CN106437129B - A kind of corner attached lifting scaffold main frame - Google Patents
A kind of corner attached lifting scaffold main frame Download PDFInfo
- Publication number
- CN106437129B CN106437129B CN201610785417.2A CN201610785417A CN106437129B CN 106437129 B CN106437129 B CN 106437129B CN 201610785417 A CN201610785417 A CN 201610785417A CN 106437129 B CN106437129 B CN 106437129B
- Authority
- CN
- China
- Prior art keywords
- corner
- main frame
- fall arrest
- attached wall
- wall guide
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 30
- 238000009434 installation Methods 0.000 claims abstract description 9
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 6
- 229910000831 Steel Inorganic materials 0.000 claims description 5
- 239000010959 steel Substances 0.000 claims description 5
- 229910052742 iron Inorganic materials 0.000 claims description 3
- 238000009435 building construction Methods 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 7
- 238000000034 method Methods 0.000 description 4
- 230000003028 elevating effect Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 230000009194 climbing Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000007665 sagging Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
- E04G3/32—Hoisting devices; Safety devices
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Movable Scaffolding (AREA)
Abstract
The present invention relates to technical field of building construction, provide a kind of corner attached lifting scaffold main frame, including fall arrest pedestal, main frame standard knot, corner attachment beam, one or more corner attached wall guide holders, horizontal truss, hoisting mechanism;One or more corner attached wall guide holder one end are fixedly mounted on building corner, and the other end is connect with hoisting mechanism, and hoisting mechanism is also connect with main frame standard knot;Fall arrest pedestal is arranged below corner attached wall guide holder, multiple main frame standard knots are successively installed to preset height on fall arrest pedestal is vertical, angled attachment beam is installed on the main frame standard knot on fall arrest pedestal top, corner attachment beam is connected as entirety by the standard staging main frame of horizontal truss and building corner two sides.The invention has the benefit that solving the problems, such as that building corner working security is poor, the strength and stability of corner frame body is increased, simple installation, stress is clear, reasonable, is suitable for popularization and application.
Description
Technical field
The present invention relates to technical field of building construction, in particular to a kind of corner attached lifting scaffold main frame.
Background technique
Currently, Climbing frame for outer-wall mostly uses raise scaffold, but adhering lifting foot in Tall Reinforced Concrete Buildings construction
Hand cradle mostly uses two sets of promotion main frames to be separately positioned on structure corner two sides, then passes through transverse direction when building corner attachment
Rod piece overhanging extends to corner, forms broken-line type connection, and sagging deflections easily occurs in the corner frame body so set up, and it is hidden safety occur
Suffer from.
To prevent such hidden danger, a kind of main frame of attached lifting scaffold that can be attached directly to building structure corner is needed
Frame;Have not yet seen the related art of building corner attached lifting scaffold main frame.
Summary of the invention
The object of the invention is to overcome the deficiencies of the prior art and provide a kind of main frame of corner attached lifting scaffold
Frame reinforces the frame body that used elevating scaffold goes out in structure corner at present, strength and stability, to improve adhering lifting
Safety.
A kind of corner attached lifting scaffold main frame of the present invention, including fall arrest pedestal, main frame standard knot, corner connect
Connect beam, one or more corner attached wall guide holders, horizontal truss, hoisting mechanism;One or more of corner attached wall guide holders
One end is fixedly mounted on building corner, and the other end is connect with hoisting mechanism, and hoisting mechanism is also connect with main frame standard knot;It is anti-
The pedestal that falls is arranged below corner attached wall guide holder, and multiple main frame standard knots are successively installed on fall arrest pedestal is vertical in advance
If height, installs angled attachment beam, corner attachment beam passes through horizontal girder on the main frame standard knot on fall arrest pedestal top
Frame and the standard staging main frame of building corner two sides are connected as entirety.
Further, the corner attached wall guide holder includes attachment end and guide end, and the attachment end passes through bolt and builds
The preformed hole for building object corner portion securely connects, and the guide end is equipped with directive wheel, with hoisting mechanism slidable connection.
Further, the hoisting mechanism includes guide rail, promotes hanging seat, electronic promotion cucurbit, wirerope, relief arrangement;
Guide rail is installed on the outside of main frame standard knot, and it is identical that height and main frame standard knot set up total height, corner attached wall guide holder
Directive wheel and guide rail between using guiding slidably sleeve snapping;It promotes hanging seat to be installed on main frame standard knot, is promoted and hung
The electronic promotion cucurbit of the lower suspension of seat, and electronic promotion cucurbit lower end is linked up with and is mounted on building structure bottom using wirerope
Corner attached wall guide holder connection;Relief arrangement is mounted on main frame standard knot, with attached wall guide holder mutually locking.
