CN106442121A - Test device for studying load imposed on anchor rods by separation layer and making method - Google Patents

Test device for studying load imposed on anchor rods by separation layer and making method Download PDF

Info

Publication number
CN106442121A
CN106442121A CN201610534274.8A CN201610534274A CN106442121A CN 106442121 A CN106442121 A CN 106442121A CN 201610534274 A CN201610534274 A CN 201610534274A CN 106442121 A CN106442121 A CN 106442121A
Authority
CN
China
Prior art keywords
test block
anchor pole
experimental rig
research
absciss layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610534274.8A
Other languages
Chinese (zh)
Other versions
CN106442121B (en
Inventor
丁潇
何晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Technology
Xian Technological University
Original Assignee
Xian Technological University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Technological University filed Critical Xian Technological University
Priority to CN201610534274.8A priority Critical patent/CN106442121B/en
Publication of CN106442121A publication Critical patent/CN106442121A/en
Application granted granted Critical
Publication of CN106442121B publication Critical patent/CN106442121B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/02Details
    • G01N3/06Special adaptations of indicating or recording means
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/28Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/02Details
    • G01N3/06Special adaptations of indicating or recording means
    • G01N3/062Special adaptations of indicating or recording means with mechanical indicating or recording means

Abstract

The invention provides a test device for studying the load imposed on anchor rods by a separation layer and a making method. The test device includes an H-shaped test block, a reserved gap is disposed on a horizontal symmetric plane of the test block, the vertical section of the H-shaped test block is internally provided with anchor rods sticked with strain gauges, and both ends of the anchor rods respectively extend to the upper side and lower side of the test block. The left and the right of the H-shaped test block respectively has a groove, the grooves are used for placing a first dial indicator equipped hydraulic jack, the front side and back side of the test block are both provided with a reinforcing steel frame, the reinforcing steel frame is disposed along the corner positions of the grooves, and the upper side and lower side in the grooves are both equipped with reinforcing steel plates. The test block is also provided with a displacement measurement system. The making method comprises the steps of: (1) mold making; (2) making of a concrete test block; (3) sticking of strain gauges to the anchor rods; (4) making of an anchoring agent; and (5) setting of the displacement measurement system. The test device provided by the invention has the advantages of high reliability of test data and convenient operation.

Description

A kind of research absciss layer is to the experimental rig of bolt action load and preparation method
Technical field
The invention belongs to mechanics study technical field, especially relate to a kind of research test to bolt action load for the absciss layer Device and preparation method.
Background technology
Absciss layer produces load action to anchor pole, for determining the absciss layer stress pattern of the body of rod and destruction in evolution Rule, should carry out experimental test, but on-the-spot test difficulty is larger, be difficult to first determine that the position of absciss layer and absciss layer value are big Little, secondly host rock environment is complicated, and influence factor is excessive, and test discreteness is larger.Laboratory test effectively studies hand as a kind of Section, can be with the correctness of proof theory model and applicability.The key point of test is reserved absciss layer, and test block is separated, this The bright test block shape from design is set about, and test block is reinforced, and will be loaded test block separation using jack, and arranges displacement prison Examining system, stress monitoring system, constitute integrity test.
Content of the invention
It is an object of the invention to provide the research absciss layer pair that a kind of structure is simple, simple to operate, test data reliability is high The experimental rig of bolt action load and preparation method.
The technical scheme is that:A kind of experimental rig to bolt action load for the research absciss layer of the present invention, described Experimental rig includes the test block of " work " font, and the horizontal symmetrical face of described test block is provided with reserving gaps, " work " font test block The anchor pole posting foil gauge is set, the two ends of described anchor pole extend respectively to the both sides up and down of test block in vertical section;
The left and right of described " work " font test block respectively forms in a groove, described groove and carries the first amesdial for placing Hydraulic jack, described test block before and after both sides be equipped with reinforcing steelframe, described reinforcing steelframe sets along the corner location of groove Put, in described groove, upper and lower surface is equipped with strengthening steel slab;
It is additionally provided with displacement measurement system in described test block.
Preferably, the angle between described anchor pole and reserving gaps is 60 ° or 90 °.
Preferably, described reinforcing steelframe is welded into by steel plate and angle steel.
Preferably, described strengthening steel slab is in concave, and extends to the both sides in front and back of anchor pole.
Preferably, described anchor pole is provided with three, and the corresponding middle anchor pole of the second amesdial of described displacement measurement system sets Put.
Preferably, arbitrary anchor pole is provided with 6 foil gauges, wherein 3 tops being located at reserving gaps, and 3 positioned at reserved The bottom in gap.
Preferably, described displacement measurement system includes being provided with two the second amesdials on front side of test block, two the second amesdials It is fixed on the both sides up and down of reserving gaps by fixing steel plate.
Another aspect of the present invention, also includes a kind of making side of the research experimental rig to bolt action load for the absciss layer Method, it comprises the following steps:
(1) Mold Making:Test block according to " work " font makes corresponding mould, and mould adopts plank sheathing, mold bottom Setting cystosepiment, inserts pvc pipe at bottom foam plate design attitude, and reserved boring anchors ready for follow-up slip casting;
(2) concrete sample make:In the mould that concreting in lifts to step (1) is made, pour point two parts, Bottom pours and stops hour to reserving gaps position, spreads one layer of plastic paper, then pours upside, and pvc pipe is pulled out after reaching initial set by test block Go out, after test block hardening form removal, row maintenance when being sent to temperature standard fog room;
Using the reinforcing steelframe that steel plate and angle steel are welded into, position is loaded to jack and carry out local stiffening;
(3) anchor pole patch foil gauge:The position needing on reinforcing bar to paste foil gauge is polished smooth, posts foil gauge, use epoxy Resin does water-proofing treatment;
(4) Anchor Agent makes:Make Anchor Agent, can directly be circulated in boring, then anchor pole insertion will be tested, wait anchoring Agent solidifies, and the anchor pole posting foil gauge is fixed on inside the test block of " work " font;
(5) displacement measurement system setting:Second amesdial of test displacement is fixed in test block by fixing steel plate, reserves The each displacement sum installed, survey two the second amesdials in the upper and lower both sides in gap, clearance gauge is then passed through in the displacement at the anchor pole of both sides Measure, finally average and carry out data analysis.
The present invention has the advantages and positive effects that:
1st, rock material, using self-control concrete test block simulation, for making test block separate, needs test block is loaded, loads and select Test block is backed down by jack, convenient for loading, and " I shape " is made in test block.
2nd, can be by foil gauge, the anchor pole additional stress field rule that monitoring absciss layer causes be pasted on anchor pole;Can study from The loading process of layer effect lower bolt, and failure law, can study under 2 kinds of different operating modes, the stress distribution of anchor pole:One kind is anchor Bar is vertical with absciss layer, and one kind is anchor pole with absciss layer at an angle, and research anchor pole tension, tension cut the stress of 2 kinds of different situations Distribution and failure law.
3rd, pass through to record load and fracture open value, draw absciss layer value size and the relation of anchor axial force, and with theory The relation curve of model is contrasted.
Brief description
Fig. 1 is the structural representation (anchor pole and reserving gaps are in 90 ° of angles) of experimental rig of the present invention.
Fig. 2 is the structural representation (anchor pole and reserving gaps are in 60 ° of angles) of experimental rig of the present invention.
Fig. 3 is the setting structure schematic diagram of strengthening steel slab.
Fig. 4 is the front view (anchor pole and reserving gaps are in 90 ° of angles) of experimental rig of the present invention.
Fig. 5 is the front view (anchor pole and reserving gaps are in 60 ° of angles) of experimental rig of the present invention.
Fig. 6 is mould structure schematic diagram.
Fig. 7 is the attachment structure schematic diagram of anchor pole and foil gauge.
Fig. 8 is the structural representation of test block.
Fig. 9 is the assembling structure schematic diagram (omit hydraulic jack, reinforce steelframe, strengthening steel slab) of the second amesdial
In figure:
1- test block, 2- reserving gaps, 3- anchor pole, 4- groove, 5- hydraulic jack, 6- first amesdial, 7- backing plate, 8- Two amesdials, 9- reinforces steelframe, 10- strengthening steel slab, 11- mould, 12- cystosepiment, and 13-PVC manages, 14- foil gauge, and 15- positions Steel plate.
Specific embodiment
Below in conjunction with the accompanying drawings the present invention is elaborated.
As Figure 1-5, the experimental rig to bolt action load for a kind of research absciss layer of the present invention, described experimental rig Including the test block 1 of " work " font, the bottom of test block 1 is provided with backing plate 7, sets the anchor pole 3 posting foil gauge in described test block 1, described The centre position of test block 1 is provided with horizontal-extending reserving gaps 2, and the left and right groove 4 of described test block is used for placing with the 1000th The hydraulic jack 5 of point table 6, before and after described test block 1, both sides are provided with the reinforcing steelframe 9 that steel plate and angle steel are welded into, described plus Gu steelframe 9 is equipped with the strengthening steel slab 10 of concave along the corner location setting of groove, the upper and lower ends of described groove.
Angle between described anchor pole and reserving gaps is 90 ° or 60 °.
A kind of preparation method of the experimental rig to bolt action load for the research absciss layer of the present invention, comprises the following steps:
(1) Mold Making
As shown in fig. 6, the corresponding mould of making 11 of the test block according to " work " font, mould adopts plank sheathing, wooden model version There is advantages below:Plate face flat smooth, can saw, and can bore, easy accessibility, simple to operate, and manufacturing speed is fast, is convenient in demoulding and becomes This is low.According to the given size of Fig. 3, make mould.For convenience of determining anchor pole position, mold bottom arranges cystosepiment 12, in bottom Pvc pipe 13 is inserted, the height of pvc pipe is higher than the height of the test block of " work " font, after reserved boring is at cystosepiment design attitude Continuous slip casting anchoring is ready.
(2) concrete sample make
Concrete grade is C30, requires (water: cement: sand: stone=0.38: 1: 1.11: 2.72) according to mix-design Weigh, the cement weighing up and sand are added water stirring, finally adds stone and be sufficiently stirred for.By concreting in lifts to step (1) in the mould making, point two parts are poured, bottom pours and stops 2 hours to reserving gaps position, spreads one layer of plastic paper, then pours Build upside.Pvc pipe is extracted after reaching initial set by test block, after test block hardening form removal, should be sent to 20 ± 3 DEG C of temperature in time, humidity is Row maintenance during more than 90% standard curing room, the good test block of maintenance is as shown in Figure 8.
Concrete also known as artificial stone, property, similar to rock, is fragile material, resistance to compression but non-tension, not shearing resistance, therefore right Also need outside test block to be reinforced, the reinforcing steelframe being welded into by steel plate and angle steel loads position to jack to carry out locally adding Gu, the test block after reinforcing is as illustrated in figures 4-5.
(3) anchor pole patch foil gauge
As shown in fig. 7, the position needing on reinforcing bar to paste foil gauge 14 is polished smooth, the area at smooth place be 5mm × 10mm.Foil gauge 14 is posted on the spiral of length 60cm, does water-proofing treatment with epoxy resin.Foil strain gauge size is 2mm × 3mm, every is pasted 6, and each patch in upper and lower both sides 3 is so that all there are 3 foil gauges to be located in reserving gaps on every anchor pole Side, 3 foil gauges are located at the downside of reserving gaps.
(4) Anchor Agent makes
Being determined according to ancillary test is used G type bar planting material as fixing agent for anchor poles, and G moulding mixture is mixed with water according to a certain percentage With, this material good fluidity, directly can be circulated in boring, then anchor pole insertion will be tested, wait Anchor Agent solidification, post foil gauge Anchor pole be fixed on inside the test block of " work " font.
(5) displacement measurement system setting
As shown in figure 9, the second amesdial 8 of test displacement is arranged at middle anchor pole position, nail positioning steel in test block 1 Plate 15, the second amesdial 8 is arranged on and is fixed on fixing steel plate 15, and the upper and lower both sides of reserving gaps are each to install one, surveys two The displacement sum of the second amesdial 8.Displacement at the anchor pole of both sides is then measured by clearance gauge, and finally averaging carries out data and divide Analysis.
Above one embodiment of the present of invention is described in detail, but described content has been only the preferable enforcement of the present invention Example is it is impossible to be considered the practical range for limiting the present invention.All impartial changes made according to the present patent application scope and improvement Deng all should still belong within the patent covering scope of the present invention.

Claims (8)

1. a kind of research absciss layer to the experimental rig of bolt action load it is characterised in that:Described experimental rig includes " work " word The test block of type, the horizontal symmetrical face of described test block is provided with reserving gaps, sets and post strain in the vertical section of " work " font test block The anchor pole of piece, the two ends of described anchor pole extend respectively to the both sides up and down of test block;
The left and right of described " work " font test block respectively forms a groove, and described groove is used for placing the hydraulic pressure with the first amesdial Jack, before and after described test block, both sides are equipped with reinforcing steelframe, and described reinforcing steelframe is along the corner location setting of groove, described In groove, upper and lower surface is equipped with strengthening steel slab;
It is additionally provided with displacement measurement system in described test block.
2. a kind of research absciss layer according to claim 1 to the experimental rig of bolt action load it is characterised in that:Described 60 ° or 90 ° of angle between anchor pole and reserving gaps.
3. a kind of research absciss layer according to claim 1 to the experimental rig of bolt action load it is characterised in that:Described Reinforce what steelframe was welded into by steel plate and angle steel.
4. a kind of research absciss layer according to claim 1 to the experimental rig of bolt action load it is characterised in that:Described Strengthening steel slab is in concave, and extends to the both sides in front and back of anchor pole.
5. a kind of research absciss layer according to claim 1 to the experimental rig of bolt action load it is characterised in that:Described Anchor pole is provided with three, the corresponding middle anchor pole setting of the second amesdial of described displacement measurement system.
6. a kind of research absciss layer according to claim 1 to the experimental rig of bolt action load it is characterised in that:Arbitrary Anchor pole is provided with 6 foil gauges, wherein 3 tops being located at reserving gaps, 3 bottoms being located at reserving gaps.
7. a kind of research absciss layer according to claim 1 to the experimental rig of bolt action load it is characterised in that:Described Displacement measurement system includes two the second amesdials of setting on front side of test block, and two the second amesdials are fixed on by fixing steel plate The both sides up and down of reserving gaps.
8. a kind of as claimed in claim 1 research the experimental rig to bolt action load for the absciss layer preparation method, including with Lower step:
(1) Mold Making:Test block according to " work " font makes corresponding mould, and mould adopts plank sheathing, and mold bottom is arranged Cystosepiment, inserts pvc pipe at bottom foam plate design attitude, reserves boring ready for follow-up slip casting anchoring;
(2) concrete sample make:In the mould that concreting in lifts to step (1) is made, pour point two parts, bottom Pour and stop hour to reserving gaps position, spread one layer of plastic paper, then pour upside, pvc pipe is extracted after reaching initial set by test block, examination After block hardening form removal, row maintenance when being sent to temperature standard fog room;
Using the reinforcing steelframe that steel plate and angle steel are welded into, position is loaded to jack and carry out local stiffening;
(3) anchor pole patch foil gauge:The position needing on reinforcing bar to paste foil gauge is polished smooth, posts foil gauge, use epoxy resin Do water-proofing treatment;
(4) Anchor Agent makes:Make Anchor Agent, can directly be circulated in boring, then anchor pole insertion will be tested, wait Anchor Agent to coagulate Gu, the anchor pole posting foil gauge is fixed on inside the test block of " work " font;
(5) displacement measurement system setting:Second amesdial of test displacement is fixed in test block by fixing steel plate, reserving gaps The each displacement sum installed, survey two the second amesdials in both sides up and down, the displacement at the anchor pole of both sides is then measured by clearance gauge, Finally average and carry out data analysis.
CN201610534274.8A 2016-06-29 2016-06-29 A kind of research absciss layer is to the experimental rig and production method of bolt action load Active CN106442121B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610534274.8A CN106442121B (en) 2016-06-29 2016-06-29 A kind of research absciss layer is to the experimental rig and production method of bolt action load

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610534274.8A CN106442121B (en) 2016-06-29 2016-06-29 A kind of research absciss layer is to the experimental rig and production method of bolt action load

Publications (2)

Publication Number Publication Date
CN106442121A true CN106442121A (en) 2017-02-22
CN106442121B CN106442121B (en) 2019-07-19

Family

ID=58183331

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610534274.8A Active CN106442121B (en) 2016-06-29 2016-06-29 A kind of research absciss layer is to the experimental rig and production method of bolt action load

Country Status (1)

Country Link
CN (1) CN106442121B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106053214A (en) * 2016-07-28 2016-10-26 西安工业大学 Testing apparatus for research of imposed load of bed separation to anchor pole and manufacturing method
CN107607380A (en) * 2017-11-15 2018-01-19 河南理工大学 The making mould of multi-angle class containing interlayer rock mass reinforcing experiment
CN110274818A (en) * 2019-06-12 2019-09-24 东南大学 A kind of cable-supported bridge fire causes the combination test apparatus of disconnected rope

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001303583A (en) * 2000-04-25 2001-10-31 Sanei Shoji Kk Foundation structure for building and its execution method
CN1773241A (en) * 2004-11-11 2006-05-17 香港理工大学 Testing box for measuring anti-pulling force of soil nailing mechanical property
CN102175518A (en) * 2011-02-22 2011-09-07 河海大学 Method for testing flexural tensile strength of pavement concrete under complete road surface
CN203083879U (en) * 2013-02-26 2013-07-24 长安大学 Soil anchor strain testing system
CN203287250U (en) * 2013-05-09 2013-11-13 深圳市工勘岩土工程有限公司 Tensile test device for sock-soil
CN203414351U (en) * 2013-09-09 2014-01-29 长沙学院 Prestrain reinforced experimental device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001303583A (en) * 2000-04-25 2001-10-31 Sanei Shoji Kk Foundation structure for building and its execution method
CN1773241A (en) * 2004-11-11 2006-05-17 香港理工大学 Testing box for measuring anti-pulling force of soil nailing mechanical property
CN102175518A (en) * 2011-02-22 2011-09-07 河海大学 Method for testing flexural tensile strength of pavement concrete under complete road surface
CN203083879U (en) * 2013-02-26 2013-07-24 长安大学 Soil anchor strain testing system
CN203287250U (en) * 2013-05-09 2013-11-13 深圳市工勘岩土工程有限公司 Tensile test device for sock-soil
CN203414351U (en) * 2013-09-09 2014-01-29 长沙学院 Prestrain reinforced experimental device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
谷拴成 等: "考虑围岩离层影响的端部锚固锚杆荷载分析及其支护设计", 《采矿与安全工程学报》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106053214A (en) * 2016-07-28 2016-10-26 西安工业大学 Testing apparatus for research of imposed load of bed separation to anchor pole and manufacturing method
CN107607380A (en) * 2017-11-15 2018-01-19 河南理工大学 The making mould of multi-angle class containing interlayer rock mass reinforcing experiment
CN107607380B (en) * 2017-11-15 2023-08-25 华侨大学 Manufacturing die for multi-angle interlayer-containing rock mass reinforcement test
CN110274818A (en) * 2019-06-12 2019-09-24 东南大学 A kind of cable-supported bridge fire causes the combination test apparatus of disconnected rope

Also Published As

Publication number Publication date
CN106442121B (en) 2019-07-19

Similar Documents

Publication Publication Date Title
CN104165807B (en) Large-deflection destruction testing device and method for prestressed concrete plate beam
CN106053214A (en) Testing apparatus for research of imposed load of bed separation to anchor pole and manufacturing method
CN102735555B (en) Rock structural surface shear test method and device for carrying out said thereof
CN104975621B (en) A kind of many anchored end retaining wall indoor model test device and test method
CN101806714B (en) Beam tester of bonding strength of fibre reinforced composite sheet and concrete
CN106092775B (en) Cement Concrete Deck Paving Course and floorings shearing strength at intersection stiffness test method
CN106442121B (en) A kind of research absciss layer is to the experimental rig and production method of bolt action load
CN101620042B (en) Method for detecting compressive strength of concrete by body sampling
CN106442153A (en) Test method and test device for simulating dam heel hydraulic fracture of concrete gravity dam
CN105259107A (en) Device for testing bond performance of reinforcing steel bar and concrete through drawing and testing method
CN110132718A (en) Structure residual bearing capacity measuring method and system based on Tunnel Lining Deformation feature
CN108982224A (en) A kind of experimental rig and method of test pile and slip casting soil body contact surface failure mechanism
CN204491390U (en) A kind of big cross section fish-belly box beam structure
CN109060532B (en) Karst area ultra-long pile buckling stability indoor model experimental device and method
CN2840008Y (en) Novel testing apparatus with structural beam plate bearing performance in-situ loading
CN110057636A (en) The production method of the mold and rock sample of production plus anchor pole rock sample containing crack
CN106932254B (en) Light-gauge steel section and foam concrete interface sliding method for testing performance
CN106017607B (en) Floating monitoring system and its monitoring method of the formwork jumbo in self-compacting concrete
CN205049466U (en) Device of survey concrete and steel bar anchoring bearing capacity
CN109406289B (en) Test method for secondary grouting reinforcement bearing characteristic of fractured rock mass
CN107655740B (en) Device and method for manufacturing test piece capable of testing shear strength of joint surfaces of different anchoring angles
CN116558976A (en) Tunnel three-dimensional simulation experiment system and preparation method of test piece thereof
CN113125292B (en) Device and method for manufacturing anchoring body of pre-buried distributed optical fiber
CN105547233A (en) Device and method for field sampling of assembly-type shear wall rough surface
CN210376012U (en) Loading system of stiffening rib stiffening type rectangular concrete-filled steel tube column

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant