CN106428436A - Offshore overwater operation platform - Google Patents

Offshore overwater operation platform Download PDF

Info

Publication number
CN106428436A
CN106428436A CN201610907978.5A CN201610907978A CN106428436A CN 106428436 A CN106428436 A CN 106428436A CN 201610907978 A CN201610907978 A CN 201610907978A CN 106428436 A CN106428436 A CN 106428436A
Authority
CN
China
Prior art keywords
buoyancy tank
water
crossbeam
offshore
pile foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610907978.5A
Other languages
Chinese (zh)
Inventor
翟世鸿
杨秀礼
冯先导
许磊磊
封有德
茅兵海
林红星
程茂林
熊韬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201610907978.5A priority Critical patent/CN106428436A/en
Publication of CN106428436A publication Critical patent/CN106428436A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/10Arrangement of ship-based loading or unloading equipment for cargo or passengers of cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Ocean & Marine Engineering (AREA)
  • Architecture (AREA)
  • Revetment (AREA)

Abstract

The invention discloses an offshore overwater operation platform. The offshore overwater operation platform comprises pile foundations fixed to the shoreside and a buoyancy tank immersed in water; the top faces of the pile foundations are arranged to extend to a cross beam arranged on the water surface, the buoyancy tank supports the end, far away from the pile foundations, of the cross beam, and multiple supporting rods are arranged between the buoyancy tank and the cross beam. According to the offshore overwater operation platform, influences of waves on floating crane equipment are overcome, the structure is simple, the cost is low, and the construction requirements can be effectively met.

