CN106416401B - Transmit the method, apparatus and the network equipment of signal - Google Patents
Transmit the method, apparatus and the network equipment of signal Download PDFInfo
- Publication number
- CN106416401B CN106416401B CN201480079585.9A CN201480079585A CN106416401B CN 106416401 B CN106416401 B CN 106416401B CN 201480079585 A CN201480079585 A CN 201480079585A CN 106416401 B CN106416401 B CN 106416401B
- Authority
- CN
- China
- Prior art keywords
- signal
- type
- resource
- pilot tone
- mapping mode
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/04—Wireless resource allocation
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The embodiment of the invention discloses it is a kind of transmit signal method, apparatus and the network equipment, be related to field of communication technology, be able to solve PDSCH will not on the resource block for being mapped with EPDCCH data resource impact, the problem for causing the utilization rate of resource low.The method comprise the steps that first network equipment receives the first signal and the second signal that second network equipment is sent, wherein first signal and the second signal are in the same Physical Resource Block;The first network equipment carries out solution resource impact to first signal and/or the second signal according to one of at least two candidate resource mapping modes resource mapping method, and the first network equipment to after solution resource impact the first signal and/or second signal detect.The present invention is suitable for the transmission of network equipment signal.
Description
Technical field
The present invention relates to field of communication technology more particularly to a kind of method, apparatus and the network equipment for transmitting signal.
Background technique
In 3GPP (The 3rd Generation Partnership Project, third generation cooperative partner program) standard
In, EPDCCH (Enhanced Physical Downlink Control Channel, the down control channel of enhancing) is located at
In PDSCH (Physical Downlink Shared Channel, Physical Downlink Shared Channel) region, the multiplexing with PDSCH
Mode be FDM (Frequency-division Multiplexing, frequency division multiplex), do not support enhancing control channel and
Multiplexing of the Traffic Channel in a time/frequency source block.The resource mapping method of PDSCH is in control channel DCI (Downlink
Control Information, Downlink Control Information) in it is indicative, and instruction PRB (Physical Resource
Block, Physical Resource Block) RE (Resource Element, physical resource unit) not all within the scope of pair may be used
To be used to transmit PDSCH, some positions are used to transmit EPDCCH.In the prior art, when instruction PDSCH money in control channel DCI
When having resource unit to be occupied by EPDCCH in the wherein at least one resource block in the resource block of source mapping, PDSCH will not
Resource impact can be carried out on this resource block, this resource block is only used to transmit EPDCCH.
At least there are the following problems in the prior art: EPDCCH can't occupy instruction PDSCH resource in control channel DCI
All resource units in the wherein at least one resource block of mapping, sometimes only take up the resource list of a quarter in resource block
Member, then this resource block only transmits the data of EPDCCH, leads to the waste of vast resources unit, reduces the utilization rate of resource.
Summary of the invention
The embodiment of the present invention provides a kind of method, apparatus and the network equipment for transmitting signal, and being able to solve PDSCH will not
The resource impact on the resource block for being mapped with EPDCCH data, the problem for causing the utilization rate of resource low.
In order to achieve the above objectives, the embodiment of the present invention adopts the following technical scheme that
In a first aspect, the embodiment of the present invention provides a kind of method for transmitting signal, comprising:
First network equipment receives the first signal and the second signal that second network equipment is sent, wherein first letter
Number and the second signal in the same Physical Resource Block;
The first network equipment is according to one of at least two candidate resource mapping modes resource mapping method to institute
It states the first signal and/or the second signal carries out solution resource impact, and to the first signal and/or the after solution resource impact
Binary signal is detected.
With reference to first aspect, in the first possible implementation of the first aspect, the candidate resource mapping mode
Including first resource mapping mode and/or information resources mapping mode and Secondary resource mapping mode;Wherein, described first
Resource mapping method is that first signal does not carry out resource impact, described the on the resource unit for transmitting the second signal
Two resource mapping methods are that first signal is carried out on the resource unit for transmitting the second signal with spatial multiplexing mode
Resource impact, the information resources mapping mode are to destroy first signal on the resource unit for transmitting the second signal
The data of resource impact.
With reference to first aspect, in the second possible implementation of the first aspect, in the first network equipment root
According to one of at least two candidate resource mapping modes resource mapping method to first signal and/or the second signal
Before carrying out solution resource impact, the method also includes:
The first network equipment receives the indication signaling that second network equipment is sent, and the indication signaling includes dynamic
State signaling or the first high-level signaling, the indication signaling be used to indicate the first network equipment to first signal and/
Or the second signal carries out the resource mapping method of solution resource impact;Alternatively,
The first network equipment determines institute according to scheduled resource impact rule from the candidate resource mapping mode
State the resource mapping method that first network equipment carries out solution resource impact to first signal and/or the second signal.
Second of possible implementation of the possible implementation of with reference to first aspect the first or first aspect, In
In the third possible implementation of first aspect, the first network equipment is according to scheduled resource impact rule, from institute
It states and determines that the first network equipment solves first signal and/or the second signal in candidate resource mapping mode
The resource mapping method of resource impact includes:
It is described when the co-located type of standard of the co-located type of standard of first signal and the second signal is type A
First network equipment is according to first resource mapping mode or information resources mapping mode to first signal and/or described
Binary signal carries out solution resource impact;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B,
The first network equipment is mapped according to the pilot tone of first signal and the pilot tone of the second signal from the candidate resource
Determine that the first network equipment carries out the resource of solution resource impact to first signal and/or the second signal in mode
Mapping mode;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A,
The first network equipment is mapped according to the pilot tone of first signal and the pilot tone of the second signal from the candidate resource
Determine that the first network equipment carries out the resource of solution resource impact to first signal and/or the second signal in mode
Mapping mode;Alternatively,
It is described when the co-located type of standard of the co-located type of standard of first signal and the second signal is type B
First network equipment is according to the pilot tone of first signal and the pilot tone of the second signal, from the candidate resource mapping mode
The middle determination first network equipment carries out the resource impact of solution resource impact to first signal and/or the second signal
Mode.
The third possible implementation with reference to first aspect, in the 4th kind of possible implementation of first aspect
In, it is described when the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B,
The first network equipment is mapped according to the pilot tone of first signal and the pilot tone of the second signal from the candidate resource
Determine that the first network equipment carries out the resource of solution resource impact to first signal and/or the second signal in mode
Mapping mode includes:
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B,
If the first kind pilot tone of first signal is identical or quasi- co-located as the first kind pilot tone of the second signal, described first
The network equipment is according to the first resource mapping mode or the information resources mapping mode to first signal and/or institute
It states second signal and carries out solution resource impact;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B,
If the first kind pilot tone of first signal is not identical or inaccurate total as the first kind pilot tone of the second signal
Location, then the first network equipment carries out first signal and/or the second signal according to Secondary resource mapping mode
Solve resource impact;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B,
If the second class pilot tone of first signal and the second class pilot tone of the second signal are identical or quasi- co-located, first net
Network equipment is according to the first resource mapping mode or the information resources mapping mode to first signal and/or described
Second signal carries out solution resource impact;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B,
If the second class pilot tone of first signal it is not identical as the second class pilot tone of the second signal or be not allowed it is co-located,
Then the first network equipment carries out solution money to first signal and/or the second signal according to Secondary resource mapping mode
Source mapping;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B,
If the first kind pilot tone of first signal and the second class pilot tone of the second signal are identical or quasi- co-located, institute
First network equipment is stated according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out solution resource impact;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B,
If the first kind pilot tone of first signal it is not identical as the second class pilot tone of the second signal or be not allowed it is co-located,
Then the first network equipment carries out solution money to first signal and/or the second signal according to Secondary resource mapping mode
Source mapping;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B,
If the second class pilot tone of first signal and the first kind pilot tone of the second signal are identical or quasi- co-located, institute
First network equipment is stated according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out solution resource impact;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B,
If the second class pilot tone of first signal it is not identical as the first kind pilot tone of the second signal or be not allowed it is co-located,
Then the first network equipment carries out solution money to first signal and/or the second signal according to Secondary resource mapping mode
Source mapping.
The third possible implementation with reference to first aspect, in the 5th kind of possible implementation of first aspect
In, it is described when the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A,
The first network equipment is mapped according to the pilot tone of first signal and the pilot tone of the second signal from the candidate resource
Determine that the first network equipment carries out the resource of solution resource impact to first signal and/or the second signal in mode
Mapping mode includes:
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A,
It is described if the first kind pilot tone of first signal and the first kind pilot tone of the second signal are identical or quasi- co-located
First network equipment according to the first resource mapping mode or the information resources mapping mode to first signal and/
Or the second signal carries out solution resource impact;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A,
If the first kind pilot tone of first signal is not identical or inaccurate total as the first kind pilot tone of the second signal
Location, then the first network equipment carries out first signal and/or the second signal according to Secondary resource mapping mode
Solve resource impact;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A,
If the second class pilot tone of first signal and the second class pilot tone of the second signal are identical or quasi- co-located, according to institute
First resource mapping mode or the information resources mapping mode is stated to carry out first signal and/or the second signal
Solve resource impact;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A,
If the second class pilot tone of first signal it is not identical as the second class pilot tone of the second signal or be not allowed it is co-located,
Then the first network equipment carries out solution money to first signal and/or the second signal according to Secondary resource mapping mode
Source mapping;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A,
If the first kind pilot tone of first signal and the second class pilot tone of the second signal are identical or quasi- co-located, institute
First network equipment is stated according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out solution resource impact;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A,
If the first kind pilot tone of first signal it is not identical as the second class pilot tone of the second signal or be not allowed it is co-located,
Then the first network equipment carries out solution money to first signal and/or the second signal according to Secondary resource mapping mode
Source mapping;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A,
If the second class pilot tone of first signal and the first kind pilot tone of the second signal are identical or quasi- co-located, institute
First network equipment is stated according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out solution resource impact;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A,
If the second class pilot tone of first signal it is not identical as the first kind pilot tone of the second signal or be not allowed it is co-located,
Then the first network equipment carries out solution money to first signal and/or the second signal according to Secondary resource mapping mode
Source mapping.
The third possible implementation with reference to first aspect, in the 6th kind of possible implementation of first aspect
In, it is described when the co-located type of standard of the co-located type of standard and the second signal of first signal is type B, described the
One network equipment is according to the pilot tone of first signal and the pilot tone of the second signal, from the candidate resource mapping mode
Determine that the first network equipment carries out the resource impact side of solution resource impact to first signal and/or the second signal
Formula includes:
When the co-located type of standard of the co-located type of standard of first signal and the second signal is type B, if institute
The first kind pilot tone for stating the first signal and the first kind pilot tone of the second signal are identical or quasi- co-located, then and described first
The network equipment is according to the first resource mapping mode or the information resources mapping mode to first signal and/or institute
It states second signal and carries out solution resource impact;Alternatively,
When the co-located type of standard of the co-located type of standard of first signal and the second signal is type B, if institute
The first kind pilot tone for stating the first signal it is not identical as the first kind pilot tone of the second signal or be not allowed it is co-located, then
The first network equipment carries out solution resource to first signal and/or the second signal according to Secondary resource mapping mode
Mapping;Alternatively,
When the co-located type of standard of the co-located type of standard of first signal and the second signal is type B, if institute
The the second class pilot tone for stating the first signal and the second class pilot tone of the second signal are identical or quasi- co-located, then first net
Network equipment is according to the first resource mapping mode or the information resources mapping mode to first signal and/or described
Second signal carries out solution resource impact;Alternatively,
When the co-located type of standard of the co-located type of standard of first signal and the second signal is type B, if institute
The the second class pilot tone for stating the first signal is not identical as the second class pilot tone of the second signal or co-located, then institute is not allowed
State first network equipment according to Secondary resource mapping mode to first signal and/or the second signal carry out solution resource reflect
It penetrates;Alternatively,
When the co-located type of standard of the co-located type of standard of first signal and the second signal is type B, if institute
The first kind pilot tone for stating the first signal and the second class pilot tone of the second signal are identical or quasi- co-located, then and described
One network equipment according to the first resource mapping mode or the information resources mapping mode to first signal and/or
The second signal carries out solution resource impact;Alternatively,
When the co-located type of standard of the co-located type of standard of first signal and the second signal is type B, if institute
The first kind pilot tone for stating the first signal is not identical as the second class pilot tone of the second signal or co-located, then institute is not allowed
State first network equipment according to Secondary resource mapping mode to first signal and/or the second signal carry out solution resource reflect
It penetrates;Alternatively,
When the co-located type of standard of the co-located type of standard of first signal and the second signal is type B, if institute
The the second class pilot tone for stating the first signal and the first kind pilot tone of the second signal are identical or quasi- co-located, then and described
One network equipment according to the first resource mapping mode or the information resources mapping mode to first signal and/or
The second signal carries out solution resource impact;Alternatively,
When the co-located type of standard of the co-located type of standard of first signal and the second signal is type B, if institute
The the second class pilot tone for stating the first signal is not identical as the first kind pilot tone of the second signal or co-located, then institute is not allowed
State first network equipment according to Secondary resource mapping mode to first signal and/or the second signal carry out solution resource reflect
It penetrates.
Second of possible implementation of the possible implementation of with reference to first aspect the first or first aspect, In
In 7th kind of possible implementation of first aspect, the first network equipment is according to scheduled resource impact rule, from institute
It states and determines that the first network equipment solves first signal and/or the second signal in candidate resource mapping mode
The resource mapping method of resource impact includes:
When the sequence initialization parameter of the third class pilot tone of first signal and the third class of the second signal
When the sequence initialization parameter of pilot tone is identical, the first network equipment is reflected according to first resource mapping mode or information resources
It penetrates mode and solution resource impact is carried out to first signal and/or the second signal;Alternatively,
When the third class pilot tone of first signal sequence initialization parameter and the second signal described the
When the sequence initialization parameter of three classes pilot tone is not identical, the first network equipment is according to Secondary resource mapping mode to described
One signal and/or the second signal carry out solution resource impact.
Second of possible implementation of the possible implementation of with reference to first aspect the first or first aspect, In
In 8th kind of possible implementation of first aspect, the first network equipment is according to scheduled resource impact rule, from institute
It states and determines that the first network equipment solves first signal and/or the second signal in candidate resource mapping mode
The resource mapping method of resource impact includes:
When the second signal is without cross-carrier scheduling, the first network equipment is according to first resource mapping mode
Or information resources mapping mode carries out solution resource impact to first signal and/or the second signal;Alternatively,
When the second signal carries out cross-carrier scheduling, the first network equipment is according to Secondary resource mapping mode pair
First signal and/or the second signal carry out solution resource impact.
Second of possible implementation of the possible implementation of with reference to first aspect the first or first aspect, In
In 9th kind of possible implementation of first aspect, the first network equipment is according to scheduled resource impact rule, from institute
It states and determines that the first network equipment solves first signal and/or the second signal in candidate resource mapping mode
The resource mapping method of resource impact includes:
When the aggregation level of the second signal is greater than preset value, the first network equipment is mapped according to first resource
Mode or information resources mapping mode carry out solution resource impact to first signal and/or the second signal;Alternatively,
When the aggregation level of the second signal is not more than preset value, the first network equipment is reflected according to Secondary resource
It penetrates mode and solution resource impact is carried out to first signal and/or the second signal.
Second of possible implementation of the possible implementation of with reference to first aspect the first or first aspect, In
In tenth kind of possible implementation of first aspect, the first network equipment is according to scheduled resource impact rule, from institute
It states and determines that the first network equipment solves first signal and/or the second signal in candidate resource mapping mode
The resource mapping method of resource impact includes:
When the scheduling format of the second signal is space-frequency code SFBC, the first network equipment is reflected according to first resource
It penetrates mode or information resources mapping mode and solution resource impact is carried out to first signal and/or the second signal;Alternatively,
When the scheduling format of the second signal is beam shaping beam forming or spatial reuse, described first
The network equipment carries out solution resource impact to first signal and/or the second signal according to Secondary resource mapping mode.
Second of possible implementation of the possible implementation of with reference to first aspect the first or first aspect, In
In a kind of possible implementation of the tenth of first aspect, the indication signaling is the quasi- co-located instruction PQI state of shared channel, institute
It states and carries the first network equipment in PQI state solution resource impact is carried out to first signal and/or the second signal
Resource mapping method.
Second of possible implementation of the possible implementation of with reference to first aspect the first or first aspect, In
In 12nd kind of possible implementation of first aspect, the first network equipment is regular according to scheduled resource impact, from
Determine that the first network equipment carries out first signal and/or the second signal in the candidate resource mapping mode
Solution resource impact resource mapping method include:
When the configuration information of the second signal includes the information of at least two second signals, the first network
Equipment according to first resource mapping mode or information resources mapping mode to first signal and/or the second signal into
Row solution resource impact, the configuration information of the second signal are that the second high-level signaling that second network equipment is sent carries.
With reference to first aspect or any possible realization in the first the tenth one kind to first aspect of first aspect
Mode, in the 13rd kind of possible implementation of first aspect, first signal is Physical Downlink Shared Channel PDSCH
Signal, the second signal are enhancing physical control channel EPDCCH signal, and the second signal dispatches first signal.
With reference to first aspect or the first any possible realization into the 12nd kind of first aspect of first aspect
Mode, in the 14th kind of possible implementation of first aspect, first signal is PDSCH signal, second letter
Number be common pilot signal CRS.
With reference to first aspect or the first possible implementation of first aspect, in the 15th kind of possibility of first aspect
Implementation in, the candidate resource mapping mode be second network equipment by third high-level signaling, dynamic signaling,
The specific cell specific signaling of cell or user equipment particular UE specific signal the first network equipment.
Any possible implementation into the 6th kind of first aspect of the 4th kind with reference to first aspect, in first party
In the 16th kind of possible implementation in face, the first kind pilot tone is public guide frequency CRS.
Any possible implementation into the 6th kind of first aspect of the 4th kind with reference to first aspect, in first party
In the 17th kind of possible implementation in face, the second class pilot tone is that channel status indicates reference signal CSI-RS.
The 7th kind of possible implementation with reference to first aspect, in the 18th kind of possible implementation of first aspect
In, the third class pilot tone is the reference signal DMRS of demodulation.
Second aspect, the embodiment of the present invention provide a kind of method for transmitting signal, comprising:
First network equipment is believed according to one of at least two candidate resource mapping modes resource mapping method first
Number and/or second signal carry out resource impact;Wherein, first signal and the second signal are in the same Physical Resource Block
It is interior;
The first network equipment to second network equipment send resource impact after the first signal and the second signal.
In conjunction with second aspect, in the first possible implementation of the second aspect, the candidate resource mapping mode
Including first resource mapping mode and/or information resources mapping mode and Secondary resource mapping mode;Wherein, described first
Resource mapping method is that first signal does not carry out resource impact, described the on the resource unit for transmitting the second signal
Two resource mapping methods are that first signal is carried out on the resource unit for transmitting the second signal with spatial multiplexing mode
Resource impact, the information resources mapping mode are to destroy first signal on the resource unit for transmitting the second signal
The data of resource impact.
In conjunction with second aspect, in a second possible implementation of the second aspect, in the first network equipment root
Resource is carried out to the first signal and/or second signal according to one of at least two candidate resource mapping modes resource mapping method
Before mapping, the method also includes:
First equipment determines described the according to preset resource impact rule from the candidate resource mapping mode
One network equipment carries out the resource mapping method of resource impact to first signal and/or the second signal.
In conjunction with the first possible implementation of second aspect or second of possible implementation of second aspect, In
In the third possible implementation of second aspect, first equipment is according to preset resource impact rule, from the time
It selects and determines that the first network equipment carries out resource to first signal and/or the second signal and reflects in resource mapping method
The resource mapping method penetrated includes:
It is described when the co-located type of standard of the co-located type of standard of first signal and the second signal is type A
First network equipment determines first resource mapping mode or information resources mapping mode to first signal and/or described
Binary signal carries out resource impact;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B,
The first network equipment is mapped according to the pilot tone of first signal and the pilot tone of the second signal from the candidate resource
The resource for determining that the first network equipment carries out resource impact to first signal and/or the second signal in mode is reflected
Penetrate mode;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A,
The first network equipment is mapped according to the pilot tone of first signal and the pilot tone of the second signal from the candidate resource
The resource for determining that the first network equipment carries out resource impact to first signal and/or the second signal in mode is reflected
Penetrate mode;Alternatively,
It is described when the co-located type of standard of the co-located type of standard of first signal and the second signal is type B
First network equipment is according to the pilot tone of first signal and the pilot tone of the second signal, from the candidate resource mapping mode
The middle determination first network equipment carries out the resource impact side of resource impact to first signal and/or the second signal
Formula.
In conjunction with the third possible implementation of second aspect, in the 4th kind of possible implementation of second aspect
In, it is described when the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B,
The first network equipment is mapped according to the pilot tone of first signal and the pilot tone of the second signal from the candidate resource
The resource for determining that the first network equipment carries out resource impact to first signal and/or the second signal in mode is reflected
The mode of penetrating includes:
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B,
It is described if the first kind pilot tone of first signal and the first kind pilot tone of the second signal are identical or quasi- co-located
First network equipment according to the first resource mapping mode or the information resources mapping mode to first signal and/
Or the second signal carries out resource impact;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B,
If the first kind pilot tone of first signal is not identical or inaccurate total as the first kind pilot tone of the second signal
Location, then the first network equipment carries out first signal and/or the second signal according to Secondary resource mapping mode
Resource impact;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B,
If the second class pilot tone of first signal and the second class pilot tone of the second signal are identical or quasi- co-located, described
One network equipment according to the first resource mapping mode or the information resources mapping mode to first signal and/or
The second signal carries out resource impact;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B,
If the second class pilot tone of first signal it is not identical as the second class pilot tone of the second signal or be not allowed it is co-located,
Then the first network equipment carries out resource to first signal and/or the second signal according to Secondary resource mapping mode
Mapping;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B,
If the first kind pilot tone of first signal and the second class pilot tone of the second signal are identical or quasi- co-located, institute
First network equipment is stated according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out resource impact;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B,
If the first kind pilot tone of first signal it is not identical as the second class pilot tone of the second signal or be not allowed it is co-located,
Then the first network equipment carries out resource to first signal and/or the second signal according to Secondary resource mapping mode
Mapping;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B,
If the second class pilot tone of first signal and the first kind pilot tone of the second signal are identical or quasi- co-located, institute
First network equipment is stated according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out resource impact;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B,
If the second class pilot tone of first signal it is not identical as the first kind pilot tone of the second signal or be not allowed it is co-located,
Then the first network equipment carries out resource to first signal and/or the second signal according to Secondary resource mapping mode
Mapping.
In conjunction with the third possible implementation of second aspect, in the 5th kind of possible implementation of second aspect
In, it is described when the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A,
The first network equipment is mapped according to the pilot tone of first signal and the pilot tone of the second signal from the candidate resource
The resource for determining that the first network equipment carries out resource impact to first signal and/or the second signal in mode is reflected
The mode of penetrating includes:
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A,
It is described if the first kind pilot tone of first signal and the first kind pilot tone of the second signal are identical or quasi- co-located
First network equipment according to the first resource mapping mode or the information resources mapping mode to first signal and/
Or the second signal carries out resource impact;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A,
If the first kind pilot tone of first signal is not identical or inaccurate total as the first kind pilot tone of the second signal
Location, then the first network equipment carries out first signal and/or the second signal according to Secondary resource mapping mode
Resource impact;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A,
If the second class pilot tone of first signal and the second class pilot tone of the second signal are identical or quasi- co-located, described
One network equipment according to the first resource mapping mode or the information resources mapping mode to first signal and/or
The second signal carries out resource impact;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A,
If the second class pilot tone of first signal it is not identical as the second class pilot tone of the second signal or be not allowed it is co-located,
Then the first network equipment carries out resource to first signal and/or the second signal according to Secondary resource mapping mode
Mapping;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A,
If the first kind pilot tone of first signal and the second class pilot tone of the second signal are identical or quasi- co-located, institute
First network equipment is stated according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out resource impact;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A,
If the first kind pilot tone of first signal it is not identical as the second class pilot tone of the second signal or be not allowed it is co-located,
Then the first network equipment carries out resource to first signal and/or the second signal according to Secondary resource mapping mode
Mapping;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A,
If the second class pilot tone of first signal and the first kind pilot tone of the second signal are identical or quasi- co-located, institute
First network equipment is stated according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out resource impact;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A,
If the second class pilot tone of first signal it is not identical as the first kind pilot tone of the second signal or be not allowed it is co-located,
Then the first network equipment carries out resource to first signal and/or the second signal according to Secondary resource mapping mode
Mapping.
In conjunction with the third possible implementation of second aspect, in the 6th kind of possible implementation of second aspect
In, it is described when the co-located type of standard of the co-located type of standard and the second signal of first signal is type B, described the
One network equipment is according to the pilot tone of first signal and the pilot tone of the second signal, from the candidate resource mapping mode
Determine that the first network equipment carries out the resource mapping method of resource impact to first signal and/or the second signal
Include:
When the co-located type of standard of the co-located type of standard of first signal and the second signal is type B, if institute
The first kind pilot tone for stating the first signal and the first kind pilot tone of the second signal are identical or quasi- co-located, then and described first
The network equipment is according to the first resource mapping mode or the information resources mapping mode to first signal and/or institute
It states second signal and carries out resource impact;Alternatively,
When the co-located type of standard of the co-located type of standard of first signal and the second signal is type B, if institute
The first kind pilot tone for stating the first signal it is not identical as the first kind pilot tone of the second signal or be not allowed it is co-located, then
The first network equipment carries out resource to first signal and/or the second signal according to Secondary resource mapping mode and reflects
It penetrates;Alternatively,
When the co-located type of standard of the co-located type of standard of first signal and the second signal is type B, if institute
The the second class pilot tone for stating the first signal and the second class pilot tone of the second signal are identical or quasi- co-located, then first net
Network equipment is according to the first resource mapping mode or the information resources mapping mode to first signal and/or described
Second signal carries out resource impact;Alternatively,
When the co-located type of standard of the co-located type of standard of first signal and the second signal is type B, if institute
The the second class pilot tone for stating the first signal is not identical as the second class pilot tone of the second signal or co-located, then institute is not allowed
It states first network equipment and first signal and/or second signal progress resource is reflected according to Secondary resource mapping mode
It penetrates;Alternatively,
When the co-located type of standard of the co-located type of standard of first signal and the second signal is type B, if institute
The first kind pilot tone for stating the first signal and the second class pilot tone of the second signal are identical or quasi- co-located, then and described
One network equipment according to the first resource mapping mode or the information resources mapping mode to first signal and/or
The second signal carries out resource impact;Alternatively,
When the co-located type of standard of the co-located type of standard of first signal and the second signal is type B, if institute
The first kind pilot tone for stating the first signal is not identical as the second class pilot tone of the second signal or co-located, then institute is not allowed
It states first network equipment and first signal and/or second signal progress resource is reflected according to Secondary resource mapping mode
It penetrates;Alternatively,
When the co-located type of standard of the co-located type of standard of first signal and the second signal is type B, if institute
The the second class pilot tone for stating the first signal and the first kind pilot tone of the second signal are identical or quasi- co-located, then and described
One network equipment according to the first resource mapping mode or the information resources mapping mode to first signal and/or
The second signal carries out resource impact;Alternatively,
When the co-located type of standard of the co-located type of standard of first signal and the second signal is type B, if institute
The the second class pilot tone for stating the first signal is not identical as the first kind pilot tone of the second signal or co-located, then institute is not allowed
It states first network equipment and first signal and/or second signal progress resource is reflected according to Secondary resource mapping mode
It penetrates.
In conjunction with the first possible implementation of second aspect or second of possible implementation of second aspect, In
In 7th kind of possible implementation of second aspect, first equipment is according to preset resource impact rule, from the time
It selects and determines that the first network equipment carries out resource to first signal and/or the second signal and reflects in resource mapping method
The resource mapping method penetrated includes:
When the sequence initialization parameter of the third class pilot tone of first signal and the third class of the second signal
When the sequence initialization parameter of pilot tone is identical, the first network equipment is reflected according to first resource mapping mode or information resources
It penetrates mode and resource impact is carried out to first signal and/or the second signal;Alternatively,
When the sequence initialization parameter of the third class pilot tone of first signal and the third class pilot tone of the second signal
Sequence initialization parameter it is not identical when, the first network equipment is according to Secondary resource mapping mode to first signal
And/or the second signal carries out resource impact.
In conjunction with the first possible implementation of second aspect or second of possible implementation of second aspect, In
In 8th kind of possible implementation of second aspect, first equipment is according to preset resource impact rule, from the time
It selects and determines that the first network equipment carries out resource to first signal and/or the second signal and reflects in resource mapping method
The resource mapping method penetrated includes:
When the second signal is without cross-carrier scheduling, the first network equipment is according to first resource mapping mode
Or information resources mapping mode carries out resource impact to first signal and/or the second signal;Alternatively,
When the second signal carries out cross-carrier scheduling, the first network equipment is according to Secondary resource mapping mode pair
First signal and/or the second signal carry out resource impact.
In conjunction with the first possible implementation of second aspect or second of possible implementation of second aspect, In
In 9th kind of possible implementation of second aspect, first equipment is according to preset resource impact rule, from the time
It selects and determines that the first network equipment carries out resource to first signal and/or the second signal and reflects in resource mapping method
The resource mapping method penetrated includes:
When the aggregation level of the second signal is greater than preset value, the first network equipment is mapped according to first resource
Mode or information resources mapping mode carry out resource impact to first signal and/or the second signal;Alternatively,
When the aggregation level of the second signal is not more than preset value, the first network equipment is reflected according to Secondary resource
It penetrates mode and resource impact is carried out to first signal and/or the second signal.
In conjunction with the first possible implementation of second aspect or second of possible implementation of second aspect, In
In tenth kind of possible implementation of second aspect, first equipment is according to preset resource impact rule, from the time
It selects and determines that the first network equipment carries out resource to first signal and/or the second signal and reflects in resource mapping method
The resource mapping method penetrated includes:
When the scheduling format of the second signal is space-frequency code SFBC, the first network equipment is reflected according to first resource
It penetrates mode or information resources mapping mode and resource impact is carried out to first signal and/or the second signal;Alternatively,
When the scheduling format of the second signal is beam shaping beam forming or spatial reuse, described first
The network equipment carries out resource impact to first signal and/or the second signal according to Secondary resource mapping mode.
In conjunction with the first possible implementation of second aspect or second of possible implementation of second aspect, In
In a kind of possible implementation of the tenth of second aspect, first equipment is according to preset resource impact rule, from described
Determine that the first network equipment carries out resource to first signal and/or the second signal in candidate resource mapping mode
The resource mapping method of mapping includes:
First equipment is according to the quasi- co-located instruction PQI state of shared channel, from the candidate resource mapping mode really
The fixed first network equipment carries out the resource mapping method of resource impact to first signal and/or the second signal.
In conjunction with the first possible implementation of second aspect or second of possible implementation of second aspect, In
In 12nd kind of possible implementation of second aspect, first equipment is according to preset resource impact rule, from described
Determine that the first network equipment carries out resource to first signal and/or the second signal in candidate resource mapping mode
The resource mapping method of mapping includes:
When the configuration information of the second signal includes the information of at least two second signals, the first network
Equipment according to first resource mapping mode or information resources mapping mode to first signal and/or the second signal into
Row resource impact, the configuration information of the second signal are that the first high-level signaling that second network equipment is sent carries.
In conjunction with the first of second aspect or second aspect to second aspect the tenth one kind in any possible realization
Mode, in the 13rd kind of possible implementation of second aspect, first signal is Physical Downlink Shared Channel PDSCH
Signal, the second signal are enhancing physical control channel EPDCCH signal, and the second signal dispatches first signal.
In conjunction with any possible realization in the 12nd kind of the first of second aspect or second aspect to second aspect
Mode, in the 14th kind of possible implementation of second aspect, first signal is PDSCH signal, second letter
Number be common pilot signal CRS.
In conjunction with the possible implementation of the first of second aspect or second aspect, in the 15th kind of possibility of second aspect
Implementation in, the candidate resource mapping mode be the first network equipment by the second high-level signaling, dynamic signaling,
The specific cell specific signaling of cell or user equipment particular UE specific signal second network equipment.
In conjunction with the 5th kind of any possible implementation into the 7th kind of second aspect of second aspect, in second party
In the 16th kind of possible implementation in face, the first kind pilot tone is public guide frequency CRS.
In conjunction with the 5th kind of any possible implementation into the 7th kind of second aspect of second aspect, in second party
In the 17th kind of possible implementation in face, the second class pilot tone is that channel status indicates reference signal CSI-RS.
In conjunction with the 8th kind of possible implementation of second aspect, in the 18th kind of possible implementation of second aspect
In, the third class pilot tone is the reference signal DMRS of demodulation.
In conjunction with second aspect, in the 19th kind of possible implementation of second aspect, in the first network equipment
The first signal and/or second signal are provided according to one of at least two candidate resource mapping modes resource mapping method
After the mapping of source, the method also includes:
The first network equipment sends indication signaling to second network equipment;Wherein, the indication signaling includes dynamic
Signaling or third high-level signaling, the indication signaling are used to indicate second network equipment to first signal and/or institute
State the resource mapping method that second signal carries out solution resource impact.
The third aspect, the embodiment of the present invention provide a kind of device for transmitting signal, comprising:
Receiving unit, for receiving the first signal and the second signal of second network equipment transmission, wherein first letter
Number and the second signal in the same Physical Resource Block;
De-mapping unit is used for according to one of at least two candidate resource mapping modes resource mapping method to described
First signal and/or the second signal carry out solution resource impact, and to the first signal and/or second after solution resource impact
Signal is detected.
In conjunction with the third aspect, in the first possible implementation of the third aspect, the candidate resource mapping mode
Including first resource mapping mode and/or information resources mapping mode and Secondary resource mapping mode;Wherein, described first
Resource mapping method is that first signal does not carry out resource impact, described the on the resource unit for transmitting the second signal
Two resource mapping methods are that first signal is carried out on the resource unit for transmitting the second signal with spatial multiplexing mode
Resource impact, the information resources mapping mode are to destroy first signal on the resource unit for transmitting the second signal
The data of resource impact.
In conjunction with the third aspect, in the second possible implementation of the third aspect, the receiving unit is also used to connect
The indication signaling that second network equipment is sent is received, the indication signaling includes dynamic signaling or the first high-level signaling, institute
State indication signaling be used to indicate the first network equipment to first signal and/or the second signal carry out solution resource reflect
The resource mapping method penetrated;Alternatively, described device further include:
Determination unit, described in being determined from the candidate resource mapping mode according to scheduled resource impact rule
First network equipment carries out the resource mapping method of solution resource impact to first signal and/or the second signal.
In conjunction with the first possible implementation of the third aspect or second of possible implementation of the third aspect, In
In the third possible implementation of the third aspect, the determination unit is specifically used for the co-located class of standard when first signal
When the co-located type of the standard of type and the second signal is type A, mapped according to first resource mapping mode or information resources
Mode carries out solution resource impact to first signal and/or the second signal;Alternatively,
The determination unit is specifically used for when the co-located type of standard of first signal being type A and the second signal
When quasi- co-located type is type B, according to the pilot tone of the pilot tone of first signal and the second signal, from the candidate resource
Determine that the first network equipment carries out solution resource impact to first signal and/or the second signal in mapping mode
Resource mapping method;Alternatively,
The determination unit is specifically used for when the co-located type of standard of first signal being type B and the second signal
When quasi- co-located type is type A, according to the pilot tone of the pilot tone of first signal and the second signal, from the candidate resource
Determine that the first network equipment carries out solution resource impact to first signal and/or the second signal in mapping mode
Resource mapping method;Alternatively,
The determination unit is specifically used for when the co-located type of standard and the standard of the second signal of first signal are co-located
When type is type B, according to the pilot tone of the pilot tone of first signal and the second signal, mapped from the candidate resource
Determine that the first network equipment carries out the resource of solution resource impact to first signal and/or the second signal in mode
Mapping mode.
In conjunction with the third possible implementation of the third aspect, in the 4th kind of possible implementation of the third aspect
In, the determination unit includes:
First determines subelement, is type A and the second signal for the co-located type of standard when first signal
When quasi- co-located type is type B, if the first kind pilot tone of the first kind pilot tone of first signal and the second signal
It is identical perhaps quasi- co-located then according to the first resource mapping mode or the information resources mapping mode to first letter
Number and/or the second signal carry out solution resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and second letter
Number standard co-located type when being type B, if described the of the first kind pilot tone of first signal and the second signal
A kind of pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or described second
Signal carries out solution resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and second letter
Number standard co-located type when being type B, if second class of the second class pilot tone of first signal and the second signal
Pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described first
Signal and/or the second signal carry out solution resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and second letter
Number standard co-located type when being type B, if described the of the second class pilot tone of first signal and the second signal
Two class pilot tones it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or it is described second letter
Number carry out solution resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and second letter
Number standard co-located type when being type B, if described the of the first kind pilot tone of first signal and the second signal
Two class pilot tones are identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described
First signal and/or the second signal carry out solution resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and second letter
Number standard co-located type when being type B, if described the of the first kind pilot tone of first signal and the second signal
Two class pilot tones it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or it is described second letter
Number carry out solution resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and second letter
Number standard co-located type when being type B, if described the of the second class pilot tone of first signal and the second signal
A kind of pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described
First signal and/or the second signal carry out solution resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and second letter
Number standard co-located type when being type B, if described the of the second class pilot tone of first signal and the second signal
A kind of pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or it is described second letter
Number carry out solution resource impact.
In conjunction with the third possible implementation of the third aspect, in the 5th kind of possible implementation of the third aspect
In, the determination unit includes:
Second determines subelement, is type B and the second signal for the co-located type of standard when first signal
When quasi- co-located type is type A, if the first kind pilot tone of the first kind pilot tone of first signal and the second signal
It is identical perhaps quasi- co-located then according to the first resource mapping mode or the information resources mapping mode to first letter
Number and/or the second signal carry out solution resource impact;Alternatively,
Described second determines that subelement is also used to when the co-located type of standard of first signal be type B and second letter
Number standard co-located type when being type A, if described the of the first kind pilot tone of first signal and the second signal
A kind of pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or described second
Signal carries out solution resource impact;Alternatively,
Described second determines that subelement is also used to when the co-located type of standard of first signal be type B and second letter
Number standard co-located type when being type A, if second class of the second class pilot tone of first signal and the second signal
Pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described first
Signal and/or the second signal carry out solution resource impact;Alternatively,
Described second determines that subelement is also used to when the co-located type of standard of first signal be type B and second letter
Number standard co-located type when being type A, if described the of the second class pilot tone of first signal and the second signal
Two class pilot tones it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or it is described second letter
Number carry out solution resource impact;Alternatively,
Described second determines that subelement is also used to when the co-located type of standard of first signal be type B and second letter
Number standard co-located type when being type A, if described the of the first kind pilot tone of first signal and the second signal
Two class pilot tones are identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described
First signal and/or the second signal carry out solution resource impact;Alternatively,
Described second determines that subelement is also used to when the co-located type of standard of first signal be type B and second letter
Number standard co-located type when being type A, if described the of the first kind pilot tone of first signal and the second signal
Two class pilot tones it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or it is described second letter
Number carry out solution resource impact;Alternatively,
Described second determines that subelement is also used to when the co-located type of standard of first signal be type B and second letter
Number standard co-located type when being type A, if described the of the second class pilot tone of first signal and the second signal
A kind of pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described
First signal and/or the second signal carry out solution resource impact;Alternatively,
Described second determines that subelement is also used to when the co-located type of standard of first signal be type B and second letter
Number standard co-located type when being type A, if described the of the second class pilot tone of first signal and the second signal
A kind of pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or it is described second letter
Number carry out solution resource impact.
In conjunction with the third possible implementation of the third aspect, in the 6th kind of possible implementation of the third aspect
In, the determination unit includes:
Third determines subelement, for when the co-located type of standard of first signal and the co-located class of standard of the second signal
When type is type B, if the first kind pilot tone of first signal it is identical as the first kind pilot tone of the second signal or
Person's standard is co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/
Or the second signal carries out solution resource impact;Alternatively,
The third determines that subelement is also used to the standard when the standard co-located type and the second signal of first signal
When co-located type is type B, if the first kind of the first kind pilot tone of first signal and the second signal
Pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal
Carry out solution resource impact;Alternatively,
The third determines that subelement is also used to the standard when the standard co-located type and the second signal of first signal
When co-located type is type B, if the second class pilot tone of the second class pilot tone of first signal and the second signal
It is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out solution resource impact;Alternatively,
The third determines that subelement is also used to the standard when the standard co-located type and the second signal of first signal
When co-located type is type B, if second class of the second class pilot tone of first signal and the second signal
Pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal into
Row solution resource impact;Alternatively,
The third determines that subelement is also used to the standard when the standard co-located type and the second signal of first signal
When co-located type is type B, if second class of the first kind pilot tone of first signal and the second signal
Pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described first
Signal and/or the second signal carry out solution resource impact;Alternatively,
The third determines that subelement is also used to the standard when the standard co-located type and the second signal of first signal
When co-located type is type B, if second class of the first kind pilot tone of first signal and the second signal
Pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal into
Row solution resource impact;Alternatively,
If the third determines that subelement is also used to the second class pilot tone and the second signal of first signal
The first kind pilot tone it is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping side
Formula carries out solution resource impact to first signal and/or the second signal;Alternatively,
The third determines that subelement is also used to the standard when the standard co-located type and the second signal of first signal
When co-located type is type B, if the first kind of the second class pilot tone of first signal and the second signal
Pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal into
Row solution resource impact.
In conjunction with the first possible implementation of the third aspect or second of possible implementation of the third aspect, In
In 7th kind of possible implementation of the third aspect, the determination unit is specifically used for leading when the third class of first signal
When the sequence initialization parameter of frequency is identical as the sequence initialization parameter of third class pilot tone of the second signal, according to described
One resource mapping method or the information resources mapping mode carry out solution money to first signal and/or the second signal
Source mapping;Alternatively,
The determination unit be specifically used for when first signal third class pilot tone sequence initialization parameter with it is described
When the sequence initialization parameter of the third class pilot tone of second signal is not identical, according to the Secondary resource mapping mode to institute
It states the first signal and/or the second signal carries out solution resource impact, the candidate resource mapping mode includes second money
Source mapping mode.
In conjunction with the first possible implementation of the third aspect or second of possible implementation of the third aspect, In
In 8th kind of possible implementation of the third aspect, the determination unit is specifically used for when the second signal is without across load
When wave is dispatched, according to first resource mapping mode or information resources mapping mode to first signal and/or described second
Signal carries out solution resource impact;Alternatively,
The determination unit is specifically used for when the second signal carries out cross-carrier scheduling, according to Secondary resource mapping side
Formula carries out solution resource impact to first signal and/or the second signal.
In conjunction with the first possible implementation of the third aspect or second of possible implementation of the third aspect, In
In 9th kind of possible implementation of the third aspect, the determination unit is specifically used for the aggregation level when the second signal
When greater than preset value, according to first resource mapping mode or information resources mapping mode to first signal and/or described
Second signal carries out solution resource impact;Alternatively,
The determination unit is specifically used for when the aggregation level of the second signal is not more than preset value, according to the second money
Source mapping mode carries out solution resource impact to first signal and/or the second signal.
In conjunction with the first possible implementation of the third aspect or second of possible implementation of the third aspect, In
In tenth kind of possible implementation of the third aspect, the determination unit is specifically used for the scheduling format when the second signal
When for space-frequency code SFBC, according to first resource mapping mode or information resources mapping mode to first signal and/or institute
It states second signal and carries out solution resource impact;Alternatively,
The determination unit be specifically used for when the second signal scheduling format be beam shaping beam forming or
When person's spatial reuse, solution resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode and is reflected
It penetrates.
In conjunction with the first possible implementation of the third aspect or second of possible implementation of the third aspect, In
In a kind of possible implementation of the tenth of the third aspect, the indication signaling is the quasi- co-located instruction PQI state of shared channel, institute
It states and carries the first network equipment in PQI state solution resource impact is carried out to first signal and/or the second signal
Resource mapping method.
In conjunction with the first possible implementation of the third aspect or second of possible implementation of the third aspect, In
In 12nd kind of possible implementation of the third aspect, the determination unit is specifically used for matching confidence when the second signal
When breath includes the information of at least two second signals, according to first resource mapping mode or information resources mapping mode pair
First signal and/or the second signal carry out solution resource impact, and the configuration information of the second signal is described second
The second high-level signaling that the network equipment is sent carries.
In conjunction with the first of the third aspect or the third aspect to the third aspect the tenth one kind in any possible realization
Mode, in the 13rd kind of possible implementation of the third aspect, first signal is Physical Downlink Shared Channel PDSCH
Signal, the second signal are enhancing physical control channel EPDCCH signal, and the second signal dispatches first signal.
In conjunction with any possible realization in the 12nd kind of the first of the third aspect or the third aspect to the third aspect
Mode, in the 14th kind of possible implementation of the third aspect, first signal is PDSCH signal, second letter
Number be common pilot signal CRS.
In conjunction with the possible implementation of the first of the third aspect or the third aspect, in the 15th kind of possibility of the third aspect
Implementation in, the candidate resource mapping mode be second network equipment by third high-level signaling, dynamic signaling,
The specific cell specific signaling of cell or user equipment particular UE specific signal the first network equipment.
In conjunction with the 4th kind of any possible implementation into the 6th kind of the third aspect of the third aspect, in third party
In the 16th kind of possible implementation in face, the first kind pilot tone is public guide frequency CRS.
In conjunction with the 4th kind of any possible implementation into the 6th kind of the third aspect of the third aspect, in third party
In the 17th kind of possible implementation in face, the second class pilot tone is that channel status indicates reference signal CSI-RS.
In conjunction with the 7th kind of possible implementation of the third aspect, in the 18th kind of possible implementation of the third aspect
In, the third class pilot tone is the reference signal DMRS of demodulation.
Fourth aspect, the embodiment of the present invention provide a kind of device for transmitting signal, comprising:
First network equipment is believed according to one of at least two candidate resource mapping modes resource mapping method first
Number and/or second signal carry out resource impact;Wherein, first signal and the second signal are in the same Physical Resource Block
It is interior;
The first network equipment to second network equipment send resource impact after the first signal and the second signal.
In conjunction with fourth aspect, in the first possible implementation of the fourth aspect, the candidate resource mapping mode
Including first resource mapping mode and/or information resources mapping mode and Secondary resource mapping mode;Wherein, described first
Resource mapping method is that first signal does not carry out resource impact, described the on the resource unit for transmitting the second signal
Two resource mapping methods are that first signal is carried out on the resource unit for transmitting the second signal with spatial multiplexing mode
Resource impact, the information resources mapping mode are to destroy first signal on the resource unit for transmitting the second signal
The data of resource impact.
In conjunction with fourth aspect, in the second possible implementation of the fourth aspect, described device further include:
Determination unit, described in being determined from the candidate resource mapping mode according to preset resource impact rule
First network equipment carries out the resource mapping method of resource impact to first signal and/or the second signal.
In conjunction with the first possible implementation of fourth aspect or second of possible implementation of fourth aspect, In
In the third possible implementation of fourth aspect, the determination unit is specifically used for the co-located class of standard when first signal
When the co-located type of the standard of type and the second signal is type A, first resource mapping mode or information resources mapping are determined
Mode carries out resource impact to first signal and/or the second signal;Alternatively,
The determination unit is specifically used for when the co-located type of standard of first signal being type A and the second signal
When quasi- co-located type is type B, according to the pilot tone of the pilot tone of first signal and the second signal, from the candidate resource
Determine that the first network equipment carries out the money of resource impact to first signal and/or the second signal in mapping mode
Source mapping mode;Alternatively,
The determination unit is specifically used for when the co-located type of standard of first signal being type B and the second signal
When quasi- co-located type is type A, according to the pilot tone of the pilot tone of first signal and the second signal, from the candidate resource
Determine that the first network equipment carries out the money of resource impact to first signal and/or the second signal in mapping mode
Source mapping mode;Alternatively,
The determination unit is specifically used for when the co-located type of standard and the standard of the second signal of first signal are co-located
When type is type B, according to the pilot tone of the pilot tone of first signal and the second signal, mapped from the candidate resource
The resource for determining that the first network equipment carries out resource impact to first signal and/or the second signal in mode is reflected
Penetrate mode.
In conjunction with the third possible implementation of fourth aspect, in the 4th kind of possible implementation of fourth aspect
In, the determination unit includes:
First determines subelement, is type A and the second signal for the co-located type of standard when first signal
When quasi- co-located type is type B, if the first kind pilot tone of first signal is identical as the first kind pilot tone of the second signal
Perhaps quasi- co-located then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and second letter
Number standard co-located type when being type B, if described the of the first kind pilot tone of first signal and the second signal
A kind of pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or described second
Signal carries out resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and second letter
Number standard co-located type when being type B, if the second class pilot tone of the second class pilot tone of first signal and the second signal
It is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and second letter
Number standard co-located type when being type B, if described the of the second class pilot tone of first signal and the second signal
Two class pilot tones it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or it is described second letter
Number carry out resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and second letter
Number standard co-located type when being type B, if described the of the first kind pilot tone of first signal and the second signal
Two class pilot tones are identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described
First signal and/or the second signal carry out resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and second letter
Number standard co-located type when being type B, if described the of the first kind pilot tone of first signal and the second signal
Two class pilot tones it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or it is described second letter
Number carry out resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and second letter
Number standard co-located type when being type B, if described the of the second class pilot tone of first signal and the second signal
A kind of pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described
First signal and/or the second signal carry out resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and second letter
Number standard co-located type when being type B, if described the of the second class pilot tone of first signal and the second signal
A kind of pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or it is described second letter
Number carry out resource impact.
In conjunction with the third possible implementation of fourth aspect, in the 5th kind of possible implementation of fourth aspect
In, the determination unit includes:
Second determines subelement, is type B and the second signal for the co-located type of standard when first signal
When quasi- co-located type is type A, if the first kind pilot tone of first signal is identical as the first kind pilot tone of the second signal
Perhaps quasi- co-located then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out resource impact;Alternatively,
Described second determines that subelement is also used to when the co-located type of standard of first signal be type B and second letter
Number standard co-located type when being type A, if described the of the first kind pilot tone of first signal and the second signal
A kind of pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or described second
Signal carries out resource impact;Alternatively,
Described second determines that subelement is also used to when the co-located type of standard of first signal be type B and second letter
Number standard co-located type when being type A, if the second class pilot tone of the second class pilot tone of first signal and the second signal
It is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out resource impact;Alternatively,
Described second determines that subelement is also used to when the co-located type of standard of first signal be type B and second letter
Number standard co-located type when being type A, if described the of the second class pilot tone of first signal and the second signal
Two class pilot tones it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or it is described second letter
Number carry out resource impact;Alternatively,
Described second determines that subelement is also used to when the co-located type of standard of first signal be type B and second letter
Number standard co-located type when being type A, if described the of the first kind pilot tone of first signal and the second signal
Two class pilot tones are identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described
First signal and/or the second signal carry out resource impact;Alternatively,
Described second determines that subelement is also used to when the co-located type of standard of first signal be type B and second letter
Number standard co-located type when being type A, if described the of the first kind pilot tone of first signal and the second signal
Two class pilot tones it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or it is described second letter
Number carry out resource impact;Alternatively,
Described second determines that subelement is also used to when the co-located type of standard of first signal be type B and second letter
Number standard co-located type when being type A, if described the of the second class pilot tone of first signal and the second signal
A kind of pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described
First signal and/or the second signal carry out resource impact;Alternatively,
Described second determines that subelement is also used to when the co-located type of standard of first signal be type B and second letter
Number standard co-located type when being type A, if described the of the second class pilot tone of first signal and the second signal
A kind of pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or it is described second letter
Number carry out resource impact.
In conjunction with the third possible implementation of fourth aspect, in the 6th kind of possible implementation of fourth aspect
In, the determination unit includes:
Third determines subelement, for when the co-located type of standard of first signal and the co-located class of standard of the second signal
When type is type B, if the first kind pilot tone of first signal and the first kind pilot tone of the second signal are identical or quasi-
It is co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/or institute
It states second signal and carries out resource impact;Alternatively,
The third determines that subelement is also used to the standard when the standard co-located type and the second signal of first signal
When co-located type is type B, if the first kind of the first kind pilot tone of first signal and the second signal
Pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal
Carry out resource impact;Alternatively,
The third determines that subelement is also used to the standard when the standard co-located type and the second signal of first signal
When co-located type is type B, if the second class pilot tone of first signal is identical as the second class pilot tone of the second signal
Or it is quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/
Or the second signal carries out resource impact;Alternatively,
The third determines that subelement is also used to the standard when the standard co-located type and the second signal of first signal
When co-located type is type B, if second class of the second class pilot tone of first signal and the second signal
Pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal into
Row resource impact;Alternatively,
The third determines that subelement is also used to the standard when the standard co-located type and the second signal of first signal
When co-located type is type B, if second class of the first kind pilot tone of first signal and the second signal
Pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described first
Signal and/or the second signal carry out resource impact;Alternatively,
The third determines that subelement is also used to the standard when the standard co-located type and the second signal of first signal
When co-located type is type B, if second class of the first kind pilot tone of first signal and the second signal
Pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal into
Row resource impact;Alternatively,
The third determines that subelement is also used to the standard when the standard co-located type and the second signal of first signal
When co-located type is type B, if the first kind of the second class pilot tone of first signal and the second signal
Pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described first
Signal and/or the second signal carry out resource impact;Alternatively,
The third determines that subelement is also used to the standard when the standard co-located type and the second signal of first signal
When co-located type is type B, if the first kind of the second class pilot tone of first signal and the second signal
Pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal into
Row resource impact.
In conjunction with the first possible implementation of fourth aspect or second of possible implementation of fourth aspect, In
In 7th kind of possible implementation of fourth aspect, the determination unit is specifically used for leading when the third class of first signal
When the sequence initialization parameter of frequency is identical as the sequence initialization parameter of third class pilot tone of the second signal, according to the first money
Source mapping mode or information resources mapping mode carry out resource impact to first signal and/or the second signal;Or
Person,
The determination unit be specifically used for when first signal third class pilot tone sequence initialization parameter with it is described
When the sequence initialization parameter of the third class pilot tone of second signal is not identical, according to Secondary resource mapping mode to first letter
Number and/or the second signal carry out resource impact.
In conjunction with the first possible implementation of fourth aspect or second of possible implementation of fourth aspect, In
In 8th kind of possible implementation of fourth aspect, the determination unit is specifically used for when the second signal is without across load
When wave is dispatched, according to first resource mapping mode or information resources mapping mode to first signal and/or described second
Signal carries out resource impact;Alternatively,
The determination unit is specifically used for when the second signal carries out cross-carrier scheduling, according to Secondary resource mapping side
Formula carries out resource impact to first signal and/or the second signal.
In conjunction with the first possible implementation of fourth aspect or second of possible implementation of fourth aspect, In
In 9th kind of possible implementation of fourth aspect, the determination unit is specifically used for the aggregation level when the second signal
When greater than preset value, according to first resource mapping mode or information resources mapping mode to first signal and/or described
Second signal carries out resource impact;Alternatively,
The determination unit is specifically used for when the aggregation level of the second signal is not more than preset value, according to the second money
Source mapping mode carries out resource impact to first signal and/or the second signal.
In conjunction with the first possible implementation of fourth aspect or second of possible implementation of fourth aspect, In
In tenth kind of possible implementation of fourth aspect, the determination unit is specifically used for the scheduling format when the second signal
When for space-frequency code SFBC, according to first resource mapping mode or information resources mapping mode to first signal and/or institute
It states second signal and carries out resource impact;Alternatively,
The determination unit be specifically used for when the second signal scheduling format be beam shaping beam forming or
When person's spatial reuse, resource impact is carried out to first signal and/or the second signal according to Secondary resource mapping mode.
In conjunction with the first possible implementation of fourth aspect or second of possible implementation of fourth aspect, In
In a kind of possible implementation of the tenth of fourth aspect, the determination unit is specifically used for according to the quasi- co-located instruction of shared channel
PQI state determines the first network equipment to first signal and/or described the from the candidate resource mapping mode
The resource mapping method of binary signal progress resource impact.
In conjunction with the first possible implementation of fourth aspect or second of possible implementation of fourth aspect, In
In 12nd kind of possible implementation of fourth aspect, the determination unit is specifically used for matching confidence when the second signal
When breath includes the information of at least two second signals, according to first resource mapping mode or information resources mapping mode pair
First signal and/or the second signal carry out resource impact, and the configuration information of the second signal is second net
The first high-level signaling that network equipment is sent carries.
In conjunction with the first of fourth aspect or fourth aspect to fourth aspect the tenth one kind in any possible realization
Mode, in the 13rd kind of possible implementation of fourth aspect, first signal is Physical Downlink Shared Channel PDSCH
Signal, the second signal are enhancing physical control channel EPDCCH signal, and the second signal dispatches first signal.
In conjunction with any possible realization in the 12nd kind of the first of fourth aspect or fourth aspect to fourth aspect
Mode, in the 14th kind of possible implementation of fourth aspect, first signal is PDSCH signal, second letter
Number be common pilot signal CRS.
In conjunction with the possible implementation of the first of fourth aspect or fourth aspect, in the 15th kind of possibility of fourth aspect
Implementation in, the candidate resource mapping mode be the first network equipment by the second high-level signaling, dynamic signaling,
The specific cell specific signaling of cell or user equipment particular UE specific signal second network equipment.
In conjunction with the 5th kind of any possible implementation into the 7th kind of fourth aspect of fourth aspect, in four directions
In the 16th kind of possible implementation in face, the first kind pilot tone is public guide frequency CRS.
In conjunction with the 5th kind of any possible implementation into the 7th kind of fourth aspect of fourth aspect, in four directions
In the 17th kind of possible implementation in face, the second class pilot tone is that channel status indicates reference signal CSI-RS.
In conjunction with the 8th kind of possible implementation of fourth aspect, in the 18th kind of possible implementation of fourth aspect
In, the third class pilot tone is the reference signal DMRS of demodulation.
In conjunction with fourth aspect, in the 19th kind of possible implementation of fourth aspect, the transmission unit is also used to
Indication signaling is sent to second network equipment;Wherein, the indication signaling includes dynamic signaling or third high-level signaling, the finger
Show that signaling is used to indicate second network equipment and carries out solution resource impact to first signal and/or the second signal
Resource mapping method.
5th aspect, the embodiment of the present invention provide a kind of network equipment, comprising:
Receiver, for receiving the first signal and the second signal of peer network device transmission, wherein first signal
With the second signal in the same Physical Resource Block;
Processor is used for according to one of at least two candidate resource mapping modes resource mapping method to described first
Signal and/or the second signal carry out solution resource impact, and to the first signal and/or second signal after solution resource impact
It is detected.
In conjunction with the 5th aspect, in the first possible implementation of the 5th aspect, the candidate resource mapping mode
Including first resource mapping mode and/or information resources mapping mode and Secondary resource mapping mode;Wherein, described first
Resource mapping method is that first signal does not carry out resource impact, described the on the resource unit for transmitting the second signal
Two resource mapping methods are that first signal is carried out on the resource unit for transmitting the second signal with spatial multiplexing mode
Resource impact, the information resources mapping mode are to destroy first signal on the resource unit for transmitting the second signal
The data of resource impact.
In conjunction with the 5th aspect, in second of possible implementation of the 5th aspect, the receiver is also used to receive
The indication signaling that the peer network device is sent, the indication signaling include dynamic signaling or the first high-level signaling, described
Indication signaling is used to indicate the money that the network equipment carries out solution resource impact to first signal and/or the second signal
Source mapping mode;Alternatively,
The receiver is also used to determine institute from the candidate resource mapping mode according to scheduled resource impact rule
State the resource mapping method that the network equipment carries out solution resource impact to first signal and/or the second signal.
In conjunction with the first possible implementation of the 5th aspect or second of possible implementation of the 5th aspect, In
In the third possible implementation of 5th aspect, the processor be also used to the co-located type of standard when first signal with
When the co-located type of standard of the second signal is type A, according to first resource mapping mode or information resources mapping mode
Solution resource impact is carried out to first signal and/or the second signal;Alternatively,
It is type A when the co-located type of standard of first signal that the processor, which is also used to, and the standard of the second signal is total
When location type is type B, according to the pilot tone of the pilot tone of first signal and the second signal, mapped from the candidate resource
Determine that the network equipment carries out the resource impact of solution resource impact to first signal and/or the second signal in mode
Mode;Alternatively,
The processor is also used to when the co-located type of standard of first signal is total for the standard of type B and the second signal
When location type is type A, according to the pilot tone of the pilot tone of first signal and the second signal, mapped from the candidate resource
Determine that the network equipment carries out the resource impact of solution resource impact to first signal and/or the second signal in mode
Mode;Alternatively,
The processor is also used to the co-located type of standard of the co-located type of standard and the second signal when first signal
When being type B, according to the pilot tone of the pilot tone of first signal and the second signal, from the candidate resource mapping mode
The middle determination network equipment carries out the resource impact side of solution resource impact to first signal and/or the second signal
Formula.
In conjunction with the third possible implementation of the 5th aspect, in the 4th kind of possible implementation of the 5th aspect
In, the processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type A and the second signal
When type is type B, if the first kind pilot tone of first signal is identical or quasi- total as the first kind pilot tone of the second signal
Location, then according to the first resource mapping mode or the information resources mapping mode to first signal and/or described
Second signal carries out solution resource impact;Alternatively,
It is type A when the co-located type of standard of first signal that the processor, which is also used to, and the standard of the second signal is total
When location type is type B, if the first kind pilot tone of the first kind pilot tone of first signal and the second signal
It is not identical or be not allowed co-located, then first signal and/or the second signal are carried out according to Secondary resource mapping mode
Solve resource impact;Alternatively,
It is type A when the co-located type of standard of first signal that the processor, which is also used to, and the standard of the second signal is total
When location type is type B, if the second class pilot tone of first signal and the second class pilot tone of the second signal are identical or quasi-
It is co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/or institute
It states second signal and carries out solution resource impact;Alternatively,
It is type A when the co-located type of standard of first signal that the processor, which is also used to, and the standard of the second signal is total
When location type is type B, if the second class pilot tone of the second class pilot tone of first signal and the second signal
It is not identical or be not allowed co-located, then first signal and/or the second signal are solved according to Secondary resource mapping mode
Resource impact;Alternatively,
It is type A when the co-located type of standard of first signal that the processor, which is also used to, and the standard of the second signal is total
When location type is type B, if the second class pilot tone of the first kind pilot tone of first signal and the second signal
It is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out solution resource impact;Alternatively,
It is type A when the co-located type of standard of first signal that the processor, which is also used to, and the standard of the second signal is total
When location type is type B, if the second class pilot tone of the first kind pilot tone of first signal and the second signal
It is not identical or be not allowed co-located, then first signal and/or the second signal are solved according to Secondary resource mapping mode
Resource impact;Alternatively,
It is type A when the co-located type of standard of first signal that the processor, which is also used to, and the standard of the second signal is total
When location type is type B, if the first kind pilot tone of the second class pilot tone of first signal and the second signal
It is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out solution resource impact;Alternatively,
It is type A when the co-located type of standard of first signal that the processor, which is also used to, and the standard of the second signal is total
When location type is type B, if the first kind pilot tone of the second class pilot tone of first signal and the second signal
It is not identical or be not allowed co-located, then first signal and/or the second signal are solved according to Secondary resource mapping mode
Resource impact.
In conjunction with the third possible implementation of the 5th aspect, in the 5th kind of possible implementation of the 5th aspect
In, the processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type B and the second signal
When type is type A, if the first kind pilot tone of first signal is identical or quasi- total as the first kind pilot tone of the second signal
Location, then according to the first resource mapping mode or the information resources mapping mode to first signal and/or described
Second signal carries out solution resource impact;Alternatively,
The processor is also used to when the co-located type of standard of first signal is total for the standard of type B and the second signal
When location type is type A, if the first kind pilot tone of the first kind pilot tone of first signal and the second signal
It is not identical or be not allowed co-located, then first signal and/or the second signal are carried out according to Secondary resource mapping mode
Solve resource impact;Alternatively,
The processor is also used to when the co-located type of standard of first signal is total for the standard of type B and the second signal
When location type is type A, if the second class pilot tone of first signal and the second class pilot tone of the second signal are identical or quasi-
It is co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/or institute
It states second signal and carries out solution resource impact;Alternatively,
The processor is also used to when the co-located type of standard of first signal is total for the standard of type B and the second signal
When location type is type A, if the second class pilot tone of the second class pilot tone of first signal and the second signal
It is not identical or be not allowed co-located, then first signal and/or the second signal are solved according to Secondary resource mapping mode
Resource impact;Alternatively,
The processor is also used to when the co-located type of standard of first signal is total for the standard of type B and the second signal
When location type is type A, if the second class pilot tone of the first kind pilot tone of first signal and the second signal
It is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out solution resource impact;Alternatively,
The processor is also used to when the co-located type of standard of first signal is total for the standard of type B and the second signal
When location type is type A, if the second class pilot tone of the first kind pilot tone of first signal and the second signal
It is not identical or be not allowed co-located, then first signal and/or the second signal are solved according to Secondary resource mapping mode
Resource impact;Alternatively,
The processor is also used to when the co-located type of standard of first signal is total for the standard of type B and the second signal
When location type is type A, if the first kind pilot tone of the second class pilot tone of first signal and the second signal
It is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out solution resource impact;Alternatively,
The processor is also used to when the co-located type of standard of first signal is total for the standard of type B and the second signal
When location type is type A, if the first kind pilot tone of the second class pilot tone of first signal and the second signal
It is not identical or be not allowed co-located, then first signal and/or the second signal are solved according to Secondary resource mapping mode
Resource impact.
In conjunction with the third possible implementation of the 5th aspect, in the 6th kind of possible implementation of the 5th aspect
In, the processor is also used to when the co-located type of standard of first signal and the co-located type of standard of the second signal be class
When type B, if the first kind pilot tone of first signal is identical or quasi- co-located as the first kind pilot tone of the second signal, root
According to the first resource mapping mode or the information resources mapping mode to first signal and/or the second signal
Carry out solution resource impact;Alternatively,
The processor is also used to the co-located type of standard of the co-located type of standard and the second signal when first signal
When being type B, if the first kind pilot tone of the first kind pilot tone of first signal and the second signal not phase
With or be not allowed co-located, then solution money is carried out to first signal and/or the second signal according to Secondary resource mapping mode
Source mapping;Alternatively,
The processor is also used to the co-located type of standard of the co-located type of standard and the second signal when first signal
When being type B, if the second class pilot tone of first signal and the second class pilot tone of the second signal are identical or quasi- co-located,
Then according to the first resource mapping mode or the information resources mapping mode to first signal and/or described second
Signal carries out solution resource impact;Alternatively,
The processor is also used to the co-located type of standard of the co-located type of standard and the second signal when first signal
When being type B, if the second class pilot tone of the second class pilot tone of first signal and the second signal not phase
With or be not allowed co-located, then solution resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode
Mapping;Alternatively,
The processor is also used to the co-located type of standard of the co-located type of standard and the second signal when first signal
When being type B, if the first kind pilot tone of first signal is identical as the second class pilot tone of the second signal
Or it is quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/
Or the second signal carries out solution resource impact;Alternatively,
The processor is also used to the co-located type of standard of the co-located type of standard and the second signal when first signal
When being type B, if the second class pilot tone of the first kind pilot tone of first signal and the second signal not phase
With or be not allowed co-located, then solution resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode
Mapping;Alternatively,
The processor is also used to the co-located type of standard of the co-located type of standard and the second signal when first signal
When being type B, if the second class pilot tone of first signal is identical as the first kind pilot tone of the second signal
Or it is quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/
Or the second signal carries out solution resource impact;Alternatively,
The processor is also used to the co-located type of standard of the co-located type of standard and the second signal when first signal
When being type B, if the first kind pilot tone of the second class pilot tone of first signal and the second signal not phase
With or be not allowed co-located, then solution resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode
Mapping.
In conjunction with the first possible implementation of the 5th aspect or second of possible implementation of the 5th aspect, In
In 7th kind of possible implementation of the 5th aspect, the processor is also used to work as the third class pilot tone of first signal
When sequence initialization parameter is identical as the sequence initialization parameter of third class pilot tone of the second signal, reflected according to first resource
It penetrates mode or information resources mapping mode and solution resource impact is carried out to first signal and/or the second signal;Alternatively,
The processor is also used to the sequence initialization parameter and described second when the third class pilot tone of first signal
When the sequence initialization parameter of the third class pilot tone of signal is not identical, according to Secondary resource mapping mode to first signal
And/or the second signal carries out solution resource impact.
In conjunction with the first possible implementation of the 5th aspect or second of possible implementation of the 5th aspect, In
In 8th kind of possible implementation of the 5th aspect, the processor is also used to when the second signal is without cross-carrier tune
When spending, according to first resource mapping mode or information resources mapping mode to first signal and/or the second signal
Carry out solution resource impact;Alternatively,
The processor is also used to when the second signal carries out cross-carrier scheduling, according to Secondary resource mapping mode pair
First signal and/or the second signal carry out solution resource impact.
In conjunction with the first possible implementation of the 5th aspect or second of possible implementation of the 5th aspect, In
In 9th kind of possible implementation of the 5th aspect, the processor is also used to be greater than when the aggregation level of the second signal
When preset value, according to first resource mapping mode or information resources mapping mode to first signal and/or described second
Signal carries out solution resource impact;Alternatively,
The processor is also used to be reflected when the aggregation level of the second signal is no more than preset value according to Secondary resource
It penetrates mode and solution resource impact is carried out to first signal and/or the second signal.
In conjunction with the first possible implementation of the 5th aspect or second of possible implementation of the 5th aspect, In
In tenth kind of possible implementation of the 5th aspect, the processor is also used to when the scheduling format of the second signal be sky
When frequency code SFBC, according to first resource mapping mode or information resources mapping mode to first signal and/or described
Binary signal carries out solution resource impact;Alternatively,
The processor is also used to when the scheduling format of the second signal be beam shaping beam forming or sky
Between when being multiplexed, solution resource impact is carried out to first signal and/or the second signal according to Secondary resource mapping mode.
In conjunction with the first possible implementation of the 5th aspect or second of possible implementation of the 5th aspect, In
In a kind of possible implementation of the tenth of 5th aspect, the indication signaling is the quasi- co-located instruction PQI state of shared channel, institute
It states and carries the money that the network equipment carries out solution resource impact to first signal and/or the second signal in PQI state
Source mapping mode.
In conjunction with the first possible implementation of the 5th aspect or second of possible implementation of the 5th aspect, In
In 12nd kind of possible implementation of the 5th aspect, the processor is also used to the configuration information packet when the second signal
When including the information of at least two second signals, according to first resource mapping mode or information resources mapping mode to described
First signal and/or the second signal carry out solution resource impact, and the configuration information of the second signal is the correspondent network
The second high-level signaling that equipment is sent carries.
In conjunction with the 5th aspect or the 5th aspect the first to the 5th aspect the tenth one kind in any possible realization
Mode, in the 13rd kind of possible implementation of the 5th aspect, first signal is Physical Downlink Shared Channel PDSCH
Signal, the second signal are enhancing physical control channel EPDCCH signal, and the second signal dispatches first signal.
In conjunction with the first any possible realization into the 12nd kind of the 5th aspect in terms of the 5th aspect or the 5th
Mode, in the 14th kind of possible implementation of the 5th aspect, first signal is PDSCH signal, second letter
Number be common pilot signal CRS.
In conjunction with the first possible implementation of the 5th aspect or the 5th aspect, in the 15th kind of possibility of the 5th aspect
Implementation in, the candidate resource mapping mode be the peer network device by third high-level signaling, dynamic signaling,
The specific cell specific signaling of cell or user equipment particular UE specific signal the network equipment.
In conjunction with the 4th kind of any possible implementation into the 6th kind of the 5th aspect of the 5th aspect, in the 5th side
In the 16th kind of possible implementation in face, the first kind pilot tone is public guide frequency CRS.
In conjunction with the 4th kind of any possible implementation into the 6th kind of the 5th aspect of the 5th aspect, in the 5th side
In the 17th kind of possible implementation in face, the second class pilot tone is that channel status indicates reference signal CSI-RS.
In conjunction with the 7th kind of possible implementation of the 5th aspect, in the 18th kind of possible implementation of the 5th aspect
In, the third class pilot tone is the reference signal DMRS of demodulation.
6th aspect, the embodiment of the present invention provide a kind of network equipment, comprising:
Processor, for the network equipment according to one of at least two candidate resource mapping modes resource mapping method pair
First signal and/or second signal carry out resource impact;Wherein, first signal and the second signal are in the same physics
In resource block;
Transmitter, for the first signal and the second signal after sending resource impact to peer network device.
In conjunction with the 6th aspect, in the first possible implementation of the 6th aspect, the candidate resource mapping mode
Including first resource mapping mode and/or information resources mapping mode and Secondary resource mapping mode;Wherein, described first
Resource mapping method is that first signal does not carry out resource impact, described the on the resource unit for transmitting the second signal
Two resource mapping methods are that first signal is carried out on the resource unit for transmitting the second signal with spatial multiplexing mode
Resource impact, the information resources mapping mode are to destroy first signal on the resource unit for transmitting the second signal
The data of resource impact.
In conjunction with the 6th aspect, in second of possible implementation of the 6th aspect, the processor is also used to basis
Preset resource impact rule, determined from the candidate resource mapping mode network equipment to first signal and/
Or the second signal carries out the resource mapping method of resource impact.
In conjunction with the first possible implementation of the 6th aspect or second of possible implementation of the 6th aspect, In
In the third possible implementation of 6th aspect, the processor be also used to the co-located type of standard when first signal with
When the co-located type of standard of the second signal is type A, first resource mapping mode or information resources mapping mode are determined
Resource impact is carried out to first signal and/or the second signal;Alternatively,
It is type A when the co-located type of standard of first signal that the processor, which is also used to, and the standard of the second signal is total
When location type is type B, according to the pilot tone of the pilot tone of first signal and the second signal, mapped from the candidate resource
Determine that the network equipment carries out the resource impact side of resource impact to first signal and/or the second signal in mode
Formula;Alternatively,
The processor is also used to when the co-located type of standard of first signal is total for the standard of type B and the second signal
When location type is type A, according to the pilot tone of the pilot tone of first signal and the second signal, mapped from the candidate resource
Determine that the network equipment carries out the resource impact side of resource impact to first signal and/or the second signal in mode
Formula;Alternatively,
The processor is also used to the co-located type of standard of the co-located type of standard and the second signal when first signal
When being type B, according to the pilot tone of the pilot tone of first signal and the second signal, from the candidate resource mapping mode
The middle determination network equipment carries out the resource mapping method of resource impact to first signal and/or the second signal.
In conjunction with the third possible implementation of the 6th aspect, in the 4th kind of possible implementation of the 6th aspect
In, the processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type A and the second signal
When type is type B, if the first kind pilot tone of first signal is identical or quasi- total as the first kind pilot tone of the second signal
Location, then according to the first resource mapping mode or the information resources mapping mode to first signal and/or described
Second signal carries out resource impact;Alternatively,
It is type A when the co-located type of standard of first signal that the processor, which is also used to, and the standard of the second signal is total
When location type is type B, if the first kind pilot tone of the first kind pilot tone of first signal and the second signal
It is not identical or be not allowed co-located, then first signal and/or the second signal are carried out according to Secondary resource mapping mode
Resource impact;Alternatively,
It is type A when the co-located type of standard of first signal that the processor, which is also used to, and the standard of the second signal is total
When location type is type B, if the second class pilot tone of first signal and the second class pilot tone of the second signal are identical or quasi-
It is co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/or institute
It states second signal and carries out resource impact;Alternatively,
It is type A when the co-located type of standard of first signal that the processor, which is also used to, and the standard of the second signal is total
When location type is type B, if the second class pilot tone of the second class pilot tone of first signal and the second signal
It is not identical or be not allowed co-located, then first signal and/or the second signal are provided according to Secondary resource mapping mode
Source mapping;Alternatively,
It is type A when the co-located type of standard of first signal that the processor, which is also used to, and the standard of the second signal is total
When location type is type B, if the second class pilot tone of the first kind pilot tone of first signal and the second signal
It is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out resource impact;Alternatively,
It is type A when the co-located type of standard of first signal that the processor, which is also used to, and the standard of the second signal is total
When location type is type B, if the second class pilot tone of the first kind pilot tone of first signal and the second signal
It is not identical or be not allowed co-located, then first signal and/or the second signal are provided according to Secondary resource mapping mode
Source mapping;Alternatively,
It is type A when the co-located type of standard of first signal that the processor, which is also used to, and the standard of the second signal is total
When location type is type B, if the first kind pilot tone of the second class pilot tone of first signal and the second signal
It is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out resource impact;Alternatively,
It is type A when the co-located type of standard of first signal that the processor, which is also used to, and the standard of the second signal is total
When location type is type B, if the first kind pilot tone of the second class pilot tone of first signal and the second signal
It is not identical or be not allowed co-located, then first signal and/or the second signal are provided according to Secondary resource mapping mode
Source mapping.
In conjunction with the third possible implementation of the 6th aspect, in the 5th kind of possible implementation of the 6th aspect
In, the processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type B and the second signal
When type is type A, if the first kind pilot tone of first signal is identical or quasi- total as the first kind pilot tone of the second signal
Location, then according to the first resource mapping mode or the information resources mapping mode to first signal and/or described
Second signal carries out resource impact;Alternatively,
The processor is also used to when the co-located type of standard of first signal is total for the standard of type B and the second signal
When location type is type A, if the first kind pilot tone of the first kind pilot tone of first signal and the second signal
It is not identical or be not allowed co-located, then first signal and/or the second signal are carried out according to Secondary resource mapping mode
Resource impact;Alternatively,
The processor is also used to when the co-located type of standard of first signal is total for the standard of type B and the second signal
When location type is type A, if the second class pilot tone of first signal and the second class pilot tone of the second signal are identical or quasi-
It is co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/or institute
It states second signal and carries out resource impact;Alternatively,
The processor is also used to when the co-located type of standard of first signal is total for the standard of type B and the second signal
When location type is type A, if the second class pilot tone of the second class pilot tone of first signal and the second signal
It is not identical or be not allowed co-located, then first signal and/or the second signal are provided according to Secondary resource mapping mode
Source mapping;Alternatively,
The processor is also used to when the co-located type of standard of first signal is total for the standard of type B and the second signal
When location type is type A, if the second class pilot tone of the first kind pilot tone of first signal and the second signal
It is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out resource impact;Alternatively,
The processor is also used to when the co-located type of standard of first signal is total for the standard of type B and the second signal
When location type is type A, if the second class pilot tone of the first kind pilot tone of first signal and the second signal
It is not identical or be not allowed co-located, then first signal and/or the second signal are provided according to Secondary resource mapping mode
Source mapping;Alternatively,
The processor is also used to when the co-located type of standard of first signal is total for the standard of type B and the second signal
When location type is type A, if the first kind pilot tone of the second class pilot tone of first signal and the second signal
It is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out resource impact;Alternatively,
The processor is also used to when the co-located type of standard of first signal is total for the standard of type B and the second signal
When location type is type A, if the first kind pilot tone of the second class pilot tone of first signal and the second signal
It is not identical or be not allowed co-located, then first signal and/or the second signal are provided according to Secondary resource mapping mode
Source mapping.
In conjunction with the third possible implementation of the 6th aspect, in the 6th kind of possible implementation of the 6th aspect
In, the processor is also used to when the co-located type of standard of first signal and the co-located type of standard of the second signal be class
When type B, if the first kind pilot tone of first signal is identical or quasi- co-located as the first kind pilot tone of the second signal, root
According to the first resource mapping mode or the information resources mapping mode to first signal and/or the second signal
Carry out resource impact;Alternatively,
The processor is also used to the co-located type of standard of the co-located type of standard and the second signal when first signal
When being type B, if the first kind pilot tone of the first kind pilot tone of first signal and the second signal not phase
With or be not allowed co-located, then resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode
Mapping;Alternatively,
The processor is also used to the co-located type of standard of the co-located type of standard and the second signal when first signal
When being type B, if the second class pilot tone of first signal and the second class pilot tone of the second signal are identical or quasi- co-located,
Then according to the first resource mapping mode or the information resources mapping mode to first signal and/or described second
Signal carries out resource impact;Alternatively,
The processor is also used to the co-located type of standard of the co-located type of standard and the second signal when first signal
When being type B, if the second class pilot tone of the second class pilot tone of first signal and the second signal not phase
With or be not allowed co-located, then resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode and reflected
It penetrates;Alternatively,
The processor is also used to the co-located type of standard of the co-located type of standard and the second signal when first signal
When being type B, if the first kind pilot tone of first signal is identical as the second class pilot tone of the second signal
Or it is quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/
Or the second signal carries out resource impact;Alternatively,
The processor is also used to the co-located type of standard of the co-located type of standard and the second signal when first signal
When being type B, if the second class pilot tone of the first kind pilot tone of first signal and the second signal not phase
With or be not allowed co-located, then resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode and reflected
It penetrates;Alternatively,
The processor is also used to the co-located type of standard of the co-located type of standard and the second signal when first signal
When being type B, if the second class pilot tone of first signal is identical as the first kind pilot tone of the second signal
Or it is quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/
Or the second signal carries out resource impact;Alternatively,
The processor is also used to the co-located type of standard of the co-located type of standard and the second signal when first signal
When being type B, if the first kind pilot tone of the second class pilot tone of first signal and the second signal not phase
With or be not allowed co-located, then resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode and reflected
It penetrates.
In conjunction with the first possible implementation of the 6th aspect or second of possible implementation of the 6th aspect, In
In 7th kind of possible implementation of the 6th aspect, the processor is also used to work as the third class pilot tone of first signal
When sequence initialization parameter is identical as the sequence initialization parameter of third class pilot tone of the second signal, reflected according to first resource
It penetrates mode or information resources mapping mode and resource impact is carried out to first signal and/or the second signal;Alternatively,
The processor is also used to the sequence initialization parameter and described second when the third class pilot tone of first signal
When the sequence initialization parameter of the third class pilot tone of signal is not identical, according to Secondary resource mapping mode to first signal
And/or the second signal carries out resource impact.
In conjunction with the first possible implementation of the 6th aspect or second of possible implementation of the 6th aspect, In
In 8th kind of possible implementation of the 6th aspect, the processor is also used to when the second signal is without cross-carrier tune
When spending, according to first resource mapping mode or information resources mapping mode to first signal and/or the second signal
Carry out resource impact;Alternatively,
The processor is also used to when the second signal carries out cross-carrier scheduling, according to Secondary resource mapping mode pair
First signal and/or the second signal carry out resource impact.
In conjunction with the first possible implementation of the 6th aspect or second of possible implementation of the 6th aspect, In
In 9th kind of possible implementation of the 6th aspect, the processor is also used to be greater than when the aggregation level of the second signal
When preset value, according to first resource mapping mode or information resources mapping mode to first signal and/or described second
Signal carries out resource impact;Alternatively,
The processor is also used to be reflected when the aggregation level of the second signal is no more than preset value according to Secondary resource
It penetrates mode and resource impact is carried out to first signal and/or the second signal.
In conjunction with the first possible implementation of the 6th aspect or second of possible implementation of the 6th aspect, In
In tenth kind of possible implementation of the 6th aspect, the processor is also used to when the scheduling format of the second signal be sky
When frequency code SFBC, according to first resource mapping mode or information resources mapping mode to first signal and/or described
Binary signal carries out resource impact;Alternatively,
The processor is also used to when the scheduling format of the second signal be beam shaping beam forming or sky
Between when being multiplexed, resource impact is carried out to first signal and/or the second signal according to Secondary resource mapping mode.
In conjunction with the first possible implementation of the 6th aspect or second of possible implementation of the 6th aspect, In
In a kind of possible implementation of the tenth of 6th aspect, the processor is also used to according to the quasi- co-located instruction PQI of shared channel
State determines the network equipment to first signal and/or the second signal from the candidate resource mapping mode
Carry out the resource mapping method of resource impact.
In conjunction with the first possible implementation of the 6th aspect or second of possible implementation of the 6th aspect, In
In 12nd kind of possible implementation of the 6th aspect, the processor is also used to the configuration information packet when the second signal
When including the information of at least two second signals, according to first resource mapping mode or information resources mapping mode to described
First signal and/or the second signal carry out resource impact, and the configuration information of the second signal is that the correspondent network is set
The first high-level signaling that preparation is sent carries.
In conjunction with the 6th aspect or the 6th aspect the first to the 6th aspect the tenth one kind in any possible realization
Mode, in the 13rd kind of possible implementation of the 6th aspect, first signal is Physical Downlink Shared Channel PDSCH
Signal, the second signal are enhancing physical control channel EPDCCH signal, and the second signal dispatches first signal.
In conjunction with the first any possible realization into the 12nd kind of the 6th aspect in terms of the 6th aspect or the 6th
Mode, in the 14th kind of possible implementation of the 6th aspect, first signal is PDSCH signal, second letter
Number be common pilot signal CRS.
In conjunction with the first possible implementation of the 6th aspect or the 6th aspect, in the 15th kind of possibility of the 6th aspect
Implementation in, the candidate resource mapping mode be the network equipment pass through the second high-level signaling, dynamic signaling, user
Specific cell specific signaling or user equipment particular UE specific signal the peer network device.
In conjunction with the 5th kind of any possible implementation into the 7th kind of the 6th aspect of the 6th aspect, in the 6th side
In the 16th kind of possible implementation in face, the first kind pilot tone is public guide frequency CRS.
In conjunction with the 5th kind of any possible implementation into the 7th kind of the 6th aspect of the 6th aspect, in the 6th side
In the 17th kind of possible implementation in face, the second class pilot tone is that channel status indicates reference signal CSI-RS.
In conjunction with the 8th kind of possible implementation of the 6th aspect, in the 18th kind of possible implementation of the 6th aspect
In, the third class pilot tone is the reference signal DMRS of demodulation.
In conjunction with the 6th aspect, the 6th aspect the 19th kind of possible implementation in, the transmitter be also used to
Peer network device sends indication signaling;Wherein, the indication signaling includes dynamic signaling or third high-level signaling, the instruction
Signaling is used to indicate the money that the peer network device carries out solution resource impact to first signal and/or the second signal
Source mapping mode.
A kind of method, apparatus and the network equipment for transmitting signal provided in an embodiment of the present invention, in the present invention, the first net
Network equipment is using one of at least two candidate resource mapping modes resource mapping method, in the same Physical Resource Block
In the first signal and the second signal carry out resource impact, then transmit a signal to second network equipment;Second network equipment
After the signal for receiving the transmission of first network equipment, solution resource impact is carried out by the resource mapping method that the first equipment uses.Such as
This, is when the first signal and the second signal are when the same Physical Resource Block carries out resource impact, first network equipment and the second net
Network equipment can determine resource mapping method according to specific channel condition and dispatch situation from candidate resource mapping method, into
Row resource impact conciliates resource impact, makes full use of the resource of Physical Resource Block, improves the utilization rate of resource.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to needed in the embodiment
Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for ability
For the those of ordinary skill of domain, without creative efforts, it can also be obtained according to these attached drawings other attached
Figure.
Fig. 1 is the method flow diagram that one embodiment of the invention provides;
Fig. 2 is the method flow diagram that further embodiment of this invention provides;
Fig. 3 is the method flow diagram that further embodiment of this invention provides;
Fig. 4 is the first resource mapping mode schematic diagram that further embodiment of this invention provides;
Fig. 5 is the Secondary resource mapping mode schematic diagram that further embodiment of this invention provides;
Fig. 6 is the information resources mapping mode schematic diagram that further embodiment of this invention provides;
Fig. 7 is the cross-carrier scheduling schematic diagram that further embodiment of this invention provides;
Fig. 8, Fig. 9 are the apparatus structure schematic diagram that further embodiment of this invention provides;
Figure 10, Figure 11 are the apparatus structure schematic diagram that further embodiment of this invention provides;
Figure 12 is the network equipment infrastructure schematic diagram that further embodiment of this invention provides;
Figure 13 is the network equipment infrastructure schematic diagram that further embodiment of this invention provides.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts all other
Embodiment shall fall within the protection scope of the present invention.
One embodiment of the invention provides a kind of method for transmitting signal, as shown in Figure 1, which comprises
101, first network equipment receives the first signal and the second signal that second network equipment is sent.
Wherein, the first signal and the second signal are in the same Physical Resource Block.
It should be noted that first network equipment and second network equipment can be the network equipments such as base station, user equipment,
It is not limited here.
102, first network equipment is according to one of at least two candidate resource mapping modes resource mapping method to
One signal and/or second signal carry out solution resource impact, and to after solution resource impact the first signal and/or second signal into
Row detection.
Wherein, first network equipment carries out solution resource impact to the first signal and/or second signal, in order to first network
Equipment to solution resource impact after the first signal and/or second signal detect.
Optionally, in first network equipment according to one of at least two candidate resource mapping modes resource mapping method
Before carrying out solution resource impact to the first signal and/or second signal, first network equipment receives what second network equipment was sent
Indication signaling, indication signaling include dynamic signaling or the first high-level signaling, and indication signaling is for first network equipment to described
First signal and/or the second signal carry out the resource mapping method of solution resource impact;Alternatively, first network equipment is according to pre-
Fixed resource impact rule, determines the first network equipment to first signal from the candidate resource mapping mode
And/or the second signal carries out the resource mapping method of solution resource impact.
Optionally, candidate resource mapping mode may include first resource mapping mode and/or information resources mapping mode,
And Secondary resource mapping mode;Wherein, the first resource mapping mode is first signal not in transmission described second
Resource impact is carried out on the resource unit of signal, the Secondary resource mapping mode is first signal in transmission described second
Resource impact is carried out with spatial multiplexing mode on the resource unit of signal, the information resources mapping mode is to destroy described first
The data of signal resource impact on the resource unit for transmitting the second signal.
Optionally, first network equipment is according to scheduled resource impact rule, from the candidate resource mapping mode really
The fixed first network equipment carries out the resource mapping method of solution resource impact to first signal and/or the second signal
It include: when the co-located type of standard of the co-located type of standard of first signal and the second signal is type A, according to first
Resource mapping method or information resources mapping mode carry out solution resource to first signal and/or the second signal and reflect
It penetrates;Alternatively, when the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B,
The first network equipment is mapped according to the pilot tone of first signal and the pilot tone of the second signal from the candidate resource
Determine that the first network equipment carries out the resource of solution resource impact to first signal and/or the second signal in mode
Mapping mode;Alternatively, when the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is class
When type A, the first network equipment is according to the pilot tone of first signal and the pilot tone of the second signal, from the candidate money
Determine that the first network equipment carries out solution resource impact to first signal and/or the second signal in the mapping mode of source
Resource mapping method;Alternatively, when the co-located type of standard of first signal and the co-located type of standard of the second signal are
When type B, the first network equipment is according to the pilot tone of first signal and the pilot tone of the second signal, from the candidate
Determine that the first network equipment carries out solution resource to first signal and/or the second signal and reflects in resource mapping method
The resource mapping method penetrated.
Further, when the co-located type of standard that the co-located type of standard of first signal is type A and the second signal
When for type B: if the first kind pilot tone of first signal is identical or quasi- co-located as the first kind pilot tone of the second signal,
Then according to the first resource mapping mode or the information resources mapping mode to first signal and/or described second
Signal carries out solution resource impact;Alternatively, if described the of the first kind pilot tone of first signal and the second signal
A kind of pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or described second
Signal carries out solution resource impact;Alternatively, if the second class pilot tone of the second class pilot tone of first signal and the second signal
It is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out solution resource impact;Alternatively, if the second class pilot tone and described second of first signal
The second class pilot tone of signal it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/
Or the second signal carries out solution resource impact;Alternatively, if the first kind pilot tone of first signal and second letter
Number the second class pilot tone it is identical or quasi- co-located, then mapped according to the first resource mapping mode or the information resources
Mode carries out solution resource impact to first signal and/or the second signal;Alternatively, if described the of first signal
A kind of pilot tone it is not identical as the second class pilot tone of the second signal or be not allowed it is co-located, then according to Secondary resource mapping mode
Solution resource impact is carried out to first signal and/or the second signal;Alternatively, if second class of first signal
Pilot tone and the first kind pilot tone of the second signal are identical or quasi- co-located, then according to the first resource mapping mode or
The information resources mapping mode carries out solution resource impact to first signal and/or the second signal;Alternatively, if described
The second class pilot tone of first signal and the first kind pilot tone of the second signal be not identical or co-located, then basis is not allowed
Secondary resource mapping mode carries out solution resource impact to first signal and/or the second signal.
Further, when the co-located type of standard that the co-located type of standard of first signal is type B and the second signal
When for type A: if the first kind pilot tone of first signal is identical or quasi- co-located as the first kind pilot tone of the second signal,
Then according to the first resource mapping mode or the information resources mapping mode to first signal and/or described second
Signal carries out solution resource impact;Alternatively, if described the of the first kind pilot tone of first signal and the second signal
A kind of pilot tone is not identical or quasi- co-located, then according to Secondary resource mapping mode to first signal and/or second letter
Number carry out solution resource impact;Alternatively, if the second class pilot tone phase of the second class pilot tone of first signal and the second signal
It is same or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out solution resource impact;Alternatively, if the second class pilot tone and described second of first signal
The second class pilot tone of signal it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/
Or the second signal carries out solution resource impact;Alternatively, if the first kind pilot tone of first signal and second letter
Number the second class pilot tone it is identical or quasi- co-located, then mapped according to the first resource mapping mode or the information resources
Mode carries out solution resource impact to first signal and/or the second signal;Alternatively, if described the of first signal
A kind of pilot tone it is not identical as the second class pilot tone of the second signal or be not allowed it is co-located, then according to Secondary resource mapping mode
Solution resource impact is carried out to first signal and/or the second signal;Alternatively, if second class of first signal
Pilot tone and the first kind pilot tone of the second signal are identical or quasi- co-located, then according to the first resource mapping mode or
The information resources mapping mode carries out solution resource impact to first signal and/or the second signal;Alternatively, if described
The second class pilot tone of first signal and the first kind pilot tone of the second signal be not identical or co-located, then basis is not allowed
Secondary resource mapping mode carries out solution resource impact to first signal and/or the second signal.
Further, when the co-located type of standard of the co-located type of standard of first signal and the second signal is type
When B: if the first kind pilot tone of first signal is identical or quasi- co-located as the first kind pilot tone of the second signal, basis
The first resource mapping mode or the information resources mapping mode to first signal and/or the second signal into
Row solution resource impact;Alternatively, if the first kind of the first kind pilot tone and the second signal of first signal is led
Frequency it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal into
Row solution resource impact;Alternatively, if the second class pilot tone of first signal it is identical as the second class pilot tone of the second signal or
It is quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/or
The second signal carries out solution resource impact;Alternatively, if the second class pilot tone of first signal and the second signal
The second class pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or institute
It states second signal and carries out solution resource impact;Alternatively, if the first kind pilot tone of first signal and the second signal
The second class pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode
Solution resource impact is carried out to first signal and/or the second signal;Alternatively, if the first kind of first signal
Pilot tone it is not identical as the second class pilot tone of the second signal or be not allowed it is co-located, then according to Secondary resource mapping mode to institute
It states the first signal and/or the second signal carries out solution resource impact;Alternatively, if the second class pilot tone of first signal
It is identical or quasi- co-located as the first kind pilot tone of the second signal, then according to the first resource mapping mode or described
Information resources mapping mode carries out solution resource impact to first signal and/or the second signal;Alternatively, if described first
The second class pilot tone of signal and the first kind pilot tone of the second signal it is not identical or be not allowed it is co-located, then according to second
Resource mapping method carries out solution resource impact to first signal and/or the second signal.
It should be noted that in the above process, due to when the first kind pilot tone of the first signal and the first kind of second signal
Pilot tone is not identical or is not allowed the second class pilot tone of co-located, the first signal first kind pilot tone and second signal not identical or inaccurate total
The first kind pilot tone of location, the second class pilot tone of the first signal and second signal is not identical or is not allowed co-located or the first signal
When second class pilot tone of two class pilot tones and second signal is not identical or is not allowed co-located, indicate the first signal and the second signal be from
Different sending node, so the first signal and the second signal can use Secondary resource mapping mode, first network equipment root
According to the corresponding solution resource mapping method solution resource impact of Secondary resource mapping mode;Similarly, when the first kind pilot tone of the first signal
Second class pilot tone of identical as the first kind pilot tone of second signal or quasi- co-located, the first signal first kind pilot tone and second signal
Identical or quasi- co-located, the first signal the second class pilot tone is identical or quasi- co-located with the first kind pilot tone of second signal or first believes
Number the second class pilot tone and identical or quasi- co-located the second class pilot tone of second signal when, indicate the first signal and the second signal be next
Identical sending node, so the first signal and the second signal can use first resource mapping mode or information resources mapping side
Formula, first network equipment is according to corresponding solution resource mapping method solution resource impact.
Optionally, first network equipment is according to scheduled resource impact rule, from the candidate resource mapping mode really
The fixed first network equipment carries out the resource mapping method of solution resource impact to first signal and/or the second signal
It include: the sequence when the third class pilot tone of the sequence initialization parameter and second signal of the third class pilot tone of first signal
When row initialization parameter is identical, according to first resource mapping mode or information resources mapping mode to first signal and/
Or the second signal carries out solution resource impact;Alternatively, the sequence initialization parameter of the third class pilot tone when first signal
When not identical as the sequence initialization parameter of the third class pilot tone of the second signal, according to Secondary resource mapping mode to described
First signal and/or the second signal carry out solution resource impact.
It should be noted that in the above process, due to the third class pilot tone when the first signal sequence initialization parameter with
When the sequence initialization parameter of the third class pilot tone of second signal is not identical, indicate that the first signal and the second signal are from difference
Sending node, so the first signal and the second signal can use Secondary resource mapping mode, first network equipment is according to the
The corresponding solution resource mapping method solution resource impact of two resource mapping methods;Similarly, when the sequence of the third class pilot tone of the first signal
When row initialization parameter is identical as the sequence initialization parameter of third class pilot tone of second signal, the first signal and the second letter are indicated
Number for come identical sending node, so the first signal and the second signal can use first resource mapping mode or information resources
Mapping mode, first network equipment is according to corresponding solution resource mapping method solution resource impact.
Optionally, first network equipment is according to scheduled resource impact rule, from the candidate resource mapping mode really
The fixed first network equipment carries out the resource mapping method of solution resource impact to first signal and/or the second signal
It include: when the second signal is without cross-carrier scheduling, according to first resource mapping mode or information resources mapping side
Formula carries out solution resource impact to first signal and/or the second signal;Alternatively, when second signal progress is cross-carrier
When scheduling, solution resource impact is carried out to first signal and/or the second signal according to Secondary resource mapping mode.
Optionally, first network equipment is according to scheduled resource impact rule, from the candidate resource mapping mode really
The fixed first network equipment carries out the resource mapping method of solution resource impact to first signal and/or the second signal
It include: to be reflected when the aggregation level of the second signal is greater than preset value according to first resource mapping mode or information resources
It penetrates mode and solution resource impact is carried out to first signal and/or the second signal;Alternatively, working as the polymerization of the second signal
When rank is not more than preset value, first signal and/or the second signal are solved according to Secondary resource mapping mode
Resource impact.
It should be noted that in the above process, due to indicating letter when the aggregation level of second signal is not more than preset value
Road condition is fine, so the first signal and the second signal can use Secondary resource mapping mode, first network equipment is according to the
The corresponding solution resource mapping method solution resource impact of two resource mapping methods;Similarly, when the aggregation level of second signal is greater than in advance
If when value, indicating that channel condition is bad, so the first signal and the second signal can use first resource mapping mode or third
Resource mapping method, first network equipment is according to corresponding solution resource mapping method solution resource impact.
Optionally, first network equipment is according to scheduled resource impact rule, from the candidate resource mapping mode really
The fixed first network equipment carries out the resource mapping method of solution resource impact to first signal and/or the second signal
Include: when the second signal scheduling format be SFBC (Space Frequency Block Code, space-frequency code), for example,
When DCI format 1A, according to first resource mapping mode or information resources mapping mode to first signal and/or institute
It states second signal and carries out solution resource impact;Alternatively, when the scheduling format of the second signal is beam shaping beam forming
Or spatial reuse, for example, when DCI format 2,2A, 2B, 2C, according to Secondary resource mapping mode to first signal
And/or the second signal carries out solution resource impact.
It should be noted that in the above process, since the scheduling format when second signal is beam shaping beam
Forming perhaps spatial reuse when indicate channel condition very well or second network equipment can know accurate precoding letter
Breath, so the first signal and the second signal can use Secondary resource mapping mode, first network equipment is reflected according to Secondary resource
Penetrate the corresponding solution resource mapping method solution resource impact of mode;Similarly, when the scheduling format of second signal is space-frequency code SFBC,
Indicate that bad second network equipment of channel condition cannot know accurate precoding information, so the first signal and the second signal can
To use first resource mapping mode or information resources mapping mode, first network equipment is according to corresponding solution resource mapping method
Solve resource impact.
Optionally, the indication signaling is that (PDSCH Quasi co-location Indication shares channel to PQI
Quasi- co-located instruction) state, the first network equipment is carried to first signal and/or described second in the PQI state
Signal carries out the resource mapping method of solution resource impact.
Optionally, the first signal is Physical Downlink Shared Channel PDSCH signal, and second signal is enhancing physical control channel
EPDCCH signal, second signal dispatch first signal.
Optionally, the first network equipment is according to scheduled resource impact rule, from the candidate resource mapping mode
The middle determination first network equipment carries out the resource impact of solution resource impact to first signal and/or the second signal
Mode includes: when the configuration information of the second signal includes the information of at least two second signals, according to the first money
Source mapping mode or information resources mapping mode carry out solution resource impact to first signal and/or the second signal,
The configuration information of the second signal is that the second high-level signaling that second network equipment is sent carries.
Optionally, it is PDSCH signal that the first signal, which is the first signal, and second signal is CRS (Common Reference
Signal, public guide frequency) signal.
Optionally, first kind pilot tone is public guide frequency CRS.Second class pilot tone is that channel status indicates reference signal CSI-
RS.Third class pilot tone is DMRS (De Modulation Reference Signal, the reference signal of demodulation).
Optionally, the candidate resource mapping mode is that second network equipment is believed by third high-level signaling, dynamic
It enables, the specific cell specific signaling of cell or UE (User Equipment, user equipment) specific specific signaling are led to
Know the first network equipment.
With in the prior art, PDSCH will not on the resource block for being mapped with EPDCCH data resource impact, lead to resource
Utilization rate is low to be compared, and in the embodiment of the present invention, first network equipment is using one of at least two candidate resource mapping modes
Resource mapping method carries out resource impact to the first signal and the second signal in the same Physical Resource Block, then will
Signal is transmitted to second network equipment.In this way, being reflected when the first signal and the second signal carry out resource in the same Physical Resource Block
When penetrating, first network equipment can determine resource according to specific channel condition and dispatch situation from candidate resource mapping method
Mapping mode carries out resource impact, makes full use of the resource of Physical Resource Block, improve the utilization rate of resource.
Further embodiment of this invention provides a kind of method for transmitting signal, as shown in Figure 2, which comprises
201, first network equipment is according to one of at least two candidate resource mapping modes resource mapping method to
One signal and/or second signal carry out resource impact.
Wherein, in the same Physical Resource Block, candidate resource mapping mode is pre- for the first signal and the second signal
First it is arranged.
It should be noted that first network equipment and second network equipment can be the network equipments such as base station, user equipment,
It is not limited here.
Optionally, candidate resource mapping mode include first resource mapping mode and/or information resources mapping mode and
Secondary resource mapping mode;Wherein, the first resource mapping mode is that first signal is not transmitting the second signal
Resource unit on carry out resource impact, the Secondary resource mapping mode is that first signal is transmitting the second signal
Resource unit on spatial multiplexing mode carry out resource impact, the information resources mapping mode be destroy first signal
The data of resource impact on the resource unit for transmitting the second signal.
Optionally, in the first network equipment according to one of at least two candidate resource mapping modes resource impact
Before mode carries out resource impact to the first signal and/or second signal, the method also includes: according to preset resource impact
Rule determines the first network equipment to first signal and/or described second from the candidate resource mapping mode
The resource mapping method of signal progress resource impact
Optionally, the first equipment determines institute according to preset resource impact rule from the candidate resource mapping mode
Stating the resource mapping method that first network equipment carries out resource impact to first signal and/or the second signal includes:
When the co-located type of standard of the co-located type of standard of first signal and the second signal is type A, first resource is determined
Mapping mode or information resources mapping mode carry out resource impact to first signal and/or the second signal;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B, described first
The network equipment is according to the pilot tone of first signal and the pilot tone of the second signal, from the candidate resource mapping mode really
The fixed first network equipment carries out the resource mapping method of resource impact to first signal and/or the second signal;
Alternatively, when the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A, institute
First network equipment is stated according to the pilot tone of first signal and the pilot tone of the second signal, from the candidate resource mapping side
Determine that the first network equipment carries out the resource impact of resource impact to first signal and/or the second signal in formula
Mode;Alternatively, when the co-located type of standard of the co-located type of standard of first signal and the second signal is type B, institute
First network equipment is stated according to the pilot tone of first signal and the pilot tone of the second signal, from the candidate resource mapping side
Determine that the first network equipment carries out the resource impact of resource impact to first signal and/or the second signal in formula
Mode.
Further, when the co-located type of standard that the co-located type of standard of first signal is type A and the second signal
When for type B: if the first kind pilot tone of first signal is identical or quasi- co-located as the first kind pilot tone of the second signal,
Then according to the first resource mapping mode or the information resources mapping mode to first signal and/or described second
Signal carries out resource impact;Alternatively, if described the first of the first kind pilot tone of first signal and the second signal
Class pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or it is described second letter
Number carry out resource impact;Alternatively, if the second class pilot tone of first signal is identical as the second class pilot tone of the second signal
Or it is quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/
Or the second signal carries out resource impact;Alternatively, if the second class pilot tone of first signal and the second signal
The second class pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or institute
It states second signal and carries out resource impact;Alternatively, if the institute of the first kind pilot tone of first signal and the second signal
It is identical or quasi- co-located to state the second class pilot tone, then according to the first resource mapping mode or the information resources mapping mode pair
First signal and/or the second signal carry out resource impact;Alternatively, if the first kind pilot tone of first signal
With the second class pilot tone of the second signal it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to described
One signal and/or the second signal carry out resource impact;Alternatively, if the second class pilot tone of first signal with it is described
The first kind pilot tone of second signal is identical or quasi- co-located, then is provided according to the first resource mapping mode or the third
Source mapping mode carries out resource impact to first signal and/or the second signal;Alternatively, if the institute of first signal
It is not identical as the first kind pilot tone of the second signal or be not allowed co-located to state the second class pilot tone, then is mapped according to Secondary resource
Mode carries out resource impact to first signal and/or the second signal.
Further, when the co-located type of standard that the co-located type of standard of first signal is type B and the second signal
When for type A: if the first kind pilot tone of first signal is identical or quasi- co-located as the first kind pilot tone of the second signal,
Then according to the first resource mapping mode or the information resources mapping mode to first signal and/or described second
Signal carries out resource impact;Alternatively, if described the first of the first kind pilot tone of first signal and the second signal
Class pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or it is described second letter
Number carry out resource impact;Alternatively, if the second class pilot tone of first signal is identical as the second class pilot tone of the second signal
Or it is quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/
Or the second signal carries out resource impact;Alternatively, if the second class pilot tone of first signal and the second signal
The second class pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or institute
It states second signal and carries out resource impact;Alternatively, if the institute of the first kind pilot tone of first signal and the second signal
It is identical or quasi- co-located to state the second class pilot tone, then according to the first resource mapping mode or the information resources mapping mode pair
First signal and/or the second signal carry out resource impact;Alternatively, if the first kind pilot tone of first signal
With the second class pilot tone of the second signal it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to described
One signal and/or the second signal carry out resource impact;Alternatively, if the second class pilot tone of first signal with it is described
The first kind pilot tone of second signal is identical or quasi- co-located, then is provided according to the first resource mapping mode or the third
Source mapping mode carries out resource impact to first signal and/or the second signal;Alternatively, if the institute of first signal
It is not identical as the first kind pilot tone of the second signal or be not allowed co-located to state the second class pilot tone, then is mapped according to Secondary resource
Mode carries out resource impact to first signal and/or the second signal.
Further, when the co-located type of standard of the co-located type of standard of first signal and the second signal is type
When B: if the first kind pilot tone of first signal is identical or quasi- co-located as the first kind pilot tone of the second signal, basis
The first resource mapping mode or the information resources mapping mode to first signal and/or the second signal into
Row resource impact;Alternatively, if the first kind pilot tone of the first kind pilot tone of first signal and the second signal
It is not identical or be not allowed co-located, then first signal and/or the second signal are carried out according to Secondary resource mapping mode
Resource impact;Alternatively, if the second class pilot tone of first signal and the second class pilot tone of the second signal are identical or quasi- total
Location, then according to the first resource mapping mode or the information resources mapping mode to first signal and/or described
Second signal carries out resource impact;Alternatively, if the second class pilot tone of first signal and the second signal it is described
Second class pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or described second
Signal carries out resource impact;Alternatively, if described the second of the first kind pilot tone of first signal and the second signal
Class pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described
One signal and/or the second signal carry out resource impact;Alternatively, if the first kind pilot tone of first signal with it is described
The second class pilot tone of second signal it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal
And/or the second signal carries out resource impact;Alternatively, if the second class pilot tone of first signal and second letter
Number the first kind pilot tone it is identical or quasi- co-located, then mapped according to the first resource mapping mode or the information resources
Mode carries out resource impact to first signal and/or the second signal;Alternatively, if described the second of first signal
Class pilot tone it is not identical as the first kind pilot tone of the second signal or be not allowed it is co-located, then according to Secondary resource mapping mode pair
First signal and/or the second signal carry out resource impact.
It should be noted that in the above process, due to when the first kind pilot tone of the first signal and the first kind of second signal
Pilot tone is not identical or is not allowed the second class pilot tone of co-located, the first signal first kind pilot tone and second signal not identical or inaccurate total
The first kind pilot tone of location, the second class pilot tone of the first signal and second signal is not identical or is not allowed co-located and the first signal
When second class pilot tone of the second class pilot tone and second signal is not identical or is not allowed co-located, indicate that the first signal and the second signal are next
From different sending nodes, so the first signal and the second signal can use Secondary resource mapping mode;Similarly, when the first letter
Number first kind pilot tone is identical as the first kind pilot tone of second signal or quasi- co-located, the first signal first kind pilot tone and the second letter
Number the second class pilot tone is identical or quasi- co-located, the first signal the second class pilot tone and the first kind pilot tone of second signal it is identical or quasi-
When co-located and the first signal the second class pilot tone and identical or quasi- co-located the second class pilot tone of second signal, the first letter is indicated
Number and second signal be come identical sending node, so the first signal and the second signal can use first resource mapping mode
Or information resources mapping mode.
Optionally, the first equipment determines institute according to preset resource impact rule from the candidate resource mapping mode
Stating the resource mapping method that first network equipment carries out resource impact to first signal and/or the second signal includes:
At the beginning of the sequence of the third class pilot tone of the sequence initialization parameter and second signal of the third class pilot tone of first signal
When beginningization parameter is identical, according to first resource mapping mode or information resources mapping mode to first signal and/or institute
It states second signal and carries out resource impact;Alternatively, when first signal third class pilot tone sequence initialization parameter with it is described
When the sequence initialization parameter of the third class pilot tone of second signal is not identical, according to Secondary resource mapping mode to first letter
Number and/or the second signal carry out resource impact.
It should be noted that in the above process, due to the third class pilot tone when the first signal sequence initialization parameter with
When the sequence initialization parameter of the third class pilot tone of second signal is not identical, indicate that the first signal and the second signal are from difference
Sending node, so the first signal and the second signal can use Secondary resource mapping mode;Similarly, when the of the first signal
When the sequence initialization parameter of three classes pilot tone is identical as the sequence initialization parameter of third class pilot tone of second signal, first is indicated
Signal and second signal are to carry out identical sending node, so the first signal and the second signal can use first resource mapping side
Formula or information resources mapping mode.
Optionally, the first equipment determines institute according to preset resource impact rule from the candidate resource mapping mode
Stating the resource mapping method that first network equipment carries out resource impact to first signal and/or the second signal includes:
When the second signal is without cross-carrier scheduling, according to first resource mapping mode or information resources mapping mode to institute
It states the first signal and/or the second signal carries out resource impact;Alternatively, when the second signal carries out cross-carrier scheduling,
Resource impact is carried out to first signal and/or the second signal according to Secondary resource mapping mode.
Optionally, the first equipment determines institute according to preset resource impact rule from the candidate resource mapping mode
Stating the resource mapping method that first network equipment carries out resource impact to first signal and/or the second signal includes:
When the aggregation level of the second signal is greater than preset value, according to first resource mapping mode or information resources mapping mode
Resource impact is carried out to first signal and/or the second signal;Alternatively, the aggregation level when the second signal is little
When preset value, resource impact is carried out to first signal and/or the second signal according to Secondary resource mapping mode.
It should be noted that in the above process, due to indicating letter when the aggregation level of second signal is not more than preset value
Road condition is fine, so the first signal and the second signal can use Secondary resource mapping mode, first network equipment is according to the
The corresponding solution resource mapping method solution resource impact of two resource mapping methods;Similarly, when the aggregation level of second signal is greater than in advance
If when value, indicating that channel condition is bad, so the first signal and the second signal can use first resource mapping mode or third
Resource mapping method, first network equipment is according to corresponding solution resource mapping method solution resource impact.
Optionally, the first equipment determines institute according to preset resource impact rule from the candidate resource mapping mode
Stating the resource mapping method that first network equipment carries out resource impact to first signal and/or the second signal includes:
When the scheduling format of the second signal is space-frequency code SFBC, for example, when DCI format 1A, according to first resource mapping side
Formula or information resources mapping mode carry out resource impact to first signal and/or the second signal;Alternatively, when described
The scheduling format of second signal be beam shaping beam forming or spatial reuse, for example, DCI format 2,2A, 2B,
When 2C, resource impact is carried out to first signal and/or the second signal according to Secondary resource mapping mode.
It should be noted that in the above process, since the scheduling format when second signal is beam shaping beam
Forming perhaps spatial reuse when indicate channel condition very well or first network equipment can know accurate precoding letter
Breath, so the first signal and the second signal can use Secondary resource mapping mode;Similarly, when the scheduling format of second signal is
When space-frequency code SFBC, indicate that the bad first network equipment of channel condition cannot know accurate precoding information, so the first letter
Number and second signal can use first resource mapping mode or information resources mapping mode.
Optionally, first equipment is according to preset resource impact rule, from the candidate resource mapping mode really
The fixed first network equipment carries out the resource mapping method packet of resource impact to first signal and/or the second signal
Include: first equipment determines the first network equipment to described according to PQI state from the candidate resource mapping mode
First signal and/or the second signal carry out the resource mapping method of resource impact.
Optionally, first equipment is according to preset resource impact rule, from the candidate resource mapping mode really
The fixed first network equipment carries out the resource mapping method packet of resource impact to first signal and/or the second signal
It includes: when the configuration information of the second signal includes the information of at least two second signals, being mapped according to first resource
Mode or information resources mapping mode carry out resource impact to first signal and/or the second signal, and described second
The configuration information of signal is that the first high-level signaling that second network equipment is sent carries.
Optionally, in the first network equipment according to one of at least two candidate resource mapping modes resource impact
Mode carries out the first signal and/or second signal after resource impact, further includes: the first network equipment is to the second network
Equipment sends indication signaling;Wherein, the indication signaling includes dynamic signaling or third high-level signaling, and the indication signaling is used for
Indicate that second network equipment carries out the resource impact side of solution resource impact to first signal and/or the second signal
Formula.
202, the first signal and the second signal after first network equipment sends resource impact to second network equipment.
Optionally, the first signal is Physical Downlink Shared Channel PDSCH signal, and the second signal is enhancing physical control
Channel EPDCCH signal, the second signal dispatch first signal.
Optionally, the first signal is Physical Downlink Shared Channel PDSCH signal, and second signal is public guide frequency CRS signal.
Optionally, first kind pilot tone is public guide frequency CRS.Second class pilot tone is that channel status indicates reference signal CSI-
RS.Third class pilot tone is the reference signal DMRS of demodulation.
Optionally, the candidate resource mapping mode is that the first network equipment is believed by the second high-level signaling, dynamic
It enables, cell specific signaling or UE specific signal second network equipment.
With in the prior art, PDSCH will not on the resource block for being mapped with EPDCCH data resource impact, lead to resource
Utilization rate is low to be compared, and in the embodiment of the present invention, first network equipment receives providing in the same physics for second network equipment transmission
After the first signal and the second signal in source block, pass through one of at least two candidate resource mapping modes resource impact side
Formula carries out solution resource impact to it.In this way, when the first signal and the second signal carry out resource impact in the same Physical Resource Block
When, first network equipment can determine that resource is reflected according to specific channel condition and dispatch situation from candidate resource mapping method
Mode is penetrated, solution resource impact is carried out, makes full use of the resource of Physical Resource Block, improves the utilization rate of resource.
Further embodiment of this invention provides a kind of method for transmitting signal, is used between the network equipment in same physical resource
The method that two kinds of signals transmission of resource impact is carried out in block, with base station to user device transmissions in same Physical Resource Block into
For EPDCCH the and PDSCH signal of row resource impact, base station is by EPDCCH and PDSCH signal in same Physical Resource Block
The resource impact rule for carrying out resource impact determines by the way of resource impact, and transmits it to user equipment, Yong Hushe
It is standby then solution resource impact is carried out according to corresponding resource mapping method, to realize the transmission of EPDCCH and PDSCH signal.Such as figure
Shown in 3, which comprises
301, base station determines the co-located type of standard of the EPDCCH and PDSCH signal of the transmission on same Physical Resource Block.
Wherein, EPDCCH the and PDSCH signal of the transmission on same Physical Resource Block is the letter for being transferred to user equipment
Number.
If assume that the CRS of serving cell it should be noted that user equipment is configured for transmission mode 1-10
Antenna port 0-3 is about (delay spread delay spread, doppler spread Doppler spread, Doppler frequency shift
Doppler shift, average gain average gain, averagely extension average delay) it is quasi- co-located.User equipment
It is configured for transmission mode 8-10, then assume that in the DMRS antenna port of subframe business cell for oral administration about (time delay expands
Exhibition, doppler spread, Doppler frequency shift, average gain are average to extend) it is quasi- co-located.If user equipment is configured for passing
Defeated mode 1-9 then assume that CRS antenna port 0-3, DMRS port 5,7-14, the port CSI-RS 15-22, about (time delay expands
Exhibition, doppler spread, Doppler frequency shift are average to extend) it is quasi- co-located.If user equipment is configured for transmission mode 10,
High-level signaling be configured with it is two kinds of with the associated co-located configuration of standard of DMRS pilot frequency port 7-14, respectively type Type A with
Type B。
Type A: user equipment assume that CRS antenna port 0-3, DMRS port 7-14, CSI-RS port 15-22, close
It is quasi- co-located in (delay spread, doppler spread, Doppler frequency shift are average to extend).
Type B: user equipment assume that NZP (non zero power, non-zero power) CSI-RS antenna end of configuration
Mouth 15-22 is quasi- co-located about (delay spread, doppler spread, Doppler frequency shift are average to extend) with the port DMRS 7-14
's.
For different channels such as EPDCCH channel and PDSCH channel, QCL's (Quasi Co-location, quasi- co-located)
Configuration may have following four situation: the first situation Case 1:PDSCH QCL Type A, EPDCCH QCL Type
A;Second situation Case 2:PDSCH QCL Type A, EPDCCH QCL Type B;The third situation Case 3:PDSCH
QCL Type B,EPDCCH QCL Type A;4th kind of situation Case 4:PDSCH QCL Type B, EPDCCH QCL
Type B。
302, base station is reflected according to the co-located type of standard and resource impact rule of EPDCCH and PDSCH signal from candidate resource
It penetrates in mode and determines the resource mapping method of EPDCCH and PDSCH.
Wherein, the mode of resource impact may include three kinds: first resource mapping mode, and PDSCH is not in transmission EPDCCH
Resource unit on carry out resource impact;Secondary resource mapping mode, PDSCH is on the resource unit of transmission EPDCCH with space
Multiplex mode carries out resource impact;Information resources mapping mode is destroyed PDSCH resource on the resource unit of transmission EPDCCH and is reflected
The data penetrated.
For example, the Physical Resource Block for distributing to PDSCH notified in control signaling is using RBG as granularity, including PRB0, PRB1
And PRB2, and EPDCCH has been had mapped on PRB1, PDSCH data flow is 1,2,3,4,5,6,7,8,9,10,11,12, is pressed
According to the mode of time domain after first frequency domain, it is mapped on the Physical Resource Block for its distribution.First resource mapping mode, as shown in figure 4,
In resource impact, skip PRB1, not PRB1 carry out resource impact, it is corresponding solution resource impact when it can be concluded that data flow
For (1,2, *, *, 3,4,5,6,7,8, *, *, 9,10,11,12), * indicates this data not and is the number in PDSCH original data stream
According to;Secondary resource mapping mode, as shown in figure 5, for PDSCH to be mapped on the resource block PRB1 of transmission EPDCCH, still
PRB1 upper EPDCCH and PDSCH is transmitted by the way of spatial reuse, it is corresponding solution resource impact when it can be concluded that data flow
For (1,2,3,4,5,6,7,8,9,10,11,12);Information resources mapping mode, as shown in fig. 6, for PDSCH is mapped to transmission
On the resource block PRB1 of EPDCCH, still, the data that PDSCH is mapped on PRB1 are destroyed, only transmit the data pair of EPDCCH
When the solution resource impact answered it can be concluded that data flow be (1,2, *, *, 5,6,7,8, *, *, 11,12).
Further, resource impact rule can the signal of EPDCCH and PDSCH according to the co-located type of standard different choosings
Select above-mentioned three kinds of different resource mapping methods.
For example, for case 1, using first resource mapping mode or information resources mapping mode.
For case 2, if the CRS of the corresponding serving cell of the PDSCH and CRS in the PQI information for EPDCCH configuration
It is identical or quasi- co-located, then use first resource mapping mode or information resources mapping mode;If the corresponding serving cell of PDSCH
The CRS and CRS in the PQI information that is configured for EPDCCH it is not identical or be not allowed co-located, then use Secondary resource mapping mode;Or
Person, if the CSI-RS of the corresponding serving cell of PDSCH and the CSI-RS in the PQI information configured for EPDCCH are identical or quasi- total
Location then uses first resource mapping mode or information resources mapping mode;If the CSI-RS of the corresponding serving cell of PDSCH with
For EPDCCH configuration PQI information in CSI-RS it is not identical or be not allowed it is co-located, then use Secondary resource mapping mode;Alternatively,
If the CRS of the corresponding serving cell of PDSCH and the CSI-RS in the PQI information configured for EPDCCH are identical or quasi- co-located,
Using first resource mapping mode or information resources mapping mode;If the CRS of the corresponding serving cell of PDSCH be EPDCCH
CSI-RS in the PQI information of configuration it is not identical or be not allowed it is co-located, then use Secondary resource mapping mode;Alternatively, if PDSCH
The CSI-RS of corresponding serving cell and the CRS in the PQI information configured for EPDCCH are identical or quasi- co-located, then using the first money
Source mapping mode or information resources mapping mode;If the CSI-RS of the corresponding serving cell of PDSCH with for EPDCCH configuration
CRS in PQI information it is not identical or be not allowed it is co-located, then use Secondary resource mapping mode.
For case 3, if the CRS in the PQI information of the CRS and PDSCH of the serving cell of EPDCCH is identical or quasi- total
Location then uses first resource mapping mode or information resources mapping mode;If the CRS and PDSCH of the serving cell of EPDCCH
PQI information in CRS it is not identical or be not allowed it is co-located, then use Secondary resource mapping mode;Alternatively, if the service of EPDCCH
CSI-RS in the PQI information of the CSI-RS and PDSCH of cell is identical or quasi- co-located, then using first resource mapping mode or the
Three resource mapping methods;If the CSI-RS in the PQI information of the CSI-RS and PDSCH of the serving cell of EPDCCH it is not identical or
Be not allowed it is co-located, then use Secondary resource mapping mode;Alternatively, if the PQI of the CRS and PDSCH of the serving cell of EPDCCH believe
CSI-RS in breath is identical or quasi- co-located, then uses first resource mapping mode or information resources mapping mode;If EPDCCH
Serving cell CRS and PDSCH PQI information in CSI-RS it is not identical or be not allowed it is co-located, then using Secondary resource map
Mode;Alternatively, if the CRS in the PQI information of the CSI-RS and PDSCH of the serving cell of EPDCCH is identical or quasi- co-located,
Using first resource mapping mode or information resources mapping mode;If the CSI-RS's and PDSCH of the serving cell of EPDCCH
CRS in PQI information it is not identical or be not allowed it is co-located, then use Secondary resource mapping mode.
For case 4, if the CRS in the PQI information of the CRS and PDSCH of the serving cell of EPDCCH is identical or quasi- total
Location then uses first resource mapping mode or information resources mapping mode;If the CRS and PDSCH of the serving cell of EPDCCH
PQI information in CRS it is not identical or be not allowed it is co-located, then use Secondary resource mapping mode;Alternatively, being configured if it is EPDCCH
PQI information in CSI-RS information and the CSI-RS in the PQI information of PDSCH it is identical or quasi- co-located, then use first resource
Mapping mode or information resources mapping mode;If it is the CSI-RS information and PDSCH in the PQI information of EPDCCH configuration
CSI-RS in PQI information it is not identical or be not allowed it is co-located, then use Secondary resource mapping mode;Alternatively, if the clothes of EPDCCH
CSI-RS in the PQI information of the CRS and PDSCH of cell of being engaged in is identical or quasi- co-located, then using first resource mapping mode or the
Three resource mapping methods;If the CSI-RS in the PQI information of the CRS and PDSCH of the serving cell of EPDCCH is not identical or not
It is quasi- co-located, then use Secondary resource mapping mode;Alternatively, if the PQI of the CSI-RS and PDSCH of the serving cell of EPDCCH believe
CRS in breath is identical or quasi- co-located, then uses first resource mapping mode or information resources mapping mode;If the clothes of EPDCCH
Be engaged in cell CSI-RS and PDSCH PQI information in CRS it is not identical or be not allowed it is co-located, then use Secondary resource mapping mode.
It should be noted that in the above process, due to the PQI information of CRS and PDSCH when the serving cell as EPDCCH
In CRS it is not identical or be not allowed the CSI-RS in the PQI information of the CRS and PDSCH of co-located, EPDCCH serving cell not identical
Or be not allowed co-located, EPDCCH serving cell CSI-RS and PDSCH PQI information in CSI-RS it is not identical or inaccurate total
When CRS in the PQI information of the CSI-RS and PDSCH of the serving cell of location or EPDCCH is not identical or is not allowed co-located, indicate
PDSCH and EPDCCH is from different sending nodes, so PDSCH and EPDCCH can use Secondary resource mapping mode;
Similarly, when the CRS in the PQI information of the CRS and PDSCH of the serving cell of EPDCCH is identical or quasi- co-located, EPDCCH service
CSI-RS in the PQI information of the CRS and PDSCH of cell is identical or the CSI-RS of quasi- co-located, EPDCCH serving cell with
CSI-RS in the PQI information of PDSCH is identical or the PQI letter of the CSI-RS and PDSCH of quasi- co-located or EPDCCH serving cell
When CRS in breath is identical or quasi- co-located, indicate that PDSCH and EPDCCH is to carry out identical sending node, so PDSCH and EPDCCH
First resource mapping mode or information resources mapping mode can be used.
It should be noted that resource impact rule is to preset in a base station, then in this step, base station can basis
The co-located type of standard of EPDCCH and PDSCH signal and resource impact rule, determination will carry out the mode of resource impact.
303, base station carries out resource impact to PDSCH according to determining resource mapping method.
Wherein, base station executes corresponding operation, completes the resource impact of PDSCH after determining the mode of resource impact.
304, the signal that base station is mapped to user device transmissions.
305, user equipment receives the signal that base station is sent.
306, user equipment determines the co-located class of standard of the EPDCCH and PDSCH signal of the transmission on same Physical Resource Block
Type.
Wherein, it is user device configuration that the co-located type of standard of EPDCCH and PDSCH signal, which is base station,.
307, user equipment is provided according to the co-located type of standard and resource impact rule of EPDCCH and PDSCH signal from candidate
The resource mapping method of EPDCCH and PDSCH is determined in the mapping mode of source.
Wherein, resource impact rule is to preset, identical as the resource impact rule in base station.
It should be noted that resource impact rule identical with base station can be pre-set in user equipment, in step
The co-located type of standard of EPDCCH and PDSCH signal is determined in 306, then user equipment is according to the standard of EPDCCH and PDSCH signal
Co-located type and resource impact rule, from candidate resource mapping mode determine EPDCCH and PDSCH resource mapping method with
The resource mapping method that base station determines in step 302 is identical.Base station will be waited when EPDCCH and PDSCH signal resource maps
Select resource mapping method specific by high-level signaling, dynamic signaling, the specific cell specific signaling of user or user equipment
UE specific signals user equipment.
308, user equipment is according to the determining corresponding solution resource mapping method of resource mapping method, to EPDCCH and
PDSCH signal carries out solution resource impact.
Wherein, the three kinds of resource mapping methods proposed in step 302, respectively correspond different solution resource mapping methods,
In this step, user equipment believes EPDCCH and PDSCH according to the determining corresponding solution resource mapping method of resource mapping method
Number carry out solution resource impact.
309, user equipment detects the signal after solution resource impact.
It should be noted that resource impact rule is the co-located class of standard according to EPDCCH and PDSCH in the embodiment of the present invention
Type setting, then base station and user equipment determine the money of EPDCCH and PDSCH all in accordance with the co-located type of standard of EPDCCH and PDSCH
Source mapping mode, but resource impact rule is not limited in the co-located type setting of standard according to EPDCCH and PDSCH.
Optionally, resource impact rule can be arranged according to the initiation parameter of the DMRS pilot tone of EPDCCH and PDSCH.Example
Such as, the DMRS pilot frequency sequence of PDSCH is generated by following formula, it is pseudo- with
The initial value of machine sequence c (i) isWherein, i=0,1, when high level is not configuredOr when using DCI format 1A, 2B or 2C,In the case of other,For EPDCCH
DMRS pilot frequency sequence generated by following formula, it is pseudo- with
The initial value of machine sequence c (i) isWhereinAnd
It is configured by high level,In i represent the number of EPDCCH PRB set.It is led according to the DMRS of EPDCCH and PDSCH base station
The initiation parameter setting resource impact rule of frequency can be with are as follows: if the pilot tone initiation parameter of EPDCCH configurationWith
The pilot tone initiation parameter of PDSCHIt is identical, then use first resource mapping mode or information resources mapping mode;Such as
The pilot tone initiation parameter of fruit EPDCCH configurationWith the pilot tone initiation parameter of PDSCHIt is not identical, then it uses
Secondary resource mapping mode.
It should be noted that in the above process, due to working as the pilot frequency sequence initiation parameter of EPDCCHWith PDSCH
Pilot frequency sequence initiation parameterWhen not identical, indicate that PDSCH and EPDCCH is from different sending nodes, institute
Secondary resource mapping mode can be used with PDSCH and EPDCCH;Similarly, when the pilot frequency sequence initiation parameter of EPDCCHWith the pilot frequency sequence initiation parameter of PDSCHWhen identical, indicate that PDSCH and EPDCCH is to carry out identical hair
Node is sent, so PDSCH and EPDCCH can use first resource mapping mode or information resources mapping mode.
Optionally, resource impact rule can be arranged according to the aggregation level of EPDCCH.For example, working as the polymer grade of EPDCCH
Not great Yu preset value when, can information resources mapping mode using first resource mapping mode;When the aggregation level of EPDCCH is little
When preset value, using Secondary resource mapping mode.
It should be noted that in the above process, due to indicating channel when the aggregation level of EPDCCH is not more than preset value
Condition is fine, so PDSCH and EPDCCH can use Secondary resource mapping mode;Similarly, when the aggregation level of EPDCCH is big
When preset value, indicate that channel condition is bad, so PDSCH and EPDCCH can be provided using first resource mapping mode or third
Source mapping mode.
Optionally, resource impact rule can be arranged according to the scheduling format of control channel.For example, the scheduling lattice of PDSCH
It, can information resources mapping mode using first resource mapping mode when formula is space-frequency code SFBC;When the scheduling format of PDSCH is wave
Beam excipient beam forming or when spatial reuse, when, using Secondary resource mapping mode.
It should be noted that in the above process, since the scheduling format as EPDCCH is beam shaping beam forming
Perhaps when spatial reuse indicate channel condition very well or base station can know accurate precoding information, so PDSCH and
EPDCCH can use Secondary resource mapping mode, and user equipment is according to the corresponding solution resource impact side of Secondary resource mapping mode
Formula solution resource impact;Similarly, when the scheduling format of EPDCCH is space-frequency code SFBC, indicate that channel condition is bad or base station not
Accurate precoding information can be known, so PDSCH and EPDCCH can be reflected using first resource mapping mode or information resources
Mode is penetrated, user equipment is according to corresponding solution resource mapping method solution resource impact.
Optionally, resource impact rule can be arranged according to PQI state.For example, when PQI state is " 00 ", using the
Two resource mapping methods.
It should be noted that when base station is determined by the scheduling format of PQI state, the aggregation level of EPDCCH or PDSCH
It, can be before user equipment determines resource mapping method, by dynamic signaling by PQI shape when by the way of resource impact
The scheduling format notifying user equipment of state, the aggregation level of EPDCCH or PDSCH.
Optionally, can be under the scene of cross-carrier scheduling in EPDCCH and PDSCH signal, resource impact rule can basis
Whether EPDCCH carries out cross-carrier scheduling setting.For example, as shown in fig. 7, being carried for the EPDCCH1 scheduling transmitted on carrier wave CC0
The PDSCH on EPDCCH2 scheduling carrier wave CC2 transmitted on PDSCH on wave CC1, carrier wave CC0.Base station according to EPDCCH and
The initiation parameter setting resource impact rule of the DMRS pilot tone of PDSCH can be with are as follows: the PDSCH on CC0 cannot be mapped to
(first resource mapping mode or information resources mapping side on Physical Resource Block shared by EPDCCH0, EPDCCH1 and EPDCCH2
Formula);Alternatively, the PDSCH on CC0 cannot be mapped on Physical Resource Block shared by EPDCCH0 (first resource mapping mode or
Information resources mapping mode), but may map on Physical Resource Block shared by EPDCCH1 and EPDCCH2 that (Secondary resource reflects
Penetrate mode);Alternatively, base station freely decides whether to may map to physical resource shared by EPDCCH0, EPDCCH1 and EPDCCH2
On block, then in a manner of dynamic signaling or high-level signaling instruction resources for user equipment mapping.
It should be noted that method described in the embodiment of the present invention, can be also used for PDSCH between base station and user equipment
The transmission of signal and CRS signal.
Optionally, when the configuration information of CRS includes at least two CRS, base station can also be according to first resource mapping side
Formula or information resources mapping mode carry out resource impact to PDSCH and/or CRS, and the configuration information of CRS is can have base station to pass through
High-level signaling is sent to user equipment.
It should be noted that under above-mentioned different resource mapping ruler, the data handling procedure and sheet of base station and user equipment
The data handling procedure of inventive embodiments is identical, and details are not described herein.
It should be noted that the present invention is real in the embodiment of the present invention by taking base station carries out signal transmission to user equipment as an example
The method for applying example can be also used for the transmission of signal between other network equipments, it is not limited here.
With in the prior art, PDSCH will not on the resource block for being mapped with EPDCCH data resource impact, lead to resource
Utilization rate is low to be compared, and in the embodiment of the present invention, base station exists according to the co-located type of standard and resource impact rule of EPDCCH and PDSCH
A kind of resource mapping method is determined at least two candidate resource mapping modes, in the same Physical Resource Block
EPDCCH and PDSCH carries out resource impact, then transmits a signal to user equipment;User equipment receives the signal of base station transmission
Afterwards, true at least two candidate resource mapping modes by the co-located type of standard and resource impact rule of EPDCCH and PDSCH
A kind of fixed resource mapping method carries out solution resource impact.In this way, when PDSCH and EPDCCH is provided in the same Physical Resource Block
When source maps, base station and user equipment can be true from candidate resource mapping method according to specific channel condition and dispatch situation
Determine resource mapping method, carries out resource impact and conciliate resource impact, make full use of the resource of Physical Resource Block, improve the benefit of resource
With rate.
Further embodiment of this invention provides a kind of device 40 for transmitting signal, as shown in figure 8, described device 40 includes:
Receiving unit 41, for receiving the first signal and the second signal of second network equipment transmission, wherein described first
Signal and the second signal are in the same Physical Resource Block;
De-mapping unit 42 is used for according to one of at least two candidate resource mapping modes resource mapping method to institute
It states the first signal and/or the second signal carries out solution resource impact, and to the first signal and/or the after solution resource impact
Binary signal is detected.
Wherein, the candidate resource mapping mode include first resource mapping mode and/or information resources mapping mode, with
And Secondary resource mapping mode;Wherein, the first resource mapping mode is that first signal is not transmitting second letter
Number resource unit on carry out resource impact, the Secondary resource mapping mode be first signal transmit it is described second letter
Number resource unit on spatial multiplexing mode carry out resource impact, the information resources mapping mode be destroy it is described first letter
The data of resource impact number on the resource unit for transmitting the second signal.
Further, the receiving unit 41 is also used to receive the indication signaling that second network equipment is sent, described
Indication signaling includes dynamic signaling or the first high-level signaling, and the indication signaling is used to indicate the first network equipment to institute
It states the first signal and/or the second signal carries out the resource mapping method of solution resource impact.
Further, as shown in figure 9, described device 40 can also include:
Determination unit 43, for determining institute from the candidate resource mapping mode according to scheduled resource impact rule
State the resource mapping method that first network equipment carries out solution resource impact to first signal and/or the second signal.
Further, the determination unit 43 is specifically used for the co-located type of standard and second letter when first signal
Number standard co-located type when being type A, according to first resource mapping mode or information resources mapping mode to described first
Signal and/or the second signal carry out solution resource impact;Alternatively,
The determination unit 43 is specifically used for when the co-located type of standard of first signal being type A and the second signal
Standard co-located type when being type B, the first network equipment is according to the pilot tone of first signal and the second signal
Pilot tone determines the first network equipment to first signal and/or described second from the candidate resource mapping mode
Signal carries out the resource mapping method of solution resource impact;Alternatively,
The determination unit 43 is specifically used for when the co-located type of standard of first signal being type B and the second signal
Standard co-located type when being type A, the first network equipment is according to the pilot tone of first signal and the second signal
Pilot tone determines the first network equipment to first signal and/or described second from the candidate resource mapping mode
Signal carries out the resource mapping method of solution resource impact;Alternatively,
The determination unit 43 is specifically used for when the co-located type of standard of first signal and the standard of the second signal are total
When location type is type B, the first network equipment according to the pilot tone of first signal and the pilot tone of the second signal,
Determined from the candidate resource mapping mode first network equipment to first signal and/or the second signal into
The resource mapping method of row solution resource impact.
Further, as shown in figure 9, the determination unit 43 can also include:
First determines subelement 431, is type A and the second signal for the co-located type of standard when first signal
Standard co-located type when being type B, if the first kind pilot tone phase of the first kind pilot tone of first signal and the second signal
With perhaps quasi- co-located then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out solution resource impact;Alternatively,
Described first determines that subelement 431 is also used to when the co-located type of standard of first signal be type A and described the
When the co-located type of standard of binary signal is type B, if the institute of the first kind pilot tone of first signal and the second signal
State first kind pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or described
Second signal carries out solution resource impact;Alternatively,
Described first determines that subelement 431 is also used to when the co-located type of standard of first signal be type A and described the
When the co-located type of standard of binary signal is type B, if the second class of the second class pilot tone of first signal and the second signal
Pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described first
Signal and/or the second signal carry out solution resource impact;Alternatively,
Described first determines that subelement 431 is also used to when the co-located type of standard of first signal be type A and described the
When the co-located type of standard of binary signal is type B, if the institute of the second class pilot tone of first signal and the second signal
State the second class pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or described
Binary signal carries out solution resource impact;Alternatively,
Described first determines that subelement 431 is also used to when the co-located type of standard of first signal be type A and described the
When the co-located type of standard of binary signal is type B, if the institute of the first kind pilot tone of first signal and the second signal
It is identical or quasi- co-located to state the second class pilot tone, then according to the first resource mapping mode or the information resources mapping mode pair
First signal and/or the second signal carry out solution resource impact;Alternatively,
Described first determines that subelement 431 is also used to when the co-located type of standard of first signal be type A and described the
When the co-located type of standard of binary signal is type B, if the institute of the first kind pilot tone of first signal and the second signal
State the second class pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or described
Binary signal carries out solution resource impact;Alternatively,
Described first determines that subelement 431 is also used to when the co-located type of standard of first signal be type A and described the
When the co-located type of standard of binary signal is type B, if the institute of the second class pilot tone of first signal and the second signal
It is identical or quasi- co-located to state first kind pilot tone, then according to the first resource mapping mode or the information resources mapping mode pair
First signal and/or the second signal carry out solution resource impact;Alternatively,
Described first determines that subelement 431 is also used to when the co-located type of standard of first signal be type A and described the
When the co-located type of standard of binary signal is type B, if the institute of the second class pilot tone of first signal and the second signal
State first kind pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or described
Binary signal carries out solution resource impact.
Further, as shown in figure 9, the determination unit 43 can also include:
Second determines subelement 432, is type B and the second signal for the co-located type of standard when first signal
Standard co-located type when being type A, if the first kind pilot tone phase of the first kind pilot tone of first signal and the second signal
With perhaps quasi- co-located then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out solution resource impact;Alternatively,
Described second determines that subelement 432 is also used to when the co-located type of standard of first signal be type B and described the
When the co-located type of standard of binary signal is type A, if the institute of the first kind pilot tone of first signal and the second signal
State first kind pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or described
Second signal carries out solution resource impact;Alternatively,
Described second determines that subelement 432 is also used to when the co-located type of standard of first signal be type B and described the
When the co-located type of standard of binary signal is type A, if the second class of the second class pilot tone of first signal and the second signal
Pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described first
Signal and/or the second signal carry out solution resource impact;Alternatively,
Described second determines that subelement 432 is also used to when the co-located type of standard of first signal be type B and described the
When the co-located type of standard of binary signal is type A, if the institute of the second class pilot tone of first signal and the second signal
State the second class pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or described
Binary signal carries out solution resource impact;Alternatively,
Described second determines that subelement 432 is also used to when the co-located type of standard of first signal be type B and described the
When the co-located type of standard of binary signal is type A, if the institute of the first kind pilot tone of first signal and the second signal
It is identical or quasi- co-located to state the second class pilot tone, then according to the first resource mapping mode or the information resources mapping mode pair
First signal and/or the second signal carry out solution resource impact;Alternatively,
Described second determines that subelement 432 is also used to when the co-located type of standard of first signal be type B and described the
When the co-located type of standard of binary signal is type A, if the institute of the first kind pilot tone of first signal and the second signal
State the second class pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or described
Binary signal carries out solution resource impact;Alternatively,
Described second determines that subelement 432 is also used to when the co-located type of standard of first signal be type B and described the
When the co-located type of standard of binary signal is type A, if the institute of the second class pilot tone of first signal and the second signal
It is identical or quasi- co-located to state first kind pilot tone, then according to the first resource mapping mode or the information resources mapping mode pair
First signal and/or the second signal carry out solution resource impact;Alternatively,
Described second determines that subelement 432 is also used to when the co-located type of standard of first signal be type B and described the
When the co-located type of standard of binary signal is type A, if the institute of the second class pilot tone of first signal and the second signal
State first kind pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or described
Binary signal carries out solution resource impact.
Further, as shown in figure 9, the determination unit 43 can also include:
Third determines subelement 433, for being total to when the co-located type of standard of first signal and the standard of the second signal
When location type is type B, if the first kind pilot tone of first signal it is identical as the first kind pilot tone of the second signal or
Person's standard is co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/
Or the second signal carries out solution resource impact;Alternatively,
The third determines that subelement 433 is also used to the co-located type of standard and the second signal when first signal
When quasi- co-located type is type B, if described the first of the first kind pilot tone of first signal and the second signal
Class pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or it is described second letter
Number carry out solution resource impact;Alternatively,
The third determines that subelement 433 is also used to the co-located type of standard and the second signal when first signal
When quasi- co-located type is type B, if the second class pilot tone phase of the second class pilot tone of first signal and the second signal
It is same or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out solution resource impact;Alternatively,
The third determines that subelement 433 is also used to the co-located type of standard and the second signal when first signal
When quasi- co-located type is type B, if described the second of the second class pilot tone of first signal and the second signal
Class pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal
Carry out solution resource impact;Alternatively,
The third determines that subelement 433 is also used to the co-located type of standard and the second signal when first signal
When quasi- co-located type is type B, if described the second of the first kind pilot tone of first signal and the second signal
Class pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described
One signal and/or the second signal carry out solution resource impact;Alternatively,
The third determines that subelement 433 is also used to the co-located type of standard and the second signal when first signal
When quasi- co-located type is type B, if described the second of the first kind pilot tone of first signal and the second signal
Class pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal
Carry out solution resource impact;Alternatively,
The third determines that subelement 433 is also used to the co-located type of standard and the second signal when first signal
When quasi- co-located type is type B, if described the first of the second class pilot tone of first signal and the second signal
Class pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described
One signal and/or the second signal carry out solution resource impact;Alternatively,
The third determines that subelement 433 is also used to the co-located type of standard and the second signal when first signal
When quasi- co-located type is type B, if described the first of the second class pilot tone of first signal and the second signal
Class pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal
Carry out solution resource impact.
Further, the determination unit 43 is specifically used for the sequence initialization when the third class pilot tone of first signal
When parameter is identical as the sequence initialization parameter of third class pilot tone of the second signal, according to first resource mapping mode or
Information resources mapping mode carries out solution resource impact to first signal and/or the second signal;Alternatively,
The determination unit 43 is specifically used for sequence initialization parameter and the institute of the third class pilot tone when first signal
State the third class pilot tone of second signal sequence initialization parameter it is not identical when, according to Secondary resource mapping mode to described first
Signal and/or the second signal carry out solution resource impact.
Further, the determination unit 43 is specifically used for when the second signal is without cross-carrier scheduling, according to
First resource mapping mode or information resources mapping mode carry out solution resource to first signal and/or the second signal
Mapping;Alternatively,
The determination unit 43 is specifically used for being mapped when the second signal carries out cross-carrier scheduling according to Secondary resource
Mode carries out solution resource impact to first signal and/or the second signal.
Further, the determination unit 43 is specifically used for when the aggregation level of the second signal is greater than preset value,
First signal and/or the second signal are solved according to first resource mapping mode or information resources mapping mode
Resource impact;Alternatively,
The determination unit 43 is specifically used for when the aggregation level of the second signal is not more than preset value, according to second
Resource mapping method carries out solution resource impact to first signal and/or the second signal.
Further, the determination unit 43 is specifically used for when the scheduling format of the second signal being space-frequency code SFBC
When, according to first resource mapping mode or information resources mapping mode to first signal and/or the second signal into
Row solution resource impact;Alternatively,
The determination unit 43 is specifically used for when the scheduling format of the second signal being beam shaping beam forming
Or when spatial reuse, solution resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode
Mapping.
Optionally, the indication signaling is PQI state, carries the first network equipment to described in the PQI state
First signal and/or the second signal carry out the resource mapping method of solution resource impact.
Further, the determination unit 43 is specifically used for when the configuration information of the second signal including at least two institutes
When stating the information of second signal, according to first resource mapping mode or information resources mapping mode to first signal and/
Or the second signal carries out solution resource impact, the configuration information of the second signal is that second network equipment is sent
Two high-level signalings carry.
Wherein, first signal is Physical Downlink Shared Channel PDSCH signal, and the second signal is enhancing physics control
Channel EPDCCH signal processed, the second signal dispatch first signal.
Optionally, first signal is PDSCH signal, and the second signal is common pilot signal CRS.
Wherein, the candidate resource mapping mode be second network equipment by third high-level signaling, dynamic signaling,
The specific cell specific signaling of cell or user equipment particular UE specific signal the first network equipment.
Optionally, the first kind pilot tone is public guide frequency CRS.The second class pilot tone is channel status instruction with reference to letter
Number CSI-RS.The third class pilot tone is the reference signal DMRS of demodulation.
With in the prior art, PDSCH will not on the resource block for being mapped with EPDCCH data resource impact, lead to resource
Utilization rate is low to be compared, and in the embodiment of the present invention, device 40 is reflected using one of at least two candidate resource mapping modes resource
Mode is penetrated, resource impact is carried out to the first signal and the second signal in the same Physical Resource Block, then passes signal
Transport to second network equipment.In this way, when the first signal and the second signal are when the same Physical Resource Block carries out resource impact, dress
Resource mapping method can be determined according to specific channel condition and dispatch situation from candidate resource mapping method by setting 40, be carried out
Resource impact is solved, the resource of Physical Resource Block is made full use of, improves the utilization rate of resource.
Further embodiment of this invention provides a kind of device 50 for transmitting signal, and as shown in Figure 10, described device 50 includes:
Map unit 51 is used for according to one of at least two candidate resource mapping modes resource mapping method to first
Signal and/or second signal carry out resource impact;Wherein, first signal and the second signal are in the same physical resource
In block, the candidate resource mapping mode is to preset;
Transmission unit 52, for the first signal and the second signal after sending resource impact to second network equipment.
Wherein, the candidate resource mapping mode include first resource mapping mode and/or information resources mapping mode, with
And Secondary resource mapping mode;Wherein, the first resource mapping mode is that first signal is not transmitting second letter
Number resource unit on carry out resource impact, the Secondary resource mapping mode be first signal transmit it is described second letter
Number resource unit on spatial multiplexing mode carry out resource impact, the information resources mapping mode be destroy it is described first letter
The data of resource impact number on the resource unit for transmitting the second signal.
Further, as shown in figure 11, described device 50 can also include:
Determination unit 53, for determining institute from the candidate resource mapping mode according to preset resource impact rule
State the resource mapping method that first network equipment carries out resource impact to first signal and/or the second signal.
Further, the determination unit 53 is specifically used for the co-located type of standard and second letter when first signal
Number standard co-located type when being type A, determine first resource mapping mode or information resources mapping mode to described first
Signal and/or the second signal carry out resource impact;Alternatively,
The determination unit 53 is specifically used for when the co-located type of standard of first signal being type A and the second signal
Standard co-located type when being type B, the first network equipment is according to the pilot tone of first signal and the second signal
Pilot tone determines the first network equipment to first signal and/or described second from the candidate resource mapping mode
The resource mapping method of signal progress resource impact;Alternatively,
The determination unit 53 is specifically used for when the co-located type of standard of first signal being type B and the second signal
Standard co-located type when being type A, the first network equipment is according to the pilot tone of first signal and the second signal
Pilot tone determines the first network equipment to first signal and/or described second from the candidate resource mapping mode
The resource mapping method of signal progress resource impact;Alternatively,
The determination unit 53 is specifically used for when the co-located type of standard of first signal and the standard of the second signal are total
When location type is type B, the first network equipment according to the pilot tone of first signal and the pilot tone of the second signal,
Determined from the candidate resource mapping mode first network equipment to first signal and/or the second signal into
The resource mapping method of row resource impact.
Further, as shown in figure 11, the determination unit 53 includes:
First determines subelement 531, is type A and the second signal for the co-located type of standard when first signal
Standard co-located type when being type B, if the first kind pilot tone phase of the first kind pilot tone of first signal and the second signal
With perhaps quasi- co-located then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out resource impact;Alternatively,
Described first determines that subelement 531 is also used to when the co-located type of standard of first signal be type A and described the
When the co-located type of standard of binary signal is type B, if the institute of the first kind pilot tone of first signal and the second signal
State first kind pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or described
Second signal carries out resource impact;Alternatively,
Described first determines that subelement 531 is also used to when the co-located type of standard of first signal be type A and described the
When the co-located type of standard of binary signal is type B, if the second class of the second class pilot tone of first signal and the second signal
Pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described first
Signal and/or the second signal carry out resource impact;Alternatively,
Described first determines that subelement 531 is also used to when the co-located type of standard of first signal be type A and described the
When the co-located type of standard of binary signal is type B, if the institute of the second class pilot tone of first signal and the second signal
State the second class pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or described
Binary signal carries out resource impact;Alternatively,
Described first determines that subelement 531 is also used to when the co-located type of standard of first signal be type A and described the
When the co-located type of standard of binary signal is type B, if the institute of the first kind pilot tone of first signal and the second signal
It is identical or quasi- co-located to state the second class pilot tone, then according to the first resource mapping mode or the information resources mapping mode pair
First signal and/or the second signal carry out resource impact;Alternatively,
Described first determines that subelement 531 is also used to when the co-located type of standard of first signal be type A and described the
When the co-located type of standard of binary signal is type B, if the institute of the first kind pilot tone of first signal and the second signal
State the second class pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or described
Binary signal carries out resource impact;Alternatively,
Described first determines that subelement 531 is also used to when the co-located type of standard of first signal be type A and described the
When the co-located type of standard of binary signal is type B, if the institute of the second class pilot tone of first signal and the second signal
It is identical or quasi- co-located to state first kind pilot tone, then according to the first resource mapping mode or the information resources mapping mode pair
First signal and/or the second signal carry out resource impact;
Described first determines that subelement 531 is also used to when the co-located type of standard of first signal be type A and described the
When the co-located type of standard of binary signal is type B, if the institute of the second class pilot tone of first signal and the second signal
State first kind pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or described
Binary signal carries out resource impact.
Further, as shown in figure 11, the determination unit 53 includes:
Second determines subelement 532, is type B and the second signal for the co-located type of standard when first signal
Standard co-located type when being type A, if the first kind pilot tone phase of the first kind pilot tone of first signal and the second signal
With perhaps quasi- co-located then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out resource impact;Alternatively,
Described second determines that subelement 532 is also used to when the co-located type of standard of first signal be type B and described the
When the co-located type of standard of binary signal is type A, if the institute of the first kind pilot tone of first signal and the second signal
State first kind pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or described
Second signal carries out resource impact;Alternatively,
Described second determines that subelement 532 is also used to when the co-located type of standard of first signal be type B and described the
When the co-located type of standard of binary signal is type A, if the second class of the second class pilot tone of first signal and the second signal
Pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described first
Signal and/or the second signal carry out resource impact;Alternatively,
Described second determines that subelement 532 is also used to when the co-located type of standard of first signal be type B and described the
When the co-located type of standard of binary signal is type A, if the institute of the second class pilot tone of first signal and the second signal
State the second class pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or described
Binary signal carries out resource impact;Alternatively,
Described second determines that subelement 532 is also used to when the co-located type of standard of first signal be type B and described the
When the co-located type of standard of binary signal is type A, if the institute of the first kind pilot tone of first signal and the second signal
It is identical or quasi- co-located to state the second class pilot tone, then according to the first resource mapping mode or the information resources mapping mode pair
First signal and/or the second signal carry out resource impact;Alternatively,
Described second determines that subelement 532 is also used to when the co-located type of standard of first signal be type B and described the
When the co-located type of standard of binary signal is type A, if the institute of the first kind pilot tone of first signal and the second signal
State the second class pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or described
Binary signal carries out resource impact;Alternatively,
Described second determines that subelement 532 is also used to when the co-located type of standard of first signal be type B and described the
When the co-located type of standard of binary signal is type A, if the institute of the second class pilot tone of first signal and the second signal
It is identical or quasi- co-located to state first kind pilot tone, then according to the first resource mapping mode or the information resources mapping mode pair
First signal and/or the second signal carry out resource impact;Alternatively,
Described second determines that subelement 532 is also used to when the co-located type of standard of first signal be type B and described the
When the co-located type of standard of binary signal is type A, if the institute of the second class pilot tone of first signal and the second signal
State first kind pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or described
Binary signal carries out resource impact.
Further, as shown in figure 11, the determination unit 53 includes:
Third determines subelement 533, for being total to when the co-located type of standard of first signal and the standard of the second signal
When location type is type B, if the first kind pilot tone of first signal it is identical as the first kind pilot tone of the second signal or
Person's standard is co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/
Or the second signal carries out resource impact;Alternatively,
The third determines that subelement 533 is also used to the co-located type of standard and the second signal when first signal
When quasi- co-located type is type B, if described the first of the first kind pilot tone of first signal and the second signal
Class pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or it is described second letter
Number carry out resource impact;Alternatively,
The third determines that subelement 533 is also used to the co-located type of standard and the second signal when first signal
When quasi- co-located type is type B, if the second class pilot tone phase of the second class pilot tone of first signal and the second signal
It is same or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out resource impact;Alternatively,
The third determines that subelement 533 is also used to the co-located type of standard and the second signal when first signal
When quasi- co-located type is type B, if described the second of the second class pilot tone of first signal and the second signal
Class pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal
Carry out resource impact;Alternatively,
The third determines that subelement 533 is also used to the co-located type of standard and the second signal when first signal
When quasi- co-located type is type B, if described the second of the first kind pilot tone of first signal and the second signal
Class pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described
One signal and/or the second signal carry out resource impact;Alternatively,
The third determines that subelement 533 is also used to the co-located type of standard and the second signal when first signal
When quasi- co-located type is type B, if described the second of the first kind pilot tone of first signal and the second signal
Class pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal
Carry out resource impact;Alternatively,
The third determines that subelement 533 is also used to the co-located type of standard and the second signal when first signal
When quasi- co-located type is type B, if described the first of the second class pilot tone of first signal and the second signal
Class pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described
One signal and/or the second signal carry out resource impact;Alternatively,
The third determines that subelement 533 is also used to the co-located type of standard and the second signal when first signal
When quasi- co-located type is type B, if described the first of the second class pilot tone of first signal and the second signal
Class pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal
Carry out resource impact.
Further, the determination unit 53 is specifically used for the sequence initialization when the third class pilot tone of first signal
When parameter is identical as the sequence initialization parameter of third class pilot tone of the second signal, according to first resource mapping mode or
Information resources mapping mode carries out resource impact to first signal and/or the second signal;Alternatively,
The determination unit 53 is specifically used for sequence initialization parameter and the institute of the third class pilot tone when first signal
State the third class pilot tone of second signal sequence initialization parameter it is not identical when, according to Secondary resource mapping mode to described first
Signal and/or the second signal carry out resource impact.
Further, the determination unit 53 is specifically used for when the second signal is without cross-carrier scheduling, according to
First resource mapping mode or information resources mapping mode carry out resource to first signal and/or the second signal and reflect
It penetrates;Alternatively,
The determination unit 53 is specifically used for being mapped when the second signal carries out cross-carrier scheduling according to Secondary resource
Mode carries out resource impact to first signal and/or the second signal.
Further, the determination unit 53 is specifically used for when the aggregation level of the second signal is greater than preset value,
First signal and/or the second signal are provided according to first resource mapping mode or information resources mapping mode
Source mapping;Alternatively,
The determination unit 53 is specifically used for when the aggregation level of the second signal is not more than preset value, according to second
Resource mapping method carries out resource impact to first signal and/or the second signal.
Further, the determination unit 53 is specifically used for when the scheduling format of the second signal being space-frequency code SFBC
When, according to first resource mapping mode or information resources mapping mode to first signal and/or the second signal into
Row resource impact;Alternatively,
The determination unit 53 is specifically used for when the scheduling format of the second signal being beam shaping beam forming
Or when spatial reuse, resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode and is reflected
It penetrates.
Further, the determination unit 53 is specifically used for according to PQI state, from the candidate resource mapping mode really
The fixed first network equipment carries out the resource mapping method of resource impact to first signal and/or the second signal.
Further, the determination unit 53 is specifically used for when the configuration information of the second signal including at least two institutes
When stating the information of second signal, according to first resource mapping mode or information resources mapping mode to first signal and/
Or the second signal carries out resource impact, the configuration information of the second signal is first that second network equipment is sent
High-level signaling carries.
Wherein, first signal is Physical Downlink Shared Channel PDSCH signal, and the second signal is enhancing physics control
Channel EPDCCH signal processed, the second signal dispatch first signal.
Optionally, first signal is PDSCH signal, and the second signal is common pilot signal CRS.
Further, the transmission unit 52 is also used to send indication signaling to second network equipment;Wherein, the instruction
Signaling includes dynamic signaling or third high-level signaling, and the indication signaling is used to indicate second network equipment to described first
Signal and/or the second signal carry out the resource mapping method of solution resource impact.
Wherein, the candidate resource mapping mode is that the network equipment passes through the second high-level signaling, dynamic signaling, user
Specific cell specific signaling or user equipment particular UE specific signal the peer network device.It is described
First kind pilot tone is public guide frequency CRS.The second class pilot tone is that channel status indicates reference signal CSI-RS.The third class
Pilot tone is the reference signal DMRS of demodulation.
With in the prior art, PDSCH will not on the resource block for being mapped with EPDCCH data resource impact, lead to resource
Utilization rate is low to be compared, in the embodiment of the present invention, device 50 receive second network equipment transmission in the same Physical Resource Block
In the first signal and the second signal after, by one of at least two candidate resource mapping modes resource mapping method to it
Carry out solution resource impact.In this way, when the first signal and the second signal are when the same Physical Resource Block carries out resource impact, it can be with
Resource mapping method is determined from candidate resource mapping method according to specific channel condition and dispatch situation, is carried out resource and is reflected
It penetrates, makes full use of the resource of Physical Resource Block, improve the utilization rate of resource.
Further embodiment of this invention provides a kind of network equipment 60, and as shown in figure 12, the network equipment 60 includes:
Receiver 61, for receiving the first signal and the second signal of peer network device transmission, wherein first letter
Number and the second signal in the same Physical Resource Block;
Processor 62, for according to one of at least two candidate resource mapping modes resource mapping method to described the
One signal and/or the second signal carry out solution resource impact, and the first network equipment is to the after solution resource impact
One signal and.
Wherein, the candidate resource mapping mode include first resource mapping mode and/or information resources mapping mode, with
And Secondary resource mapping mode;Wherein, the first resource mapping mode is that first signal is not transmitting second letter
Number resource unit on carry out resource impact, the Secondary resource mapping mode be first signal transmit it is described second letter
Number resource unit on spatial multiplexing mode carry out resource impact, the information resources mapping mode be destroy it is described first letter
The data of resource impact number on the resource unit for transmitting the second signal.
Further, the receiver 61 is also used to receive the indication signaling that the peer network device is sent, the finger
Show that signaling includes dynamic signaling or the first high-level signaling, the indication signaling is used to indicate the network equipment to described first
Signal and/or the second signal carry out the resource mapping method of solution resource impact;Alternatively,
The receiver 61 is also used to be determined from the candidate resource mapping mode according to scheduled resource impact rule
The network equipment carries out the resource mapping method of solution resource impact to first signal and/or the second signal.
Wherein, the indication signaling is PQI state, and the network equipment is carried in the PQI state to first letter
Number and/or the second signal carry out solution resource impact resource mapping method.
Further, the processor 62 is also used to the co-located type of standard and the second signal when first signal
When quasi- co-located type is type A, according to first resource mapping mode or information resources mapping mode to first signal
And/or the second signal carries out solution resource impact;Alternatively,
The processor 62 is also used to when the standard that the co-located type of standard of first signal is type A and the second signal
When co-located type is type B, according to the pilot tone of the pilot tone of first signal and the second signal, reflected from the candidate resource
The resource for determining that the network equipment carries out solution resource impact to first signal and/or the second signal is penetrated in mode to reflect
Penetrate mode;Alternatively,
The processor 62 is also used to when the standard that the co-located type of standard of first signal is type B and the second signal
When co-located type is type A, according to the pilot tone of the pilot tone of first signal and the second signal, reflected from the candidate resource
The resource for determining that the network equipment carries out solution resource impact to first signal and/or the second signal is penetrated in mode to reflect
Penetrate mode;Alternatively,
The processor 62 is also used to the co-located class of standard of the co-located type of standard and the second signal when first signal
When type is type B, the network equipment is according to the pilot tone of first signal and the pilot tone of the second signal, from the time
It selects and determines that the network equipment carries out solution resource impact to first signal and/or the second signal in resource mapping method
Resource mapping method.
Further, the processor 62 is also used to when the co-located type of standard of first signal be type A and described the
When the co-located type of standard of binary signal is type B, if the first kind of the first kind pilot tone of first signal and the second signal
Pilot tone is identical perhaps quasi- co-located then according to the first resource mapping mode or the information resources mapping mode to described
One signal and/or the second signal carry out solution resource impact;Alternatively,
The processor 62 is also used to when the standard that the co-located type of standard of first signal is type A and the second signal
When co-located type is type B, if the first kind of the first kind pilot tone and the second signal of first signal is led
Frequency it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal into
Row solution resource impact;Alternatively,
The processor 62 is also used to when the standard that the co-located type of standard of first signal is type A and the second signal
Co-located type be type B when, if the second class pilot tone of first signal it is identical as the second class pilot tone of the second signal or
It is quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/or
The second signal carries out solution resource impact;Alternatively,
The processor 62 is also used to when the standard that the co-located type of standard of first signal is type A and the second signal
When co-located type is type B, if the second class pilot tone of first signal and second class of the second signal are led
Frequency is not identical or is not allowed co-located, then is carried out according to Secondary resource mapping mode to first signal and/or the second signal
Solve resource impact;Alternatively,
The processor 62 is also used to when the standard that the co-located type of standard of first signal is type A and the second signal
When co-located type is type B, if the first kind pilot tone of first signal and second class of the second signal are led
Frequently identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first letter
Number and/or the second signal carry out solution resource impact;Alternatively,
The processor 62 is also used to when the standard that the co-located type of standard of first signal is type A and the second signal
When co-located type is type B, if the first kind pilot tone of first signal and second class of the second signal are led
Frequency is not identical or is not allowed co-located, then is carried out according to Secondary resource mapping mode to first signal and/or the second signal
Solve resource impact;Alternatively,
The processor 62 is also used to when the standard that the co-located type of standard of first signal is type A and the second signal
When co-located type is type B, if the first kind of the second class pilot tone and the second signal of first signal is led
Frequently identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first letter
Number and/or the second signal carry out solution resource impact;Alternatively,
The processor 62 is also used to when the standard that the co-located type of standard of first signal is type A and the second signal
When co-located type is type B, if the first kind of the second class pilot tone and the second signal of first signal is led
Frequency is not identical or is not allowed co-located, then is carried out according to Secondary resource mapping mode to first signal and/or the second signal
Solve resource impact.
