CN106412722A - Data center device - Google Patents
Data center device Download PDFInfo
- Publication number
- CN106412722A CN106412722A CN201510448261.4A CN201510448261A CN106412722A CN 106412722 A CN106412722 A CN 106412722A CN 201510448261 A CN201510448261 A CN 201510448261A CN 106412722 A CN106412722 A CN 106412722A
- Authority
- CN
- China
- Prior art keywords
- data center
- center apparatus
- rack
- receiving space
- base frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K7/00—Constructional details common to different types of electric apparatus
- H05K7/20—Modifications to facilitate cooling, ventilating, or heating
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04Q—SELECTING
- H04Q1/00—Details of selecting apparatus or arrangements
- H04Q1/02—Constructional details
- H04Q1/028—Subscriber network interface devices
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04Q—SELECTING
- H04Q1/00—Details of selecting apparatus or arrangements
- H04Q1/02—Constructional details
- H04Q1/03—Power distribution arrangements
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04Q—SELECTING
- H04Q1/00—Details of selecting apparatus or arrangements
- H04Q1/02—Constructional details
- H04Q1/035—Cooling of active equipments, e.g. air ducts
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Power Engineering (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Microelectronics & Electronic Packaging (AREA)
- Cooling Or The Like Of Electrical Apparatus (AREA)
- Structure Of Telephone Exchanges (AREA)
Abstract
A data center device provided by the present invention comprises a basic frame on which a battery cabinet, a DC voltage cabinet, a power distribution cabinet and a management and control cabinet are arranged; a cabinet movably placed in a cabinet accommodating space arranged on the basic frame. The data center device of the present invention solves the problem in the prior art that a data center or a data machine room is lower in building efficiency.
Description
Technical field
The present invention relates to data center's infrastructure field, in particular to a kind of data center apparatus.
Background technology
At present, there is construction period length, the low problem of cooling effectiveness, thus leading to generally deposit in traditional machine room, data center
In following two problems:
(1) finish overlong time from demand to construction, can not meet Client application demand;
(2) the low situation of cooling effectiveness such as data center/machine room generally existing backflow, leads to consumption of data center too high.
Content of the invention
Present invention is primarily targeted at providing a kind of data center apparatus, to solve data center of the prior art or number
Build less efficient problem according to machine room.
To achieve these goals, the invention provides a kind of data center apparatus, including:Base frame, base frame
On battery rack, DC voltage cabinet, power distribution cabinet and management and control cabinet are installed;Rack, base frame is provided with rack and accommodates sky
Between, rack is movably disposed in rack receiving space.
Further, data center apparatus also include:Air-conditioning and freezing water distribution units, air-conditioning and freezing water distribution units
It is arranged on base frame, freezing water distribution units are passed through pipeline and supplied water for air-conditioning.
Further, base frame is provided with optical fiber chute, forceful electric power chute and light current chute, optical fiber chute,
Forceful electric power chute and light current chute are installed in the top of base frame.
Further, base frame includes chassis body and is arranged on the roof window at the top of chassis body.
Further, the forward and backward two ends of chassis body are mounted on access door.
Further, chassis body includes two installation frames being arranged side by side, and two installation frames are arranged at intervals.
Further, rack receiving space is arranged on installation frame, and rack receiving space is multiple, and multiple racks accommodate
Space is along the bearing of trend distribution of installation frame.
Further, installation frame includes multiple spaced subframes, and rack receiving space is arranged on adjacent two
Between subframe.
Further, the import of rack receiving space is towards the outside of installation frame.
Further, installation frame is provided with blend stop, blend stop be arranged on rack receiving space away from install import one
End.
Further, chassis body also includes mounting rail, and the two ends of mounting rail are connected with corresponding installation frame respectively, and
Mounting rail is arranged on the top of installation frame.
Data center apparatus in the present invention include base frame and be arranged on base frame battery rack, DC voltage cabinet,
Power distribution cabinet and management and control cabinet, and the rack receiving space for placing rack is provided with base frame.So, whole data
Modularization just can be realized in center, and base frame is separated with each functional unit, and each functional unit can be in integrated engineering
Install after finishing, dismantle and replace.
Data center apparatus in the present invention can realize quickly taking of various scale data center by field module splicing
Build, improve data center builds efficiency.