Description

Offshore operation at sea platform
Technical field
The present invention relates to port and pier and coastal engineering construction field.It is more particularly related to a kind of semi-girder half Submersible offshore operation at sea platform.
Background technology
In the offshore construction in open waters, due to the impact of the depth of water, middle long period wave and tide, can be significantly greatly increased and apply Work difficulty.
Port and pier typically adopt operation at sea and land operation two ways with the offshore construction of coastal engineering.Waterborne apply Work typically adopts crane barge, and in the severe ripple condition such as middle long period wave, due to ship motion intense, crane barge construction quality is difficult to reach To requiring, such as piling precision, block stone installation accuracy etc., while effective operation time is also limited by surging, and have necessarily Security risk.Although land construction can be prevented effectively from the impact of wave, distant constructing, when lifting thing is heavier, The construction ability of mini-plant is difficult to meet and requires, needs using main equipment such as large caterpillar, but this also greatly increases The construction cost of project.
Content of the invention
It is an object of the invention at least the above is solved, and provide the advantage that at least will be described later.
It is a still further object of the present invention to provide one kind evades wave effect, the water of mini-plant construction ability deficiency is solved Upper job platform.
In order to realize according to object of the present invention and further advantage, there is provided a kind of offshore operation at sea platform, bag Include:
The pile foundation on bank is fixed on, the top surface of the pile foundation arranges the crossbeam for extending on the water surface;And
Buoyancy tank submerged in water, one end away from pile foundation of its supporting crossbeam, the buoyancy tank and the crossbeam Between be provided with many support bars.
Preferably, one end of the close described pile foundation of the crossbeam arranges ballast box.
Preferably, the inside of the buoyancy tank has receiving space, and the receiving space is provided with water inlet and outlet, described Water inlet and discharge outlet connect the first water pump and the second water pump respectively.
Preferably, between the pile foundation and the crossbeam, pressure transducer is set, the pressure transducer is respectively at institute State the first water pump and second water pump connection.
Preferably, the buoyancy tank is spherical.
The present invention at least includes following beneficial effect:
1st, on existing crane barge equipment is bubbled through the water column, very big by medium-term and long-term wave effect, this offshore operation at sea one end is propped up Support in land, the other end relies on buoyancy tank support, buoyancy support is provided by buoyancy tank, and buoyancy tank is submerged in below the water surface, energy Enough effectively evade wave effect.
When the 2nd, carrying out land construction using main equipment, construction cost is larger, and main equipment is located at breakwater temporary section Levee crown, and need to carry out reinforcement process to levee crown, to meet the bearing capacity demand of main equipment.This job platform equipment from Add buoyancy tank buoyancy in a basic balance with the ripple towing force for acting on buoyancy tank again, and carry out balancing equipment in bank side end increase counterweight and exist The additional load for producing in operation process.
3rd, during equipment runs to semi-girder leading portion and returns to land, by adjusting the buoyancy of buoyancy tank, job platform is made Keep horizontal stable.
Part is embodied by the further advantage, target of the present invention and feature by description below, and part will also be by this The research of invention and practice and be understood by the person skilled in the art.
Description of the drawings
Fig. 1 is the structural representation of offshore operation at sea platform of the present invention.
Specific embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings, to make those skilled in the art with reference to description text Word can be implemented according to this.
It should be noted that experimental technique described in following embodiments, if no special instructions, is conventional method, institute Reagent and material is stated, if no special instructions, is all commercially obtained;In describing the invention, term " horizontal ", " vertical To ", " on ", D score, "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", the instruction such as " outward " side Position or position relationship are based on orientation shown in the drawings or position relationship, are for only for ease of the description present invention and simplify description, Be not indicate or imply the device of indication or element must with specific orientation, with specific azimuth configuration and operation, because This is not considered as limiting the invention.
As shown in figure 1, the present invention provides a kind of offshore operation at sea platform, including:
The pile foundation 5 on bank is fixed on, the top surface of the pile foundation 5 arranges the crossbeam 2 for extending on the water surface;And
Buoyancy tank 4 submerged in water, one end away from pile foundation 5 of its supporting crossbeam 2, the buoyancy tank 4 with described Many support bars 3 are provided between crossbeam 2.
In another embodiment, one end of the close described pile foundation 5 of the crossbeam 2 arranges ballast box 6.
In another embodiment, the inside of the buoyancy tank 4 has receiving space, the receiving space be provided with water inlet and Outlet, the water inlet and discharge outlet connect the first water pump and the second water pump respectively.
In another embodiment, pressure transducer is set between the pile foundation 5 and the crossbeam 2, and the pressure is passed Sensor connects respectively at first water pump and second water pump.Pressure transducer is used for monitoring reaction of bearing, prevents crossbeam Topple, if excessive by water side reaction of bearing, the second water pump is opened, the water in buoyancy tank is discharged a part to increase buoyancy, if Bank side reaction of bearing is big, is switched on the first water pump to fill a part of water to buoyancy tank, reduces the buoyancy of buoyancy tank, and purpose is provided to Operation at sea platform stable is made, is not toppled.
In another embodiment, the buoyancy tank 4 is spherical, and the surface area that square buoyancy tank compared by spherical buoyancy tank is less, receives Easily to infarctional after power, such active area will become big, survivable under phase same material.
The installation steps of the present invention:
1) on bank, pile foundation is installed;
2) buoyancy tank is installed in precalculated position in the seawater;
3) crossbeam is installed in the position toward buoyancy tank in pile foundation, installs and support instead for detecting between crossbeam and pile foundation The pressure transducer of power, and ensure crossbeam and the firm connection of pile foundation;
4) loop wheel machine 1 is travelled upper job platform, and the size of buoyancy tank buoyancy is adjusted, to ensure platform stable;
5) counterweight is installed on crossbeam.
The present invention at least includes following beneficial effect:
1st, on existing crane barge equipment is bubbled through the water column, very big by medium-term and long-term wave effect, this offshore operation at sea one end is propped up Support in land, the other end relies on buoyancy tank 4 to support, buoyancy support provided by buoyancy tank 4, and buoyancy tank 4 is submerged in below the water surface, Effectively wave effect can be evaded, effective operation natural law is increased, improves utilization rate of equipment and installations.
When the 2nd, carrying out land construction using main equipment, construction cost is larger, and main equipment is located at breakwater temporary section Levee crown, and need to carry out reinforcement process to levee crown, to meet the bearing capacity demand of main equipment.This job platform equipment from Weight adds 4 buoyancy of buoyancy tank in a basic balance with the ripple towing force for acting on buoyancy tank 4, and carrys out balancing equipment in bank side end increase counterweight The additional load for producing in operation process.
3rd, during equipment runs to semi-girder leading portion and returns to land, by adjusting the buoyancy of buoyancy tank 4, job platform is made Keep horizontal stable.
4th, this job platform low cost, economic benefit is obvious, this job platform versatility height, can be in similar engineering project Application.
Although embodiment of the present invention is disclosed as above, but its be not restricted in description and embodiment listed With, it can be applied to various suitable the field of the invention completely, for those skilled in the art, can be easily Other modification is realized, therefore under the general concept for being limited without departing substantially from claim and equivalency range, the present invention is not limited In specific details and shown here as the legend with description.

Claims (5)

1. a kind of offshore operation at sea platform, it is characterised in that include:
The pile foundation on bank is fixed on, the top surface of the pile foundation arranges the crossbeam for extending on the water surface;And
Buoyancy tank submerged in water, one end away from pile foundation of its supporting crossbeam, between the buoyancy tank and the crossbeam It is provided with many support bars.
2. offshore operation at sea platform as claimed in claim 1, it is characterised in that the close described pile foundation of the crossbeam One end arranges ballast box.
3. offshore operation at sea platform as claimed in claim 1, it is characterised in that the inside of the buoyancy tank have accommodate empty Between, the receiving space is provided with water inlet and outlet, and the water inlet and discharge outlet connect the first water pump and the second water respectively Pump.
4. offshore operation at sea platform as claimed in claim 3, it is characterised in that set between the pile foundation and the crossbeam Pressure transducer is put, the pressure transducer connects respectively at first water pump and second water pump.
5. offshore operation at sea platform as claimed in claim 1, it is characterised in that the buoyancy tank is spherical.
CN201610907978.5A 2016-10-18 2016-10-18 Offshore overwater operation platform Pending CN106428436A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610907978.5A CN106428436A (en) 2016-10-18 2016-10-18 Offshore overwater operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610907978.5A CN106428436A (en) 2016-10-18 2016-10-18 Offshore overwater operation platform

Publications (1)

Publication Number Publication Date
CN106428436A true CN106428436A (en) 2017-02-22

Family

ID=58177159

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610907978.5A Pending CN106428436A (en) 2016-10-18 2016-10-18 Offshore overwater operation platform

Country Status (1)

Country Link
CN (1) CN106428436A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018166522A1 (en) * 2017-03-17 2018-09-20 王燏斌 Construction device for revetment and construction method therefor
WO2018166521A1 (en) * 2017-03-17 2018-09-20 王燏斌 Construction device for shore foundation and construction method therefor
CN117738231A (en) * 2024-02-18 2024-03-22 保利长大工程有限公司 High-support underwater tower crane foundation and construction method thereof

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB470982A (en) * 1936-02-28 1937-08-26 Reginald Alfred Charles Brie Improvements in and relating to means for landing and launching aircraft
SU1654182A1 (en) * 1987-12-25 1991-06-07 В.М. Кутов. Р.А. Атаиас н и Ю.Б, Нуждин Floating landing stage for cargo handling of water craft
US5216773A (en) * 1990-06-07 1993-06-08 Norwegian Contractors A.S. Method of formation and installation of a floating bridge
CN2219854Y (en) * 1994-07-23 1996-02-14 马顺文 Bamboo or timber raft type travelling dock
US6739279B2 (en) * 2002-05-23 2004-05-25 James E. Funk Portable dock structure
CN2639170Y (en) * 2003-09-02 2004-09-08 中国船舶重工集团公司第七○二研究所 Small water plane double-hull ship
CN2780612Y (en) * 2005-03-20 2006-05-17 中国船舶重工集团公司第七○二研究所 Small water plane catamaran body having connected fin
CN2797204Y (en) * 2005-05-08 2006-07-19 上海智密技术工程研究所有限公司 Shore catching expansion tail pile type dock barge
CN1986330A (en) * 2006-12-20 2007-06-27 哈尔滨工程大学 Bionic double tail sterm propeller
CN201224866Y (en) * 2008-10-08 2009-04-22 中交第二航务工程勘察设计院有限公司 Floating pier steel bridge approach floating type elevating system
CN201587530U (en) * 2009-12-16 2010-09-22 中国船舶重工集团公司第七〇二研究所 Small water plane catamaran provided with center opened watertight doors
US20120103242A1 (en) * 2010-11-01 2012-05-03 Craft Kevin T Self-propelled boat dock system
CN104210627A (en) * 2014-09-05 2014-12-17 大连船舶重工集团有限公司 Device and method for launching after flat ground construction of self-elevating platform
CN205203299U (en) * 2015-11-26 2016-05-04 四川百工科技有限责任公司 Water sports single user wharf
CN205396474U (en) * 2016-03-02 2016-07-27 中国港湾工程有限责任公司 Pier
CN206218146U (en) * 2016-10-18 2017-06-06 中交第二航务工程局有限公司 Offshore operation at sea platform

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB470982A (en) * 1936-02-28 1937-08-26 Reginald Alfred Charles Brie Improvements in and relating to means for landing and launching aircraft
SU1654182A1 (en) * 1987-12-25 1991-06-07 В.М. Кутов. Р.А. Атаиас н и Ю.Б, Нуждин Floating landing stage for cargo handling of water craft
US5216773A (en) * 1990-06-07 1993-06-08 Norwegian Contractors A.S. Method of formation and installation of a floating bridge
CN2219854Y (en) * 1994-07-23 1996-02-14 马顺文 Bamboo or timber raft type travelling dock
US6739279B2 (en) * 2002-05-23 2004-05-25 James E. Funk Portable dock structure
CN2639170Y (en) * 2003-09-02 2004-09-08 中国船舶重工集团公司第七○二研究所 Small water plane double-hull ship
CN2780612Y (en) * 2005-03-20 2006-05-17 中国船舶重工集团公司第七○二研究所 Small water plane catamaran body having connected fin
CN2797204Y (en) * 2005-05-08 2006-07-19 上海智密技术工程研究所有限公司 Shore catching expansion tail pile type dock barge
CN1986330A (en) * 2006-12-20 2007-06-27 哈尔滨工程大学 Bionic double tail sterm propeller
CN201224866Y (en) * 2008-10-08 2009-04-22 中交第二航务工程勘察设计院有限公司 Floating pier steel bridge approach floating type elevating system
CN201587530U (en) * 2009-12-16 2010-09-22 中国船舶重工集团公司第七〇二研究所 Small water plane catamaran provided with center opened watertight doors
US20120103242A1 (en) * 2010-11-01 2012-05-03 Craft Kevin T Self-propelled boat dock system
CN104210627A (en) * 2014-09-05 2014-12-17 大连船舶重工集团有限公司 Device and method for launching after flat ground construction of self-elevating platform
CN205203299U (en) * 2015-11-26 2016-05-04 四川百工科技有限责任公司 Water sports single user wharf
CN205396474U (en) * 2016-03-02 2016-07-27 中国港湾工程有限责任公司 Pier
CN206218146U (en) * 2016-10-18 2017-06-06 中交第二航务工程局有限公司 Offshore operation at sea platform

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018166522A1 (en) * 2017-03-17 2018-09-20 王燏斌 Construction device for revetment and construction method therefor
WO2018166521A1 (en) * 2017-03-17 2018-09-20 王燏斌 Construction device for shore foundation and construction method therefor
CN117738231A (en) * 2024-02-18 2024-03-22 保利长大工程有限公司 High-support underwater tower crane foundation and construction method thereof
CN117738231B (en) * 2024-02-18 2024-05-17 保利长大工程有限公司 High-support underwater tower crane foundation and construction method thereof

Similar Documents

Publication Publication Date Title
RU2719645C1 (en) Mounting base resting on seabed and method for installation thereof
CN110382781B (en) Marine structure for laying the foundation of buildings, equipment and wind turbines by gravity in a marine environment
CN101666101B (en) Movable prefabricated multi-barrel type gravity mixed foundation
CN102322062B (en) Transportation and installation process of base barrel body of barrel type breakwater
CA2980959C (en) Gravity-based foundation for the installation of offshore wind turbines
CN106428436A (en) Offshore overwater operation platform
CN202416251U (en) Water-breaking ocean platform
CN2806564Y (en) Oil gas processing platform for shoal water zone
CN201214785Y (en) Cylinder moveable box reel type foundation structure member with rib pile
CN208763045U (en) Multi-functional caisson foundation structure
CN206218146U (en) Offshore operation at sea platform
CN201649036U (en) Pipe pile platform used for building dock
NO20092241L (en) Subsoil foundations, as well as methods for installing the foundation
CA1058893A (en) Underwater structure
CN210887094U (en) Gravity wharf upgrading structure
CN110758662A (en) Movable free-rising and sinking storm platform
WO2014184312A1 (en) A pumped storage facility
CN211032946U (en) Movable free-rising and sinking storm platform
CN107585269B (en) Seawater three-dimensional oil tank platform, system and construction method thereof
CN203473217U (en) Supporting rod of offshore platform positioning column
CN101666102B (en) Movable prefabricated barrel-type gravity mixed foundation
CN102535390B (en) Construction method of anti-wave-type offshore platform
KR102192138B1 (en) Water level control system of floating marine structure
CN203174612U (en) Underwater construction device for large objects
CN212128811U (en) Main tower artificial island structure of deep open sea suspension bridge

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170222