Further, the processor 62 is also used to when the co-located type of standard of first signal be type B and described the
When the co-located type of standard of binary signal is type A, if the first kind of the first kind pilot tone of first signal and the second signal
Pilot tone is identical perhaps quasi- co-located then according to the first resource mapping mode or the information resources mapping mode to described
One signal and/or the second signal carry out solution resource impact;Alternatively,
The processor 62 is also used to when the standard that the co-located type of standard of first signal is type B and the second signal
When co-located type is type A, if the first kind of the first kind pilot tone and the second signal of first signal is led
Frequency it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal into
Row solution resource impact;Alternatively,
The processor 62 is also used to when the standard that the co-located type of standard of first signal is type B and the second signal
Co-located type be type A when, if the second class pilot tone of first signal it is identical as the second class pilot tone of the second signal or
It is quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/or
The second signal carries out solution resource impact;Alternatively,
The processor 62 is also used to when the standard that the co-located type of standard of first signal is type B and the second signal
When co-located type is type A, if the second class pilot tone of first signal and second class of the second signal are led
Frequency is not identical or is not allowed co-located, then is carried out according to Secondary resource mapping mode to first signal and/or the second signal
Solve resource impact;Alternatively,
The processor 62 is also used to when the standard that the co-located type of standard of first signal is type B and the second signal
When co-located type is type A, if the first kind pilot tone of first signal and second class of the second signal are led
Frequently identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first letter
Number and/or the second signal carry out solution resource impact;Alternatively,
The processor 62 is also used to when the standard that the co-located type of standard of first signal is type B and the second signal
When co-located type is type A, if the first kind pilot tone of first signal and second class of the second signal are led
Frequency is not identical or is not allowed co-located, then is carried out according to Secondary resource mapping mode to first signal and/or the second signal
Solve resource impact;Alternatively,
The processor 62 is also used to when the standard that the co-located type of standard of first signal is type B and the second signal
When co-located type is type A, if the first kind of the second class pilot tone and the second signal of first signal is led
Frequently identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first letter
Number and/or the second signal carry out solution resource impact;Alternatively,
The processor 62 is also used to when the standard that the co-located type of standard of first signal is type B and the second signal
When co-located type is type A, if the first kind of the second class pilot tone and the second signal of first signal is led
Frequency is not identical or is not allowed co-located, then is carried out according to Secondary resource mapping mode to first signal and/or the second signal
Solve resource impact.
Further, the processor 62 is also used to the co-located type of standard and the second signal when first signal
When quasi- co-located type is type B, if the first kind pilot tone phase of the first kind pilot tone of first signal and the second signal
With perhaps quasi- co-located then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out solution resource impact;Alternatively,
The processor 62 is also used to the co-located class of standard of the co-located type of standard and the second signal when first signal
When type is type B, if the first kind pilot tone of the first kind pilot tone of first signal and the second signal is not
It is identical or be not allowed co-located, then first signal and/or the second signal are solved according to Secondary resource mapping mode
Resource impact;Alternatively,
The processor 62 is also used to the co-located class of standard of the co-located type of standard and the second signal when first signal
When type is type B, if the second class pilot tone of first signal and the second class pilot tone of the second signal are identical or quasi- total
Location, then according to the first resource mapping mode or the information resources mapping mode to first signal and/or described
Second signal carries out solution resource impact;Alternatively,
The processor 62 is also used to the co-located class of standard of the co-located type of standard and the second signal when first signal
When type is type B, if the second class pilot tone of the second class pilot tone of first signal and the second signal is not
It is identical or be not allowed co-located, then solution money is carried out to first signal and/or the second signal according to Secondary resource mapping mode
Source mapping;Alternatively,
The processor 62 is also used to the co-located class of standard of the co-located type of standard and the second signal when first signal
When type is type B, if the second class pilot tone phase of the first kind pilot tone of first signal and the second signal
It is same or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out solution resource impact;Alternatively,
The processor 62 is also used to the co-located class of standard of the co-located type of standard and the second signal when first signal
When type is type B, if the second class pilot tone of the first kind pilot tone of first signal and the second signal is not
It is identical or be not allowed co-located, then solution money is carried out to first signal and/or the second signal according to Secondary resource mapping mode
Source mapping;Alternatively,
The processor 62 is also used to the co-located class of standard of the co-located type of standard and the second signal when first signal
When type is type B, if the first kind pilot tone phase of the second class pilot tone of first signal and the second signal
It is same or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out solution resource impact;Alternatively,
The processor 62 is also used to the co-located class of standard of the co-located type of standard and the second signal when first signal
When type is type B, if the first kind pilot tone of the second class pilot tone of first signal and the second signal is not
It is identical or be not allowed co-located, then solution money is carried out to first signal and/or the second signal according to Secondary resource mapping mode
Source mapping.
Further, the processor 62 is also used to the sequence initialization parameter when the third class pilot tone of first signal
When identical as the sequence initialization parameter of third class pilot tone of the second signal, according to first resource mapping mode or third
Resource mapping method carries out solution resource impact to first signal and/or the second signal;Alternatively,
The processor 62 is also used to the sequence initialization parameter when the third class pilot tone of first signal and described the
When the sequence initialization parameter of the third class pilot tone of binary signal is not identical, according to Secondary resource mapping mode to first signal
And/or the second signal carries out solution resource impact.
Further, the processor 62 is also used to when the second signal is without cross-carrier scheduling, according to first
Resource mapping method or information resources mapping mode carry out solution resource to first signal and/or the second signal and reflect
It penetrates;Alternatively,
The processor 62 is also used to when the second signal carries out cross-carrier scheduling, according to Secondary resource mapping mode
Solution resource impact is carried out to first signal and/or the second signal.
Further, the processor 62 is also used to when the aggregation level of the second signal is greater than preset value, according to
First resource mapping mode or information resources mapping mode carry out solution resource to first signal and/or the second signal
Mapping;Alternatively,
The processor 62 is also used to when the aggregation level of the second signal is no more than preset value, according to Secondary resource
Mapping mode carries out solution resource impact to first signal and/or the second signal.
Further, the processor 62 is also used to when the scheduling format of the second signal is space-frequency code SFBC, root
Solution money is carried out to first signal and/or the second signal according to first resource mapping mode or information resources mapping mode
Source mapping;Alternatively,
The processor 62 be also used to when the second signal scheduling format be beam shaping beam forming or
When spatial reuse, solution resource impact is carried out to first signal and/or the second signal according to Secondary resource mapping mode.
Further, the processor 62 is also used to when the configuration information of the second signal include at least two described the
When the information of binary signal, according to first resource mapping mode or information resources mapping mode to first signal and/or institute
It states second signal and carries out solution resource impact, it is second high that the configuration information of the second signal is that the peer network device is sent
Layer signaling carries.
Wherein, first signal is Physical Downlink Shared Channel PDSCH signal, and the second signal is enhancing physics control
Channel EPDCCH signal processed, the second signal dispatch first signal.First signal is PDSCH signal, described the
Binary signal is common pilot signal CRS.The candidate resource mapping mode is that the peer network device is believed by third high level
Enable, dynamic signaling, the specific cell specific signaling of cell or user equipment particular UE specific signal it is described
The network equipment.The first kind pilot tone is public guide frequency CRS.The second class pilot tone is that channel status indicates reference signal CSI-
RS.The third class pilot tone is the reference signal DMRS of demodulation.
With in the prior art, PDSCH will not on the resource block for being mapped with EPDCCH data resource impact, lead to resource
Utilization rate is low to be compared, in the embodiment of the present invention, the network equipment 60 receive peer network device transmission in the same physical resource
After the first signal and the second signal in block, pass through one of at least two candidate resource mapping modes resource mapping method
Solution resource impact is carried out to it.In this way, when the first signal and the second signal are when the same Physical Resource Block carries out resource impact,
Solution resource mapping method, Xie Ziyuan can be determined from candidate resource mapping method according to specific channel condition and dispatch situation
The data for mapping out resource block transmission, make full use of the resource of Physical Resource Block, improve the utilization rate of resource.
Further embodiment of this invention provides a kind of network equipment 70, and as shown in figure 13, the network equipment 70 includes:
Processor 71, for being believed according to one of at least two candidate resource mapping modes resource mapping method first
Number and/or second signal carry out resource impact;Wherein, first signal and the second signal are in the same Physical Resource Block
It is interior;
Transmitter 72, for the first signal and the second signal after sending resource impact to peer network device.
Wherein, the candidate resource mapping mode include first resource mapping mode and/or information resources mapping mode, with
And Secondary resource mapping mode;Wherein, the first resource mapping mode is that first signal is not transmitting second letter
Number resource unit on carry out resource impact, the Secondary resource mapping mode be first signal transmit it is described second letter
Number resource unit on spatial multiplexing mode carry out resource impact, the information resources mapping mode be destroy it is described first letter
The data of resource impact number on the resource unit for transmitting the second signal.
Further, the processor 71 is also used to be mapped according to preset resource impact rule from the candidate resource
Determine that the network equipment carries out the resource impact side of resource impact to first signal and/or the second signal in mode
Formula.
Further, the processor 71 is also used to the co-located type of standard and the second signal when first signal
When quasi- co-located type is type A, determine first resource mapping mode or information resources mapping mode to first signal
And/or the second signal carries out resource impact;Alternatively,
The processor 71 is also used to when the standard that the co-located type of standard of first signal is type A and the second signal
When co-located type is type B, according to the pilot tone of the pilot tone of first signal and the second signal, reflected from the candidate resource
It penetrates in mode and determines that the network equipment carries out the resource impact of resource impact to first signal and/or the second signal
Mode;Alternatively,
The processor 71 is also used to when the standard that the co-located type of standard of first signal is type B and the second signal
When co-located type is type A, according to the pilot tone of the pilot tone of first signal and the second signal, reflected from the candidate resource
It penetrates in mode and determines that the network equipment carries out the resource impact of resource impact to first signal and/or the second signal
Mode;Alternatively,
The processor 71 is also used to the co-located class of standard of the co-located type of standard and the second signal when first signal
When type is type B, according to the pilot tone of the pilot tone of first signal and the second signal, from the candidate resource mapping side
Determine that the network equipment carries out the resource impact side of resource impact to first signal and/or the second signal in formula
Formula.
Further, the processor 71 is also used to when the co-located type of standard of first signal be type A and described the
When the co-located type of standard of binary signal is type B, if the first kind of the first kind pilot tone of first signal and the second signal
Pilot tone is identical perhaps quasi- co-located then according to the first resource mapping mode or the information resources mapping mode to described
One signal and/or the second signal carry out resource impact;Alternatively,
The processor 71 is also used to when the standard that the co-located type of standard of first signal is type A and the second signal
When co-located type is type B, if the first kind of the first kind pilot tone and the second signal of first signal is led
Frequency it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal into
Row resource impact;Alternatively,
The processor 71 is also used to when the standard that the co-located type of standard of first signal is type A and the second signal
Co-located type be type B when, if the second class pilot tone of first signal it is identical as the second class pilot tone of the second signal or
It is quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/or
The second signal carries out resource impact;Alternatively,
The processor 71 is also used to when the standard that the co-located type of standard of first signal is type A and the second signal
When co-located type is type B, if the second class pilot tone of first signal and second class of the second signal are led
Frequency is not identical or is not allowed co-located, then is carried out according to Secondary resource mapping mode to first signal and/or the second signal
Resource impact;Alternatively,
The processor 71 is also used to when the standard that the co-located type of standard of first signal is type A and the second signal
When co-located type is type B, if the first kind pilot tone of first signal and second class of the second signal are led
Frequently identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first letter
Number and/or the second signal carry out resource impact;Alternatively,
The processor 71 is also used to when the standard that the co-located type of standard of first signal is type A and the second signal
When co-located type is type B, if the first kind pilot tone of first signal and second class of the second signal are led
Frequency is not identical or is not allowed co-located, then is carried out according to Secondary resource mapping mode to first signal and/or the second signal
Resource impact;Alternatively,
The processor 71 is also used to when the standard that the co-located type of standard of first signal is type A and the second signal
When co-located type is type B, if the first kind of the second class pilot tone and the second signal of first signal is led
Frequently identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first letter
Number and/or the second signal carry out resource impact;Alternatively,
The processor 71 is also used to when the standard that the co-located type of standard of first signal is type A and the second signal
When co-located type is type B, if the first kind of the second class pilot tone and the second signal of first signal is led
Frequency is not identical or is not allowed co-located, then is carried out according to Secondary resource mapping mode to first signal and/or the second signal
Resource impact.
Further, the processor 71 is also used to when the co-located type of standard of first signal be type B and described the
When the co-located type of standard of binary signal is type A, if the first kind of the first kind pilot tone of first signal and the second signal
Pilot tone is identical perhaps quasi- co-located then according to the first resource mapping mode or the information resources mapping mode to described
One signal and/or the second signal carry out resource impact;Alternatively,
The processor 71 is also used to when the standard that the co-located type of standard of first signal is type B and the second signal
When co-located type is type A, if the first kind of the first kind pilot tone and the second signal of first signal is led
Frequency it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal into
Row resource impact;Alternatively,
The processor 71 is also used to when the standard that the co-located type of standard of first signal is type B and the second signal
Co-located type be type A when, if the second class pilot tone of first signal it is identical as the second class pilot tone of the second signal or
It is quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/or
The second signal carries out resource impact;Alternatively,
The processor 71 is also used to when the standard that the co-located type of standard of first signal is type B and the second signal
When co-located type is type A, if the second class pilot tone of first signal and second class of the second signal are led
Frequency is not identical or is not allowed co-located, then is carried out according to Secondary resource mapping mode to first signal and/or the second signal
Resource impact;Alternatively,
The processor 71 is also used to when the standard that the co-located type of standard of first signal is type B and the second signal
When co-located type is type A, if the first kind pilot tone of first signal and second class of the second signal are led
Frequently identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first letter
Number and/or the second signal carry out resource impact;Alternatively,
The processor 71 is also used to when the standard that the co-located type of standard of first signal is type B and the second signal
When co-located type is type A, if the first kind pilot tone of first signal and second class of the second signal are led
Frequency is not identical or is not allowed co-located, then is carried out according to Secondary resource mapping mode to first signal and/or the second signal
Resource impact;Alternatively,
The processor 71 is also used to when the standard that the co-located type of standard of first signal is type B and the second signal
When co-located type is type A, if the first kind of the second class pilot tone and the second signal of first signal is led
Frequently identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first letter
Number and/or the second signal carry out resource impact;Alternatively,
The processor 71 is also used to when the standard that the co-located type of standard of first signal is type B and the second signal
When co-located type is type A, if the first kind of the second class pilot tone and the second signal of first signal is led
Frequency is not identical or is not allowed co-located, then is carried out according to Secondary resource mapping mode to first signal and/or the second signal
Resource impact.
Further, the processor 71 is also used to the co-located type of standard and the second signal when first signal
When quasi- co-located type is type B, if the first kind pilot tone phase of the first kind pilot tone of first signal and the second signal
With perhaps quasi- co-located then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out resource impact;Alternatively,
The processor 71 is also used to the co-located class of standard of the co-located type of standard and the second signal when first signal
When type is type B, if the first kind pilot tone of the first kind pilot tone of first signal and the second signal is not
It is identical or be not allowed co-located, then first signal and/or the second signal are provided according to Secondary resource mapping mode
Source mapping;Alternatively,
The processor 71 is also used to the co-located class of standard of the co-located type of standard and the second signal when first signal
When type is type B, if the second class pilot tone of first signal and the second class pilot tone of the second signal are identical or quasi- total
Location, then according to the first resource mapping mode or the information resources mapping mode to first signal and/or described
Second signal carries out resource impact;Alternatively,
The processor 71 is also used to the co-located class of standard of the co-located type of standard and the second signal when first signal
When type is type B, if the second class pilot tone of the second class pilot tone of first signal and the second signal is not
It is identical or be not allowed co-located, then resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode
Mapping;Alternatively,
The processor 71 is also used to the co-located class of standard of the co-located type of standard and the second signal when first signal
When type is type B, if the second class pilot tone phase of the first kind pilot tone of first signal and the second signal
It is same or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out resource impact;Alternatively,
The processor 71 is also used to the co-located class of standard of the co-located type of standard and the second signal when first signal
When type is type B, if the second class pilot tone of the first kind pilot tone of first signal and the second signal is not
It is identical or be not allowed co-located, then resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode
Mapping;Alternatively,
The processor 71 is also used to the co-located class of standard of the co-located type of standard and the second signal when first signal
When type is type B, if the first kind pilot tone phase of the second class pilot tone of first signal and the second signal
It is same or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out resource impact;Alternatively,
The processor 71 is also used to the co-located class of standard of the co-located type of standard and the second signal when first signal
When type is type B, if the first kind pilot tone of the second class pilot tone of first signal and the second signal is not
It is identical or be not allowed co-located, then resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode
Mapping.
Further, the processor 71 is also used to the sequence initialization parameter when the third class pilot tone of first signal
When identical as the sequence initialization parameter of third class pilot tone of the second signal, according to first resource mapping mode or third
Resource mapping method carries out resource impact to first signal and/or the second signal;Alternatively,
The processor 71 is also used to the sequence initialization parameter when the third class pilot tone of first signal and described the
When the sequence initialization parameter of the third class pilot tone of binary signal is not identical, according to Secondary resource mapping mode to first signal
And/or the second signal carries out resource impact.
Further, the processor 71 is also used to when the second signal is without cross-carrier scheduling, according to first
Resource mapping method or information resources mapping mode carry out resource impact to first signal and/or the second signal;
Alternatively,
The processor 71 is also used to when the second signal carries out cross-carrier scheduling, according to Secondary resource mapping mode
Resource impact is carried out to first signal and/or the second signal.
Further, the processor 71 is also used to when the aggregation level of the second signal is greater than preset value, according to
First resource mapping mode or information resources mapping mode carry out resource to first signal and/or the second signal and reflect
It penetrates;Alternatively,
The processor 71 is also used to when the aggregation level of the second signal is no more than preset value, according to Secondary resource
Mapping mode carries out resource impact to first signal and/or the second signal.
Further, the processor 71 is also used to when the scheduling format of the second signal is space-frequency code SFBC, root
Resource is carried out to first signal and/or the second signal according to first resource mapping mode or information resources mapping mode
Mapping;Alternatively,
The processor 71 be also used to when the second signal scheduling format be beam shaping beam forming or
When spatial reuse, resource impact is carried out to first signal and/or the second signal according to Secondary resource mapping mode.
Further, the processor 71 is also used to according to PQI state, and institute is determined from the candidate resource mapping mode
State the resource mapping method that the network equipment carries out resource impact to first signal and/or the second signal.
Further, the processor 71 is also used to when the configuration information of the second signal include at least two described the
When the information of binary signal, according to first resource mapping mode or information resources mapping mode to first signal and/or institute
It states second signal and carries out resource impact, the configuration information of the second signal is the first high level that the peer network device is sent
Signaling carries.
Wherein, first signal is Physical Downlink Shared Channel PDSCH signal, and the second signal is enhancing physics control
Channel EPDCCH signal processed, the second signal dispatch first signal.First signal is PDSCH signal, described the
Binary signal is common pilot signal CRS.The candidate resource mapping mode is that the network equipment passes through the second high-level signaling, moves
The specific cell specific signaling of state signaling, cell or user equipment particular UE specific signal the opposite end net
Network equipment.The first kind pilot tone is public guide frequency CRS.The second class pilot tone is that channel status indicates reference signal CSI-
RS.The third class pilot tone is the reference signal DMRS of demodulation.
Further, the transmitter 72 is also used to send indication signaling to peer network device;Wherein, the instruction letter
Enabling includes dynamic signaling or third high-level signaling, and the indication signaling is used to indicate the peer network device to first letter
Number and/or the second signal carry out solution resource impact resource mapping method.
With in the prior art, PDSCH will not on the resource block for being mapped with EPDCCH data resource impact, lead to resource
Utilization rate is low to be compared, in the embodiment of the present invention, the network equipment 70 receive peer network device transmission in the same physical resource
After the first signal and the second signal in block, pass through one of at least two candidate resource mapping modes resource mapping method
Solution resource impact is carried out to it.In this way, when the first signal and the second signal are when the same Physical Resource Block carries out resource impact,
The network equipment 70 can determine resource impact side according to specific channel condition and dispatch situation from candidate resource mapping method
Formula carries out resource impact, makes full use of the resource of Physical Resource Block, improve the utilization rate of resource.
The embodiment of the method for above-mentioned offer, concrete function may be implemented in the device of transmission signal provided in an embodiment of the present invention
Realize the explanation referred in embodiment of the method, details are not described herein.The method of transmission signal provided in an embodiment of the present invention, dress
It sets and the network equipment can be adapted for the network equipment, but be not limited only to this.
All the embodiments in this specification are described in a progressive manner, same and similar portion between each embodiment
Dividing may refer to each other, and each embodiment focuses on the differences from other embodiments.Especially for equipment reality
For applying example, since it is substantially similar to the method embodiment, so describing fairly simple, related place is referring to embodiment of the method
Part explanation.
Those of ordinary skill in the art will appreciate that realizing all or part of the process in above-described embodiment method, being can be with
Relevant hardware is instructed to complete by computer program, the program can be stored in a computer-readable storage medium
In, the program is when being executed, it may include such as the process of the embodiment of above-mentioned each method.Wherein, the storage medium can be magnetic
Dish, CD, read-only memory (Read-Only Memory, ROM) or random access memory (Random Access
Memory, RAM) etc..
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any
In the technical scope disclosed by the present invention, any changes or substitutions that can be easily thought of by those familiar with the art, all answers
It is included within the scope of the present invention.Therefore, protection scope of the present invention should be subject to the protection scope in claims.
Claims (111)
1. a kind of method for transmitting signal characterized by comprising
First network equipment receive second network equipment send the first signal and the second signal, wherein first signal and
The second signal is in the same Physical Resource Block;
The first network equipment is according to one of at least two candidate resource mapping modes resource mapping method to described
One signal and/or the second signal carry out solution resource impact, and the first network equipment is to the after solution resource impact
One signal and/or second signal are detected;
The candidate resource mapping mode includes first resource mapping mode and/or information resources mapping mode and the second money
Source mapping mode;Wherein, the first resource mapping mode is first signal not in the resource for transmitting the second signal
Resource impact is carried out on unit, the Secondary resource mapping mode is first signal in the resource for transmitting the second signal
Resource impact is carried out with spatial multiplexing mode on unit, the information resources mapping mode is to destroy first signal transmitting
The data of resource impact on the resource unit of the second signal.
2. the method according to claim 1, wherein in the first network equipment according at least two candidate moneys
One of source mapping mode resource mapping method to first signal and/or the second signal carry out solution resource impact it
Before, the method also includes:
The first network equipment receives the indication signaling that second network equipment is sent, and the indication signaling includes that dynamic is believed
It enables or the first high-level signaling, the indication signaling is used to indicate the first network equipment to first signal and/or institute
State the resource mapping method that second signal carries out solution resource impact;Alternatively,
The first network equipment determines described the according to scheduled resource impact rule from the candidate resource mapping mode
One network equipment carries out the resource mapping method of solution resource impact to first signal and/or the second signal.
3. according to the method described in claim 2, it is characterized in that, the first network equipment is advised according to scheduled resource impact
Then, determine the first network equipment to first signal and/or second letter from the candidate resource mapping mode
The resource mapping method for number carrying out solution resource impact includes:
When the co-located type of standard of the co-located type of standard of first signal and the second signal is type A, described first
The network equipment is according to first resource mapping mode or information resources mapping mode to first signal and/or second letter
Number carry out solution resource impact;Alternatively,
It is described when the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B
First network equipment is according to the pilot tone of first signal and the pilot tone of the second signal, from the candidate resource mapping mode
The middle determination first network equipment carries out the resource impact of solution resource impact to first signal and/or the second signal
Mode;Alternatively,
It is described when the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A
First network equipment is according to the pilot tone of first signal and the pilot tone of the second signal, from the candidate resource mapping mode
The middle determination first network equipment carries out the resource impact of solution resource impact to first signal and/or the second signal
Mode;Alternatively,
When the co-located type of standard of the co-located type of standard of first signal and the second signal is type B, described first
The network equipment is according to the pilot tone of first signal and the pilot tone of the second signal, from the candidate resource mapping mode really
The fixed first network equipment carries out the resource impact side of solution resource impact to first signal and/or the second signal
Formula.
4. according to the method described in claim 3, it is characterized in that, described when the co-located type of standard of first signal is type
When the co-located type of standard of A and the second signal is type B, the first network equipment according to the pilot tone of first signal with
The pilot tone of the second signal determines the first network equipment to first signal from the candidate resource mapping mode
And/or the second signal carry out solution resource impact resource mapping method include:
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B, if institute
The first kind pilot tone for stating the first signal is identical or quasi- co-located as the first kind pilot tone of the second signal, then the first network
Equipment is according to the first resource mapping mode or the information resources mapping mode to first signal and/or described
Binary signal carries out solution resource impact;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B, if institute
The first kind pilot tone for stating the first signal it is not identical as the first kind pilot tone of the second signal or be not allowed it is co-located, then
The first network equipment carries out solution resource to first signal and/or the second signal according to Secondary resource mapping mode
Mapping;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B, if institute
The the second class pilot tone for stating the first signal and the second class pilot tone of the second signal are identical or quasi- co-located, then the first network is set
It is standby according to the first resource mapping mode or the information resources mapping mode to first signal and/or described second
Signal carries out solution resource impact;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B, if institute
The the second class pilot tone for stating the first signal is not identical as the second class pilot tone of the second signal or co-located, then institute is not allowed
State first network equipment according to Secondary resource mapping mode to first signal and/or the second signal carry out solution resource reflect
It penetrates;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B, if institute
The first kind pilot tone for stating the first signal and the second class pilot tone of the second signal are identical or quasi- co-located, then and described
One network equipment according to the first resource mapping mode or the information resources mapping mode to first signal and/or
The second signal carries out solution resource impact;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B, if institute
The first kind pilot tone for stating the first signal is not identical as the second class pilot tone of the second signal or co-located, then institute is not allowed
State first network equipment according to Secondary resource mapping mode to first signal and/or the second signal carry out solution resource reflect
It penetrates;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B, if institute
The the second class pilot tone for stating the first signal and the first kind pilot tone of the second signal are identical or quasi- co-located, then and described
One network equipment according to the first resource mapping mode or the information resources mapping mode to first signal and/or
The second signal carries out solution resource impact;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B, if institute
The the second class pilot tone for stating the first signal is not identical as the first kind pilot tone of the second signal or co-located, then institute is not allowed
State first network equipment according to Secondary resource mapping mode to first signal and/or the second signal carry out solution resource reflect
It penetrates.
5. according to the method described in claim 3, it is characterized in that, described when the co-located type of standard of first signal is type
When the co-located type of standard of B and the second signal is type A, the first network equipment according to the pilot tone of first signal with
The pilot tone of the second signal determines the first network equipment to first signal from the candidate resource mapping mode
And/or the second signal carry out solution resource impact resource mapping method include:
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A, if institute
The first kind pilot tone for stating the first signal and the first kind pilot tone of the second signal are identical or quasi- co-located, then and described first
The network equipment is according to the first resource mapping mode or the information resources mapping mode to first signal and/or institute
It states second signal and carries out solution resource impact;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A, if institute
The first kind pilot tone for stating the first signal it is not identical as the first kind pilot tone of the second signal or be not allowed it is co-located, then
The first network equipment carries out solution resource to first signal and/or the second signal according to Secondary resource mapping mode
Mapping;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A, if institute
The the second class pilot tone for stating the first signal and the second class pilot tone of the second signal are identical or quasi- co-located, then according to described
One resource mapping method or the information resources mapping mode carry out solution money to first signal and/or the second signal
Source mapping;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A, if institute
The the second class pilot tone for stating the first signal is not identical as the second class pilot tone of the second signal or co-located, then institute is not allowed
State first network equipment according to Secondary resource mapping mode to first signal and/or the second signal carry out solution resource reflect
It penetrates;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A, if institute
The first kind pilot tone for stating the first signal and the second class pilot tone of the second signal are identical or quasi- co-located, then and described
One network equipment according to the first resource mapping mode or the information resources mapping mode to first signal and/or
The second signal carries out solution resource impact;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A, if institute
The first kind pilot tone for stating the first signal is not identical as the second class pilot tone of the second signal or co-located, then institute is not allowed
State first network equipment according to Secondary resource mapping mode to first signal and/or the second signal carry out solution resource reflect
It penetrates;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A, if institute
The the second class pilot tone for stating the first signal and the first kind pilot tone of the second signal are identical or quasi- co-located, then and described
One network equipment according to the first resource mapping mode or the information resources mapping mode to first signal and/or
The second signal carries out solution resource impact;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A, if institute
The the second class pilot tone for stating the first signal is not identical as the first kind pilot tone of the second signal or co-located, then institute is not allowed
State first network equipment according to Secondary resource mapping mode to first signal and/or the second signal carry out solution resource reflect
It penetrates.
6. according to the method described in claim 3, it is characterized in that, the co-located type of standard when first signal with it is described
When the co-located type of standard of second signal is type B, the first network equipment according to the pilot tone of first signal with it is described
The pilot tone of second signal, determined from the candidate resource mapping mode first network equipment to first signal and/
Or the second signal carry out solution resource impact resource mapping method include:
When the co-located type of standard of the co-located type of standard and the second signal of first signal is type B, if described the
The first kind pilot tone of one signal and the first kind pilot tone of the second signal are identical or quasi- co-located, then the first network
Equipment is according to the first resource mapping mode or the information resources mapping mode to first signal and/or described
Binary signal carries out solution resource impact;Alternatively,
When the co-located type of standard of the co-located type of standard and the second signal of first signal is type B, if described the
The first kind pilot tone of one signal and the first kind pilot tone of the second signal it is not identical or be not allowed it is co-located, then it is described
First network equipment carries out solution resource to first signal and/or the second signal according to Secondary resource mapping mode and reflects
It penetrates;Alternatively,
When the co-located type of standard of the co-located type of standard and the second signal of first signal is type B, if described the
Second class pilot tone of one signal and the second class pilot tone of the second signal are identical or quasi- co-located, then the first network is set
It is standby according to the first resource mapping mode or the information resources mapping mode to first signal and/or described second
Signal carries out solution resource impact;Alternatively,
When the co-located type of standard of the co-located type of standard and the second signal of first signal is type B, if described the
The second class pilot tone of one signal it is not identical as the second class pilot tone of the second signal or be not allowed it is co-located, then described
One network equipment carries out solution resource impact to first signal and/or the second signal according to Secondary resource mapping mode;
Alternatively,
When the co-located type of standard of the co-located type of standard and the second signal of first signal is type B, if described the
The first kind pilot tone of one signal and the second class pilot tone of the second signal are identical or quasi- co-located, then first net
Network equipment is according to the first resource mapping mode or the information resources mapping mode to first signal and/or described
Second signal carries out solution resource impact;Alternatively,
When the co-located type of standard of the co-located type of standard and the second signal of first signal is type B, if described the
The first kind pilot tone of one signal it is not identical as the second class pilot tone of the second signal or be not allowed it is co-located, then described
One network equipment carries out solution resource impact to first signal and/or the second signal according to Secondary resource mapping mode;
Alternatively,
When the co-located type of standard of the co-located type of standard and the second signal of first signal is type B, if described the
The second class pilot tone of one signal and the first kind pilot tone of the second signal are identical or quasi- co-located, then first net
Network equipment is according to the first resource mapping mode or the information resources mapping mode to first signal and/or described
Second signal carries out solution resource impact;Alternatively,
When the co-located type of standard of the co-located type of standard and the second signal of first signal is type B, if described the
The second class pilot tone of one signal and the first kind pilot tone of the second signal it is not identical or be not allowed it is co-located, then described
One network equipment carries out solution resource impact to first signal and/or the second signal according to Secondary resource mapping mode.
7. according to the method described in claim 2, it is characterized in that, the first network equipment is advised according to scheduled resource impact
Then, determine the first network equipment to first signal and/or second letter from the candidate resource mapping mode
The resource mapping method for number carrying out solution resource impact includes:
When the sequence initialization parameter of the third class pilot tone of first signal and the third class pilot tone of the second signal
Sequence initialization parameter it is identical when, the first network equipment is according to first resource mapping mode or information resources mapping side
Formula carries out solution resource impact to first signal and/or the second signal;Alternatively,
When the sequence initialization parameter of the third class pilot tone of first signal and the third class of the second signal
When the sequence initialization parameter of pilot tone is not identical, the first network equipment is according to Secondary resource mapping mode to first letter
Number and/or the second signal carry out solution resource impact.
8. according to the method described in claim 2, it is characterized in that, the first network equipment is advised according to scheduled resource impact
Then, determine the first network equipment to first signal and/or second letter from the candidate resource mapping mode
The resource mapping method for number carrying out solution resource impact includes:
When the second signal is without cross-carrier scheduling, the first network equipment according to first resource mapping mode or
Information resources mapping mode carries out solution resource impact to first signal and/or the second signal;Alternatively,
When the second signal carries out cross-carrier scheduling, the first network equipment is according to Secondary resource mapping mode to described
First signal and/or the second signal carry out solution resource impact.
9. according to the method described in claim 2, it is characterized in that, the first network equipment is advised according to scheduled resource impact
Then, determine the first network equipment to first signal and/or second letter from the candidate resource mapping mode
The resource mapping method for number carrying out solution resource impact includes:
When the aggregation level of the second signal is greater than preset value, the first network equipment is according to first resource mapping mode
Or information resources mapping mode carries out solution resource impact to first signal and/or the second signal;Alternatively,
When the aggregation level of the second signal is not more than preset value, the first network equipment is according to Secondary resource mapping side
Formula carries out solution resource impact to first signal and/or the second signal.
10. according to the method described in claim 2, it is characterized in that, the first network equipment is according to scheduled resource impact
Rule determines the first network equipment to first signal and/or described second from the candidate resource mapping mode
Signal carry out solution resource impact resource mapping method include:
When the scheduling format of the second signal is space-frequency code SFBC, the first network equipment is according to first resource mapping side
Formula or information resources mapping mode carry out solution resource impact to first signal and/or the second signal;Alternatively,
When the scheduling format of the second signal is beam shaping beam forming or spatial reuse, the first network
Equipment carries out solution resource impact to first signal and/or the second signal according to Secondary resource mapping mode.
11. according to the method described in claim 2, it is characterized in that, the indication signaling is the quasi- co-located instruction PQI of shared channel
State carries the first network equipment in the PQI state and carries out solution money to first signal and/or the second signal
The resource mapping method of source mapping.
12. according to the method described in claim 2, it is characterized in that, the first network equipment is according to scheduled resource impact
Rule determines the first network equipment to first signal and/or described second from the candidate resource mapping mode
Signal carry out solution resource impact resource mapping method include:
When the configuration information of the second signal includes the information of at least two second signals, the first network equipment
First signal and/or the second signal are solved according to first resource mapping mode or information resources mapping mode
Resource impact, the configuration information of the second signal are that the second high-level signaling that second network equipment is sent carries.
13. -11 described in any item methods according to claim 1, which is characterized in that first signal is shared for physical down
Channel PDSCH signal, the second signal are enhancing physical control channel EPDCCH signal, second signal scheduling described the
One signal.
14. -12 described in any item methods according to claim 1, which is characterized in that first signal is PDSCH signal, institute
Stating second signal is common pilot signal CRS.
15. the method according to claim 1, wherein the candidate resource mapping mode is second network
Equipment passes through third high-level signaling, dynamic signaling, the specific cell specific signaling of cell or user equipment particular UE
Specific signals the first network equipment.
16. according to the described in any item methods of claim 4-6, which is characterized in that the first kind pilot tone is public guide frequency
CRS。
17. according to the described in any item methods of claim 4-6, which is characterized in that the second class pilot tone refers to for channel status
Show reference signal CSI-RS.
18. the method according to the description of claim 7 is characterized in that the third class pilot tone is the reference signal DMRS of demodulation.
19. a kind of method for transmitting signal characterized by comprising
First network equipment according to one of at least two candidate resource mapping modes resource mapping method to the first signal and/
Or second signal carries out resource impact;Wherein, first signal and the second signal are in the same Physical Resource Block;Institute
Stating candidate resource mapping mode includes first resource mapping mode and/or information resources mapping mode and Secondary resource mapping
Mode;Wherein, the first resource mapping mode is first signal not on the resource unit for transmitting the second signal
Carry out resource impact, the Secondary resource mapping mode is first signal on the resource unit for transmitting the second signal
Resource impact is carried out with spatial multiplexing mode, the information resources mapping mode is to destroy first signal to transmit described the
The data of resource impact on the resource unit of binary signal;
The first network equipment to second network equipment send resource impact after the first signal and the second signal.
20. according to the method for claim 19, which is characterized in that in the first network equipment according at least two candidates
It is described before one of resource mapping method resource mapping method carries out resource impact to the first signal and/or second signal
Method further include:
The first network equipment determines described the according to preset resource impact rule from the candidate resource mapping mode
One network equipment carries out the resource mapping method of resource impact to first signal and/or the second signal.
21. according to the method for claim 20, which is characterized in that the first network equipment is according to preset resource impact
Rule determines the first network equipment to first signal and/or described second from the candidate resource mapping mode
Signal carry out resource impact resource mapping method include:
When the co-located type of standard of the co-located type of standard of first signal and the second signal is type A, described first
The network equipment determines first resource mapping mode or information resources mapping mode to first signal and/or second letter
Number carry out resource impact;Alternatively,
It is described when the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B
First network equipment is according to the pilot tone of first signal and the pilot tone of the second signal, from the candidate resource mapping mode
The middle determination first network equipment carries out the resource impact side of resource impact to first signal and/or the second signal
Formula;Alternatively,
It is described when the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A
First network equipment is according to the pilot tone of first signal and the pilot tone of the second signal, from the candidate resource mapping mode
The middle determination first network equipment carries out the resource impact side of resource impact to first signal and/or the second signal
Formula;Alternatively,
When the co-located type of standard of the co-located type of standard of first signal and the second signal is type B, described first
The network equipment is according to the pilot tone of first signal and the pilot tone of the second signal, from the candidate resource mapping mode really
The fixed first network equipment carries out the resource mapping method of resource impact to first signal and/or the second signal.
22. according to the method for claim 21, which is characterized in that described when the co-located type of standard of first signal is class
When the co-located type of standard of type A and the second signal is type B, the first network equipment is according to the pilot tone of first signal
With the pilot tone of the second signal, determine the first network equipment to first letter from the candidate resource mapping mode
Number and/or the second signal carry out resource impact resource mapping method include:
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B, if institute
The first kind pilot tone for stating the first signal and the first kind pilot tone of the second signal are identical or quasi- co-located, then and described first
The network equipment is according to the first resource mapping mode or the information resources mapping mode to first signal and/or institute
It states second signal and carries out resource impact;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B, if institute
The first kind pilot tone for stating the first signal it is not identical as the first kind pilot tone of the second signal or be not allowed it is co-located, then
The first network equipment carries out resource to first signal and/or the second signal according to Secondary resource mapping mode and reflects
It penetrates;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B, if institute
The the second class pilot tone for stating the first signal and the second class pilot tone of the second signal are identical or quasi- co-located, then first net
Network equipment is according to the first resource mapping mode or the information resources mapping mode to first signal and/or described
Second signal carries out resource impact;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B, if institute
The the second class pilot tone for stating the first signal is not identical as the second class pilot tone of the second signal or co-located, then institute is not allowed
It states first network equipment and first signal and/or second signal progress resource is reflected according to Secondary resource mapping mode
It penetrates;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B, if institute
The first kind pilot tone for stating the first signal and the second class pilot tone of the second signal are identical or quasi- co-located, then and described
One network equipment according to the first resource mapping mode or the information resources mapping mode to first signal and/or
The second signal carries out resource impact;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B, if institute
The first kind pilot tone for stating the first signal is not identical as the second class pilot tone of the second signal or co-located, then institute is not allowed
It states first network equipment and first signal and/or second signal progress resource is reflected according to Secondary resource mapping mode
It penetrates;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B, if institute
The the second class pilot tone for stating the first signal and the first kind pilot tone of the second signal are identical or quasi- co-located, then and described
One network equipment according to the first resource mapping mode or the information resources mapping mode to first signal and/or
The second signal carries out resource impact;Alternatively,
When the co-located type of standard of first signal is type A and the co-located type of standard of the second signal is type B, if institute
The the second class pilot tone for stating the first signal is not identical as the first kind pilot tone of the second signal or co-located, then institute is not allowed
It states first network equipment and first signal and/or second signal progress resource is reflected according to Secondary resource mapping mode
It penetrates.
23. according to the method for claim 21, which is characterized in that described when the co-located type of standard of first signal is class
When the co-located type of standard of type B and the second signal is type A, the first network equipment is according to the pilot tone of first signal
With the pilot tone of the second signal, determine the first network equipment to first letter from the candidate resource mapping mode
Number and/or the second signal carry out resource impact resource mapping method include:
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A, if institute
The first kind pilot tone for stating the first signal and the first kind pilot tone of the second signal are identical or quasi- co-located, then and described first
The network equipment is according to the first resource mapping mode or the information resources mapping mode to first signal and/or institute
It states second signal and carries out resource impact;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A, if institute
The first kind pilot tone for stating the first signal it is not identical as the first kind pilot tone of the second signal or be not allowed it is co-located, then
The first network equipment carries out resource to first signal and/or the second signal according to Secondary resource mapping mode and reflects
It penetrates;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A, if institute
The the second class pilot tone for stating the first signal and the second class pilot tone of the second signal are identical or quasi- co-located, then first net
Network equipment is according to the first resource mapping mode or the information resources mapping mode to first signal and/or described
Second signal carries out resource impact;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A, if institute
The the second class pilot tone for stating the first signal is not identical as the second class pilot tone of the second signal or co-located, then institute is not allowed
It states first network equipment and first signal and/or second signal progress resource is reflected according to Secondary resource mapping mode
It penetrates;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A, if institute
The first kind pilot tone for stating the first signal and the second class pilot tone of the second signal are identical or quasi- co-located, then and described
One network equipment according to the first resource mapping mode or the information resources mapping mode to first signal and/or
The second signal carries out resource impact;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A, if institute
The first kind pilot tone for stating the first signal is not identical as the second class pilot tone of the second signal or co-located, then institute is not allowed
It states first network equipment and first signal and/or second signal progress resource is reflected according to Secondary resource mapping mode
It penetrates;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A, if institute
The the second class pilot tone for stating the first signal and the first kind pilot tone of the second signal are identical or quasi- co-located, then and described
One network equipment according to the first resource mapping mode or the information resources mapping mode to first signal and/or
The second signal carries out resource impact;Alternatively,
When the co-located type of standard that the co-located type of standard of first signal is type B and the second signal is type A, if institute
The the second class pilot tone for stating the first signal is not identical as the first kind pilot tone of the second signal or co-located, then institute is not allowed
It states first network equipment and first signal and/or second signal progress resource is reflected according to Secondary resource mapping mode
It penetrates.
24. according to the method for claim 21, which is characterized in that described when the co-located type of standard of first signal and institute
When stating the co-located type of standard of second signal and being type B, pilot tone and institute of the first network equipment according to first signal
The pilot tone for stating second signal determines the first network equipment to first signal from the candidate resource mapping mode
And/or the resource mapping method of the second signal progress resource impact includes:
When the co-located type of standard of the co-located type of standard and the second signal of first signal is type B, if described the
The first kind pilot tone of one signal and the first kind pilot tone of the second signal are identical or quasi- co-located, then the first network
Equipment is according to the first resource mapping mode or the information resources mapping mode to first signal and/or described
Binary signal carries out resource impact;Alternatively,
When the co-located type of standard of the co-located type of standard and the second signal of first signal is type B, if described the
The first kind pilot tone of one signal and the first kind pilot tone of the second signal it is not identical or be not allowed it is co-located, then it is described
First network equipment carries out resource impact to first signal and/or the second signal according to Secondary resource mapping mode;
Alternatively,
When the co-located type of standard of the co-located type of standard and the second signal of first signal is type B, if described the
Second class pilot tone of one signal and the second class pilot tone of the second signal are identical or quasi- co-located, then the first network is set
It is standby according to the first resource mapping mode or the information resources mapping mode to first signal and/or described second
Signal carries out resource impact;Alternatively,
When the co-located type of standard of the co-located type of standard and the second signal of first signal is type B, if described the
The second class pilot tone of one signal it is not identical as the second class pilot tone of the second signal or be not allowed it is co-located, then described
One network equipment carries out resource impact to first signal and/or the second signal according to Secondary resource mapping mode;Or
Person,
When the co-located type of standard of the co-located type of standard and the second signal of first signal is type B, if described the
The first kind pilot tone of one signal and the second class pilot tone of the second signal are identical or quasi- co-located, then first net
Network equipment is according to the first resource mapping mode or the information resources mapping mode to first signal and/or described
Second signal carries out resource impact;Alternatively,
When the co-located type of standard of the co-located type of standard and the second signal of first signal is type B, if described the
The first kind pilot tone of one signal it is not identical as the second class pilot tone of the second signal or be not allowed it is co-located, then described
One network equipment carries out resource impact to first signal and/or the second signal according to Secondary resource mapping mode;Or
Person,
When the co-located type of standard of the co-located type of standard and the second signal of first signal is type B, if described the
The second class pilot tone of one signal and the first kind pilot tone of the second signal are identical or quasi- co-located, then first net
Network equipment is according to the first resource mapping mode or the information resources mapping mode to first signal and/or described
Second signal carries out resource impact;Alternatively,
When the co-located type of standard of the co-located type of standard and the second signal of first signal is type B, if described the
The second class pilot tone of one signal and the first kind pilot tone of the second signal it is not identical or be not allowed it is co-located, then described
One network equipment carries out resource impact to first signal and/or the second signal according to Secondary resource mapping mode.
25. according to the method for claim 20, which is characterized in that the first network equipment is according to preset resource impact
Rule determines the first network equipment to first signal and/or described second from the candidate resource mapping mode
Signal carry out resource impact resource mapping method include:
When the sequence initialization parameter of the third class pilot tone of first signal and the third class pilot tone of the second signal
Sequence initialization parameter it is identical when, the first network equipment is according to first resource mapping mode or information resources mapping side
Formula carries out resource impact to first signal and/or the second signal;Alternatively,
When the sequence of the third class pilot tone of the sequence initialization parameter and second signal of the third class pilot tone of first signal
When row initialization parameter is not identical, the first network equipment according to Secondary resource mapping mode to first signal and/or
The second signal carries out resource impact.
26. according to the method for claim 20, which is characterized in that the first network equipment is according to preset resource impact
Rule determines the first network equipment to first signal and/or described second from the candidate resource mapping mode
Signal carry out resource impact resource mapping method include:
When the second signal is without cross-carrier scheduling, the first network equipment according to first resource mapping mode or
Information resources mapping mode carries out resource impact to first signal and/or the second signal;Alternatively,
When the second signal carries out cross-carrier scheduling, the first network equipment is according to Secondary resource mapping mode to described
First signal and/or the second signal carry out resource impact.
27. according to the method for claim 20, which is characterized in that first network equipment is according to preset resource impact
Rule determines the first network equipment to first signal and/or described second from the candidate resource mapping mode
Signal carry out resource impact resource mapping method include:
When the aggregation level of the second signal is greater than preset value, the first network equipment is according to first resource mapping mode
Or information resources mapping mode carries out resource impact to first signal and/or the second signal;Alternatively,
When the aggregation level of the second signal is not more than preset value, the first network equipment is according to Secondary resource mapping side
Formula carries out resource impact to first signal and/or the second signal.
28. according to the method for claim 20, which is characterized in that the first network equipment is according to preset resource impact
Rule determines the first network equipment to first signal and/or described second from the candidate resource mapping mode
Signal carry out resource impact resource mapping method include:
When the scheduling format of the second signal is space-frequency code SFBC, the first network equipment is according to first resource mapping side
Formula or information resources mapping mode carry out resource impact to first signal and/or the second signal;Alternatively,
When the scheduling format of the second signal is beam shaping beam forming or spatial reuse, the first network
Equipment carries out resource impact to first signal and/or the second signal according to Secondary resource mapping mode.
29. according to the method for claim 20, which is characterized in that the first network equipment is according to preset resource impact
Rule determines the first network equipment to first signal and/or described second from the candidate resource mapping mode
Signal carry out resource impact resource mapping method include:
The first network equipment is according to the quasi- co-located instruction PQI state of shared channel, from the candidate resource mapping mode really
The fixed first network equipment carries out the resource mapping method of resource impact to first signal and/or the second signal.
30. according to the method for claim 20, which is characterized in that the first network equipment is according to preset resource impact
Rule determines the first network equipment to first signal and/or described second from the candidate resource mapping mode
Signal carry out resource impact resource mapping method include:
When the configuration information of the second signal includes the information of at least two second signals, the first network equipment
First signal and/or the second signal are provided according to first resource mapping mode or information resources mapping mode
Source mapping, the configuration information of the second signal are that the first high-level signaling that second network equipment is sent carries.
31. the described in any item methods of 9-29 according to claim 1, which is characterized in that first signal is total for physical down
Channel PDSCH signal is enjoyed, the second signal is enhancing physical control channel EPDCCH signal, described in the second signal scheduling
First signal.
32. the described in any item methods of 9-30 according to claim 1, which is characterized in that first signal is PDSCH signal,
The second signal is common pilot signal CRS.
33. according to the method for claim 19, which is characterized in that the candidate resource mapping mode is the first network
Equipment passes through the second high-level signaling, dynamic signaling, the specific cell specific signaling of cell or user equipment particular UE
Specific signals second network equipment.
34. according to the described in any item methods of claim 23-24, which is characterized in that the first kind pilot tone is public guide frequency
CRS。
35. according to the described in any item methods of claim 23-24, which is characterized in that the second class pilot tone is channel status
Indicate reference signal CSI-RS.
36. according to the method for claim 25, which is characterized in that the third class pilot tone is the reference signal of demodulation
DMRS。
37. according to the method for claim 19, which is characterized in that in the first network equipment according at least two candidates
It is described after one of resource mapping method resource mapping method carries out resource impact to the first signal and/or second signal
Method further include:
The first network equipment sends indication signaling to second network equipment;Wherein, the indication signaling includes dynamic signaling
Or third high-level signaling, the indication signaling are used to indicate second network equipment to first signal and/or described
Binary signal carries out the resource mapping method of solution resource impact.
38. a kind of device for transmitting signal characterized by comprising
Receiving unit, for receive second network equipment transmission the first signal and the second signal, wherein first signal and
The second signal is in the same Physical Resource Block;
De-mapping unit is used for according to one of at least two candidate resource mapping modes resource mapping method to described first
Signal and/or the second signal carry out solution resource impact, and to the first signal and/or second signal after solution resource impact
It is detected, the candidate resource mapping mode includes first resource mapping mode and/or information resources mapping mode, Yi Ji
Two resource mapping methods;Wherein, the first resource mapping mode is that first signal is not transmitting the second signal
Resource impact is carried out on resource unit, the Secondary resource mapping mode is that first signal is transmitting the second signal
Resource impact is carried out with spatial multiplexing mode on resource unit, the information resources mapping mode is to destroy first signal to exist
Transmit the data of resource impact on the resource unit of the second signal.
39. the device according to claim 38, which is characterized in that the receiving unit is also used to receive second network
The indication signaling that equipment is sent, the indication signaling includes dynamic signaling or the first high-level signaling, and the indication signaling is used for
Indicate that first network equipment carries out the resource mapping method of solution resource impact to first signal and/or the second signal;
Alternatively, described device further include:
Determination unit, for determining described first from the candidate resource mapping mode according to scheduled resource impact rule
The network equipment carries out the resource mapping method of solution resource impact to first signal and/or the second signal.
40. device according to claim 39, which is characterized in that the determination unit is specifically used for working as first signal
The standard co-located type of the co-located type of standard and second signal when being type A, according to first resource mapping mode or the
Three resource mapping methods carry out solution resource impact to first signal and/or the second signal;Alternatively,
It is type A when the co-located type of standard of first signal that the determination unit, which is specifically used for, and the standard of the second signal is total
When location type is type B, according to the pilot tone of the pilot tone of first signal and the second signal, mapped from the candidate resource
Determine that the first network equipment carries out the resource of solution resource impact to first signal and/or the second signal in mode
Mapping mode;Alternatively,
The determination unit is specifically used for when the co-located type of standard of first signal is total for the standard of type B and the second signal
When location type is type A, according to the pilot tone of the pilot tone of first signal and the second signal, mapped from the candidate resource
Determine that the first network equipment carries out the resource of solution resource impact to first signal and/or the second signal in mode
Mapping mode;Alternatively,
The determination unit is specifically used for the co-located type of standard of the co-located type of standard and the second signal when first signal
When being type B, according to the pilot tone of the pilot tone of first signal and the second signal, from the candidate resource mapping mode
The middle determination first network equipment carries out the resource impact of solution resource impact to first signal and/or the second signal
Mode.
41. device according to claim 40, which is characterized in that the determination unit includes:
First determines subelement, and for the co-located type of standard when first signal be type A and the standard of the second signal is total
When location type is type B, if the first kind pilot tone of first signal is identical as the first kind pilot tone of the second signal
Perhaps quasi- co-located then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out solution resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and the second signal
When quasi- co-located type is type B, if the first kind of the first kind pilot tone of first signal and the second signal
Pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal
Carry out solution resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and the second signal
When quasi- co-located type is type B, if the second class pilot tone of the second class pilot tone of first signal and the second signal
It is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out solution resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and the second signal
When quasi- co-located type is type B, if second class of the second class pilot tone of first signal and the second signal
Pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal into
Row solution resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and the second signal
When quasi- co-located type is type B, if second class of the first kind pilot tone of first signal and the second signal
Pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described first
Signal and/or the second signal carry out solution resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and the second signal
When quasi- co-located type is type B, if second class of the first kind pilot tone of first signal and the second signal
Pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal into
Row solution resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and the second signal
When quasi- co-located type is type B, if the first kind of the second class pilot tone of first signal and the second signal
Pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described first
Signal and/or the second signal carry out solution resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and the second signal
When quasi- co-located type is type B, if the first kind of the second class pilot tone of first signal and the second signal
Pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal into
Row solution resource impact.
42. device according to claim 40, which is characterized in that the determination unit includes:
Second determines subelement, total for the standard of type B and the second signal for the co-located type of standard when first signal
When location type is type A, if the first kind pilot tone of first signal is identical as the first kind pilot tone of the second signal
Perhaps quasi- co-located then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out solution resource impact;Alternatively,
Described second determines that subelement is also used to when the co-located type of standard of first signal be type B and the second signal
When quasi- co-located type is type A, if the first kind of the first kind pilot tone of first signal and the second signal
Pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal
Carry out solution resource impact;Alternatively,
Described second determines that subelement is also used to when the co-located type of standard of first signal be type B and the second signal
When quasi- co-located type is type A, if the second class pilot tone of the second class pilot tone of first signal and the second signal
It is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out solution resource impact;Alternatively,
Described second determines that subelement is also used to when the co-located type of standard of first signal be type B and the second signal
When quasi- co-located type is type A, if second class of the second class pilot tone of first signal and the second signal
Pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal into
Row solution resource impact;Alternatively,
Described second determines that subelement is also used to when the co-located type of standard of first signal be type B and the second signal
When quasi- co-located type is type A, if second class of the first kind pilot tone of first signal and the second signal
Pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described first
Signal and/or the second signal carry out solution resource impact;Alternatively,
Described second determines that subelement is co-located for the standard of type B and the second signal when the co-located type of standard of first signal
When type is type A, if the second class pilot tone of the first kind pilot tone of first signal and the second signal is not
It is identical or be not allowed co-located, then solution money is carried out to first signal and/or the second signal according to Secondary resource mapping mode
Source mapping;Alternatively,
Described second determines that subelement is also used to when the co-located type of standard of first signal be type B and the second signal
When quasi- co-located type is type A, if the first kind of the second class pilot tone of first signal and the second signal
Pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described first
Signal and/or the second signal carry out solution resource impact;Alternatively,
Described second determines that subelement is co-located for the standard of type B and the second signal when the co-located type of standard of first signal
When type is type A, if the first kind pilot tone of the second class pilot tone of first signal and the second signal is not
It is identical or be not allowed co-located, then solution money is carried out to first signal and/or the second signal according to Secondary resource mapping mode
Source mapping.
43. device according to claim 40, which is characterized in that the determination unit includes:
Third determines subelement, and the co-located type of standard for the quasi- co-located type and the second signal when first signal is equal
When for type B, if the first kind pilot tone of first signal and the first kind pilot tone of the second signal are identical or quasi-
It is co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/or institute
It states second signal and carries out solution resource impact;Alternatively,
The third determines that subelement is also used to when the co-located type of standard and the standard of the second signal of first signal are co-located
When type is type B, if the first kind pilot tone of the first kind pilot tone of first signal and the second signal
It is not identical or be not allowed co-located, then first signal and/or the second signal are carried out according to Secondary resource mapping mode
Solve resource impact;Alternatively,
The third determines that subelement is also used to when the co-located type of standard and the standard of the second signal of first signal are co-located
When type is type B, if the second class pilot tone of first signal is identical as the second class pilot tone of the second signal
Or it is quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/
Or the second signal carries out solution resource impact;
The third determines that subelement is also used to when the co-located type of standard and the standard of the second signal of first signal are co-located
When type is type B, if the second class pilot tone of the second class pilot tone of first signal and the second signal
It is not identical or be not allowed co-located, then first signal and/or the second signal are solved according to Secondary resource mapping mode
Resource impact;Alternatively,
The third determines that subelement is also used to when the co-located type of standard and the standard of the second signal of first signal are co-located
When type is type B, if the second class pilot tone of the first kind pilot tone of first signal and the second signal
It is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out solution resource impact;Alternatively,
The third determines that subelement is also used to when the co-located type of standard and the standard of the second signal of first signal are co-located
When type is type B, if the second class pilot tone of the first kind pilot tone of first signal and the second signal
It is not identical or be not allowed co-located, then first signal and/or the second signal are solved according to Secondary resource mapping mode
Resource impact;Alternatively,
The third determines that subelement is also used to when the co-located type of standard and the standard of the second signal of first signal are co-located
When type is type B, if the first kind pilot tone of the second class pilot tone of first signal and the second signal
It is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out solution resource impact;Alternatively,
The third determines that subelement is also used to when the co-located type of standard and the standard of the second signal of first signal are co-located
When type is type B, if the first kind pilot tone of the second class pilot tone of first signal and the second signal
It is not identical or be not allowed co-located, then first signal and/or the second signal are solved according to Secondary resource mapping mode
Resource impact.
44. device according to claim 39, which is characterized in that the determination unit is specifically used for working as first signal
Third class pilot tone sequence initialization parameter it is identical as the sequence initialization parameter of third class pilot tone of the second signal when,
According to the first resource mapping mode or the information resources mapping mode to first signal and/or second letter
Number carry out solution resource impact;Alternatively,
The determination unit is specifically used for the sequence initialization parameter and described second when the third class pilot tone of first signal
When the sequence initialization parameter of the third class pilot tone of signal is not identical, according to the Secondary resource mapping mode to described
One signal and/or the second signal carry out solution resource impact, and the candidate resource mapping mode includes that the Secondary resource reflects
Penetrate mode.
45. device according to claim 39, which is characterized in that the determination unit is specifically used for working as the second signal
When without cross-carrier scheduling, according to first resource mapping mode or information resources mapping mode to first signal and/
Or the second signal carries out solution resource impact;Alternatively,
The determination unit is specifically used for when the second signal carries out cross-carrier scheduling, according to Secondary resource mapping mode pair
First signal and/or the second signal carry out solution resource impact.
46. device according to claim 39, which is characterized in that the determination unit is specifically used for working as the second signal
Aggregation level be greater than preset value when, according to first resource mapping mode or information resources mapping mode to first signal
And/or the second signal carries out solution resource impact;Alternatively,
The determination unit is specifically used for being reflected when the aggregation level of the second signal is not more than preset value according to Secondary resource
It penetrates mode and solution resource impact is carried out to first signal and/or the second signal.
47. device according to claim 39, which is characterized in that the determination unit is specifically used for working as the second signal
Scheduling format when being space-frequency code SFBC, according to first resource mapping mode or information resources mapping mode to first letter
Number and/or the second signal carry out solution resource impact;Alternatively,
The determination unit is specifically used for when the scheduling format of the second signal being beam shaping beam forming or sky
Between when being multiplexed, solution resource impact is carried out to first signal and/or the second signal according to Secondary resource mapping mode.
48. device according to claim 39, which is characterized in that the indication signaling is the quasi- co-located instruction of shared channel
PQI state carries the first network equipment in the PQI state and carries out to first signal and/or the second signal
Solve the resource mapping method of resource impact.
49. device according to claim 39, which is characterized in that the determination unit is specifically used for working as the second signal
Configuration information when including the information of at least two second signals, reflected according to first resource mapping mode or information resources
It penetrates mode and solution resource impact is carried out to first signal and/or the second signal, the configuration information of the second signal is
The second high-level signaling that second network equipment is sent carries.
50. according to the described in any item devices of claim 38-48, which is characterized in that first signal is total for physical down
Channel PDSCH signal is enjoyed, the second signal is enhancing physical control channel EPDCCH signal, described in the second signal scheduling
First signal.
51. according to the described in any item devices of claim 38-49, which is characterized in that first signal is PDSCH signal,
The second signal is common pilot signal CRS.
52. the device according to claim 38, which is characterized in that the candidate resource mapping mode is second network
Equipment passes through third high-level signaling, dynamic signaling, the specific cell specific signaling of cell or user equipment particular UE
Specific signals first network equipment.
53. according to the described in any item devices of claim 41-43, which is characterized in that the first kind pilot tone is public guide frequency
CRS。
54. according to the described in any item devices of claim 41-43, which is characterized in that the second class pilot tone is channel status
Indicate reference signal CSI-RS.
55. device according to claim 44, which is characterized in that the third class pilot tone is the reference signal of demodulation
DMRS。
56. a kind of device for transmitting signal characterized by comprising
Map unit is used for according to one of at least two candidate resource mapping modes resource mapping method to the first signal
And/or second signal carries out resource impact;Wherein, first signal and the second signal are in the same Physical Resource Block
Interior, the candidate resource mapping mode is to preset;The candidate resource mapping mode include first resource mapping mode and/
Or information resources mapping mode and Secondary resource mapping mode;Wherein, the first resource mapping mode is first letter
Resource impact is not carried out on the resource unit for transmitting the second signal number not, the Secondary resource mapping mode is described first
Signal carries out resource impact, information resources mapping on the resource unit for transmitting the second signal with spatial multiplexing mode
Mode is to destroy the data of first signal resource impact on the resource unit for transmitting the second signal;
Transmission unit, for the first signal and the second signal after sending resource impact to second network equipment.
57. device according to claim 56, which is characterized in that described device further include:
Determination unit, for determining first network from the candidate resource mapping mode according to preset resource impact rule
Equipment carries out the resource mapping method of resource impact to first signal and/or the second signal.
58. device according to claim 57, which is characterized in that the determination unit is specifically used for working as first signal
The standard co-located type of the co-located type of standard and second signal when being type A, determine first resource mapping mode or the
Three resource mapping methods carry out resource impact to first signal and/or the second signal;Alternatively,
It is type A when the co-located type of standard of first signal that the determination unit, which is specifically used for, and the standard of the second signal is total
When location type is type B, according to the pilot tone of the pilot tone of first signal and the second signal, mapped from the candidate resource
The resource for determining that the first network equipment carries out resource impact to first signal and/or the second signal in mode is reflected
Penetrate mode;Alternatively,
The determination unit is specifically used for when the co-located type of standard of first signal is total for the standard of type B and the second signal
When location type is type A, according to the pilot tone of the pilot tone of first signal and the second signal, mapped from the candidate resource
The resource for determining that the first network equipment carries out resource impact to first signal and/or the second signal in mode is reflected
Penetrate mode;Alternatively,
The determination unit is specifically used for the co-located type of standard of the co-located type of standard and the second signal when first signal
When being type B, according to the pilot tone of the pilot tone of first signal and the second signal, from the candidate resource mapping mode
The middle determination first network equipment carries out the resource impact side of resource impact to first signal and/or the second signal
Formula.
59. device according to claim 58, which is characterized in that the determination unit includes:
First determines subelement, and for the co-located type of standard when first signal be type A and the standard of the second signal is total
Location type be type B when, if the first kind pilot tone of first signal it is identical as the first kind pilot tone of the second signal or
It is quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/or
The second signal carries out resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and the second signal
When quasi- co-located type is type B, if the first kind of the first kind pilot tone of first signal and the second signal
Pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal
Carry out resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and the second signal
When quasi- co-located type is type B, if the second class pilot tone of first signal is identical as the second class pilot tone of the second signal
Or it is quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/
Or the second signal carries out resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and the second signal
When quasi- co-located type is type B, if second class of the second class pilot tone of first signal and the second signal
Pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal into
Row resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and the second signal
When quasi- co-located type is type B, if second class of the first kind pilot tone of first signal and the second signal
Pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described first
Signal and/or the second signal carry out resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and the second signal
When quasi- co-located type is type B, if second class of the first kind pilot tone of first signal and the second signal
Pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal into
Row resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and the second signal
When quasi- co-located type is type B, if the first kind of the second class pilot tone of first signal and the second signal
Pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described first
Signal and/or the second signal carry out resource impact;Alternatively,
Described first determines that subelement is also used to when the co-located type of standard of first signal be type A and the second signal
When quasi- co-located type is type B, if the first kind of the second class pilot tone of first signal and the second signal
Pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal into
Row resource impact.
60. device according to claim 58, which is characterized in that the determination unit includes:
Second determines subelement, total for the standard of type B and the second signal for the co-located type of standard when first signal
Location type be type A when, if the first kind pilot tone of first signal it is identical as the first kind pilot tone of the second signal or
It is quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/or
The second signal carries out resource impact;Alternatively,
Described second determines that subelement is also used to when the co-located type of standard of first signal be type B and the second signal
When quasi- co-located type is type A, if the first kind of the first kind pilot tone of first signal and the second signal
Pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal
Carry out resource impact;Alternatively,
Described second determines that subelement is also used to when the co-located type of standard of first signal be type B and the second signal
When quasi- co-located type is type A, if the second class pilot tone of first signal is identical as the second class pilot tone of the second signal
Or it is quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/
Or the second signal carries out resource impact;Alternatively,
Described second determines that subelement is also used to when the co-located type of standard of first signal be type B and the second signal
When quasi- co-located type is type A, if second class of the second class pilot tone of first signal and the second signal
Pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal into
Row resource impact;Alternatively,
Described second determines that subelement is also used to when the co-located type of standard of first signal be type B and the second signal
When quasi- co-located type is type A, if second class of the first kind pilot tone of first signal and the second signal
Pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described first
Signal and/or the second signal carry out resource impact;Alternatively,
Described second determines that subelement is also used to when the co-located type of standard of first signal be type B and the second signal
When quasi- co-located type is type A, if second class of the first kind pilot tone of first signal and the second signal
Pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal into
Row resource impact;Alternatively,
Described second determines that subelement is also used to when the co-located type of standard of first signal be type B and the second signal
When quasi- co-located type is type A, if the first kind of the second class pilot tone of first signal and the second signal
Pilot tone is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to described first
Signal and/or the second signal carry out resource impact;Alternatively,
Described second determines that subelement is also used to when the co-located type of standard of first signal be type B and the second signal
When quasi- co-located type is type A, if the first kind of the second class pilot tone of first signal and the second signal
Pilot tone it is not identical or be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal into
Row resource impact.
61. device according to claim 58, which is characterized in that the determination unit includes:
Third determines subelement, and the co-located type of standard for the quasi- co-located type and the second signal when first signal is equal
When for type B, if the first kind pilot tone of first signal is identical or quasi- co-located as the first kind pilot tone of the second signal,
Then according to the first resource mapping mode or the information resources mapping mode to first signal and/or described second
Signal carries out resource impact;Alternatively,
The third determines that subelement is also used to when the co-located type of standard and the standard of the second signal of first signal are co-located
When type is type B, if the first kind pilot tone of the first kind pilot tone of first signal and the second signal
It is not identical or be not allowed co-located, then first signal and/or the second signal are carried out according to Secondary resource mapping mode
Resource impact;Alternatively,
The third determines that subelement is also used to when the co-located type of standard and the standard of the second signal of first signal are co-located
When type is type B, if the second class pilot tone of first signal and the second class pilot tone of the second signal are identical or quasi-
It is co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/or institute
It states second signal and carries out resource impact;Alternatively,
The third determines that subelement is also used to when the co-located type of standard and the standard of the second signal of first signal are co-located
When type is type B, if the second class pilot tone of the second class pilot tone of first signal and the second signal
It is not identical or be not allowed co-located, then first signal and/or the second signal are provided according to Secondary resource mapping mode
Source mapping;Alternatively,
The third determines that subelement is also used to when the co-located type of standard and the standard of the second signal of first signal are co-located
When type is type B, if the second class pilot tone of the first kind pilot tone of first signal and the second signal
It is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out resource impact;Alternatively,
The third determines that subelement is also used to when the co-located type of standard and the standard of the second signal of first signal are co-located
When type is type B, if the second class pilot tone of the first kind pilot tone of first signal and the second signal
It is not identical or be not allowed co-located, then first signal and/or the second signal are provided according to Secondary resource mapping mode
Source mapping;Alternatively,
The third determines that subelement is also used to when the co-located type of standard and the standard of the second signal of first signal are co-located
When type is type B, if the first kind pilot tone of the second class pilot tone of first signal and the second signal
It is identical or quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal
And/or the second signal carries out resource impact;Alternatively,
The third determines that subelement is also used to when the co-located type of standard and the standard of the second signal of first signal are co-located
When type is type B, if the first kind pilot tone of the second class pilot tone of first signal and the second signal
It is not identical or be not allowed co-located, then first signal and/or the second signal are provided according to Secondary resource mapping mode
Source mapping.
62. device according to claim 57, which is characterized in that the determination unit is specifically used for working as first signal
Third class pilot tone sequence initialization parameter it is identical as the sequence initialization parameter of third class pilot tone of the second signal when,
First signal and/or the second signal are provided according to first resource mapping mode or information resources mapping mode
Source mapping;Alternatively,
The determination unit is specifically used for the sequence initialization parameter and described second when the third class pilot tone of first signal
When the sequence initialization parameter of the third class pilot tone of signal is not identical, according to Secondary resource mapping mode to first signal
And/or the second signal carries out resource impact.
63. device according to claim 57, which is characterized in that the determination unit is specifically used for working as the second signal
When without cross-carrier scheduling, according to first resource mapping mode or information resources mapping mode to first signal and/
Or the second signal carries out resource impact;Alternatively,
The determination unit is specifically used for when the second signal carries out cross-carrier scheduling, according to Secondary resource mapping mode pair
First signal and/or the second signal carry out resource impact.
64. device according to claim 57, which is characterized in that the determination unit is specifically used for working as the second signal
Aggregation level be greater than preset value when, according to first resource mapping mode or information resources mapping mode to first signal
And/or the second signal carries out resource impact;Alternatively,
The determination unit is specifically used for being reflected when the aggregation level of the second signal is not more than preset value according to Secondary resource
It penetrates mode and resource impact is carried out to first signal and/or the second signal.
65. device according to claim 57, which is characterized in that the determination unit is specifically used for working as the second signal
Scheduling format when being space-frequency code SFBC, according to first resource mapping mode or information resources mapping mode to first letter
Number and/or the second signal carry out resource impact;Alternatively,
The determination unit is specifically used for when the scheduling format of the second signal being beam shaping beam forming or sky
Between when being multiplexed, resource impact is carried out to first signal and/or the second signal according to Secondary resource mapping mode.
66. device according to claim 57, which is characterized in that the determination unit is specifically used for quasi- according to channel is shared
Co-located instruction PQI state, determined from the candidate resource mapping mode first network equipment to first signal and/
Or the second signal carries out the resource mapping method of resource impact.
67. device according to claim 57, which is characterized in that the determination unit is specifically used for working as the second signal
Configuration information when including the information of at least two second signals, reflected according to first resource mapping mode or information resources
It penetrates mode and resource impact is carried out to first signal and/or the second signal, the configuration information of the second signal is institute
The first high-level signaling for stating the transmission of second network equipment carries.
68. according to the described in any item devices of claim 56-66, which is characterized in that first signal is total for physical down
Channel PDSCH signal is enjoyed, the second signal is enhancing physical control channel EPDCCH signal, described in the second signal scheduling
First signal.
69. according to the described in any item devices of claim 56-67, which is characterized in that first signal is PDSCH signal,
The second signal is common pilot signal CRS.
70. device according to claim 56, which is characterized in that the candidate resource mapping mode is first network equipment
Pass through the second high-level signaling, dynamic signaling, the specific cell specific signaling of cell or user equipment particular UE
Specific signals second network equipment.
71. according to the described in any item devices of claim 60-61, which is characterized in that the first kind pilot tone is public guide frequency
CRS。
72. according to the described in any item devices of claim 60-61, which is characterized in that the second class pilot tone is channel status
Indicate reference signal CSI-RS.
73. device according to claim 62, which is characterized in that the third class pilot tone is the reference signal of demodulation
DMRS。
74. device according to claim 56, which is characterized in that the transmission unit is also used to send out to second network equipment
Send indication signaling;Wherein, the indication signaling includes dynamic signaling or third high-level signaling, and the indication signaling is used to indicate institute
State the resource mapping method that second network equipment carries out solution resource impact to first signal and/or the second signal.
75. a kind of network equipment characterized by comprising
Receiver, for receiving the first signal and the second signal of peer network device transmission, wherein first signal and institute
Second signal is stated in the same Physical Resource Block;
Processor is used for according to one of at least two candidate resource mapping modes resource mapping method to first signal
And/or the second signal carries out solution resource impact, and to after solution resource impact the first signal and/or second signal carry out
Detection, the candidate resource mapping mode include first resource mapping mode and/or information resources mapping mode and the second money
Source mapping mode;Wherein, the first resource mapping mode is first signal not in the resource for transmitting the second signal
Resource impact is carried out on unit, the Secondary resource mapping mode is first signal in the resource for transmitting the second signal
Resource impact is carried out with spatial multiplexing mode on unit, the information resources mapping mode is to destroy first signal transmitting
The data of resource impact on the resource unit of the second signal.
76. the network equipment according to claim 75, which is characterized in that the receiver is also used to receive the opposite end net
The indication signaling that network equipment is sent, the indication signaling include dynamic signaling or the first high-level signaling, and the indication signaling is used
The resource impact side of solution resource impact is carried out to first signal and/or the second signal in the instruction network equipment
Formula;Alternatively,
The receiver is also used to determine the net from the candidate resource mapping mode according to scheduled resource impact rule
Network equipment carries out the resource mapping method of solution resource impact to first signal and/or the second signal.
77. the network equipment according to claim 75, which is characterized in that the processor is also used to when first signal
The standard co-located type of the co-located type of standard and second signal when being type A, according to first resource mapping mode or the
Three resource mapping methods carry out solution resource impact to first signal and/or the second signal;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type A and the second signal
When type is type B, according to the pilot tone of the pilot tone of first signal and the second signal, from the candidate resource mapping mode
The middle determination network equipment carries out the resource impact side of solution resource impact to first signal and/or the second signal
Formula;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type B and the second signal
When type is type A, according to the pilot tone of the pilot tone of first signal and the second signal, from the candidate resource mapping mode
The middle determination network equipment carries out the resource impact side of solution resource impact to first signal and/or the second signal
Formula;Alternatively,
The processor is also used to
When type B, according to the pilot tone of the pilot tone of first signal and the second signal, from the candidate resource mapping mode really
The fixed network equipment carries out the resource mapping method of solution resource impact to first signal and/or the second signal.
78. the network equipment according to claim 77, which is characterized in that the processor is also used to when first signal
The co-located type of standard be type A and when the co-located type of standard of the second signal is type B, if the first kind of first signal
Pilot tone is identical perhaps quasi- with the first kind pilot tone of the second signal co-located then according to the first resource mapping mode or institute
It states information resources mapping mode and solution resource impact is carried out to first signal and/or the second signal;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type A and the second signal
When type is type B, if the first kind pilot tone of the first kind pilot tone of first signal and the second signal not phase
With or be not allowed co-located, then solution money is carried out to first signal and/or the second signal according to Secondary resource mapping mode
Source mapping;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type A and the second signal
When type is type B, if the second class pilot tone of first signal and the second class pilot tone of the second signal are identical or quasi- co-located,
Then according to the first resource mapping mode or the information resources mapping mode to first signal and/or described second
Signal carries out solution resource impact;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type A and the second signal
When type is type B, if the second class pilot tone of the second class pilot tone of first signal and the second signal not phase
With or be not allowed co-located, then solution resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode
Mapping;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type A and the second signal
When type is type B, if the first kind pilot tone of first signal is identical as the second class pilot tone of the second signal
Or it is quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/
Or the second signal carries out solution resource impact;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type A and the second signal
When type is type B, if the second class pilot tone of the first kind pilot tone of first signal and the second signal not phase
With or be not allowed co-located, then solution resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode
Mapping;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type A and the second signal
When type is type B, if the second class pilot tone of first signal is identical as the first kind pilot tone of the second signal
Or it is quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/
Or the second signal carries out solution resource impact;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type A and the second signal
When type is type B, if the first kind pilot tone of the second class pilot tone of first signal and the second signal not phase
With or be not allowed co-located, then solution resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode
Mapping.
79. the network equipment according to claim 77, which is characterized in that the processor is also used to when first signal
Standard co-located type when be the co-located type of standard of type B and the second signal being type A, if the first kind of first signal
Pilot tone is identical perhaps quasi- with the first kind pilot tone of the second signal co-located then according to the first resource mapping mode or institute
It states information resources mapping mode and solution resource impact is carried out to first signal and/or the second signal;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type B and the second signal
When type is type A, if the first kind pilot tone of the first kind pilot tone of first signal and the second signal not phase
With or be not allowed co-located, then solution money is carried out to first signal and/or the second signal according to Secondary resource mapping mode
Source mapping;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type B and the second signal
When type is type A, if the second class pilot tone of first signal and the second class pilot tone of the second signal are identical or quasi- co-located,
Then according to the first resource mapping mode or the information resources mapping mode to first signal and/or described second
Signal carries out solution resource impact;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type B and the second signal
When type is type A, if the second class pilot tone of the second class pilot tone of first signal and the second signal not phase
With or be not allowed co-located, then solution resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode
Mapping;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type B and the second signal
When type is type A, if the first kind pilot tone of first signal is identical as the second class pilot tone of the second signal
Or it is quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/
Or the second signal carries out solution resource impact;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type B and the second signal
When type is type A, if the second class pilot tone of the first kind pilot tone of first signal and the second signal not phase
With or be not allowed co-located, then solution resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode
Mapping;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type B and the second signal
When type is type A, if the second class pilot tone of first signal is identical as the first kind pilot tone of the second signal
Or it is quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/
Or the second signal carries out solution resource impact;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type B and the second signal
When type is type A, if the first kind pilot tone of the second class pilot tone of first signal and the second signal not phase
With or be not allowed co-located, then solution resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode
Mapping.
80. the network equipment according to claim 79, which is characterized in that the processor is also used to when first signal
The standard co-located type of the co-located type of standard and second signal when being type B, if the first kind pilot tone of first signal
It is identical perhaps quasi- with the first kind pilot tone of the second signal co-located then according to the first resource mapping mode or described
Three resource mapping methods carry out solution resource impact to first signal and/or the second signal;Alternatively,
The processor is also used to
When type B, if the first kind pilot tone of the first kind pilot tone of first signal and the second signal it is not identical or
Person be not allowed it is co-located, then according to Secondary resource mapping mode to first signal and/or the second signal carry out solution resource reflect
It penetrates;Alternatively,
The processor is also used to
When type B, if the second class pilot tone of first signal and the second class pilot tone of the second signal are identical or quasi- co-located, root
According to the first resource mapping mode or the information resources mapping mode to first signal and/or the second signal
Carry out solution resource impact;Alternatively,
The processor is also used to
When type B, if the second class pilot tone of the second class pilot tone of first signal and the second signal it is not identical or
It is not allowed co-located, then solution resource impact is carried out to first signal and/or the second signal according to Secondary resource mapping mode;
Alternatively,
The processor is also used to
When type B, if the first kind pilot tone of first signal and the second class pilot tone of the second signal are identical or quasi-
It is co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/or institute
It states second signal and carries out solution resource impact;Alternatively,
The processor is also used to
When type B, if the second class pilot tone of the first kind pilot tone of first signal and the second signal it is not identical or
It is not allowed co-located, then solution resource impact is carried out to first signal and/or the second signal according to Secondary resource mapping mode;
Alternatively,
The processor is also used to
When type B, if the second class pilot tone of first signal and the first kind pilot tone of the second signal are identical or quasi-
It is co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/or institute
It states second signal and carries out solution resource impact;Alternatively,
The processor is also used to
When type B, if the first kind pilot tone of the second class pilot tone of first signal and the second signal it is not identical or
It is not allowed co-located, then solution resource impact is carried out to first signal and/or the second signal according to Secondary resource mapping mode.
81. the network equipment according to claim 75, which is characterized in that the processor is also used to when first signal
Third class pilot tone sequence initialization parameter it is identical as the sequence initialization parameter of third class pilot tone of the second signal when,
First signal and/or the second signal are solved according to first resource mapping mode or information resources mapping mode
Resource impact;Alternatively,
The processor is also used to the sequence initialization parameter and the second signal of the third class pilot tone when first signal
Third class pilot tone sequence initialization parameter it is not identical when, according to Secondary resource mapping mode to first signal and/or
The second signal carries out solution resource impact.
82. the network equipment according to claim 75, which is characterized in that the processor is also used to when the second signal
When without cross-carrier scheduling, according to first resource mapping mode or information resources mapping mode to first signal and/
Or the second signal carries out solution resource impact;Alternatively,
The processor is also used to when the second signal carries out cross-carrier scheduling, according to Secondary resource mapping mode to described
First signal and/or the second signal carry out solution resource impact.
83. the network equipment according to claim 75, which is characterized in that the processor is also used to when the second signal
Aggregation level be greater than preset value when, according to first resource mapping mode or information resources mapping mode to first signal
And/or the second signal carries out solution resource impact;Alternatively,
The processor is also used to when the aggregation level of the second signal is no more than preset value, according to Secondary resource mapping side
Formula carries out solution resource impact to first signal and/or the second signal.
84. the network equipment according to claim 75, which is characterized in that the processor is also used to when the second signal
Scheduling format when being space-frequency code SFBC, according to first resource mapping mode or information resources mapping mode to first letter
Number and/or the second signal carry out solution resource impact;Alternatively,
It is beam shaping beam forming when the scheduling format of the second signal that the processor, which is also used to, or space is multiple
Used time carries out solution resource impact to first signal and/or the second signal according to Secondary resource mapping mode.
85. the network equipment according to claim 76, which is characterized in that the indication signaling is the quasi- co-located finger of shared channel
Show PQI state, the network equipment is carried in the PQI state, first signal and/or the second signal are solved
The resource mapping method of resource impact.
86. the network equipment according to claim 75, which is characterized in that the processor is also used to when the second signal
Configuration information when including the information of at least two second signals, reflected according to first resource mapping mode or information resources
It penetrates mode and solution resource impact is carried out to first signal and/or the second signal, the configuration information of the second signal is
The second high-level signaling that the peer network device is sent carries.
87. according to the described in any item network equipments of claim 75-85, which is characterized in that first signal is under physics
The shared channel PDSCH signal of row, the second signal are enhancing physical control channel EPDCCH signal, the second signal scheduling
First signal.
88. according to the described in any item network equipments of claim 75-86, which is characterized in that first signal is PDSCH letter
Number, the second signal is common pilot signal CRS.
89. the network equipment according to claim 75, which is characterized in that the candidate resource mapping mode is the opposite end
The network equipment passes through third high-level signaling, dynamic signaling, the specific cell specific signaling of cell or user equipment particular UE
Specific signals the network equipment.
90. according to the described in any item network equipments of claim 78-80, which is characterized in that the first kind pilot tone is public
Pilot tone CRS.
91. according to the described in any item network equipments of claim 78-80, which is characterized in that the second class pilot tone is channel
State instruction reference signal CSI-RS.
92. the network equipment according to claim 81, which is characterized in that the third class pilot tone is the reference signal of demodulation
DMRS。
93. a kind of network equipment characterized by comprising
Processor, for according to one of at least two candidate resource mapping modes resource mapping method to the first signal and/
Or second signal carries out resource impact;Wherein, first signal and the second signal are in the same Physical Resource Block;Institute
Stating candidate resource mapping mode includes first resource mapping mode and/or information resources mapping mode and Secondary resource mapping
Mode;Wherein, the first resource mapping mode is first signal not on the resource unit for transmitting the second signal
Carry out resource impact, the Secondary resource mapping mode is first signal on the resource unit for transmitting the second signal
Resource impact is carried out with spatial multiplexing mode, the information resources mapping mode is to destroy first signal to transmit described the
The data of resource impact on the resource unit of binary signal;
Transmitter, for the first signal and the second signal after sending resource impact to peer network device.
94. the network equipment according to claim 93, which is characterized in that the processor is also used to according to preset resource
Mapping ruler determines the network equipment to first signal and/or described second from the candidate resource mapping mode
The resource mapping method of signal progress resource impact.
95. the network equipment according to claim 94, which is characterized in that the processor is also used to when first signal
The standard co-located type of the co-located type of standard and second signal when being type A, determine first resource mapping mode or the
Three resource mapping methods carry out resource impact to first signal and/or the second signal;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type A and the second signal
When type is type B, according to the pilot tone of the pilot tone of first signal and the second signal, from the candidate resource mapping mode
The middle determination network equipment carries out the resource mapping method of resource impact to first signal and/or the second signal;
Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type B and the second signal
When type is type A, according to the pilot tone of the pilot tone of first signal and the second signal, from the candidate resource mapping mode
The middle determination network equipment carries out the resource mapping method of resource impact to first signal and/or the second signal;
Alternatively,
The processor is also used to
When type B, according to the pilot tone of the pilot tone of first signal and the second signal, from the candidate resource mapping mode really
The fixed network equipment carries out the resource mapping method of resource impact to first signal and/or the second signal.
96. the network equipment according to claim 95, which is characterized in that the processor is also used to when first signal
The co-located type of standard be type A and when the co-located type of standard of the second signal is type B, if the first kind of first signal
Pilot tone is identical perhaps quasi- with the first kind pilot tone of the second signal co-located then according to the first resource mapping mode or institute
It states information resources mapping mode and resource impact is carried out to first signal and/or the second signal;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type A and the second signal
When type is type B, if the first kind pilot tone of the first kind pilot tone of first signal and the second signal not phase
With or be not allowed co-located, then resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode
Mapping;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type A and the second signal
When type is type B, if the second class pilot tone of first signal and the second class pilot tone of the second signal are identical or quasi- co-located,
Then according to the first resource mapping mode or the information resources mapping mode to first signal and/or described second
Signal carries out resource impact;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type A and the second signal
When type is type B, if the second class pilot tone of the second class pilot tone of first signal and the second signal not phase
With or be not allowed co-located, then resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode and reflected
It penetrates;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type A and the second signal
When type is type B, if the first kind pilot tone of first signal is identical as the second class pilot tone of the second signal
Or it is quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/
Or the second signal carries out resource impact;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type A and the second signal
When type is type B, if the second class pilot tone of the first kind pilot tone of first signal and the second signal not phase
With or be not allowed co-located, then resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode and reflected
It penetrates;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type A and the second signal
When type is type B, if the second class pilot tone of first signal is identical as the first kind pilot tone of the second signal
Or it is quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/
Or the second signal carries out resource impact;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type A and the second signal
When type is type B, if the first kind pilot tone of the second class pilot tone of first signal and the second signal not phase
With or be not allowed co-located, then resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode and reflected
It penetrates.
97. the network equipment according to claim 95, which is characterized in that the processor is also used to when first signal
Standard co-located type when be the co-located type of standard of type B and the second signal being type A, if the first kind of first signal
Pilot tone is identical perhaps quasi- with the first kind pilot tone of the second signal co-located then according to the first resource mapping mode or institute
It states information resources mapping mode and resource impact is carried out to first signal and/or the second signal;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type B and the second signal
When type is type A, if the first kind pilot tone of the first kind pilot tone of first signal and the second signal not phase
With or be not allowed co-located, then resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode
Mapping;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type B and the second signal
When type is type A, if the second class pilot tone of first signal and the second class pilot tone of the second signal are identical or quasi- co-located,
Then according to the first resource mapping mode or the information resources mapping mode to first signal and/or described second
Signal carries out resource impact;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type B and the second signal
When type is type A, if the second class pilot tone of the second class pilot tone of first signal and the second signal not phase
With or be not allowed co-located, then resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode and reflected
It penetrates;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type B and the second signal
When type is type A, if the first kind pilot tone of first signal is identical as the second class pilot tone of the second signal
Or it is quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/
Or the second signal carries out resource impact;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type B and the second signal
When type is type A, if the second class pilot tone of the first kind pilot tone of first signal and the second signal not phase
With or be not allowed co-located, then resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode and reflected
It penetrates;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type B and the second signal
When type is type A, if the second class pilot tone of first signal is identical as the first kind pilot tone of the second signal
Or it is quasi- co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/
Or the second signal carries out resource impact;Alternatively,
The processor is also used to when the co-located class of standard that the co-located type of standard of first signal is type B and the second signal
When type is type A, if the first kind pilot tone of the second class pilot tone of first signal and the second signal not phase
With or be not allowed co-located, then resource is carried out to first signal and/or the second signal according to Secondary resource mapping mode and reflected
It penetrates.
98. the network equipment according to claim 95, which is characterized in that the processor is also used to when first signal
The standard co-located type of the co-located type of standard and second signal when being type B, if the first kind pilot tone of first signal
It is identical perhaps quasi- with the first kind pilot tone of the second signal co-located then according to the first resource mapping mode or described
Three resource mapping methods carry out resource impact to first signal and/or the second signal;
The processor is also used to
When type B, if the first kind pilot tone of the first kind pilot tone of first signal and the second signal it is not identical or
Person is not allowed co-located, then carries out resource impact to first signal and/or the second signal according to Secondary resource mapping mode;
Alternatively,
The processor is also used to
When type B, if the second class pilot tone of first signal and the second class pilot tone of the second signal are identical or quasi- co-located, root
According to the first resource mapping mode or the information resources mapping mode to first signal and/or the second signal
Carry out resource impact;Alternatively,
The processor is also used to
When type B, if the second class pilot tone of the second class pilot tone of first signal and the second signal it is not identical or
It is not allowed co-located, then resource impact is carried out to first signal and/or the second signal according to Secondary resource mapping mode;Or
Person,
The processor is also used to
When type B, if the first kind pilot tone of first signal and the second class pilot tone of the second signal are identical or quasi-
It is co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/or institute
It states second signal and carries out resource impact;Alternatively,
The processor is also used to
When type B, if the second class pilot tone of the first kind pilot tone of first signal and the second signal it is not identical or
It is not allowed co-located, then resource impact is carried out to first signal and/or the second signal according to Secondary resource mapping mode;Or
Person,
The processor is also used to
When type B, if the second class pilot tone of first signal and the first kind pilot tone of the second signal are identical or quasi-
It is co-located, then according to the first resource mapping mode or the information resources mapping mode to first signal and/or institute
It states second signal and carries out resource impact;Alternatively,
The processor is also used to
When type B, if the first kind pilot tone of the second class pilot tone of first signal and the second signal it is not identical or
It is not allowed co-located, then resource impact is carried out to first signal and/or the second signal according to Secondary resource mapping mode.
99. the network equipment according to claim 94, which is characterized in that the processor is also used to when first signal
Third class pilot tone sequence initialization parameter it is identical as the sequence initialization parameter of third class pilot tone of the second signal when,
First signal and/or the second signal are provided according to first resource mapping mode or information resources mapping mode
Source mapping;Alternatively,
The processor is also used to the sequence initialization parameter and the second signal of the third class pilot tone when first signal
Third class pilot tone sequence initialization parameter it is not identical when, according to Secondary resource mapping mode to first signal and/or
The second signal carries out resource impact.
100. the network equipment according to claim 94, which is characterized in that the processor is also used to when second letter
When number without cross-carrier scheduling, according to first resource mapping mode or information resources mapping mode to first signal
And/or the second signal carries out resource impact;Alternatively,
The processor is also used to when the second signal carries out cross-carrier scheduling, according to Secondary resource mapping mode to described
First signal and/or the second signal carry out resource impact.
101. the network equipment according to claim 94, which is characterized in that the processor is also used to when second letter
Number aggregation level when being greater than preset value, according to first resource mapping mode or information resources mapping mode to first letter
Number and/or the second signal carry out resource impact;Alternatively,
The processor is also used to when the aggregation level of the second signal is no more than preset value, according to Secondary resource mapping side
Formula carries out resource impact to first signal and/or the second signal.
102. the network equipment according to claim 94, which is characterized in that the processor is also used to when second letter
Number scheduling format be space-frequency code SFBC when, according to first resource mapping mode or information resources mapping mode to described first
Signal and/or the second signal carry out resource impact;Alternatively,
It is beam shaping beam forming when the scheduling format of the second signal that the processor, which is also used to, or space is multiple
Used time carries out resource impact to first signal and/or the second signal according to Secondary resource mapping mode.
103. the network equipment according to claim 94, which is characterized in that the processor is also used to according to shared channel
Quasi- co-located instruction PQI state, from the candidate resource mapping mode determination network equipment to first signal and/or
The second signal carries out the resource mapping method of resource impact.
104. the network equipment according to claim 94, which is characterized in that the processor is also used to when second letter
Number configuration information when including the information of at least two second signals, according to first resource mapping mode or information resources
Mapping mode carries out resource impact to first signal and/or the second signal, and the configuration information of the second signal is
The first high-level signaling that the peer network device is sent carries.
105. according to the described in any item network equipments of claim 93-103, which is characterized in that first signal is physics
DSCH Downlink Shared Channel PDSCH signal, the second signal are enhancing physical control channel EPDCCH signal, the second signal tune
Spend first signal.
106. according to the described in any item network equipments of claim 93-104, which is characterized in that first signal is PDSCH
Signal, the second signal are common pilot signal CRS.
107. the network equipment according to claim 93, which is characterized in that the candidate resource mapping mode is the net
Network equipment passes through the second high-level signaling, dynamic signaling, the specific cell specific signaling of user or user equipment particular UE
Specific signals the peer network device.
108. according to the described in any item network equipments of claim 97-98, which is characterized in that the first kind pilot tone is public
Pilot tone CRS.
109. according to the described in any item network equipments of claim 97-98, which is characterized in that the second class pilot tone is channel
State instruction reference signal CSI-RS.
110. the network equipment according to claim 99, which is characterized in that the third class pilot tone is the reference letter of demodulation
Number DMRS.
111. the network equipment according to claim 93, which is characterized in that the transmitter is also used to set to correspondent network
Preparation send indication signaling;Wherein, the indication signaling includes dynamic signaling or third high-level signaling, and the indication signaling is for referring to
Show that the peer network device carries out the resource impact side of solution resource impact to first signal and/or the second signal
Formula.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2014/081032 WO2015196480A1 (en) | 2014-06-27 | 2014-06-27 | Method and apparatus for transmitting signal and network device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106416401A CN106416401A (en) | 2017-02-15 |
CN106416401B true CN106416401B (en) | 2019-11-12 |
Family
ID=54936531
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201480079585.9A Active CN106416401B (en) | 2014-06-27 | 2014-06-27 | Transmit the method, apparatus and the network equipment of signal |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN106416401B (en) |
WO (1) | WO2015196480A1 (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018210202A1 (en) * | 2017-05-14 | 2018-11-22 | Fg Innovation Ip Company Limited | Methods, devices, and systems for beam refinement during handover |
CN112152687B (en) * | 2017-06-16 | 2024-04-09 | 华为技术有限公司 | Communication method, terminal and network equipment |
CN109787663B (en) * | 2017-11-13 | 2020-06-30 | 上海朗帛通信技术有限公司 | Method and device used in user and base station of wireless communication |
CN112314023B (en) | 2018-07-06 | 2023-04-14 | 中兴通讯股份有限公司 | Method and apparatus for signal transmission and reception |
CN113411176B (en) * | 2021-06-25 | 2022-07-19 | 展讯通信(上海)有限公司 | PDSCH (physical Downlink shared channel) de-resource mapping method and device, computer readable storage medium and baseband chip |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013155167A1 (en) * | 2012-04-13 | 2013-10-17 | Intel Corporation | Mapping of enhanced physical downlink control channels in a wireless communication network |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8917679B2 (en) * | 2011-08-16 | 2014-12-23 | Nokia Corporation | Method for signaling the overlap of downlink control and data channels |
WO2013110040A1 (en) * | 2012-01-19 | 2013-07-25 | Samsung Electronics Co., Ltd. | Apparatus and method for pilot scrambling for enhanced physical downlink control channels |
US9215058B2 (en) * | 2012-03-06 | 2015-12-15 | Blackberry Limited | Enhanced PHICH transmission for LTE-advanced |
CN103313273B (en) * | 2012-03-13 | 2018-04-27 | 中兴通讯股份有限公司 | A kind of channel sending method, detection method, base station and terminal |
US9521664B2 (en) * | 2012-11-02 | 2016-12-13 | Qualcomm Incorporated | EPDCCH resource and quasi-co-location management in LTE |
-
2014
- 2014-06-27 WO PCT/CN2014/081032 patent/WO2015196480A1/en active Application Filing
- 2014-06-27 CN CN201480079585.9A patent/CN106416401B/en active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013155167A1 (en) * | 2012-04-13 | 2013-10-17 | Intel Corporation | Mapping of enhanced physical downlink control channels in a wireless communication network |
Non-Patent Citations (2)
Title |
---|
3GPP.Evolved Universal Terrestrial Radio Access (E-UTRA) * |
Multiplexing and channel coding.《3GPP TS 36.212 V11.4.0》.2013, * |
Also Published As
Publication number | Publication date |
---|---|
CN106416401A (en) | 2017-02-15 |
WO2015196480A1 (en) | 2015-12-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3606219B1 (en) | Method, apparatus and system for reference signal transmission | |
US10912080B2 (en) | Signal scrambling method and apparatus, and signal descrambling method and apparatus | |
CN106416401B (en) | Transmit the method, apparatus and the network equipment of signal | |
US9882816B2 (en) | Method of mapping CSI-RS ports to resource blocks, base station and user equipment | |
CN105934917B (en) | A kind of downlink control channel transmission and equipment | |
CN109150387A (en) | It sends the method for reference signal, receive the method and communication device of reference signal | |
US11153033B2 (en) | Method and apparatus for transmitting and receiving a signal on PUSCH in a wireless communication | |
CN105191441B (en) | A kind of determination method and apparatus of channel power distribution priority | |
CN108781362A (en) | Terminal installation and base station apparatus | |
CN108352967A (en) | Method and apparatus for the multicast based on full dimension multiple-input and multiple-output in vehicular communication system | |
KR102323001B1 (en) | Method and apparatus for transmitting control channel in intra-cell carrier aggregation system | |
CN102282881B (en) | Method, access network device and terminal for communicating using convergence carrier wave | |
CN109076526A (en) | A kind of data transmission method, network side equipment and terminal device | |
JP2018523943A (en) | Data transmission method and equipment | |
CN104380792A (en) | Wireless communication system, wireless base station device, user terminal, and communication control method | |
KR20180070260A (en) | Method and apparatus for channel measurement in wireless communication system | |
CN104662982B (en) | A kind of distribution method and device of control channel candidate | |
KR20230050388A (en) | Method and Apparatus for Inter-Cell Downlink and Uplink Beam Directing, Measurement, and Reporting | |
CN108112076A (en) | The method and device of collocating uplink signal | |
US11489574B2 (en) | Method and user equipment for transmitting channel state information | |
CN110431816A (en) | User terminal and wireless communications method | |
CN105164962B (en) | A kind of downstream parameter determines method, equipment and device | |
CN108633007A (en) | The method, apparatus and system of transmission control information | |
US11064530B2 (en) | Method and device for executing random access in wireless cellular communication system | |
CN108141725A (en) | The base station used in a wireless communication system and wireless device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |