CN205030018U - Installing support and computer lab - Google Patents
Installing support and computer lab Download PDFInfo
- Publication number
- CN205030018U CN205030018U CN201520555890.2U CN201520555890U CN205030018U CN 205030018 U CN205030018 U CN 205030018U CN 201520555890 U CN201520555890 U CN 201520555890U CN 205030018 U CN205030018 U CN 205030018U
- Authority
- CN
- China
- Prior art keywords
- main frame
- mounting bracket
- chute
- server cabinet
- server
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K5/00—Casings, cabinets or drawers for electric apparatus
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K7/00—Constructional details common to different types of electric apparatus
- H05K7/18—Construction of rack or frame
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K7/00—Constructional details common to different types of electric apparatus
- H05K7/20—Modifications to facilitate cooling, ventilating, or heating
Abstract
The utility model provides an installing support and computer lab, this installing support include the main frame, and the main frame still includes a plurality of server racks that are used for placing server equipment by the formation of mutually supporting of a plurality of frames of crossbeam, fixed cross beam, and the server rack is fixed in between the frame of main frame, still arrange and power supply unit including female, power supply unit depends on the main frame sets up, female arranging depends on the main frame sets up, female arranging is connected power supply unit. Through the utility model discloses an implementing, providing an installing support, it, can be accomplished the installation of installing support earlier, then place the construction that can accomplish the computer lab in the server rack with server equipment when using including the server rack that is used for placing server equipment, and is fast, adopt female power supply system of arranging, the complicated distribution mode of having avoided adoption switch board + cable for the distribution is simple more, convenient.
Description
Technical field
The utility model relates to computer room construction field, particularly relates to a kind of mounting bracket and machine room.
Background technology
Tradition machine room (also known as data center), when building, needs first to arrange server apparatus, after server apparatus is arranged, carries out connecting up, the setting of cooling system, last construction framework, mounting door-window etc.; There is the problems such as construction period length in it, can not meet Client application demand.
Therefore, how to provide a kind of can the machine room technology of Fast Construction, be those skilled in the art's technical problems urgently to be resolved hurrily.
Utility model content
The utility model provides a kind of mounting bracket and machine room, to solve the slow-footed problem of existing computer room construction.
The utility model provides a kind of mounting bracket, and it comprises main frame, and main frame is complemented each other to form by multiple frameworks of crossbeam, fixed cross beam; Also comprise multiple server cabinet for placing server apparatus, server cabinet is fixed between the framework of main frame; Also comprise busbar and electric supply installation, described electric supply installation depends on described main frame and arranges, and described busbar depends on described main frame and arranges, and described busbar connects described electric supply installation.
Further, between parallel, symmetrical, the framework that is fixed on main frame in column of server cabinet.
Further, the Qianmen of server cabinet and back door are all high opening rate air door.
Further, also comprise: be arranged at the air-conditioning in the ranks between server cabinet adjacent column, in the ranks the air outlet of air-conditioning is relative with high opening rate air door.
Further, also comprise: chilled water allocation units, chilled water allocation units, by depending on the pipe-line system of main frame design, are connected with in the ranks air-conditioning.
Further, also comprise: the access door and the roof window that are arranged at main frame periphery, the position that access door and roof window do not arrange server cabinet around main frame is arranged.
Further, also comprise: forceful electric power chute, light current chute, between forceful electric power chute, light current chute, there is safe distance.
Further, forceful electric power chute, light current chute depend on main frame and arrange.
Further, also comprise: optical fiber chute.
Further, server cabinet is provided with line throughhole.
Further, electric supply installation comprises: high voltage direct current cabinet, and/or, battery rack.
The utility model provides a kind of machine room, and it comprises the mounting bracket that the utility model provides, and server apparatus, and server apparatus is positioned in the server cabinet of mounting bracket.
The beneficial effects of the utility model:
The utility model provides a kind of mounting bracket, it comprises the server cabinet for placing server apparatus, in use, first can complete the installation of mounting bracket, then server apparatus is placed on the construction that can complete machine room in server cabinet, speed is fast; Meanwhile, adopt busbar electric power system, eliminate the complicated power distribution mode of employing power distribution cabinet+cable, make distribution simpler, convenient.
Accompanying drawing explanation
The schematic diagram of the mounting bracket that Fig. 1 provides for the utility model first embodiment;
The schematic diagram of the mounting bracket that Fig. 2 provides for the utility model second embodiment;
Fig. 3 is that first of mounting bracket in the utility model second embodiment uses schematic diagram;
Fig. 4 is that second of mounting bracket in the utility model second embodiment uses schematic diagram;
Fig. 5 is that the 3rd of mounting bracket in the utility model second embodiment uses schematic diagram;
Fig. 6 is server cabinet schematic layout pattern in the utility model second embodiment.
Embodiment
Now by embodiment mode by reference to the accompanying drawings the utility model made and further annotate explanation.
First embodiment:
The schematic diagram of the mounting bracket that Fig. 1 provides for the utility model first embodiment, as shown in Figure 1, in the present embodiment, the mounting bracket that the utility model provides comprises:
Main frame 1, main frame 1 is complemented each other to form by multiple framework 1-12 of crossbeam 1-11, fixed cross beam; Also comprise,
Multiple server cabinet 2 for placing server apparatus (Fig. 1 only exemplary give one), server cabinet fixes 2 between the framework 1-12 of main frame 1.
In certain embodiments, between the framework that the server cabinet 2 in above-described embodiment is parallel, symmetrical, be fixed on main frame in column.
In certain embodiments, the Qianmen of the server cabinet 2 in above-described embodiment and back door are all high opening rate air door.
In certain embodiments, the mounting bracket in above-described embodiment also comprises: be arranged at the air-conditioning in the ranks between server cabinet adjacent column, and in the ranks the air outlet of air-conditioning is relative with high opening rate air door.
In certain embodiments, the mounting bracket in above-described embodiment also comprises: chilled water allocation units, and chilled water allocation units, by depending on the pipe-line system of main frame design, are connected with in the ranks air-conditioning.
In certain embodiments, the mounting bracket in above-described embodiment also comprises: the access door and the roof window that are arranged at main frame periphery, and the position that access door and roof window do not arrange server cabinet around main frame is arranged.
In certain embodiments, the mounting bracket in above-described embodiment also comprises: forceful electric power chute, light current chute, there is safe distance between forceful electric power chute, light current chute.
In certain embodiments, the forceful electric power chute in above-described embodiment, light current chute depend on main frame and arrange.
In certain embodiments, the mounting bracket in above-described embodiment also comprises: optical fiber chute.
In certain embodiments, the server cabinet 2 in above-described embodiment is provided with line throughhole.
In certain embodiments, the mounting bracket in above-described embodiment also comprises busbar and electric supply installation, and described electric supply installation depends on described main frame and arranges, and described busbar depends on described main frame and arranges, and described busbar connects described electric supply installation.
In certain embodiments, the mounting bracket electric supply installation in above-described embodiment comprises: high voltage direct current cabinet, and/or, battery rack.
Corresponding, the utility model provides a kind of machine room, and it comprises the mounting bracket that the utility model provides, and server apparatus, and server apparatus is positioned in the server cabinet of mounting bracket.
Existing composition graphs 2-Fig. 6 and embody rule scene are done the utility model and are further annotated explanation.
Second embodiment:
In the present embodiment, be that 2 rows are described for server cabinet.
From Fig. 2 to Fig. 6, the mounting bracket completely after assembling comprises: main frame 1, server cabinet 2, access door 3, roof window 5, passage cabling and illumination mounting rail 5, high voltage direct current cabinet 6, chilled water allocation units 7, battery rack 8, exchange machine frame 9, in the ranks air-conditioning 10, pipeline 11, busbar 11, light current chute 13, forceful electric power chute 14, optical fiber chute 15.Wherein,
Wherein server cabinet 2 totally two rows, place face-to-face or back-to-back, the quantity of server cabinet 2 can be configured according to the actual requirements.
Wherein in the ranks air-conditioning 10 is placed in the middle of two row's server cabinets 2 respectively, and totally six, between rack, physical location can configure quantity according to rack and adjust.
Wherein bus bar 12 a set of two rows altogether, are arranged on module top two row rack top.
Wherein totally one, high voltage direct current cabinet 6, is installed on the position of passage left-hand line head.
Wherein chilled water allocation units 7 totally, are installed on whole module channels right-hand column tail.
Wherein battery rack 8 totally two, a position being arranged on high voltage direct current cabinet 6 side, a position being arranged on passage right-hand column head.
Wherein, forceful electric power chute 14 lays for busbar system cable, is installed on inside busbar 12; And connected across row chute by three covers;
Wherein, light current chute 13 is positioned at module channels both sides cabinet top outer, and at row tail by interconnected across row chute; Optical fiber chute 15 is arranged on above light current chute.
In use, main frame, access door, the roof window passage to two row rack forms is closed, and makes to be positioned at cold airflow wherein or thermal current can not be excessive, guarantees airflow pattern simple subprogram, avoids windage loss.High 2500mm in main frame, can be adapted to≤all racks of 2500mm high standard install, and when rack height is lower than 2500mm, install baffle plate for closing between rack and cruciform bracing.
Wherein, main frame 1 by framework 1-12 according to the actual requirements distributed number install over the ground, and be fixed connection by crossbeam 1-11, the framework being positioned at the rightmost side needs to install row epicranial plate 1-13 respectively and closes after installing; Wherein, shelves bar 1-14 is installed on inside passage, between framework, for the location when the cabinet of server cabinet is installed.
Mounting bracket comprise basic component as main frame 1, server cabinet 2, access door 3, roof window 5, passage cabling and illumination mounting rail 5, high voltage direct current cabinet 6, chilled water allocation units 7, battery rack 8, exchange machine frame 9, in the ranks air-conditioning 10, pipeline 11, busbar 12, light current chute 13, forceful electric power chute 14, optical fiber chute 15 comprise and the facility of other necessity, as LED, audible-visual annunciator, gate inhibition etc.Above equipment constitutes the infrastructure framework that the application provides, for server apparatus product provides necessary distribution, refrigeration, illumination, wiring etc.
Above-mentioned mounting bracket is carried out Function Classification, and it comprises:
1, structure closed subsystem;
Comprise module frame, access door, roof window.
2, rack subsystem;
Comprise two row's server cabinets, two row's racks are placed face-to-face, the cold passage of middle formation or the passage of heat.It is all high opening rate air door that rack comprises front/rear door.The quantity of rack can quantification according to actual traffic load.
3, cooling subsystem;
Comprise that six 300mm are wide, 1200mm air-conditioning deeply in the ranks.This air conditioning room is every being arranged between server cabinet; Comprise that 600mm is wide, 1200mm deep-freezing water distribution units, for distributing chilled water and the pipe-line system between them to air-conditioning in the ranks, wherein chilled water allocation units are installed on passage right-hand column tail.
4, electrical subsystem;
Comprise a set of busbar electric power system, be positioned on row rack top, frame top two; A high voltage direct current cabinet, 600mm is wide, 1200mm is dark, for providing high voltage direct current to module, is positioned at module channels left-hand line head; Two battery racks, 600mm is wide, 1200mm is dark, for providing stand-by power supply to equipment, to lay respectively on the left of passage after high voltage direct current cabinet and passage right-hand column head.
5, cable subsystem;
Comprise strong, weak electricity chute and optical fiber chute;
Compared with prior art, adopt frame-type, full decoupling design, module basis framework is separated with functional unit (cabinet), and each functional unit can be installed, dismantles and replace after integrated engineering.
Whole module for power supply system adopts high voltage direct current+interchanges to supply power with double circuit, refrigeration then adopt the water-cooled of band chilled water allocation units arrange between refrigerating mode.
Whole module comprise a station power distribution cabinet, high voltage direct current cabinet, two battery racks, six in the ranks air-conditioning, chilled water allocation units as the basic configuration of the infrastructure of this module.
Its modularization framework can realize the fast construction of data center, and inside comprises the modules such as cooling, distribution, wiring, can adapt to large, medium and small type data center rapid deployment.
The mounting bracket that the utility model provides, when building, comprises the following steps:
The first step, carry out the installation of main frame, first framework is installed over the ground according to layout in advance, be fixed on ground by expansion bolt; Then connect all frameworks by crossbeam, afterwards inside passage, shelves bar is installed between framework; Finally complete the installation of row epicranial plate;
Second step, carry out the installation of distribution, refrigerated, first power distribution cabinet, management and control cabinet are installed; Secondly the pipeline between installed rows between air-conditioning, chilled water allocation units and connection;
3rd step, carry out throwing light on, the installation of wiring system, first passage cabling and illumination mounting rail are installed; Next installs bus bar, light current chute, forceful electric power chute, optical fiber chute; Finally on passage cabling and illumination mounting rail, fluorescent tube is installed.
4th step, carry out the installation of server cabinet according to the actual requirements, server cabinet when mounted, only needs to push rack position, connecting strong and weak electricity, without the need to being fixed with other equipment; When needs are safeguarded or whole machine cabinet is replaced, disconnect strong and weak electricity, pull-out rack carries out replacing; And business ought not reach actual demand at the beginning, when server apparatus is less, then close corresponding rack position by baffle plate.
It is exactly a kind of data center's form that simultaneously can meet rapid deployment and high cooling efficiency that the present embodiment puies forward the pattern of having paid modular data center/machine room.It, by modular assembly form, can realize building of various scale data center fast by field module is assembled.The form that it is closed respectively by hot and cold passage or all closed, avoids backflow phenomenon, improves cooling effectiveness.
