CN106442121B - A kind of research absciss layer is to the experimental rig and production method of bolt action load - Google Patents

A kind of research absciss layer is to the experimental rig and production method of bolt action load Download PDF

Info

Publication number
CN106442121B
CN106442121B CN201610534274.8A CN201610534274A CN106442121B CN 106442121 B CN106442121 B CN 106442121B CN 201610534274 A CN201610534274 A CN 201610534274A CN 106442121 B CN106442121 B CN 106442121B
Authority
CN
China
Prior art keywords
test block
anchor pole
experimental rig
research
absciss layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610534274.8A
Other languages
Chinese (zh)
Other versions
CN106442121A (en
Inventor
丁潇
何晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Technological University
Original Assignee
Xian Technological University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Technological University filed Critical Xian Technological University
Priority to CN201610534274.8A priority Critical patent/CN106442121B/en
Publication of CN106442121A publication Critical patent/CN106442121A/en
Application granted granted Critical
Publication of CN106442121B publication Critical patent/CN106442121B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/02Details
    • G01N3/06Special adaptations of indicating or recording means
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/28Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/02Details
    • G01N3/06Special adaptations of indicating or recording means
    • G01N3/062Special adaptations of indicating or recording means with mechanical indicating or recording means

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention provides a kind of research absciss layer to the experimental rig and production method of bolt action load, the experimental rig includes the test block of " I " fonts, the horizontal symmetrical face of the test block is equipped with reserving gaps, the anchor pole for posting foil gauge is set in the vertical section of " I " fonts test block, the both ends of the anchor pole extend respectively to the two sides up and down of test block;One groove of each formation in the left and right of the " I " fonts test block, the groove is used to place the hydraulic jack with the first amesdial, the front and rear sides of the test block are equipped with reinforcing steelframe, the steelframe of reinforcing is arranged along the corner location of groove, and upper and lower surface is equipped with strengthening steel slab in the groove;Displacement measurement system is additionally provided in the test block.The production method includes: (1) Mold Making;(2) concrete sample make;(3) anchor pole pastes foil gauge;(4) Anchor Agent makes;(5) displacement measurement system is arranged.The beneficial effects of the invention are as follows test data high reliablity, convenient for operation.

Description

A kind of research absciss layer is to the experimental rig and production method of bolt action load
Technical field
The invention belongs to mechanics study technical fields, the test more particularly, to a kind of research absciss layer to bolt action load Device and production method.
Background technique
Absciss layer generates load action to anchor pole, to determine the absciss layer stress pattern of the body of rod and destruction in development process Rule, Ying Jinhang experimental test, however on-the-spot test difficulty is larger, is difficult to determine that the position of absciss layer and absciss layer value are big first Small, secondly host rock environment is complicated, and influence factor is excessive, and test discreteness is larger.Laboratory test is as a kind of effective research hand Section, can be with the correctness and applicability of proof theory model.The key point of test is reserved absciss layer, and test block is separated, this hair It is bright to set about from the test block shape of design, test block is reinforced, will be loaded using jack and separate test block, and displacement prison is set Examining system, stress monitoring system constitute integrity test.
Summary of the invention
A kind of the object of the present invention is to provide structures simple, easy to operate, test data high reliablity research absciss layer pair The experimental rig and production method of bolt action load.
The technical scheme is that a kind of experimental rig of research absciss layer of the invention to bolt action load, described Experimental rig includes the test block of " I " fonts, and the horizontal symmetrical face of the test block is equipped with reserving gaps, " I " fonts test block The anchor pole for posting foil gauge is set in vertical section, the both ends of the anchor pole extend respectively to the two sides up and down of test block;
One groove of each formation in the left and right of the " I " fonts test block, the groove is interior to have the first amesdial for placing Hydraulic jack, the front and rear sides of the test block are equipped with reinforcing steelframe, and the reinforcing steelframe is set along the corner location of groove It sets, upper and lower surface is equipped with strengthening steel slab in the groove;
Displacement measurement system is additionally provided in the test block.
Preferably, the angle between the anchor pole and reserving gaps is 60 ° or 90 °.
Preferably, described to reinforce what steelframe was welded by steel plate and angle steel.
Preferably, the strengthening steel slab is in concave, and extends to the front and rear sides of anchor pole.
Preferably, there are three the anchor pole is set, the corresponding intermediate anchor pole of the second amesdial of the displacement measurement system is set It sets.
Preferably, any anchor pole is equipped with 6 foil gauges, wherein 3 are located at the top of reserving gaps, 3 positioned at reserved The bottom end in gap.
Preferably, the displacement measurement system includes the second amesdial there are two test block front side is set, two the second amesdials The two sides up and down of reserving gaps are fixed on by fixing steel plate.
Another aspect of the present invention further includes a kind of research absciss layer to the production side of the experimental rig of bolt action load Method comprising following steps:
(1) Mold Making: corresponding mold is made according to the test block of " I " fonts, mold uses plank sheathing, mold bottom Cystosepiment is set, pvc pipe is inserted at bottom foam plate design position, reserved drilling is that subsequent slip casting anchoring is ready;
(2) concrete sample make: by the mold of concreting in lifts to step (1) production, pouring and be divided into two parts, Bottom pours to reserving gaps position and stops hour, spreads one layer of plastic paper, then pours upside, and test block pulls out pvc pipe after reaching initial set Out, after test block hardening demoulding, row is conserved when being sent to temperature standard fog room;
The reinforcing steelframe being welded into using steel plate and angle steel carries out local stiffening to jack load position;
(3) anchor pole pastes foil gauge: the position for needing to paste foil gauge on reinforcing bar being polished smooth, foil gauge is posted, uses epoxy Resin does water-proofing treatment;
(4) Anchor Agent makes: production Anchor Agent can be directly circulated into drilling, then test anchor pole is inserted into, and wait anchoring Agent solidification, the anchor pole for posting foil gauge are fixed on inside the test block of " I " fonts;
(5) displacement measurement system is arranged: the second amesdial for testing displacement is fixed in test block by fixing steel plate, is reserved Two sides respectively install one up and down in gap, survey the sum of the displacement of two the second amesdials, and the displacement at the anchor pole of two sides then passes through clearance gauge It measures, is finally averaged and carries out data analysis.
The advantages and positive effects of the present invention are:
1, rock material is using self-control concrete test block simulation, to separate test block, needs to load test block, load is selected Jack opens test block, convenient for load, and test block is made into " I-shaped ".
2, anchor pole additional stress field rule caused by absciss layer can be monitored by pasting foil gauge on anchor pole;Can study from The loading process and failure law of layer effect lower bolt can be studied under 2 kinds of different operating conditions, and the stress distribution of anchor pole: one is anchors Bar is vertical with absciss layer, and one is anchor pole and absciss layers at an angle, and research anchor pole tension, tension cut the stress of 2 kinds of different situations Distribution and failure law.
3, by record load and fracture open magnitude, obtain the relationship of absciss layer value size and anchor axial force, and with theory The relation curve of model compares.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of experimental rig of the present invention (anchor pole and reserving gaps are in 90 ° of angles).
Fig. 2 is the structural schematic diagram of experimental rig of the present invention (anchor pole and reserving gaps are in 60 ° of angles).
Fig. 3 is the setting structure schematic diagram of strengthening steel slab.
Fig. 4 is the front view of experimental rig of the present invention (anchor pole and reserving gaps are in 90 ° of angles).
Fig. 5 is the front view of experimental rig of the present invention (anchor pole and reserving gaps are in 60 ° of angles).
Fig. 6 is mold structure diagram.
Fig. 7 is the attachment structure schematic diagram of anchor pole and foil gauge.
Fig. 8 is the structural schematic diagram of test block.
Fig. 9 is the assembling structure schematic diagram (omit hydraulic jack, reinforce steelframe, strengthening steel slab) of the second amesdial
In figure:
1- test block, 2- reserving gaps, 3- anchor pole, 4- groove, 5- hydraulic jack, the first amesdial of 6-, 7- backing plate, 8- Two amesdials, 9- reinforce steelframe, 10- strengthening steel slab, 11- mold, 12- cystosepiment, 13-PVC pipe, 14- foil gauge, 15- positioning Steel plate.
Specific embodiment
It elaborates with reference to the accompanying drawing to the present invention.
As shown in Figs. 1-5, the experimental rig of a kind of research absciss layer of the invention to bolt action load, the experimental rig Test block 1 including " I " fonts, the bottom end of test block 1 is equipped with backing plate 7, sets the anchor pole 3 for posting foil gauge in the test block 1, described The middle position of test block 1 is equipped with horizontal-extending reserving gaps 2, and the left and right groove 4 of the test block has the 1000th for placing Divide the hydraulic jack 5 of table 6, the front and rear sides of the test block 1 are equipped with the reinforcing steelframe 9 that steel plate and angle steel are welded into, described to add Gu steelframe 9 is arranged along the corner location of groove, the upper and lower ends of the groove are equipped with the strengthening steel slab 10 of concave.
Angle between the anchor pole and reserving gaps is 90 ° or 60 °.
A kind of production method of research absciss layer of the invention to the experimental rig of bolt action load, comprising the following steps:
(1) Mold Making
As shown in fig. 6, mold uses plank sheathing, wooden model version according to the production corresponding mold 11 of the test block of " I " fonts Have the advantage that plate face is flat and smooth, can saw, can bore, convenient for disassembly and assembly, easy to operate, manufacturing speed is fast, be convenient in demoulding and at This is low.According to the given size of Fig. 3, mold is made.For convenience of anchor pole position is determined, cystosepiment 12 is arranged in mold bottom, in bottom Pvc pipe 13 is inserted at cystosepiment design position, the height of pvc pipe is higher than the height of the test block of " I " fonts, after reserved drilling is Continuous slip casting anchoring is ready.
(2) concrete sample make
Concrete grade is C30, requires (water: cement: sand: stone=0.38: 1: 1.11: 2.72) according to mix-design Weighing, the cement weighed up and sand are added water and stirred, stone is finally added and is sufficiently stirred.By concreting in lifts to step (1) it in the mold made, pours and is divided into two parts, bottom is poured to reserving gaps position and stopped 2 hours, spreads one layer of plastic paper, then pour Build upside.Test block extracts pvc pipe after reaching initial set, after demoulding is hardened in test block, should be sent to 20 ± 3 DEG C of temperature in time, humidity is Row conserves when 90% or more standard curing room, and the test block conserved is as shown in Figure 8.
Concrete also known as artificial stone, property are similar to rock, are fragile material, resistance to compression but non-tension, not shearing resistance, therefore right It also needs to be reinforced outside test block, the reinforcing steelframe being welded by steel plate and angle steel loads position to jack and carries out local add Gu the test block after reinforcing is as illustrated in figures 4-5.
(3) anchor pole pastes foil gauge
As shown in fig. 7, the position for needing to paste foil gauge 14 on reinforcing bar is polished smooth, the area at smooth place be 5mm × 10mm.Foil gauge 14 is posted on the spiral of length 60cm, does water-proofing treatment with epoxy resin.Foil strain gauge size is 2mm × 3mm, every is pasted 6, and upper and lower two sides respectively paste 3, so that there is 3 foil gauges to be located in reserving gaps on every anchor pole Side, 3 foil gauges are located at the downside of reserving gaps.
(4) Anchor Agent makes
It uses G type bar planting material as fixing agent for anchor poles according to ancillary test determination, G moulding mixture is mixed with water according to a certain percentage With, which can directly be circulated into drilling, then will test anchor pole insertion, wait Anchor Agent solidification, post foil gauge Anchor pole i.e. be fixed on inside the test block of " I " fonts.
(5) displacement measurement system is arranged
As shown in figure 9, the second amesdial 8 of test displacement is arranged at intermediate anchor pole position, the nail positioning steel in test block 1 Second amesdial 8 is mounted on and is fixed on fixing steel plate 15 by plate 15, and two sides respectively install one to reserving gaps up and down, surveys two The sum of the displacement of second amesdial 8.Displacement at the anchor pole of two sides is then measured by clearance gauge, is finally averaged and is carried out data point Analysis.
One embodiment of the present invention has been described in detail above, but the content is only preferable implementation of the invention Example, should not be considered as limiting the scope of the invention.It is all according to all the changes and improvements made by the present patent application range Deng should still be within the scope of the patent of the present invention.

Claims (7)

1. a kind of research absciss layer is to the experimental rig of bolt action load, it is characterised in that: the experimental rig includes " work " word The test block of type, the horizontal symmetrical face of the test block are equipped with reserving gaps, set in the vertical section of " I " fonts test block and post strain The anchor pole of piece, the both ends of the anchor pole extend respectively to the two sides up and down of test block;
One groove of each formation in the left and right of the " I " fonts test block, the groove are used to place hydraulic with the first amesdial Jack, the front and rear sides of the test block are equipped with reinforcing steelframe, and the steelframe of reinforcing is arranged along the corner location of groove, described Upper and lower surface is equipped with strengthening steel slab in groove;
Displacement measurement system is additionally provided in the test block;
There are three the anchor pole is set, the corresponding intermediate anchor pole setting of the second amesdial of the displacement measurement system.
2. a kind of research absciss layer according to claim 1 is to the experimental rig of bolt action load, it is characterised in that: described 60 ° or 90 ° of angle between anchor pole and reserving gaps.
3. a kind of research absciss layer according to claim 1 is to the experimental rig of bolt action load, it is characterised in that: described Reinforce what steelframe was welded by steel plate and angle steel.
4. a kind of research absciss layer according to claim 1 is to the experimental rig of bolt action load, it is characterised in that: described Strengthening steel slab is in concave, and extends to the front and rear sides of anchor pole.
5. a kind of research absciss layer according to claim 1 is to the experimental rig of bolt action load, it is characterised in that: any Anchor pole is equipped with 6 foil gauges, wherein 3 are located at the top of reserving gaps, 3 are located at the bottom end of reserving gaps.
6. a kind of research absciss layer according to claim 1 is to the experimental rig of bolt action load, it is characterised in that: described Displacement measurement system includes two the second amesdials being arranged on front side of test block, and two the second amesdials are fixed on by fixing steel plate The two sides up and down of reserving gaps.
7. one kind studies absciss layer to the production method of the experimental rig of bolt action load as described in claim 1, including with Lower step:
(1) Mold Making: corresponding mold is made according to the test block of " I " fonts, mold uses plank sheathing, mold bottom setting Cystosepiment is inserted into pvc pipe at bottom foam plate design position, and reserved drilling is that subsequent slip casting anchoring is ready,
(2) concrete sample make: by the mold of concreting in lifts to step (1) production, pouring and be divided into two parts, bottom It pours to reserving gaps position and stops 2 hours, spread one layer of plastic paper, then pour upside, test block extracts pvc pipe after reaching initial set, After demoulding is hardened in test block, it is sent to temperature standard fog room and is conserved;
The reinforcing steelframe being welded into using steel plate and angle steel carries out local stiffening to jack load position;
(3) anchor pole pastes foil gauge: the position for needing to paste foil gauge on reinforcing bar being polished smooth, foil gauge is posted, uses epoxy resin Do water-proofing treatment;
(4) Anchor Agent makes: production Anchor Agent is directly circulated into drilling, then test anchor pole is inserted into, and waits Anchor Agent solidifying Gu the anchor pole for posting foil gauge is fixed on inside the test block of " I " fonts;
(5) displacement measurement system is arranged: the second amesdial for testing displacement is fixed in test block by fixing steel plate, reserving gaps Upper and lower two sides respectively install one, survey the sum of the displacement of two the second amesdials, and the displacement at the anchor pole of two sides is then measured by clearance gauge, It is finally averaged and carries out data analysis.
CN201610534274.8A 2016-06-29 2016-06-29 A kind of research absciss layer is to the experimental rig and production method of bolt action load Expired - Fee Related CN106442121B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610534274.8A CN106442121B (en) 2016-06-29 2016-06-29 A kind of research absciss layer is to the experimental rig and production method of bolt action load

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610534274.8A CN106442121B (en) 2016-06-29 2016-06-29 A kind of research absciss layer is to the experimental rig and production method of bolt action load

Publications (2)

Publication Number Publication Date
CN106442121A CN106442121A (en) 2017-02-22
CN106442121B true CN106442121B (en) 2019-07-19

Family

ID=58183331

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610534274.8A Expired - Fee Related CN106442121B (en) 2016-06-29 2016-06-29 A kind of research absciss layer is to the experimental rig and production method of bolt action load

Country Status (1)

Country Link
CN (1) CN106442121B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106053214A (en) * 2016-07-28 2016-10-26 西安工业大学 Testing apparatus for research of imposed load of bed separation to anchor pole and manufacturing method
CN107607380B (en) * 2017-11-15 2023-08-25 华侨大学 Manufacturing die for multi-angle interlayer-containing rock mass reinforcement test
CN110274818A (en) * 2019-06-12 2019-09-24 东南大学 A kind of cable-supported bridge fire causes the combination test apparatus of disconnected rope
CN113933174B (en) * 2021-09-16 2024-09-20 青岛理工大学 Method and system for testing interface stress of full-length anchoring anchor rod under influence of rock separation layer deformation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1773241A (en) * 2004-11-11 2006-05-17 香港理工大学 Testing box for measuring anti-pulling force of soil nailing mechanical property
CN102175518A (en) * 2011-02-22 2011-09-07 河海大学 Method for testing flexural tensile strength of pavement concrete under complete road surface
CN203083879U (en) * 2013-02-26 2013-07-24 长安大学 Soil anchor strain testing system
CN203287250U (en) * 2013-05-09 2013-11-13 深圳市工勘岩土工程有限公司 Tensile test device for sock-soil
CN203414351U (en) * 2013-09-09 2014-01-29 长沙学院 Prestrain reinforced experimental device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001303583A (en) * 2000-04-25 2001-10-31 Sanei Shoji Kk Foundation structure for building and its execution method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1773241A (en) * 2004-11-11 2006-05-17 香港理工大学 Testing box for measuring anti-pulling force of soil nailing mechanical property
CN102175518A (en) * 2011-02-22 2011-09-07 河海大学 Method for testing flexural tensile strength of pavement concrete under complete road surface
CN203083879U (en) * 2013-02-26 2013-07-24 长安大学 Soil anchor strain testing system
CN203287250U (en) * 2013-05-09 2013-11-13 深圳市工勘岩土工程有限公司 Tensile test device for sock-soil
CN203414351U (en) * 2013-09-09 2014-01-29 长沙学院 Prestrain reinforced experimental device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
考虑围岩离层影响的端部锚固锚杆荷载分析及其支护设计;谷拴成 等;《采矿与安全工程学报》;20150930;第32卷(第5期);第760-764页

Also Published As

Publication number Publication date
CN106442121A (en) 2017-02-22

Similar Documents

Publication Publication Date Title
CN106442121B (en) A kind of research absciss layer is to the experimental rig and production method of bolt action load
CN106053214A (en) Testing apparatus for research of imposed load of bed separation to anchor pole and manufacturing method
Cunha et al. An integrated approach for modelling the tensile behaviour of steel fibre reinforced self-compacting concrete
CN102289980B (en) Method for preparing preset cracks in hydrofracture simulation specimen
CN105133487B (en) Construction method for using combined type bridge temporary support to rapidly build continuous beams
CN106092775B (en) Cement Concrete Deck Paving Course and floorings shearing strength at intersection stiffness test method
Park et al. Prediction of interfacial fracture between concrete and fiber reinforced polymer (FRP) by using cohesive zone modeling
CN107941594A (en) A kind of multifunction test device for liner structure
CN109060532B (en) Karst area ultra-long pile buckling stability indoor model experimental device and method
CN101620042A (en) Method for detecting compressive strength of concrete by body sampling
Liu et al. Test research on prestressed beam of inorganic polymer concrete
CN111257101A (en) Group anchor effect model test device and detection method
CN104863379B (en) Special reinforced concrete beam strengthening member and its effective reinforcement means and application
CN205049466U (en) Device of survey concrete and steel bar anchoring bearing capacity
Li et al. Study and Numerical Analysis on Seismic Performance of Concrete U‐Shaped Shear Wall
CN107655740B (en) Device and method for manufacturing test piece capable of testing shear strength of joint surfaces of different anchoring angles
CN205035732U (en) Interim support of combined type bridge
CN207582978U (en) A kind of floorslab thickness control device
CN202562922U (en) Test device for measuring early-age anti-crack performance of layered pouring concrete
CN207336179U (en) The device of different anchorage angle joint plane shear strength test specimens can be tested by making
CN201637656U (en) Girder type tester of bonding strength between fiber-reinforced compound sheet and concrete
Yang et al. Push-out test to study bond properties of mortar–concrete interface
Shariff et al. Creep and shrinkage effects on reinforced concrete walls: Experimental study
Hamid et al. Determination of Concrete Shrinkage Initiation in Internally Cured and Conventional Concrete Decks
CN206693227U (en) Tower crane anchor based on BIM Deepen Designs

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190719