Further, anti-fall sunpender is installed, anti-fall downrod lower end passes through fall arrest bottom on the corner attached wall guide holder
The falling proof device of seat front end.
Further, the corner attached wall guide holder has ratchet-type anti-fall device and reset spring.
Further, the fall arrest pedestal of building bottom installation is provided with double anti-fall cams and signal shaft.
Further, the position of corner attachment beam is the above 1.8m of fall arrest pedestal.
Further, the horizontal truss is made of steel pipe or fashioned iron connection.
The invention has the benefit that
1, connection protection is overhang using steel pipe after building structure corner two sides install promote main frame respectively compared to tradition
The mode for building corner, increases the lifting force of corner positions, stress is more reasonable;
2, corner attachment beam and horizontal truss are connected by screw bolts, and increase the strength and stability of corner frame body, installation
Simply, stress is clear;
3, corner attached wall guide holder is made of guide head and wall-attaching base two parts, and when connecting with guide rail, adjusting range is big, side
Just it dismounts;
4, there are double anti-fall cams, signal shaft is anti-fall sensitive, it is ensured that will be entire in the 8cm of frame body whereabouts on fall arrest pedestal
Frame body is locked on preparatory mounted anti-fall sunpender.
Detailed description of the invention
Fig. 1 show a kind of corner attached lifting scaffold main frame structure schematic diagram of the embodiment of the present invention.
Fig. 2 show a kind of top view of corner attached lifting scaffold main frame of the embodiment of the present invention.
Fig. 3 show a kind of side view of corner attached lifting scaffold main frame of the embodiment of the present invention.
Fig. 4 show a kind of perspective view of corner attached lifting scaffold main frame of the embodiment of the present invention.
Fig. 5 show a kind of fall arrest base schematic diagram of corner attached lifting scaffold main frame of the embodiment of the present invention.
Fig. 6 show a kind of attached wall guide seat structure signal of corner attached lifting scaffold main frame of the embodiment of the present invention
Figure.
Wherein: 1- fall arrest pedestal, 2- guide rail, 3- main frame standard knot, 4- corner attachment beam, 5- corner attached wall guiding
Seat, 6- promoted hanging seat, the electronic promotion cucurbit of 7-, 8- wirerope, 9- relief arrangement, 10- falling proof device, 11- horizontal truss,
The anti-fall sunpender of 12-, 13- building structure, the bis- anti-fall cams of 14-, 15- reset spring, 16- attachment end, 17- guide end, 18- guiding
Wheel, 111- corner attached lifting scaffold main frame, 112- standard staging main frame.
Specific embodiment
Below in conjunction with specific attached drawing the present invention is described in detail specific embodiment.It should be noted that in following embodiments
The combination of the technical characteristic or technical characteristic of description is not construed as isolated, they can be combined with each other to reaching
To superior technique effect.In the drawings of the following embodiments, the identical label that each attached drawing occurs represent identical feature or
Person's component, can be apply to different embodiments.
As shown in Figs. 1-5, a kind of corner attached lifting scaffold main frame 111 of the embodiment of the present invention, including fall arrest bottom
Seat 1, main frame standard knot 3, corner attachment beam 4, one or more corner attached wall guide holders 5, horizontal truss 11, hoisting mechanism;
One or more of 5 one end of corner attached wall guide holder are fixedly mounted on building corner, and the other end is connect with hoisting mechanism, is mentioned
Mechanism is risen also to connect with main frame standard knot 3;Fall arrest pedestal 1 is arranged below corner attached wall guide holder 5, fall arrest pedestal 1
Multiple main frame standard knots 3 are successively installed to preset height, on the main frame standard knot 3 on 1 top of fall arrest pedestal on vertical
Angled attachment beam 4 is installed, corner attachment beam 4 passes through the standard staging main frame of horizontal truss 11 and building corner two sides
112 are connected as entirety.
As shown in Figure 6, it is preferred that the corner attached wall guide holder 5 includes attachment end 16 and guide end 17, the attachment end
16 are securely connect by bolt with the preformed hole of building corner portion, and the guide end 17 is equipped with directive wheel 18, with elevator
Structure slidable connection.
Preferably, the hoisting mechanism includes guide rail 2, promotes hanging seat 6, electronic promotion cucurbit 7, wirerope 8, relief arrangement
9;Guide rail 2 is installed on the outside of main frame standard knot 3, and height sets up that total height is identical, and corner attached wall is led with main frame standard knot 3
Slidably sleeve snapping is oriented to using between the directive wheel 18 and guide rail 2 of seat 5;It promotes hanging seat 6 and is installed on main frame standard knot 3
On, the electronic promotion cucurbit 7 of the lower suspension of hanging seat 6 is promoted, and electronic 7 lower end of promotion cucurbit is linked up with and is mounted on using wirerope 8
Building structure the lowermost corner attached wall guide holder 5 connects;Relief arrangement 9 is mounted on main frame standard knot 3 and leads with attached wall
It is locked to seat.
Preferably, anti-fall sunpender 12 is installed, anti-fall 12 lower end of sunpender passes through fall arrest on the corner attached wall guide holder 5
The falling proof device 10 of 1 front end of pedestal.
Preferably, the corner attached wall guide holder 5 has ratchet-type anti-fall device and reset spring 15.
Preferably, the fall arrest pedestal 1 of building bottom installation is provided with double anti-fall cams 14 and signal shaft.
Preferably, the position of corner attachment beam 4 is 1 or more 1.8m of fall arrest pedestal.
Preferably, the horizontal truss 11 is made of steel pipe or fashioned iron connection.
Using the embodiment of the present invention, it should be studied by professional determine arrangement and method for construction first, calculate the load of scaffold
With each position stress condition, load and stress condition in construction are checked.Special construction should be organized when building scaffold
Troop and service technician, are built in strict accordance with arrangement and method for construction.
Whole attached lifting scaffold plan view is designed according to attached building structure 13, fall arrest pedestal 1 is placed in corner
The corresponding position of the lower section of attached wall guide holder 5 is connect on fall arrest pedestal 1 by the main frame standard that bolt installs first segment and saves 3 Hes
Guide rail 2, apart from 1 1.8 meters of positions of intermediate connecting hole of fall arrest pedestal (other positions also can be selected) peace on main frame standard knot 3
Corner attachment beam 4 is filled, water is used between the standard staging main frame 112 of 111 two sides of corner attached lifting scaffold frame
Plane frame work 11 is connect with corner attachment beam 4, and all attached lifting scaffold bottoms of whole building outer ring is made to form whole circle closing
Entirety.
According to construction speed, the reserving installation hole in building structure 13 passes through from bottom to top by corner attached wall guide holder 5
Bolt etc. is installed on mounting hole, multiple 5 vertical alignments of corner attached wall guide holder.Guide rail 2 is installed on the outer of main frame standard knot 3
Side, height are identical as the height of main frame standard knot 3.It (can be adjusted according to the actual situation above the second section main frame standard knot 3
It is whole) installation promotion hanging seat 6, hangs electronic promotion cucurbit 7, and will promote 7 lower end of electric block using wirerope 8 and hang above it
Hook is connect with the lowermost corner attached wall guide holder 5 in building structure 13 is mounted on.The specific installation number of main frame standard knot 3,
Up to specified height is connect according to construction situation.
The guide end 17 of corner attached wall guide holder 5 is equipped with directive wheel 18 and guide rail 2 is oriented to slidably sleeve snapping,
The attachment end 16 of corner attached wall guide holder 5 is firmly installed by bolt and 13 corner preformed hole of building structure, and one below
Anti-fall sunpender 12 is installed, anti-fall 12 lower end of sunpender passes through the falling proof device of 1 front end of fall arrest pedestal on corner attached wall guide holder 5
10.To form attached lifting scaffold corner main frame structure.
In a state of use, it is necessary to entire frame body be fixed on corner attached wall guide holder 5 by relief arrangement 9.At this time
It promotes electric block 7 and wirerope 8 does not stress, under jacking condition, must first remove relief arrangement 9, then starting promotes electricity
Dynamic cucurbit 7, by frame body integral elevating to designated position.
Entire frame body is in stress when wirerope 8, and the falling proof device 10 of 1 front end of fall arrest pedestal is in open shape
State causes pulling force to disappear once frame body can freely rise the loop chain failure for perhaps declining wirerope 8 or promoting electric block 7
It loses, falling proof device 10 can automatically lock frame body on anti-fall sunpender 12, play anti-fall effect.Continue after debugging to
It will be unlocked after upper elevating fall prevention dropping control device 10 to pulling force, frame body can continue to rise.
The invention has the benefit that
1, connection protection is overhang using steel pipe after building structure corner two sides install promote main frame respectively compared to tradition
The mode for building corner, increases the lifting force of corner positions, stress is more reasonable;
2, corner attachment beam and horizontal truss are connected by screw bolts, and increase the strength and stability of corner frame body, installation
Simply, stress is clear;
3, corner attached wall guide holder is made of guide head and wall-attaching base two parts, and when connecting with guide rail, adjusting range is big, side
Just it dismounts;
4, there are double anti-fall cams, signal shaft is anti-fall sensitive, it is ensured that will be entire in the 8cm of frame body whereabouts on fall arrest pedestal
Frame body is locked on preparatory mounted anti-fall sunpender.
Although having been presented for several embodiments of the present invention herein, it will be appreciated by those of skill in the art that
Without departing from the spirit of the invention, the embodiments herein can be changed.Above-described embodiment is only exemplary, no
It should be using the embodiments herein as the restriction of interest field of the present invention.
Claims (7)
1. a kind of corner attached lifting scaffold main frame, which is characterized in that including fall arrest pedestal, main frame standard knot, turn
Angle attachment beam, one or more corner attached wall guide holders, horizontal truss, hoisting mechanism;One or more of corner attached walls are led
It is fixedly mounted on building corner to seat one end, the other end is connect with hoisting mechanism, and hoisting mechanism also connects with main frame standard knot
It connects;Fall arrest pedestal is arranged below corner attached wall guide holder, successively installs multiple main frame standards on fall arrest pedestal is vertical
Preset height is saved, angled attachment beam is installed on the main frame standard knot on fall arrest pedestal top, corner attachment beam passes through
Horizontal truss and the standard staging main frame of building corner two sides are connected as entirety;Corner attachment beam and horizontal truss use
It is bolted;
The corner attached wall guide holder includes attachment end and guide end, and the attachment end is pre- by bolt and building corner portion
It boxes out secured connection, the guide end is equipped with directive wheel, with hoisting mechanism slidable connection;The guiding of corner attached wall guide holder
Guiding slidably sleeve snapping is used between wheel and the guide rail of hoisting mechanism.
2. corner attached lifting scaffold main frame as described in claim 1, which is characterized in that the hoisting mechanism includes leading
Rail promotes hanging seat, electronic promotion cucurbit, wirerope, relief arrangement;Guide rail is installed on the outside of main frame standard knot, height with
The total height that main frame standard knot is set up is identical, is slidably inserted between the directive wheel and guide rail of corner attached wall guide holder using guiding
Cover snapping;It promotes hanging seat to be installed on main frame standard knot, is promoted and hang electronic promotion cucurbit under hanging seat, and will using wirerope
It links up with and is mounted on building structure the lowermost corner attached wall guide holder and connect in electronic promotion cucurbit lower end;Relief arrangement is mounted on
On main frame standard knot, with attached wall guide holder mutually locking.
3. corner attached lifting scaffold main frame as claimed in claim 2, which is characterized in that the corner attached wall guide holder
On anti-fall sunpender is installed, anti-fall downrod lower end passes through the falling proof device of fall arrest pan frontward end.
4. corner attached lifting scaffold main frame as claimed in claim 3, which is characterized in that the corner attached wall guide holder
There are double cam-type anti-fall device and reset spring.
5. corner attached lifting scaffold main frame according to any one of claims 1-4, which is characterized in that building bottom
The fall arrest pedestal of installation is provided with double anti-fall cams and signal shaft.
6. corner attached lifting scaffold main frame according to any one of claims 1-4, which is characterized in that corner attachment beam
Position be the above 1.8m of fall arrest pedestal.
7. corner attached lifting scaffold main frame according to any one of claims 1-4, which is characterized in that the horizontal girder
Frame is made of steel pipe or fashioned iron connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610785417.2A CN106437129B (en) | 2016-08-30 | 2016-08-30 | A kind of corner attached lifting scaffold main frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610785417.2A CN106437129B (en) | 2016-08-30 | 2016-08-30 | A kind of corner attached lifting scaffold main frame |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106437129A CN106437129A (en) | 2017-02-22 |
CN106437129B true CN106437129B (en) | 2019-08-23 |
Family
ID=58091526
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610785417.2A Active CN106437129B (en) | 2016-08-30 | 2016-08-30 | A kind of corner attached lifting scaffold main frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106437129B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112144857A (en) * | 2020-10-23 | 2020-12-29 | 河南贵凯建筑机械设备有限公司 | Attached lifting scaffold |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2054534A1 (en) * | 1991-10-30 | 1993-05-01 | Gerardo Rizzardo | Scaffolding support system |
CN201722910U (en) * | 2010-07-16 | 2011-01-26 | 北京星河人施工技术有限责任公司 | Moveable rail type climbing ladder |
CN201826515U (en) * | 2010-06-09 | 2011-05-11 | 北京星河人施工技术有限责任公司 | Wall-attached guiding device for elevating rack |
CN202945798U (en) * | 2012-11-19 | 2013-05-22 | 中国华冶科工集团有限公司 | Overhanging type scaffold corner device |
CN105421748A (en) * | 2015-12-15 | 2016-03-23 | 南通四建集团有限公司 | Anchoring device of cantilever scaffold |
CN205171979U (en) * | 2015-10-29 | 2016-04-20 | 保定市裕升建筑安装股份有限公司 | Integrated form all steel lift platform |
JP6000766B2 (en) * | 2012-09-04 | 2016-10-05 | 大和ハウス工業株式会社 | Indoor work floor and construction method thereof |
CN206053282U (en) * | 2016-08-30 | 2017-03-29 | 北京星河人施工技术有限责任公司 | A kind of corner attached lifting scaffold main frame |
-
2016
- 2016-08-30 CN CN201610785417.2A patent/CN106437129B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2054534A1 (en) * | 1991-10-30 | 1993-05-01 | Gerardo Rizzardo | Scaffolding support system |
CN201826515U (en) * | 2010-06-09 | 2011-05-11 | 北京星河人施工技术有限责任公司 | Wall-attached guiding device for elevating rack |
CN201722910U (en) * | 2010-07-16 | 2011-01-26 | 北京星河人施工技术有限责任公司 | Moveable rail type climbing ladder |
JP6000766B2 (en) * | 2012-09-04 | 2016-10-05 | 大和ハウス工業株式会社 | Indoor work floor and construction method thereof |
CN202945798U (en) * | 2012-11-19 | 2013-05-22 | 中国华冶科工集团有限公司 | Overhanging type scaffold corner device |
CN205171979U (en) * | 2015-10-29 | 2016-04-20 | 保定市裕升建筑安装股份有限公司 | Integrated form all steel lift platform |
CN105421748A (en) * | 2015-12-15 | 2016-03-23 | 南通四建集团有限公司 | Anchoring device of cantilever scaffold |
CN206053282U (en) * | 2016-08-30 | 2017-03-29 | 北京星河人施工技术有限责任公司 | A kind of corner attached lifting scaffold main frame |
Also Published As
Publication number | Publication date |
---|---|
CN106437129A (en) | 2017-02-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2020052291A1 (en) | Construction elevator wall-attaching frame mounting platform attached to steel platform formwork and method therefor | |
CN206053282U (en) | A kind of corner attached lifting scaffold main frame | |
CN201722910U (en) | Moveable rail type climbing ladder | |
CN107558724A (en) | Merge the anti-fall wall-attached supporting seat of suspension centre formula anti-dumping | |
CN106437129B (en) | A kind of corner attached lifting scaffold main frame | |
CN207499385U (en) | Plug-in tower crane supporting beam, which has bad luck installation and climbs, uses operating platform | |
CN109440985A (en) | Super high-rise building super large curtain wall unit hydraulic synchronizing lifting system and its construction method | |
CN104153586B (en) | A kind of suspension cable hangs the construction method of mounting purlines | |
CN201614731U (en) | Novel electric lifting scaffold | |
CN202441045U (en) | Rail-type electric attached lifting scaffold | |
CN205171979U (en) | Integrated form all steel lift platform | |
CN204510775U (en) | Construction of High-rise elevating safety protecting screen | |
CN204355947U (en) | Large-scale without eye plate lifting beam device | |
CN209855192U (en) | Automatic lifting frame for shaped elevator shaft way | |
CN205259573U (en) | A hanging flower basket hangs mechanism for high -rise roofing transformation | |
CN205369876U (en) | Lifting foot hand frame is adhered to to dish knot formula | |
CN107814318A (en) | Loop wheel machine | |
CN206599375U (en) | A kind of door type steel structure hoisting instrument | |
JPH0734069Y2 (en) | Lifting device for car or counterweight in elevator | |
CN218624047U (en) | Support for hanging high-altitude escape rope ladder | |
CN204645010U (en) | For the stage apparatus that ship lift tooth bar is installed | |
CN215666502U (en) | A safe lift platform for construction | |
CN113914599B (en) | Scaffold attached climbing frame chain mechanism for building engineering | |
CN103397772A (en) | Hanging basket counterweight supporting structure | |
CN201193400Y (en) | Hoisting falsework for building high lattice antenna on top of buildings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20231114 Address after: 271614 Chaoquan Town Industrial Park, Feicheng City, Tai'an City, Shandong Province Patentee after: Shandong Xinghe formwork Co.,Ltd. Address before: 710, Block A, Yuyang Real Estate Building, No. A2 Xiaoguan Beili, Chaoyang District, Beijing, 100029 Patentee before: BEIJING XINGHEREN CONSTRUCTION TECHNIQUE CO.,LTD. |