In summary, by enforcement of the present utility model, at least there is following beneficial effect:
The utility model provides a kind of mounting bracket, it comprises the server cabinet for placing server apparatus, in use, first can complete the installation of mounting bracket, then server apparatus is placed on the construction that can complete machine room in server cabinet, speed is fast.Adopt busbar electric power system, eliminate the complicated power distribution mode of employing power distribution cabinet+cable, make distribution simpler, convenient.
Below be only embodiment of the present utility model; not any pro forma restriction is done to the utility model; every above execution mode is done according to technical spirit of the present utility model any simple modification, equivalent variations, combination or modification, all still belong to the protection range of technical solutions of the utility model.
Claims (12)
1. a mounting bracket, is characterized in that, comprises main frame, and described main frame is complemented each other to form by multiple frameworks of crossbeam, fixing described crossbeam; Also comprise multiple server cabinet for placing server apparatus, described server cabinet is fixed between the framework of described main frame; Also comprise busbar and electric supply installation, described electric supply installation depends on described main frame and arranges, and described busbar depends on described main frame and arranges, and described busbar connects described electric supply installation.
2. mounting bracket as claimed in claim 1, is characterized in that, described server cabinet is parallel, symmetrical, between the framework that is fixed on described main frame in column.
3. mounting bracket as claimed in claim 2, it is characterized in that, the Qianmen of described server cabinet and back door are all high opening rate air door.
4. mounting bracket as claimed in claim 3, it is characterized in that, also comprise: be arranged at the air-conditioning in the ranks between described server cabinet adjacent column, the air outlet of described air-conditioning is in the ranks relative with high opening rate air door.
5. mounting bracket as claimed in claim 4, is characterized in that, also comprise: chilled water allocation units, and described chilled water allocation units, by depending on the pipe-line system of described main frame design, are connected with described air-conditioning in the ranks.
6. mounting bracket as claimed in claim 1, is characterized in that, also comprise: the access door and the roof window that are arranged at described main frame periphery, and the position that described access door and roof window do not arrange described server cabinet around described main frame is arranged.
7. mounting bracket as claimed in claim 1, is characterized in that, also comprise: forceful electric power chute, light current chute, there is safe distance between described forceful electric power chute, light current chute.
8. mounting bracket as claimed in claim 7, is characterized in that, described forceful electric power chute, light current chute depend on described main frame and arrange.
9. mounting bracket as claimed in claim 7, is characterized in that, also comprise: optical fiber chute.
10. mounting bracket as claimed in claim 9, it is characterized in that, described server cabinet is provided with line throughhole.
11. mounting brackets as described in any one of claim 1 to 10, it is characterized in that, described electric supply installation comprises: high voltage direct current cabinet, and/or, battery rack.
12. 1 kinds of machine rooms, is characterized in that, comprise the mounting bracket as described in any one of claim 1 to 11, and server apparatus, and described server apparatus is positioned in the server cabinet of described mounting bracket.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520555890.2U CN205030018U (en) | 2015-07-28 | 2015-07-28 | Installing support and computer lab |
PCT/CN2016/074103 WO2017016217A1 (en) | 2015-07-28 | 2016-02-19 | Mounting support and computer room |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520555890.2U CN205030018U (en) | 2015-07-28 | 2015-07-28 | Installing support and computer lab |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205030018U true CN205030018U (en) | 2016-02-10 |
Family
ID=55262516
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520555890.2U Active CN205030018U (en) | 2015-07-28 | 2015-07-28 | Installing support and computer lab |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN205030018U (en) |
WO (1) | WO2017016217A1 (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105888315A (en) * | 2016-04-12 | 2016-08-24 | 华信咨询设计研究院有限公司 | Equipment room |
CN106163235A (en) * | 2016-08-05 | 2016-11-23 | 曙光信息产业(北京)有限公司 | three-dimensional machine room |
CN106285073A (en) * | 2016-08-05 | 2017-01-04 | 曙光信息产业(北京)有限公司 | three-dimensional machine room |
WO2017016217A1 (en) * | 2015-07-28 | 2017-02-02 | 中兴通讯股份有限公司 | Mounting support and computer room |
WO2017016214A1 (en) * | 2015-07-28 | 2017-02-02 | 中兴通讯股份有限公司 | Mounting support and computer room |
CN106413353A (en) * | 2016-12-02 | 2017-02-15 | 郑州云海信息技术有限公司 | Refrigeration device for container data center |
CN106659046A (en) * | 2017-01-09 | 2017-05-10 | 北京百度网讯科技有限公司 | Server cabinet |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114040626B (en) * | 2021-11-10 | 2024-01-26 | 中国核动力研究设计院 | Cabinet suitable for electrical and electronic equipment |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020153814A1 (en) * | 2000-12-19 | 2002-10-24 | Robideau Thomas J. | Storage cabinet for electronic components |
CN201766793U (en) * | 2010-08-09 | 2011-03-16 | 中兴通讯股份有限公司 | General stand for machine cabinet |
CN201981809U (en) * | 2011-03-08 | 2011-09-21 | 北京创和世纪通讯技术有限公司 | Container type data machine room |
CN102387683B (en) * | 2011-11-17 | 2015-01-14 | 深圳市怡富精密机械有限公司 | Combined and parallelly-mounted cabinet |
CN202799446U (en) * | 2012-09-18 | 2013-03-13 | 刘绍友 | Cabinet group |
CN104214827A (en) * | 2013-06-05 | 2014-12-17 | 中国石油天然气股份有限公司 | Method for improving horizontal lateral air sending refrigeration efficiency |
CN204316932U (en) * | 2014-12-30 | 2015-05-06 | 中天宽带技术有限公司 | A kind of passage cooling system of modularization machine room |
CN205030019U (en) * | 2015-07-28 | 2016-02-10 | 中兴通讯股份有限公司 | Installing support and computer lab |
CN205030018U (en) * | 2015-07-28 | 2016-02-10 | 中兴通讯股份有限公司 | Installing support and computer lab |
-
2015
- 2015-07-28 CN CN201520555890.2U patent/CN205030018U/en active Active
-
2016
- 2016-02-19 WO PCT/CN2016/074103 patent/WO2017016217A1/en active Application Filing
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017016217A1 (en) * | 2015-07-28 | 2017-02-02 | 中兴通讯股份有限公司 | Mounting support and computer room |
WO2017016214A1 (en) * | 2015-07-28 | 2017-02-02 | 中兴通讯股份有限公司 | Mounting support and computer room |
CN105888315A (en) * | 2016-04-12 | 2016-08-24 | 华信咨询设计研究院有限公司 | Equipment room |
CN106163235A (en) * | 2016-08-05 | 2016-11-23 | 曙光信息产业(北京)有限公司 | three-dimensional machine room |
CN106285073A (en) * | 2016-08-05 | 2017-01-04 | 曙光信息产业(北京)有限公司 | three-dimensional machine room |
CN106413353A (en) * | 2016-12-02 | 2017-02-15 | 郑州云海信息技术有限公司 | Refrigeration device for container data center |
CN106659046A (en) * | 2017-01-09 | 2017-05-10 | 北京百度网讯科技有限公司 | Server cabinet |
Also Published As
Publication number | Publication date |
---|---|
WO2017016217A1 (en) | 2017-02-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205030018U (en) | Installing support and computer lab | |
CN205030019U (en) | Installing support and computer lab | |
EP1774842B1 (en) | Data center cooling | |
CN106358419B (en) | Modular data center | |
EP2079000B1 (en) | Data center cooling system | |
EP2392201B1 (en) | Hot aisle containment cooling system and method | |
CN203340497U (en) | Modularization data center | |
WO2016177068A1 (en) | Data center device | |
GB2493324A (en) | Cooling System with heat-exchanger mounted within a server cabinet | |
CN103747640A (en) | Splicing modularization data center infrastructure and splicing modularization data center containing the same | |
CN110797489A (en) | Energy storage system and energy storage container that reliability is high | |
CN104684339A (en) | Container type data center | |
CN203105000U (en) | Heat-insulating blind plate, and cabinet having same | |
CN205231537U (en) | Single busbar segmented system high voltage distribution cabinet | |
CN210926677U (en) | Multi-loop low-voltage switch cabinet with switches distributed vertically in rows | |
CN212786233U (en) | Network cabinet and container type data center | |
CN210607398U (en) | Energy storage system and energy storage container that reliability is high | |
WO2022183605A1 (en) | Power distribution and monitoring integrated access door | |
CN215671376U (en) | Modular data center room | |
CN215872076U (en) | Container modular data center | |
KR102553929B1 (en) | Hot aisle self-containment racking system | |
CN207652835U (en) | cabinet system | |
CN208028508U (en) | A kind of knockdown novel two-sided distributing frame | |
CN113543604A (en) | Hybrid heat dissipation device | |
CN112911883A (en) | Container data center and hardware unit thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |