voltage or medium voltage devices
- G01R31/3272—Apparatus, systems or circuits therefor
Abstract
本发明一种用于超/特高压断路器开合并联电抗器负载的试验回路及方法,结构简单,设计合理,能够满足超/特高压下的实验要求。所述试验回路,包括依次连接的电源部分,变压器组,主回路部分和负载部分;电源部分包括短路冲击发电机G和电源侧阻抗Ls;所述的变压器组包括两组变压器;主回路部分包括第一辅助开关AB1、第二辅助开关AB2、试品断路器TO、电流互感器I和电压互感器U;负载部分包括高压电抗器L、调频电容C和负载损耗电阻R;调频电容C、负载损耗电阻R分别与高压电抗器L并联;第一组变压器和第二组变压器的一次绕组通过电源侧阻抗Ls与短路冲击发电机G连接。
Description
技术领域
本发明涉及高压断路器大容量试验领域,具体为一种用于超/特高压断路器开合并联电抗器负载的试验回路及方法。
背景技术
并联电抗器通常用来限制电网处于较轻负荷时的过电压。当电网负荷较重时,并联电抗器必须全部或部分切断,以避免过分的消耗系统感性功率。当断路器开合感性电流时,通常断路器断口和周围电路交互作用产生高幅度、高频率的暂态电压,对电网造成很大威胁,尤其对超/特高压断路器,感性开合电流大,重燃过电压高。由于试验能力限制,国内试验室现仅能完成额定电压252kV及以下断路器开合并联电抗器负载试验,无法完成550kV~1100kV超/特高压断路器并联电抗器开合试验。
发明内容
针对现有技术中存在的问题,本发明提供一种用于超/特高压断路器开合并联电抗器负载的试验回路及方法,结构简单,设计合理,能够满足超/特高压下的实验要求。
本发明是通过以下技术方案来实现:
一种用于超/特高压断路器开合并联电抗器负载的试验回路,包括依次连接的电源部分,变压器组,主回路部分和负载部分;所述的电源部分包括短路冲击发电机G和电源侧阻抗Ls;所述的变压器组包括两组变压器;两组变压器一次绕组并联且同名端相反连接,二次绕组串联;所述的主回路部分包括第一辅助开关AB1、第二辅助开关AB2、试品断路器TO、电流互感器I和电压互感器U;所述的负载部分包括高压电抗器L、调频电容C和负载损耗电阻R;调频电容C、负载损耗电阻R分别与高压电抗器L并联;第一组变压器和第二组变压器的一次绕组通过电源侧阻抗Ls与短路冲击发电机G连接;二次绕组串联后,第一组变压器的二次绕组出线端依次与辅助开关AB1、试品断路器TO、电流互感器I、高压电抗器L、辅助开关AB2串联后返回第二组变压器的二次绕组出线端,形成回路;电压互感器设置在形成的回路中。
优选的,高压电抗器L两端并联有金属氧化物避雷器AR。
优选的,两组变压器二次绕组串联且低压端连接后接地,在高压侧负载进、出线两端分别安装有金属氧化物避雷器AR。
优选的,两组变压器低压侧并联;高压侧产生极性相反的电压分别施加在试品两侧,提供所需的试验电压。
优选的,还包括分别用于测量第一、第二组变压器二次绕组输出电压的第一电压互感器U1和第二电压互感器U2,以及设置在负载部分与试品断路器TO共同节点的第三电压互感器U3和电流互感器I。
优选的,所述的电源部分还包括依次设置在短路冲击发电机G输出端的保护断路器GB、合闸开关MS和操作断路器MB,电源侧阻抗Ls设置在合闸开关MS和操作断路器MB之间。
一种用于超/特高压断路器开合并联电抗器负载的试验方法,其特征在于,采用本发明所述的试验回路,包括如下步骤,
步骤1,先合保护断路器GB、操作断路器MB、合闸开关MS和第一、二辅助开关AB1、AB2,试品断路器TO处于分闸位置,对短路冲击发电机G进行励磁,试品断路器TO两端带电压;
步骤2,按试验程序先合试品断路器TO,试品断路器TO关合感性电流,需承受较高电流峰值和频率的关合涌流,此时试验回路接通;
步骤3,试验回路接通200~240毫秒后试品断路器TO分闸,此时试品断路器TO开断感性电流,同时试品断路器TO断口要承受很高的瞬态恢复电压;
步骤4,试品断路器TO分闸300毫秒后第一、二辅助开关AB1、AB2分闸,试品断路器TO两端不承受恢复电压,50毫秒后操作断路器MB分闸,同时对短路冲击发电机G进行灭磁,试验结束。
优选的,还包括如下试验前准备,
准备1,通过计算得出所需设备参数,考虑回路中固有参数的影响得出具体投入时的设备值并搭建试验回路;
准备2,以第一电压互感器U1和第二电压互感器U2读出第一、第二组变压器副边输出电压,差分后得出电源电压;以第三电压互感器U3读出试品电源侧电压,与第二电压互感器U2读数差分后得出试品断口电压;以电流互感器I读取试品试验电流;
准备3,试验开始前,以半电压小检方式检验试验回路完好性并验证标准要求各参数值;根据小检参数,对调频电容C、负载损耗电阻R及高压电抗器L和电源阻抗Ls进行调整,确保全电压下TRV、电压和电流所有参数满足要求。
与现有技术相比,本发明具有以下有益的技术效果:
本发明通过设置的两组变压器在一次绕组并联,二次绕组串联后产生极性相反的电压分别施加在试品两侧提供所需的试验电压,其中一组采用多台变压器串联的接线方式提高输出电压,两组变压器副边低压端串联位置接地;由于高压侧采用双端加压方式,高压侧产品两端悬浮,降低单套电源回路中高压侧对地电压等级及回路各设备绝缘条件,,提高了试验安全系数。根据标准参数要求,及试验回路特性计算,在降低成本的前提下,以试验回路中的固有电抗,布置相应调频电容、负载损耗电阻与所选取高压电抗器共同控制瞬态恢复电压。
进一步的,通过高压侧产生极性相反的电压分别施加在试品两侧,提供所需的试验电压;降低单套电源回路中高压侧对地电压等级及回路各设备绝缘条件,提高回路安全系数。
进一步的,通过测量系统设置在第一、第二组变压器二次绕组输出电压端的第一、二电压互感器,以及设置在负载损耗电阻与试品断路器共同节点的第三电压互感器和电流互感器。能够通过三台电压互感器的相互差分得到电源电压、断口电压和负载电压。
附图说明
图1为本发明实例中所述试验回路的结构原理图。
图中:1为电源部分,G为短路冲击发电机,GB为保护断路器,MS为合闸开关,MB为操作断路器,Ls为电源侧阻抗;2为变压器组;3为主回路部分,AB1、AB2为第一、二辅助开关,TO为试品断路器,AR为金属氧化物避雷器,U1、U2为第一、第二电压互感器,U3为第三电压互感器,I为电流互感器;4为负载部分,C为调频电容,R为负载损耗电阻,L为高压电抗器。
具体实施方式
下面结合附图对本发明做进一步的详细说明,所述是对本发明的解释而不是限定。
本发明提出了一种不同于标准中提供的试验回路,来达到超/特高压断路器开合并联电抗器负载的试验,且满足标准试验参数要求,此发明极大的提升了我国试验室的试验技术能力,为国内制造行业自主开发具备开合并联电抗器能力的特高压断路器提供试验平台,打破国外企业在特高压领域的垄断局面,加快我国特高压开关设备的自主研制及国产化进程,为我国后续特高压工程的如期投运、安全运行具有重要的战略意义,为我国后续进一步制定特高压断路器并联电抗器开合试验相关国家标准提供了试验依据。
本发明一种用于超/特高压断路器开合并联电抗器负载的试验回路,包括作为电源的短路冲击发电机G、电源侧阻抗LS,变压器组2,依次串接成回路的辅助开关、试品断路器TO、电流互感器I、电压互感器,高压电抗器L、调频电容C和负载损耗电阻R。变压器组2包括两组变压器,第一、第二组变压器的一次绕组通过电源侧阻抗LS与短路冲击发电机G连接,其二次绕组串联后,第一组变压器的二次绕组出线端与第一辅助开关AB1、试品断路器TO、高压电抗器L、第二辅助开关AB2串联后返回第二组变压器的二次绕组出线端。调频电容C、负载损耗电阻R分别与高压电抗器L并联,高压电抗器L两端并联有金属氧化物避雷器AR。两组变压器二次绕组出线端对地,在高压侧负载进、出线两端分别安装有金属氧化物避雷器AR。两组变压器二次绕组串联位置的非同名端节点接地。其中优选的,第一、第二组变压器为第一、第二组短路变压器。
两组变压器低压侧并联,高压侧产生极性相反的电压分别施加在试品两侧提供所需的试验电压,其中一组变压器采用多台串联的接线方式提高输出电压,如图1所示,其中一组变压器采用T1-T6串联的接线方式,另外一组为独立的变压器T7。由于高压侧采用双端加压方式,使得作为高压侧产品的试品断路器TO两端电位悬浮,降低保护限制值,提高了试验安全系数。
根据回路特性、电抗器参数及标准要求,由试验回路中的固有电抗、调频电容C、负载损耗电阻R及高压电抗器L共同控制瞬态恢复电压。
其中,还包括分别测量第一、第二组变压器二次绕组输出电压的第一、二电压互感器U1、U2,以及设置在负载部分4与试品断路器TO共同节点的第三电压互感器U3和电流互感器I。试验电压、断口电压、负载电压分别为三台电压互感器相互差分所得。
具体的,参见图1所示,试验电源由短路冲击发电机G经保护断路器GB、合闸开关MS、操作断路器MB接至第一组变压器和第二组变压器的一次绕组,第一组变压器和第二组的一次绕组并联,其中第一组为六台变压器串联,第一组变压器的二次绕组出线端与辅助开关AB1、试品TO、高压侧负载、辅助开关AB2串联后返回第二组变压器的二次绕组出线端。高压侧调频电容C、电阻R及高压电抗器L相互并联。两组变压器二次绕组出线端对地,在高压侧负载进、出线两端分别安装有金属氧化物避雷器AR。两组变压器副边低压端串联位置接地。试验时,先合保护断路器GB、操作断路器MB、合闸开关MS、辅助开关AB1/AB2,试品断路器TO处于分闸位置,对短路冲击发电机G进行励磁,试品断路器TO两端带电压。然后,按试验程序先合试品断路器TO,试品断路器TO关合感性电流,需承受较高电流峰值和频率的关合涌流,此时试验回路接通,200~240毫秒后试品断路器TO分闸,此时试品断路器TO开断感性电流,同时试品断路器TO断口要承受很高的瞬态恢复电压。300毫秒后辅助开关AB1/AB2分闸,试品断路器TO两端不承受恢复电压,50毫秒后操作断路器MB分闸,同时对发电机进行灭磁,试验结束。
Claims (8)
1.一种用于超/特高压断路器开合并联电抗器负载的试验回路,其特征在于,包括依次连接的电源部分(1),变压器组(2),主回路部分(3)和负载部分(4);
所述的电源部分(1)包括短路冲击发电机G和电源侧阻抗Ls;
所述的变压器组(2)包括两组变压器;两组变压器一次绕组并联且同名端相反连接,二次绕组串联;
所述的主回路部分(3)包括第一辅助开关AB1、第二辅助开关AB2、试品断路器TO、电流互感器I和电压互感器U;
所述的负载部分(4)包括高压电抗器L、调频电容C和负载损耗电阻R;调频电容C、负载损耗电阻R分别与高压电抗器L并联;
第一组变压器和第二组变压器的一次绕组通过电源侧阻抗Ls与短路冲击发电机G连接;二次绕组串联后,第一组变压器的二次绕组出线端依次与辅助开关AB1、试品断路器TO、电流互感器I、高压电抗器L、辅助开关AB2串联后返回第二组变压器的二次绕组出线端,形成回路;电压互感器设置在形成的回路中。
2.根据权利要求1所述的一种用于超/特高压断路器开合并联电抗器负载的试验回路,其特征在于,高压电抗器L两端并联有金属氧化物避雷器AR。
3.根据权利要求1所述的一种用于超/特高压断路器开合并联电抗器负载的试验回路,其特征在于,两组变压器二次绕组串联且低压端连接后接地,在高压侧负载进、出线两端分别安装有金属氧化物避雷器AR。
4.根据权利要求1所述的一种用于超/特高压断路器开合并联电抗器负载的试验回路,其特征在于,两组变压器低压侧并联;高压侧产生极性相反的电压分别施加在试品两侧,提供所需的试验电压。
5.根据权利要求1所述的一种用于超/特高压断路器开合并联电抗器负载的试验回路,其特征在于,还包括分别用于测量第一、第二组变压器二次绕组输出电压的第一电压互感器U1和第二电压互感器U2,以及设置在负载部分(4)与试品断路器TO共同节点的第三电压互感器U3和电流互感器I。
6.根据权利要求1所述的一种用于超/特高压断路器开合并联电抗器负载的试验回路,其特征在于,所述的电源部分还包括依次设置在短路冲击发电机G输出端的保护断路器GB、合闸开关MS和操作断路器MB,电源侧阻抗Ls设置在合闸开关MS和操作断路器MB之间。
7.一种用于超/特高压断路器开合并联电抗器负载的试验方法,其特征在于,采用如权利要求6所述的试验回路,包括如下步骤,
步骤1,先合保护断路器GB、操作断路器MB、合闸开关MS和第一、二辅助开关AB1、AB2,试品断路器TO处于分闸位置,对短路冲击发电机G进行励磁,试品断路器TO两端带电压;
步骤2,按试验程序先合试品断路器TO,试品断路器TO关合感性电流,需承受较高电流峰值和频率的关合涌流,此时试验回路接通;
步骤3,试验回路接通200~240毫秒后试品断路器TO分闸,此时试品断路器TO开断感性电流,同时试品断路器TO断口要承受很高的瞬态恢复电压;
步骤4,试品断路器TO分闸300毫秒后第一、二辅助开关AB1、AB2分闸,试品断路器TO两端不承受恢复电压,50毫秒后操作断路器MB分闸,同时对短路冲击发电机G进行灭磁,试验结束。
8.根据权利要求7所述的一种用于超/特高压断路器开合并联电抗器负载的试验方法,其特征在于,还包括如下试验前准备,
准备1,通过计算得出所需设备参数,考虑回路中固有参数的影响得出具体投入时的设备值并搭建试验回路;
准备2,以第一电压互感器U1和第二电压互感器U2读出第一、第二组变压器副边输出电压,差分后得出电源电压;以第三电压互感器U3读出试品电源侧电压,与第二电压互感器U2读数差分后得出试品断口电压;以电流互感器I读取试品试验电流;
准备3,试验开始前,以半电压小检方式检验试验回路完好性并验证标准要求各参数值;根据小检参数,对调频电容C、负载损耗电阻R及高压电抗器L和电源阻抗Ls进行调整,确保全电压下TRV、电压和电流所有参数满足要求。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610794896.4A CN106443431A (zh) | 2016-08-31 | 2016-08-31 | 一种用于超/特高压断路器开合并联电抗器负载的试验回路及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610794896.4A CN106443431A (zh) | 2016-08-31 | 2016-08-31 | 一种用于超/特高压断路器开合并联电抗器负载的试验回路及方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106443431A true CN106443431A (zh) | 2017-02-22 |
Family
ID=58163734
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610794896.4A Pending CN106443431A (zh) | 2016-08-31 | 2016-08-31 | 一种用于超/特高压断路器开合并联电抗器负载的试验回路及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106443431A (zh) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107329068A (zh) * | 2017-06-30 | 2017-11-07 | 中国西电电气股份有限公司 | 一种串补装置中火花间隙进行恢复电压试验的回路及方法 |
CN108363001A (zh) * | 2018-01-29 | 2018-08-03 | 温州大学 | 一种低压断路器短路试验系统及其阻抗自适应校正方法 |
CN109683106A (zh) * | 2017-10-17 | 2019-04-26 | 苏州电器科学研究院股份有限公司 | 不同容量冲击发电机并网提供电源的短路试验系统 |
CN110376513A (zh) * | 2019-07-10 | 2019-10-25 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | 一种直流高速开关内部燃弧耐受试验回路 |
CN111273167A (zh) * | 2018-12-05 | 2020-06-12 | 西安高压电器研究院有限责任公司 | 一种隔离开关小感性电流开合试验电路 |
CN111273166A (zh) * | 2018-12-05 | 2020-06-12 | 西安高压电器研究院有限责任公司 | 一种隔离开关小感性电流开合试验电路 |
CN112394262A (zh) * | 2019-08-15 | 2021-02-23 | 西安高压电器研究院有限责任公司 | 一种电弧外部效应时刻检测装置和方法 |
CN113109702A (zh) * | 2020-01-09 | 2021-07-13 | 苏州电器科学研究院股份有限公司 | 一种开断大电流的试验回路及试验方法 |
CN113466687A (zh) * | 2021-06-29 | 2021-10-01 | 西安西电电力电容器有限责任公司 | 一种用于中压交流断路器开合容性负载试验用装置及方法 |
CN113985191A (zh) * | 2021-12-29 | 2022-01-28 | 苏州电器科学研究院股份有限公司 | 特高压变压器短路承受能力试验系统及方法 |
CN114325360A (zh) * | 2020-10-10 | 2022-04-12 | 西安高压电器研究院股份有限公司 | 一种高压交流断路器的短路开断试验方法和系统 |
CN114895178A (zh) * | 2022-05-17 | 2022-08-12 | 安徽一天电气技术股份有限公司 | 一种断路器试验系统及方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2591525B2 (ja) * | 1989-09-20 | 1997-03-19 | 株式会社日立製作所 | 遮断器の試験装置 |
CN201298065Y (zh) * | 2008-10-27 | 2009-08-26 | 中国西电电气股份有限公司 | 一种用于超/特高压断路器容性负载开合的试验回路 |
CN201449439U (zh) * | 2009-04-13 | 2010-05-05 | 中国西电电气股份有限公司 | 一种用于高压断路器容性负载开合的试验回路 |
CN201926742U (zh) * | 2010-12-15 | 2011-08-10 | 中国西电电气股份有限公司 | 一种用于高压交流断路器开合并联电抗器试验回路 |
CN203365636U (zh) * | 2013-06-27 | 2013-12-25 | 中国西电电气股份有限公司 | 一种用于大容量发电机断路器的合成试验回路 |
-
2016
- 2016-08-31 CN CN201610794896.4A patent/CN106443431A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2591525B2 (ja) * | 1989-09-20 | 1997-03-19 | 株式会社日立製作所 | 遮断器の試験装置 |
CN201298065Y (zh) * | 2008-10-27 | 2009-08-26 | 中国西电电气股份有限公司 | 一种用于超/特高压断路器容性负载开合的试验回路 |
CN201449439U (zh) * | 2009-04-13 | 2010-05-05 | 中国西电电气股份有限公司 | 一种用于高压断路器容性负载开合的试验回路 |
CN201926742U (zh) * | 2010-12-15 | 2011-08-10 | 中国西电电气股份有限公司 | 一种用于高压交流断路器开合并联电抗器试验回路 |
CN203365636U (zh) * | 2013-06-27 | 2013-12-25 | 中国西电电气股份有限公司 | 一种用于大容量发电机断路器的合成试验回路 |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107329068B (zh) * | 2017-06-30 | 2020-06-23 | 中国西电电气股份有限公司 | 一种串补装置中火花间隙进行恢复电压试验的回路及方法 |
CN107329068A (zh) * | 2017-06-30 | 2017-11-07 | 中国西电电气股份有限公司 | 一种串补装置中火花间隙进行恢复电压试验的回路及方法 |
CN109683106B (zh) * | 2017-10-17 | 2021-11-26 | 苏州电器科学研究院股份有限公司 | 不同容量冲击发电机并网提供电源的短路试验系统 |
CN109683106A (zh) * | 2017-10-17 | 2019-04-26 | 苏州电器科学研究院股份有限公司 | 不同容量冲击发电机并网提供电源的短路试验系统 |
CN108363001A (zh) * | 2018-01-29 | 2018-08-03 | 温州大学 | 一种低压断路器短路试验系统及其阻抗自适应校正方法 |
CN111273167A (zh) * | 2018-12-05 | 2020-06-12 | 西安高压电器研究院有限责任公司 | 一种隔离开关小感性电流开合试验电路 |
CN111273166A (zh) * | 2018-12-05 | 2020-06-12 | 西安高压电器研究院有限责任公司 | 一种隔离开关小感性电流开合试验电路 |
CN111273167B (zh) * | 2018-12-05 | 2022-06-03 | 西安高压电器研究院股份有限公司 | 一种隔离开关小感性电流开合试验电路 |
CN110376513A (zh) * | 2019-07-10 | 2019-10-25 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | 一种直流高速开关内部燃弧耐受试验回路 |
CN112394262A (zh) * | 2019-08-15 | 2021-02-23 | 西安高压电器研究院有限责任公司 | 一种电弧外部效应时刻检测装置和方法 |
CN113109702A (zh) * | 2020-01-09 | 2021-07-13 | 苏州电器科学研究院股份有限公司 | 一种开断大电流的试验回路及试验方法 |
CN113109702B (zh) * | 2020-01-09 | 2023-03-03 | 苏州电器科学研究院股份有限公司 | 一种开断大电流的试验回路及试验方法 |
CN114325360A (zh) * | 2020-10-10 | 2022-04-12 | 西安高压电器研究院股份有限公司 | 一种高压交流断路器的短路开断试验方法和系统 |
CN113466687A (zh) * | 2021-06-29 | 2021-10-01 | 西安西电电力电容器有限责任公司 | 一种用于中压交流断路器开合容性负载试验用装置及方法 |
CN113985191A (zh) * | 2021-12-29 | 2022-01-28 | 苏州电器科学研究院股份有限公司 | 特高压变压器短路承受能力试验系统及方法 |
CN114895178A (zh) * | 2022-05-17 | 2022-08-12 | 安徽一天电气技术股份有限公司 | 一种断路器试验系统及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106443431A (zh) | 一种用于超/特高压断路器开合并联电抗器负载的试验回路及方法 | |
CN102680861B (zh) | 变压器或电抗器的短路承受能力试验系统及其方法 | |
CN108490304A (zh) | 发电机定子绕组单相接地故障位置定位方法 | |
CN201298065Y (zh) | 一种用于超/特高压断路器容性负载开合的试验回路 | |
CN109119971A (zh) | 零序过流保护方法、系统、装置及计算机可读存储介质 | |
CN103389422B (zh) | 线路重合闸期间非故障相母差保护误动原因的检测方法 | |
CN108318762A (zh) | 电压互感器工频铁磁谐振的判别方法 | |
CN201666902U (zh) | 高压线路参数测试保护装置 | |
CN201514437U (zh) | 一种配网电容电流测试仪 | |
CN205027865U (zh) | 一种干式空心电抗器匝间绝缘电老化试验系统 | |
CN106205306B (zh) | 一种35kV电容式电压互感器铁磁谐振仿真模型 | |
CN205355803U (zh) | 抗谐振4pt全过电压抑制装置 | |
CN108459285A (zh) | 电压互感器铁磁谐振实验方法 | |
CN109946571A (zh) | 利用继电保护测试仪进行电压互感器感应耐压试验的方法 | |
CN103513171A (zh) | 一种复合支柱绝缘子工频耐压试验设备及方法 | |
CN203551730U (zh) | 一种复合支柱绝缘子工频耐压试验设备 | |
Mitra et al. | Resonant behavior of EHV transformer windings under system originated oscillatory transient over voltages | |
CN104597899B (zh) | 配电自动化装置技术性能测试平台 | |
CN112824911A (zh) | 用于测试消弧线圈的装置 | |
Malek et al. | Effect of shunt capacitance on ferroresonance model for distribution Voltage Transformer | |
CN113076646A (zh) | 一种水轮发电机中性点接地参数计算方法 | |
CN103326331A (zh) | 预防线路重合闸期间非故障相母差保护误动的方法 | |
CN109286173A (zh) | 变压器空载投切涌流和过电压消除装置 | |
CN204065267U (zh) | 一种基于直流偏磁的铁磁谐振回路 | |
CN103199495B (zh) | 一种防止发电机工频零序电流保护误动的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170222 |