Brief description
The Figure of description constituting the part of the application is used for providing a further understanding of the present invention, the signal of the present invention
Property embodiment and its illustrate for explaining the present invention, does not constitute inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 shows the structural representation of the embodiment of the data equipment according to the present invention;
Fig. 2 shows that the data equipment in Fig. 1 removes the structural representation after atop part structure;
Fig. 3 shows the structural representation of the base frame in the data equipment in Fig. 1;
Fig. 4 shows the structural representation of the chassis body of the base frame in Fig. 3;And
Fig. 5 shows rack in Fig. 1 distribution map in base frame.
Wherein, above-mentioned accompanying drawing includes the following drawings mark:
10th, base frame;11st, rack receiving space;12nd, chassis body;12a, installation frame;121a, sub- frame
Frame;12b, mounting rail;12c, crossbeam;13rd, roof window;14th, access door;15th, blend stop;20th, battery rack;30、
DC voltage cabinet;40th, power distribution cabinet;50th, management and control cabinet;60th, rack;71st, air-conditioning;72nd, water distribution units are freezed;
73rd, pipeline;81st, optical fiber chute;82nd, forceful electric power chute;83rd, light current chute;91st, exchange machine frame;92、
Cover plate.
Specific embodiment
It should be noted that in the case of not conflicting, the embodiment in the application and the feature in embodiment can be mutual
Combination.To describe the present invention below with reference to the accompanying drawings and in conjunction with the embodiments in detail.
The invention provides a kind of data center apparatus, refer to Fig. 1 to Fig. 5, this data center apparatus includes:Basis
Framework 10, base frame 10 is provided with battery rack 20, DC voltage cabinet 30, power distribution cabinet 40 and management and control cabinet 50;Machine
Cabinet 60, base frame 10 is provided with rack receiving space 11, and rack 60 is movably disposed in rack receiving space
In 11.
Data center apparatus in the present invention include base frame 10 and the battery rack 20 being arranged on base frame 10, straight
Rack for placing rack 60 is provided with stream voltage cabinet 30, power distribution cabinet 40 and management and control cabinet 50, and base frame 10
Receiving space 11.So, whole data center just can realize modularization, and base frame 10 is divided with each functional unit
From each functional unit can be installed after integrated engineering finishes, dismantles and replace.
Data center apparatus in the present invention can realize quickly taking of various scale data center by field module splicing
Build, improve data center builds efficiency.
In the present embodiment, data center apparatus also include:Air-conditioning 71 and freezing water distribution units 72, air-conditioning 71 and cold
Freeze water distribution units 72 to be arranged on base frame 10, freezing water distribution units 72 are supplied for air-conditioning 71 by pipeline 73
Water.The present embodiment passes through to arrange air-conditioning 71 and freezing water distribution units 72 can more easily cool down this data center and set
Standby.
In the present embodiment, air-conditioning 71 is arranged on the top of base frame 10, and freezing water distribution units 72 are arranged on base
The end of plinth framework 10.
In the present embodiment, base frame 10 is provided with optical fiber chute 81, forceful electric power chute 82 and light current chute
83, optical fiber chute 81, forceful electric power chute 82 and light current chute 83 are installed in the top of base frame 10.This
Application is by installing optical fiber chute 81, forceful electric power chute 82 and light current chute 83 on base frame 10, permissible
More easily realize the cabling of whole data center apparatus.
In the present embodiment, base frame 10 includes chassis body 12 and is arranged on the roof window at the top of chassis body 12
13.By arranging roof window 13 on base frame 10, light can be made preferably to enter in data center apparatus, favorably
In the light intensity within this data center apparatus of raising.
In the present embodiment, chassis body 12 is additionally provided with exchange machine frame 91.As such, it is possible to more easily realize
The installation of switch.
In the present embodiment, the forward and backward two ends of chassis body 12 are mounted on access door 14.The application passes through in framework
The forward and backward two ends installation passage door 14 of main body 12, can more easily make staff enter in data center.
In the present embodiment, chassis body 12 includes two installation frame 12a being arranged side by side, two installation frame 12a
Arrange at intervals.The present embodiment includes two installation frame 12a being arranged side by side by making chassis body 12, can compare
More easily constitute the framework of whole data center.
In the present embodiment, rack receiving space 11 is arranged on installation frame 12a, and rack receiving space 11 is multiple,
Multiple rack receiving spaces 11 are along the bearing of trend distribution of installation frame 12a.As such, it is possible to more easily by rack
60 push in corresponding rack receiving space 11.
In the present embodiment, installation frame 12a includes multiple spaced subframe 121a, rack receiving space 11
It is arranged between adjacent two subframe 121a.As such, it is possible to more easily form rack receiving space 11.
In the present embodiment, the import of rack receiving space 11 is towards the outside of installation frame 12a.As such, it is possible to ratio
More easily rack 60 is pushed in corresponding rack receiving space 11.
In the present embodiment, installation frame 12a is provided with blend stop 15, blend stop 15 is arranged on rack receiving space 11
Away from install import one end.The present embodiment passes through to install blend stop 15, more easily can form limit to rack 60
Position effect, prevents rack 60 from pushing through position.
In the present embodiment, chassis body 12 also includes mounting rail 12b, and the two ends of mounting rail 12b are pacified with corresponding respectively
The frame 12a that frames up connects, and mounting rail 12b is arranged on the top of installation frame 12a.The present embodiment passes through to arrange mounting rail
12b, both can more easily connect two installation frame 12a, can also be more easily by passage cabling and illuminating lamp
It is arranged on this mounting rail 12b.
The application essentially provides a kind of modular data center/machine room, and this pattern is exactly that one kind can expire simultaneously
Data center's form of sufficient rapid deployment and high cooling efficiency, it passes through modular assembly form, by field module
Building of various scale data center can be quickly realized in assembly, and it is closed off by hot and cold passage or all closes
Form, it is to avoid backflow phenomenon, improves cooling effectiveness.
The present invention relates to electronics, telecommunications room or data center's infrastructure field, especially one kind be applied to big or middle,
Little various scale demand, can rapidly deployment module data center/machine room.
Data center in the application both can meet Fast Installation, can lift cooling effectiveness again, and have concurrently cooling, distribution,
The functions such as wiring, fire-fighting.Meanwhile, this modular data center is using the top-mounted air conditioner pattern near thermal source;And pass through base
The full structure design of Infrastructure system server rack, adapts to:The high various series clothes of 2000mm up to 2500mm
Business device enclosure product;The subsequently added and replacing of rack, maintenance;Whole machine cabinet server.
Data center apparatus in the application mainly include:
(1) structure closed subsystem:Comprise module frame, access door and roof window;
(2) rack subsystem:Comprise two row's racks, two row's racks are placed face-to-face, middle formation cold passage or heat are logical
Road.Rack includes forward and backward door high opening rate air door, and the quantity of rack is responsible for being configured according to practical business.
(3) cooling subsystem:Comprise six 300mm width, the air-conditioning of 1200mm depth.This air-conditioning is installed on passage two
Side frame top;Comprise a 600mm width, the freezing water distribution units of 1200mm depth, cold for distributing to top-mounted air conditioner
Freeze water and the pipe-line system between them;
(4) electrical subsystem:Comprise a station power distribution cabinet, 300mm is deep, 1200mm width, is installed on whole modularization
The leftmost side of two row's racks of data center, as row head power distribution cabinet;One HVDC cabinet, 600mm width, 1200mm
Deep, for providing high voltage direct current to module;Two battery racks, 600mm width, 1200mm are deep, for carrying to equipment
For stand-by power supply;
(5) management and control subsystem:Comprise a management and control cabinet, inside comprises management and control correlation software and hardware;
(6) cable subsystem:Comprise strong, weak electricity chute and optical fiber chute.
Compared with prior art, the application adopts frame-type, full decoupling design, module basis framework and functional unit (cabinet
Body) separate, each functional unit can be installed after integrated engineering finishes, dismantles and replace.
The application can be quickly move through in the ranks using the top-mounted air conditioner refrigerating mode near thermal source, rack thermal current out
Air-conditioning heat dissipation, this pattern air flow direction is that heat rises cold fall pattern simultaneously, services air-flow natural flow feature, is lifted further
Radiating efficiency, supports more highdensity rack power.
In this application, whole module for power supply system is supplied power with double circuit using HVDC+exchange, and refrigeration is then using band freezing
Refrigerating mode between the water-cooled row of water distribution units.
In this application, whole module comprises a station power distribution cabinet, HVDC cabinet, two battery racks, six overheads
Air-conditioning, one freezing water distribution units as the infrastructure of this module basic configuration.
In this application, modularization framework can realize the fast construction of data center, and inside comprise cooling, distribution,
The modules such as wiring, are adapted to large, medium and small type data center rapid deployment.
In this application, rack totally two row, places, the quantity of rack can be entered according to the actual requirements face-to-face or back-to-back
Row configuration, the air-conditioning of overhead is individually positioned in frame top both sides, and power distribution cabinet totally is arranged on whole module channels left-hand line
Head, totally one, management and control cabinet, it is arranged on whole module channels right-hand column head, wherein totally one, HVDC cabinet, be arranged on logical
Against the position of power distribution cabinet on the left of road, freeze water distribution units totally, be installed on the row tail of whole module channels.
In this application, battery rack totally two, a position being arranged on HVDC cabinet side, install over there for one
The position of tubulation control cabinet;Light current chute is located at outside the cabinet of passage both sides respectively, and is walked across row by one in row tail
Coil holder is attached;Optical fiber chute is installed on light current chute, each one of both sides, need not connect;Forceful electric power chute
It is located at respectively inside the cabinet of passage both sides, and be attached by across row chutes in row head.
In this application, main frame, access door, roof window have carried out closing so that being located to the passage of two row rack forms
Cold airflow therein or thermal current will not excessive it is ensured that airflow pattern simple subprogram, it is to avoid windage loss.High in main frame
2500mm, be adapted to≤all racks of 2500mm high standard install, when rack height is less than 2500mm,
Baffle plate is installed between rack and cruciform bracing be used for closing.
In this application, main frame by framework, install over the ground according to the actual requirements by distributed number, and is fixed by crossbeam
Connect, the framework positioned at the rightmost side needs to be respectively mounted row epicranial plate after installing to be closed;Shelves bar is installed on logical
Inside road, between framework, for positioning when cabinet is installed.
In this application, the infrastructure framework of whole module comprises main frame, access door, roof window, passage cabling and photograph
Bright mounting rail, HVDC cabinet, freezing water distribution units, battery rack, exchange machine frame, top-mounted air conditioner, pipeline, distribution
Cabinet, light current chute, forceful electric power chute, optical fiber chute and other necessary facilities, such as LED, acousto-optic report
Alert device, gate inhibition etc..Above equipment constitutes the infrastructure framework of this micromodule product, and providing for server product must
The distribution wanted, refrigeration, illumination, wiring etc..
Data center apparatus in the application are when being built:
The first step carries out the installation of main frame, first subframe 121a is installed over the ground according to layout in advance, leads to
Cross expansion bolt and be fixed on ground;Then all subframe 121a are connected by crossbeam 12c, afterwards inside passage, son
Blend stop 15 is installed between framework 121a;Finally complete the installation of row epicranial plate 92;
Second step carries out the installation of distribution, refrigerated, installs power distribution cabinet 40, management and control cabinet 50 first;Secondly install empty
Adjust 71, freezing water distribution units 72 and the pipeline 73 connecting both.
3rd step is illuminated, the installation of wiring system, installs the mounting rail for installation passage cabling and illuminating lamp first
12b;Secondly light current chute 83, forceful electric power chute 82, optical fiber chute 81 are installed;Last peace on mounting rail 12b
Dress fluorescent tube.
Complete above step, that is, complete all of infrastructure system of this micromodule.
4th step is then to carry out the installation of rack 60 according to the actual requirements, and rack 60 is when mounted it is only necessary to push rack
Position, connection strong and weak electricity, need not be fixed with other equipment;When needing to safeguard or whole machine cabinet is replaced, disconnect strong
Light current, pull-out rack is replaced;And business ought be not up to actual demand at the beginning, when server apparatus are less,
Then corresponding rack position is closed by baffle plate.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for the technology of this area
For personnel, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, made any
Modification, equivalent, improvement etc., should be included within the scope of the present invention.
Claims (11)
1. a kind of data center apparatus are it is characterised in that include:
Base frame (10), described base frame (10) is provided with battery rack (20), DC voltage cabinet (30),
Power distribution cabinet (40) and management and control cabinet (50);
Rack (60), described base frame (10) is provided with rack receiving space (11), described rack (60)
It is movably disposed in described rack receiving space (11).
2. data center apparatus according to claim 1 are it is characterised in that described data center apparatus also include:
Air-conditioning (71) and freezing water distribution units (72), described air-conditioning (71) and described freezing water distribution units
(72) it is arranged on described base frame (10), described freezing water distribution units (72) passes through pipeline (73)
Supply water for described air-conditioning (71).
3. data center apparatus according to claim 1 are it is characterised in that be provided with described base frame (10)
Optical fiber chute (81), forceful electric power chute (82) and light current chute (83), described optical fiber chute (81),
Described forceful electric power chute (82) and described light current chute (83) are installed in the top of described base frame (10)
Portion.
4. data center apparatus according to claim 1 are it is characterised in that described base frame (10) includes framework
Main body (12) and be arranged on described chassis body (12) top roof window (13).
5. data center apparatus according to claim 4 it is characterised in that described chassis body (12) forward and backward
Two ends are mounted on access door (14).
6. data center apparatus according to claim 4 are it is characterised in that described chassis body (12) includes two
The installation frame (12a) being arranged side by side, two described installation frames (12a) are arranged at intervals.
7. data center apparatus according to claim 6 are it is characterised in that described rack receiving space (11) is arranged
On described installation frame (12a), described rack receiving space (11) is multiple, and multiple described racks accommodate
Space (11) is along the bearing of trend distribution of described installation frame (12a).
8. data center apparatus according to claim 7 are it is characterised in that described installation frame (12a) inclusion is many
Individual spaced subframe (121a), described rack receiving space (11) is arranged on the described son of adjacent two
Between framework (121a).
9. data center apparatus according to claim 7 are it is characterised in that the entering of described rack receiving space (11)
Mouth is towards the outside of described installation frame (12a).
10. data center apparatus according to claim 9 are it is characterised in that described installation frame (12a) is above installed
There is blend stop (15), described blend stop (15) is arranged on being installed into away from described of described rack receiving space (11)
One end of mouth.
11. data center apparatus according to claim 6 are it is characterised in that described chassis body (12) also includes pacifying
Dress beam (12b), the two ends of described mounting rail (12b) are connected with corresponding installation frame (12a) respectively, and institute
State the top that mounting rail (12b) is arranged on described installation frame (12a).
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510448261.4A CN106412722B (en) | 2015-07-27 | 2015-07-27 | Data center equipment |
PCT/CN2016/075545 WO2016177068A1 (en) | 2015-07-27 | 2016-03-03 | Data center device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510448261.4A CN106412722B (en) | 2015-07-27 | 2015-07-27 | Data center equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106412722A true CN106412722A (en) | 2017-02-15 |
CN106412722B CN106412722B (en) | 2021-10-12 |
Family
ID=57218091
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510448261.4A Active CN106412722B (en) | 2015-07-27 | 2015-07-27 | Data center equipment |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN106412722B (en) |
WO (1) | WO2016177068A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108287395A (en) * | 2017-12-29 | 2018-07-17 | 北京世纪互联宽带数据中心有限公司 | Network wiring case and data center machine room module |
CN108811457A (en) * | 2018-06-29 | 2018-11-13 | 北京百度网讯科技有限公司 | Cooling system |
WO2022183605A1 (en) * | 2021-03-03 | 2022-09-09 | 维谛技术(西安)有限公司 | Power distribution and monitoring integrated access door |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108770280B (en) * | 2018-08-16 | 2023-08-29 | 浙江德塔森特数据技术有限公司 | MINI type data center single machine |
CN113734601A (en) * | 2021-09-16 | 2021-12-03 | 远景能源有限公司 | Energy storage cabinet system |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201114564Y (en) * | 2007-08-21 | 2008-09-10 | 深圳日海通讯技术股份有限公司 | Integrated monitoring system integration cabinet |
WO2012142620A1 (en) * | 2011-04-15 | 2012-10-18 | Kevin Smith | Systems and methods for balanced power and thermal management of mission critical environments |
CN102771202A (en) * | 2009-10-26 | 2012-11-07 | 莱特线路有限责任公司 | Data center air routing system |
CN202694202U (en) * | 2011-12-31 | 2013-01-23 | 朱鸿江 | Modular data center |
CN103747640A (en) * | 2013-12-16 | 2014-04-23 | 天津云立方科技有限公司 | Splicing modularization data center infrastructure and splicing modularization data center containing the same |
CN103743004A (en) * | 2014-01-09 | 2014-04-23 | 南京佳力图空调机电有限公司 | Energy-saving refrigeration device of container-type data center |
CN203924790U (en) * | 2014-05-16 | 2014-11-05 | 北京百度网讯科技有限公司 | Data center |
CN204244579U (en) * | 2014-11-07 | 2015-04-01 | 中兴通讯股份有限公司 | A kind of mobile device and container data center system |
CN204373119U (en) * | 2014-11-28 | 2015-06-03 | 中兴通讯股份有限公司 | Modular data center |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW201416838A (en) * | 2012-10-29 | 2014-05-01 | Hon Hai Prec Ind Co Ltd | Container data center |
CN204014398U (en) * | 2014-08-19 | 2014-12-10 | 艾默生网络能源有限公司 | A kind of rack of modular data center and modular data center |
-
2015
- 2015-07-27 CN CN201510448261.4A patent/CN106412722B/en active Active
-
2016
- 2016-03-03 WO PCT/CN2016/075545 patent/WO2016177068A1/en active Application Filing
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201114564Y (en) * | 2007-08-21 | 2008-09-10 | 深圳日海通讯技术股份有限公司 | Integrated monitoring system integration cabinet |
CN102771202A (en) * | 2009-10-26 | 2012-11-07 | 莱特线路有限责任公司 | Data center air routing system |
WO2012142620A1 (en) * | 2011-04-15 | 2012-10-18 | Kevin Smith | Systems and methods for balanced power and thermal management of mission critical environments |
CN202694202U (en) * | 2011-12-31 | 2013-01-23 | 朱鸿江 | Modular data center |
CN103747640A (en) * | 2013-12-16 | 2014-04-23 | 天津云立方科技有限公司 | Splicing modularization data center infrastructure and splicing modularization data center containing the same |
CN103743004A (en) * | 2014-01-09 | 2014-04-23 | 南京佳力图空调机电有限公司 | Energy-saving refrigeration device of container-type data center |
CN203924790U (en) * | 2014-05-16 | 2014-11-05 | 北京百度网讯科技有限公司 | Data center |
CN204244579U (en) * | 2014-11-07 | 2015-04-01 | 中兴通讯股份有限公司 | A kind of mobile device and container data center system |
CN204373119U (en) * | 2014-11-28 | 2015-06-03 | 中兴通讯股份有限公司 | Modular data center |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108287395A (en) * | 2017-12-29 | 2018-07-17 | 北京世纪互联宽带数据中心有限公司 | Network wiring case and data center machine room module |
CN108287395B (en) * | 2017-12-29 | 2020-02-28 | 北京世纪互联宽带数据中心有限公司 | Network distribution box and data center machine room module |
CN108811457A (en) * | 2018-06-29 | 2018-11-13 | 北京百度网讯科技有限公司 | Cooling system |
CN108811457B (en) * | 2018-06-29 | 2020-04-28 | 北京百度网讯科技有限公司 | Cooling system |
WO2022183605A1 (en) * | 2021-03-03 | 2022-09-09 | 维谛技术(西安)有限公司 | Power distribution and monitoring integrated access door |
Also Published As
Publication number | Publication date |
---|---|
CN106412722B (en) | 2021-10-12 |
WO2016177068A1 (en) | 2016-11-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106358419B (en) | Modular data center | |
CN205030018U (en) | Installing support and computer lab | |
CN106412722A (en) | Data center device | |
CN205030019U (en) | Installing support and computer lab | |
CN204373119U (en) | Modular data center | |
AU2010257100B2 (en) | Hot aisle containment cooling unit and method for cooling | |
CN1777855B (en) | Data center cooling system and cooling method | |
CN102334396B (en) | Hot aisle containment cooling system and method | |
US7173820B2 (en) | Data center cooling | |
CN204796024U (en) | High density micromodule data center | |
CN102802383A (en) | Self-circulating cooling data machine cabinet with air-conditioner terminal | |
CN212183989U (en) | Cloud storage server cabinet convenient and rapid to cool | |
CN210630136U (en) | Heat radiation structure of BBU cabinet of base station | |
CN204948580U (en) | Cabinet installed by electronic equipment | |
CN109617378B (en) | Cabinet array power module and array cabinet | |
CN204940945U (en) | Cooling unit bottom type modular communication machine room | |
CN203100061U (en) | Energy-saving sealing system of hot and cold channels of machine room | |
CN204631753U (en) | A kind of data center | |
CN102333432A (en) | Array type machine cabinet | |
CN220292427U (en) | Electric tracing control cabinet | |
CN220342564U (en) | Control box of closed channel system | |
CN208272441U (en) | A kind of distribution box | |
CN219980230U (en) | Wiring device for weak current intelligent system | |
CN200962702Y (en) | Heat radiation structure | |
CN202041899U (en) | Container type data system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |