CN106436735B - A kind of installation method of blower foundation ring - Google Patents
A kind of installation method of blower foundation ring Download PDFInfo
- Publication number
- CN106436735B CN106436735B CN201610598477.3A CN201610598477A CN106436735B CN 106436735 B CN106436735 B CN 106436735B CN 201610598477 A CN201610598477 A CN 201610598477A CN 106436735 B CN106436735 B CN 106436735B
- Authority
- CN
- China
- Prior art keywords
- foundation
- foundation ring
- reinforcing bar
- ring
- installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
- E02D27/425—Foundations for poles, masts or chimneys specially adapted for wind motors masts
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Wind Motors (AREA)
Abstract
The invention discloses a kind of installation methods of blower foundation ring, include the installation of basic embedded part, blinding layer pours, basic ring support installation, foundation ring installation, foundation forms peace, reinforcement foundation binding and base concrete pour, the design and installation of each installation steps ensure that the intensity of foundation ring and the stability of mounting structure.
Description
Technical field
The present invention relates to Construction of Wind Power field, the installation method of specifically a kind of blower foundation ring.
Background technology
It is arrived it is well known that the Chinese government makes promise in Copenhagen climate change conference in 2009 to international community
The year two thousand twenty unit GDP CO2 emissions declined 40%~50% than 2005, and non-fossil energy will meet this country
15% energy demand, this is proposed the development scale of China's future wind-powered electricity generation and progress etc. unprecedented expectation, accelerates wind energy money
The utilization in source with develop by as in China's considerably long one period realize the strategy of sustainable development important measure, to the year two thousand twenty
China's wind-powered electricity generation installation reaches 2.3 hundred million KW;Good greatly development environment and opportunity are provided for our Wind Power Developments.
The core of wind-powered electricity generation conversion is wind turbine, and the support of wind turbine is supported using tower, and the base support of tower uses base
Plinth ring is supported, and the stability of foundation ring mounting structure determines the service life of wind turbine.
Invention content
The technical problem to be solved in the present invention is to provide a kind of installation method of blower foundation ring, installation fixed structure is steady
It is fixed, it ensure that the normal use and service life of wind turbine.
The technical scheme is that:
A kind of installation method of blower foundation ring, has specifically included following steps:
(1), it is first that basic ring support embedded part and lower rebar mesh sheet is secured according to air door direction location and installation, check true
Recognize errorless after-pouring concrete cushion;After the completion of pouring, the center of blower foundation center line and foundation ring support element is measured,
The absolute altitude of three pre-embedded steel slabs in bed course is measured using automatic compensated level again, calculates the height of three pre-embedded steel slabs in bed course
Difference adjusts three support adjusting rods according to the height difference of three built-in fittings, foundation ring apical side height, pacifies the support adjusting rod of each point
Upper plane after dress is on same absolute altitude, blower foundation tower door mark direction and in 90 ° to 135 ° angles of prevailing wind direction;
(2), foundation ring is sling into certain altitude degree with crane after, slowly rotate foundation ring, make 0 point of foundation ring label towards wind
Then machine basis tower door direction connects three support adjusting rods and three foundation bolts, is directed at corresponding exact position just
Position, while fastening support adjusting rod and foundation ring connecting screw and reach defined moment values;1 self leveling is equipped with during installation
Spirit level carries out tracking observation measurement, detects the height of equally distributed 12 points of foundation ring upper flange, the highest point and the lowest point
The difference of level value is no more than 1mm, if it exceeds the angle that should be then turned by accurately calculating three support adjusting rods, passes through jack
Coordinate three support adjusting rods, and readjust spirit level, detect again, measurement is so repeated with adjusting, until making
The levelness of foundation ring is controlled within the scope of defined;
(3), after bed course reaches intensity value, by drawing snap the line on bed course, mark reinforcement location line, reinforcing bar sole plate connects
Head mutually staggers, and has been bound in the upper and lower mesh sheet reinforcing bar of sole plate, has set up steel pipe frame, for brace foundation master in work progress
Beam steel, while bind basic beam steel;
(4), foundation forms using sizing punching block assembling, with the punching block slab supporting processed in advance, template after the completion of reinforcing bar
Seam will paste sponge strip mortar leakage prevention, and circular arc is made hoop and reinforced using reinforcing bar or steel pipe, is vertically reinforced with steel pipe and flitch, under
Portion's fulcrum spacing is not more than 60cm, and top fulcrum spacing is not more than 90cm spacing;
(5), reinforcing bar be laid with and complete and after the completion of template support, casting concrete has been poured using periphery before concrete placings
Concrete is to the effect solid base ring of reinforcing bar, because base thickness is larger, vibration compacting during to ensure that lower floor pours is pouring lower floor
During concrete, the personnel of pouring, which should enter in steel reinforcement cage, vibrates.
Reinforcing bar, electric instrument built-in pipe are checked before the foundation forms molding, ensures reinforcing bar, electric instrument built-in pipe exhaustive, position
Put it is accurate, firmly install.
The sizing punching block surface smear interleaving agent, and the distortionless deformation of appearance, sticking two-faced adhesive tape band at form joint
With mortar leakage prevention.
Advantages of the present invention:
The installation steps of foundation ring of the present invention include basic embedded part installation, blinding layer pours, basic ring support is installed,
Foundation ring installation, foundation forms peace, reinforcement foundation binding and base concrete pour, and the design and installation of each installation steps are equal
It ensure that the intensity of foundation ring and the stability of mounting structure.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other without making creative work
Embodiment shall fall within the protection scope of the present invention.
A kind of installation method of blower foundation ring, has specifically included following steps:
(1), it is first that basic ring support embedded part and lower rebar mesh sheet is secured according to air door direction location and installation, check true
Recognize errorless after-pouring concrete cushion;After the completion of pouring, the center of blower foundation center line and foundation ring support element is measured,
The absolute altitude of three pre-embedded steel slabs in bed course is measured using automatic compensated level again, calculates the height of three pre-embedded steel slabs in bed course
Difference adjusts three support adjusting rods according to the height difference of three built-in fittings, foundation ring apical side height, pacifies the support adjusting rod of each point
Upper plane after dress is on same absolute altitude, blower foundation tower door mark direction and in 90 ° to 135 ° angles of prevailing wind direction;
(2), foundation ring is sling into certain altitude degree with crane after, slowly rotate foundation ring, make 0 point of foundation ring label towards wind
Then machine basis tower door direction connects three support adjusting rods and three foundation bolts, is directed at corresponding exact position just
Position, while fastening support adjusting rod and foundation ring connecting screw and reach defined moment values;1 self leveling is equipped with during installation
Spirit level carries out tracking observation measurement, detects the height of equally distributed 12 points of foundation ring upper flange, the highest point and the lowest point
The difference of level value is no more than 1mm, if it exceeds the angle that should be then turned by accurately calculating three support adjusting rods, passes through jack
Coordinate three support adjusting rods, and readjust spirit level, detect again, measurement is so repeated with adjusting, until making
The levelness of foundation ring is controlled within the scope of defined;
(3), after bed course reaches intensity value, by drawing snap the line on bed course, mark reinforcement location line, reinforcing bar sole plate connects
Head mutually staggers, and has been bound in the upper and lower mesh sheet reinforcing bar of sole plate, has set up steel pipe frame, for brace foundation master in work progress
Beam steel, while bind basic beam steel;
(4), foundation forms using sizing punching block assembling, punching block surface smear interleaving agent of shaping, and the distortionless deformation of appearance,
Sticking two-faced adhesive tape band is with mortar leakage prevention at form joint, and reinforcing bar is after the completion with the punching block slab supporting processed in advance, form joint
Sponge strip mortar leakage prevention is pasted, circular arc is made hoop and reinforced using reinforcing bar or steel pipe, is vertically reinforced with steel pipe and flitch, lower part branch
Point spacing is not more than 90cm spacing no more than 60cm, top fulcrum spacing;Check that reinforcing bar, electric instrument are pre-buried before foundation forms molding
Pipe ensures that reinforcing bar, electric instrument built-in pipe exhaustive, position is accurate, firmly installs
(5), reinforcing bar be laid with and complete and after the completion of template support, casting concrete has been poured using periphery before concrete placings
Concrete is to the effect solid base ring of reinforcing bar, because base thickness is larger, vibration compacting during to ensure that lower floor pours is pouring lower floor
During concrete, the personnel of pouring, which should enter in steel reinforcement cage, vibrates.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace
And modification, the scope of the present invention is defined by the appended.
Claims (3)
1. a kind of installation method of blower foundation ring, it is characterised in that:Following steps are specifically included:
(1), it is first that basic ring support embedded part and lower rebar mesh sheet is secured according to air door direction location and installation, check confirm nothing
Accidentally after-pouring concrete cushion;After the completion of pouring, the center of blower foundation center line and foundation ring support element is measured, then is adopted
The absolute altitude of three pre-embedded steel slabs in bed course is measured with automatic compensated level, calculates the height difference of three pre-embedded steel slabs in bed course,
Three support adjusting rods are adjusted according to the height difference of three built-in fittings, foundation ring apical side height, the support adjusting rod of each point is installed
Upper plane afterwards is on same absolute altitude, blower foundation tower door mark direction and in 90 ° to 135 ° angles of prevailing wind direction;
(2), foundation ring is sling into certain altitude degree with crane after, slowly rotate foundation ring, make 0 point of foundation ring label towards wind turbine base
Then plinth tower door direction connects three support adjusting rods and three foundation bolts, it is in place to be directed at corresponding exact position, together
When fastening support adjusting rod and foundation ring connecting screw and reach defined moment values;1 Beam Auto-Level is equipped with during installation
Instrument carries out tracking observation measurement, detects the height of equally distributed 12 points of foundation ring upper flange, and the highest point and the lowest point is horizontal
The difference of value is no more than 1mm, if it exceeds the angle that should be then turned by accurately calculating three support adjusting rods, is coordinated by jack
Three support adjusting rods, and spirit level is readjusted, it detects again, measurement is so repeated with adjusting, until making basis
The levelness of ring is controlled within the scope of defined;
(3), after bed course reaches intensity value, by drawing snap the line on bed course, mark reinforcement location line, reinforcing bar sole plate connector phase
It is mutually staggered, has been bound in the upper and lower mesh sheet reinforcing bar of sole plate, set up steel pipe frame, for brace foundation girder steel in work progress
Muscle, while bind basic beam steel;
(4), foundation forms using sizing punching block assembling, with the punching block slab supporting processed in advance, form joint after the completion of reinforcing bar
Sponge strip mortar leakage prevention is pasted, circular arc is made hoop and reinforced using reinforcing bar or steel pipe, is vertically reinforced with steel pipe and flitch, lower part branch
Point spacing is not more than 90cm spacing no more than 60cm, top fulcrum spacing;
(5), reinforcing bar be laid with and complete and after the completion of template support, casting concrete, the concrete pair that periphery is utilized before concrete placings to pour
The effect solid base ring of reinforcing bar, because base thickness is larger, vibration compacting during to ensure that lower floor pours is pouring lower floor's coagulation
When native, the personnel of pouring, which should enter in steel reinforcement cage, vibrates.
2. a kind of installation method of blower foundation ring according to claim 1, it is characterised in that:The foundation forms closes
Reinforcing bar, electric instrument built-in pipe are checked before mould, ensures that reinforcing bar, electric instrument built-in pipe exhaustive, position is accurate, firmly installs.
3. a kind of installation method of blower foundation ring according to claim 1, it is characterised in that:The sizing punching block table
Interleaving agent, and the distortionless deformation of appearance are smeared in face, and sticking two-faced adhesive tape band is with mortar leakage prevention at form joint.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610598477.3A CN106436735B (en) | 2016-07-27 | 2016-07-27 | A kind of installation method of blower foundation ring |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610598477.3A CN106436735B (en) | 2016-07-27 | 2016-07-27 | A kind of installation method of blower foundation ring |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106436735A CN106436735A (en) | 2017-02-22 |
CN106436735B true CN106436735B (en) | 2018-06-12 |
Family
ID=58184419
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610598477.3A Active CN106436735B (en) | 2016-07-27 | 2016-07-27 | A kind of installation method of blower foundation ring |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106436735B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106703068A (en) * | 2017-03-01 | 2017-05-24 | 北京建筑大学 | Concrete tower cylinder and foundation connecting mode |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102747746A (en) * | 2012-07-25 | 2012-10-24 | 中国二十二冶集团有限公司 | Device and method for mounting and leveling foundation ring of fan |
CN103243746A (en) * | 2013-05-20 | 2013-08-14 | 四川谦泰仁投资管理有限公司 | Wind generator foundation ring precision calibrating system and construction method thereof |
CN103967048A (en) * | 2014-05-21 | 2014-08-06 | 中冶天工集团有限公司 | Fan foundation ring leveling method |
CN103967041A (en) * | 2014-05-21 | 2014-08-06 | 中冶天工集团有限公司 | Construction method of fan foundation ring |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8443557B2 (en) * | 2011-09-16 | 2013-05-21 | General Electric Company | Tower base section of a wind turbine, a wind turbine and a system for mounting a tower |
-
2016
- 2016-07-27 CN CN201610598477.3A patent/CN106436735B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102747746A (en) * | 2012-07-25 | 2012-10-24 | 中国二十二冶集团有限公司 | Device and method for mounting and leveling foundation ring of fan |
CN103243746A (en) * | 2013-05-20 | 2013-08-14 | 四川谦泰仁投资管理有限公司 | Wind generator foundation ring precision calibrating system and construction method thereof |
CN103967048A (en) * | 2014-05-21 | 2014-08-06 | 中冶天工集团有限公司 | Fan foundation ring leveling method |
CN103967041A (en) * | 2014-05-21 | 2014-08-06 | 中冶天工集团有限公司 | Construction method of fan foundation ring |
Also Published As
Publication number | Publication date |
---|---|
CN106436735A (en) | 2017-02-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203320700U (en) | Steel structure column foot connecting structure | |
CN106065681B (en) | It is a kind of based on BIM technology overall assembled building in superimposed sheet hoard strip construction method | |
CN201649633U (en) | Steel formwork for forming building stair treads | |
CN105908902B (en) | Precast Pier Columns steel reinforcement cage locating rack and pier stud steel reinforcement cage construction method | |
CN102912900A (en) | Prefabricated assembled superposed plate type concrete shear wall and construction method thereof | |
CN102433841A (en) | Method for installing abnormal-shape curve steel box girder | |
CN102864928B (en) | Construction method for spiral stairs with large-spspace | |
CN207063515U (en) | A kind of scalable aluminium frame template | |
CN110374321A (en) | A kind of assembled waffle beam superstructure gang form and construction method | |
CN106193589A (en) | Concrete superelevation heavy type beam and superimposed sheet combinative structure method for supporting | |
CN103255866B (en) | Roof circular arc-shaped dome structure and manufacturing method | |
CN106436735B (en) | A kind of installation method of blower foundation ring | |
CN202925721U (en) | Prefabricated superimposed sheet-type concrete shear wall structure | |
CN114717954A (en) | Ultrahigh concrete tower column construction method based on three-dimensional space coordinate positioning | |
CN215210582U (en) | Large-span steel-concrete composite beam falling device | |
CN113756561A (en) | Novel cantilever scaffold building method for high-assembly-rate building | |
CN110409800B (en) | High-precision formwork construction method for cast-in-situ bare concrete wind tunnel | |
CN217810530U (en) | Oblique steel column base positioner | |
CN103174165A (en) | Full diameter embedded bolt positioning method | |
CN204038921U (en) | Wall-attached device for super high-rise tower crane | |
CN206646817U (en) | The form bracing system of the cast-in-place decorative panel of staged Arc Stand | |
CN205955197U (en) | A fixing device that be used for prefabricated non - design of bench, can all rotary die boards | |
CN205617664U (en) | Prefabricated pier stud locating rack for steel reinforcement cage | |
CN206408807U (en) | A kind of connecting bracket | |
CN105113799A (en) | Prearranged adjustable clamping fixture of large embedded part and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 230000 no.218, Xiangzhang Avenue, hi tech Development Zone, Hefei City, Anhui Province Patentee after: China Energy Construction Group Co.,Ltd. Address before: No. 218, Xiangzhang Avenue, high tech Zone, Hefei City, Anhui Province, 230088 Patentee before: China Energy Engineering Group Anhui No.1 Electric Power Construction Co.,Ltd. |
|
CP03 | Change of name, title or address |