CN106439395A - Method for constructing insulating layer in air duct made of iron sheet - Google Patents

Method for constructing insulating layer in air duct made of iron sheet Download PDF

Info

Publication number
CN106439395A
CN106439395A CN201611008662.9A CN201611008662A CN106439395A CN 106439395 A CN106439395 A CN 106439395A CN 201611008662 A CN201611008662 A CN 201611008662A CN 106439395 A CN106439395 A CN 106439395A
Authority
CN
China
Prior art keywords
bar
airduct
line
warming plate
insulation layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611008662.9A
Other languages
Chinese (zh)
Other versions
CN106439395B (en
Inventor
尹振宗
吴华
王新华
顾林红
沈万国
杨朝晖
倪磊
徐保国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Installation Group Ltd By Share Ltd
Original Assignee
Nantong Installation Group Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Installation Group Ltd By Share Ltd filed Critical Nantong Installation Group Ltd By Share Ltd
Priority to CN201611008662.9A priority Critical patent/CN106439395B/en
Publication of CN106439395A publication Critical patent/CN106439395A/en
Application granted granted Critical
Publication of CN106439395B publication Critical patent/CN106439395B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L59/00Thermal insulation in general
    • F16L59/04Arrangements using dry fillers, e.g. using slag wool which is added to the object to be insulated by pouring, spreading, spraying or the like

Abstract

The invention discloses a method for constructing an insulating layer in an air duct made of an iron sheet. The method comprises the following steps: preparing before construction; distributing and fixing insulating nails; cutting an insulating plate; splicing the insulating plates; cutting and splicing an aluminum-foil glass fiber cloth layer; performing insulation treatment on the flange surface of the air duct; fixing the insulating nails with the insulating layer; and assembling brace rods. According to the method, the insulating layer is arranged inside the air duct, so that the insulating layer is prevented from being broken when the air duct is assembled, and noise generated when wind current in the air duct impacts the insulating layer can be greatly reduced; and the air duct made of the iron sheet can be intensively prefabricated, so that the productivity is greatly improved.

Description

A kind of construction of iron duct inner thermal insulating layer
Technical field
The present invention relates to the realm of building construction is and in particular to a kind of construction of iron duct inner thermal insulating layer.
Background technology
With the fast development of IT industry, the construction of large-scale no furred ceiling workshop especially electronic workshop emerges in an endless stream. Simultaneously because this kind of Factory Building generally has the characteristics that area is big, space is big, electromechanical facility is bright setting, the requirement to air conditioning system is also got over Come higher.
, as the indispensable part of air conditioning system, its heat-insulating property is particularly important, and existing airduct adopts external thermal insulation for airduct Form is although certain insulation effect can be played, but the insulation material of outside is easily subject to external force to damage when mounted, with Big with airduct inwall rigid contact when Shi Fengliu passes through in scene, therefore produce larger noise.
Content of the invention
Goal of the invention:The invention aims to making up the deficiencies in the prior art, provide a kind of iron duct inside holding The construction of layer, heat-insulation layer is arranged so that will not damage heat-insulation layer when airduct is installed inside airduct, airduct endogenous wind simultaneously Stream with impact the noise producing during heat-insulation layer and substantially reduce, the airduct of iron sheet can be processed with concentration pre-casting, substantially increases life Force of labor.
Technical scheme:A kind of construction of iron duct inner thermal insulating layer, specifically includes following steps:
Prepare before a, construction:
With vacuum cleaner, the floating dust of airduct inner surface is absorbed, use cloth to wipe with and wipe clean, greasy dirt cleaning agent is removed;
Punch in advance in the airduct inwall installing support bar additional, and with environmentally-friendly universal glue top nut at support rod hole;
B, bar for line distribution are fixed
Setting-out is carried out to bar for line position it is ensured that every square metre of bar for line quantity is on airduct inwall according to setting-out drawing requirement 20, coat, using 2 cun of hairbrush, the all-purpose adhesive that glue surface size is 50*50mm at each setting-out, will protect after glue surface is tack-free The fixing compacting of temperature nail at setting-out, wherein compare insulation layer thickness and grow 10 ~ 20mm by bar for line length;
Pattern status requirement is in that more parallel rows are arranged for bar for line, and between up-downgoing, bar for line is to be dislocatedly distributed, and two line spaces Less than 200mm, with being smaller than 200mm between a line bar for line, first trip and bottom row bar for line are less than with airduct Edge Distance 50mm, the bar for line of both sides and air duct flange back gauge are 40mm;
C, warming plate cutting
Top and bottom warming plate, its length 20 ~ 30mm bigger than duct length, the big 2 ~ 3mm of width ratio airduct width, side warming plate, Its length reaches 20 ~ 30mm than duct length, width ratio airduct highly reduce insulation layer thickness after the big 5 ~ 10mm of size;
D, warming plate bonding
Airduct inwall and bar for line base uniformly coat white glue, after glue surface is tack-free, the insulation of top and bottom is done and puts To on the bar for line of the top and bottom of airduct, when putting, warming plate two ends respectively grow 10 ~ 15mm relative to airduct, then first press middle right Surrounding alternately and repeatedly presses so that warming plate is bonded in top and bottom in airduct afterwards, and bar for line passes through heat-insulation layer simultaneously;
By two sides insulation board placing on the bar for line of the side of airduct, when putting, warming plate two ends respectively grow 10 relative to airduct ~ 15mm, then first alternately and repeatedly presses so that warming plate is bonded in airduct medial surface by middle and then surrounding, bar for line simultaneously Through heat-insulation layer;
E, the cutting bonding of aluminium foil glass fiber layer of cloth
Cutting aluminium foil glass fiber fabric makes its length and width all than the length of warming plate and the big 50mm of width, at the aluminium foil glass fiber fabric back side Uniformly coating white glue, after surface with glue is tack-free, aluminium foil glass fiber fabric is bonded on warming plate, and passes through bar for line, gently smears aluminium foil Glass-fiber-fabric is closely knit with warming plate bonding;
F, air duct flange face isothermal holding
The aluminium foil glass fiber fabric growing at air duct flange face is wrapped prominent warming plate, and is longitudinally gently depressed into warming plate along airduct On the flange face of top, its adhesion width is more than the 2/3 of flange face width;
G, bar for line and heat-insulation layer are fixed, and cover round tablet on bar for line, so that tabletting is fitted with insulation layer surface, and bending is protected Bar for line outside warm plate is in parallel position as airduct;
H, support bar are installed
Using a diameter of 10mm zinc-plated full tooth screw mandrel as support bar, the support rod hole vertical direction reserved along airduct, with cone Heat-insulation layer is penetrated by son, and flame-proof PVC sleeve pipe is placed on the corresponding position of airduct inner bracing piece, the long discharge pipe of PVC casing length Full tooth screw mandrel is screwed into and through PVC sleeve pipe from airduct upper support rod aperture by free height 10mm after insulation, and from airduct opposite side Relative support rod hole position screws out, and two ends nut fastens;
In nut and airduct faying face, with silica gel sealing at the faying face of nut and full tooth screw mandrel, between PVC sleeve pipe and heat-insulation layer Space closely knit with aluminum foil and adhesive tape bonding.
Described warming plate is centrifugally glass-wool.
Described bar for line is aluminum bar for line.
Beneficial effect:A kind of construction of disclosed iron duct inner thermal insulating layer, has beneficial effect as follows Really:
By heat-insulation layer be arranged on airduct internal so that heat-insulation layer will not be damaged when airduct is installed, simultaneously distinguished and admirable walk in airduct When impact certain cushioning effect played on heat-insulation layer, thus impacting, rigidity is little, noise also decreases;
Using iron sheet as airduct so that do not need mat insulation to split between airduct and support, iron sheet material can be concentrated simultaneously Prefabricated processing, execute-in-place, thus greatly improve labor productivity;
Cover one layer of aluminium foil glass fiber fabric again in insulation layer surface, can be kicked up with distinguished and admirable with the thin wadding of effective control glass cotton.
Brief description
Fig. 1 is bar for line scattergram.
Specific embodiment
With reference to specific embodiment, the invention will be further described:
A kind of construction of iron duct inner thermal insulating layer, specifically includes following steps:
Prepare before a, construction:
Material selects, and heat-insulation layer selects not firing A level centrifugally glass-wool, its material, density, and specification and thickness meet GB8624- 2012《Construction material and product burns grading performance》Regulation, bar for line be aluminum bar for line;
Process in airduct, with vacuum cleaner, the floating dust of airduct inner surface is absorbed, use cloth to wipe with and wipe clean, greasy dirt cleaning agent is gone Remove;
Punching is processed, and beats support rod hole in advance in the airduct inwall installing support bar additional, and uses environmentally-friendly universal glue at support rod hole Paste top nut;
B, bar for line distribution are fixed
Setting-out is carried out to bar for line position it is ensured that every square metre of bar for line quantity is on airduct inwall according to setting-out drawing requirement 20, coat, using 2 cun of hairbrush, the all-purpose adhesive that glue surface size is 50*50mm at each setting-out, will protect after glue surface is tack-free At setting-out, wherein bar for line length is equal to insulation layer thickness and adds 10 ~ 20mm the fixing compacting of temperature nail;
Pattern status requirement(As shown in Figure 1)It is in that more parallel rows are arranged for bar for line, between up-downgoing, bar for line is to be dislocatedly distributed (Assume diamond in shape), and the distance between two row are less than 200mm, with being smaller than 200mm between a line bar for line, first trip and bottom row are protected Wen Ding and airduct Edge Distance are less than 50mm, and the bar for line of both sides and air duct flange back gauge are 40mm;
C, warming plate cutting
Top and bottom warming plate, its length 20 ~ 30mm bigger than duct length, the big 2 ~ 3mm of width ratio airduct width, side warming plate, Its length reaches 20 ~ 30mm than duct length, width ratio airduct highly reduce insulation layer thickness after the big 5 ~ 10mm of size;
D, warming plate bonding
Airduct inwall and bar for line base uniformly coat white glue, after glue surface is tack-free, by the insulation board placing of top and bottom To on the bar for line of the top and bottom of airduct, when putting, warming plate two ends respectively grow 10 ~ 15mm relative to airduct, then first press middle right Surrounding alternately and repeatedly presses so that warming plate is bonded in top and bottom in airduct afterwards, and bar for line passes through heat-insulation layer simultaneously;
By two sides insulation board placing on the bar for line of the side of airduct, when putting, warming plate two ends respectively grow 10 relative to airduct ~ 15mm, then first alternately and repeatedly presses so that warming plate is bonded in airduct medial surface by middle and then surrounding, bar for line simultaneously Through heat-insulation layer;
E, the cutting bonding of aluminium foil glass fiber layer of cloth
Cutting aluminium foil glass fiber fabric makes its length and width all than the length of warming plate and the big 50mm of width, at the aluminium foil glass fiber fabric back side Uniformly coating white glue, after surface with glue is tack-free, aluminium foil glass fiber fabric is bonded on warming plate, and passes through bar for line, gently smears aluminium foil Glass-fiber-fabric is closely knit with warming plate bonding;
F, air duct flange face isothermal holding
The aluminium foil glass fiber fabric growing at air duct flange face is wrapped prominent warming plate, and is longitudinally gently depressed into warming plate along airduct On the flange face of top, its adhesion width is more than the 2/3 of flange face width;
G, bar for line and heat-insulation layer are fixed, and cover round tablet on bar for line, so that tabletting is fitted with insulation layer surface, and bending is protected Bar for line outside warm plate is in parallel position as airduct;
H, support bar are installed
Using a diameter of 10mm zinc-plated full tooth screw mandrel as support bar, the support rod hole vertical direction reserved along airduct, with cone Heat-insulation layer is penetrated by son, and flame-proof PVC sleeve pipe is placed on the corresponding position of airduct inner bracing piece, the long discharge pipe of PVC casing length Full tooth screw mandrel is screwed into and through PVC sleeve pipe from airduct upper support rod aperture by free height 10mm after insulation, and from airduct opposite side Relative support rod hole position screws out, and two ends nut fastens;
In nut and airduct faying face, with silica gel sealing at the faying face of nut and full tooth screw mandrel, between PVC sleeve pipe and heat-insulation layer Space closely knit with aluminum foil and adhesive tape bonding.
The technology contents of the present invention and technical characteristic have revealed that as above, but those of ordinary skill in the art still may base Make a variety of replacements without departing substantially from spirit of the present invention and modification in the announcement of the present invention, therefore, the scope of the present invention should not limit Content disclosed in embodiment, and the various replacements without departing substantially from the present invention and modification should be included, and be present patent application right Require to be covered.

Claims (3)

1. a kind of construction of iron duct inner thermal insulating layer is it is characterised in that specifically include following steps:
Prepare before a, construction:
With vacuum cleaner, the floating dust of airduct inner surface is absorbed, use cloth to wipe with and wipe clean, greasy dirt cleaning agent is removed;
Punch in advance in the airduct inwall installing support bar additional, and with environmentally-friendly universal glue top nut at support rod hole;
B, bar for line distribution are fixed
Setting-out is carried out to bar for line position it is ensured that every square metre of bar for line quantity is on airduct inwall according to setting-out drawing requirement 20, coat, using 2 cun of hairbrush, the all-purpose adhesive that glue surface size is 50*50mm at each setting-out, will protect after glue surface is tack-free The fixing compacting of temperature nail at setting-out, wherein compare insulation layer thickness and grow 10 ~ 20mm by bar for line length;
Pattern status requirement is in that more parallel rows are arranged for bar for line, and between up-downgoing, bar for line is to be dislocatedly distributed, and two line spaces Less than 200mm, with being smaller than 200mm between a line bar for line, first trip and bottom row bar for line are less than with airduct Edge Distance 50mm, the bar for line of both sides and air duct flange back gauge are 40mm;
C, warming plate cutting
Top and bottom warming plate, its length 20 ~ 30mm bigger than duct length, the big 2 ~ 3mm of width ratio airduct width, side warming plate, Its length reaches 20 ~ 30mm than duct length, width ratio airduct highly reduce insulation layer thickness after the big 5 ~ 10mm of size;
D, warming plate bonding
Airduct inwall and bar for line base uniformly coat white glue, after glue surface is tack-free, the insulation of top and bottom is done and puts To on the bar for line of the top and bottom of airduct, when putting, warming plate two ends respectively grow 10 ~ 15mm relative to airduct, then first press middle right Surrounding alternately and repeatedly presses so that warming plate is bonded in top and bottom in airduct afterwards, and bar for line passes through heat-insulation layer simultaneously;
By two sides insulation board placing on the bar for line of the side of airduct, when putting, warming plate two ends respectively grow 10 relative to airduct ~ 15mm, then first alternately and repeatedly presses so that warming plate is bonded in airduct medial surface by middle and then surrounding, bar for line simultaneously Through heat-insulation layer;
E, the cutting bonding of aluminium foil glass fiber layer of cloth
Cutting aluminium foil glass fiber fabric makes its length and width all than the length of warming plate and the big 50mm of width, at the aluminium foil glass fiber fabric back side Uniformly coating white glue, after surface with glue is tack-free, aluminium foil glass fiber fabric is bonded on warming plate, and passes through bar for line, gently smears aluminium foil Glass-fiber-fabric is closely knit with warming plate bonding;
F, air duct flange face isothermal holding
The aluminium foil glass fiber fabric growing at air duct flange face is wrapped prominent warming plate, and is longitudinally gently depressed into warming plate along airduct On the flange face of top, its adhesion width is more than the 2/3 of flange face width;
G, bar for line and heat-insulation layer are fixed, and cover round tablet on bar for line, so that tabletting is fitted with insulation layer surface, and bending is protected Bar for line outside warm plate is in parallel position as airduct;
H, support bar are installed
Using a diameter of 10mm zinc-plated full tooth screw mandrel as support bar, the support rod hole vertical direction reserved along airduct, with cone Heat-insulation layer is penetrated by son, and flame-proof PVC sleeve pipe is placed on the corresponding position of airduct inner bracing piece, the long discharge pipe of PVC casing length Full tooth screw mandrel is screwed into and through PVC sleeve pipe from airduct upper support rod aperture by free height 10mm after insulation, and from airduct opposite side Relative support rod hole position screws out, and two ends nut fastens;
In nut and airduct faying face, with silica gel sealing at the faying face of nut and full tooth screw mandrel, between PVC sleeve pipe and heat-insulation layer Space closely knit with aluminum foil and adhesive tape bonding.
2. a kind of iron duct inner thermal insulating layer according to claim 1 construction it is characterised in that:Described warming plate For centrifugally glass-wool.
3. a kind of iron duct inner thermal insulating layer according to claim 1 construction it is characterised in that:Described bar for line For aluminum bar for line.
CN201611008662.9A 2016-11-16 2016-11-16 A kind of construction of iron duct inner thermal insulating layer Expired - Fee Related CN106439395B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611008662.9A CN106439395B (en) 2016-11-16 2016-11-16 A kind of construction of iron duct inner thermal insulating layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611008662.9A CN106439395B (en) 2016-11-16 2016-11-16 A kind of construction of iron duct inner thermal insulating layer

Publications (2)

Publication Number Publication Date
CN106439395A true CN106439395A (en) 2017-02-22
CN106439395B CN106439395B (en) 2018-06-29

Family

ID=58219948

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611008662.9A Expired - Fee Related CN106439395B (en) 2016-11-16 2016-11-16 A kind of construction of iron duct inner thermal insulating layer

Country Status (1)

Country Link
CN (1) CN106439395B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106989237A (en) * 2017-04-19 2017-07-28 上海建工集团股份有限公司 A kind of air conditioning wind pipe transformed by industrial smoke discharging pipe and its construction method
CN109307125A (en) * 2018-10-31 2019-02-05 上海二十冶建设有限公司 A kind of installation method of air conditioning wind pipe heat preservation rope band
CN115199865A (en) * 2022-06-30 2022-10-18 中建二局第三建筑工程有限公司 Bridge type closed heat preservation fixing device for rectangular air pipe flange and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201884833U (en) * 2010-12-16 2011-06-29 中国建筑第七工程局有限公司 Lined flange composite glass wool board air duct
US20110258964A1 (en) * 2008-12-30 2011-10-27 Shuhuan Wu Composite Thermal Insulation Wall Body of a Building
CN102538160A (en) * 2010-12-20 2012-07-04 中国建筑第七工程局有限公司 Construction method for compound glass wool board air pipe
CN202811541U (en) * 2012-09-02 2013-03-20 湖北省风机厂有限公司 Heat insulation device of large ventilation machine shell
CN103604007A (en) * 2013-11-26 2014-02-26 中国建筑第八工程局有限公司 Composite blast pipe construction method
CN104534185A (en) * 2014-12-11 2015-04-22 浙江中创科技有限公司 Composite air pipe

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110258964A1 (en) * 2008-12-30 2011-10-27 Shuhuan Wu Composite Thermal Insulation Wall Body of a Building
CN201884833U (en) * 2010-12-16 2011-06-29 中国建筑第七工程局有限公司 Lined flange composite glass wool board air duct
CN102538160A (en) * 2010-12-20 2012-07-04 中国建筑第七工程局有限公司 Construction method for compound glass wool board air pipe
CN202811541U (en) * 2012-09-02 2013-03-20 湖北省风机厂有限公司 Heat insulation device of large ventilation machine shell
CN103604007A (en) * 2013-11-26 2014-02-26 中国建筑第八工程局有限公司 Composite blast pipe construction method
CN104534185A (en) * 2014-12-11 2015-04-22 浙江中创科技有限公司 Composite air pipe

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106989237A (en) * 2017-04-19 2017-07-28 上海建工集团股份有限公司 A kind of air conditioning wind pipe transformed by industrial smoke discharging pipe and its construction method
CN109307125A (en) * 2018-10-31 2019-02-05 上海二十冶建设有限公司 A kind of installation method of air conditioning wind pipe heat preservation rope band
CN109307125B (en) * 2018-10-31 2020-11-03 上海二十冶建设有限公司 Method for installing air-conditioning air duct heat-insulating rope belt
CN115199865A (en) * 2022-06-30 2022-10-18 中建二局第三建筑工程有限公司 Bridge type closed heat preservation fixing device for rectangular air pipe flange and construction method
CN115199865B (en) * 2022-06-30 2023-10-27 中建二局第三建筑工程有限公司 Bridge type closed heat preservation fixing device for rectangular air duct flange and construction method

Also Published As

Publication number Publication date
CN106439395B (en) 2018-06-29

Similar Documents

Publication Publication Date Title
CN106439395A (en) Method for constructing insulating layer in air duct made of iron sheet
CN203684566U (en) Decorative wall surface soft package veneer structure
CN104294984A (en) Thin-wall square box anti-floating structure and construction method thereof
CN201661035U (en) Polyurethane corrugated compound heat preservation board
RU89557U1 (en) BUILDING PANEL
CN113585594A (en) Construction method of large-span arc-shaped suspended ceiling
CN206034902U (en) Compound incubation outer wall -in -place mould
CN211899388U (en) Soil-shaped bamboo-wood fiber integrated wallboard
CN216865803U (en) Novel honeycomb metal heat preservation decorative board
CN1394251A (en) Residential heat insulation construction, and heat insulator to be used
CN213952692U (en) Autoclaved aerated concrete slab
CN114439266A (en) Reinforcing device for reinforcing shear wall by adhering steel plates and construction method
CN202152522U (en) Heat preservation brick and heat preservation wall
KR100630858B1 (en) A method of forming metal roof tile with dimples
CN205348771U (en) Template system of imitative tang jianzhu's wing angle upturned eaves
CN217379805U (en) Waterproof thermal insulation wall installation device for constructional engineering
CN205631634U (en) Cold rolling pressurizer of heat preservation decorative board
RU89558U1 (en) BUILDING PANEL
CN204920214U (en) A elasticity template for concrete expansion joint
CN207620152U (en) Wall different materials interface mesh plaster constructing structure
CN214329706U (en) Pasting structure of small-sized ceramic tile
CN209942139U (en) Heat transfer floor
CN209779939U (en) Interior wall with environmental protection and decorative layer
CN102777028A (en) Pseudo-classic building eaves rafter poly-phenyl template system and construction method thereof
DK201500115U3 (en) clothing Clay

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180629

Termination date: 20201116

CF01 Termination of patent right due to non-payment of annual fee