CN106408432A - Coal mine emergency aid decision making support system - Google Patents
Coal mine emergency aid decision making support system Download PDFInfo
- Publication number
- CN106408432A CN106408432A CN201611022041.6A CN201611022041A CN106408432A CN 106408432 A CN106408432 A CN 106408432A CN 201611022041 A CN201611022041 A CN 201611022041A CN 106408432 A CN106408432 A CN 106408432A
- Authority
- CN
- China
- Prior art keywords
- emergency
- accident
- module
- prediction scheme
- management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000003245 coal Substances 0.000 title claims abstract description 19
- 238000007726 management method Methods 0.000 claims abstract description 57
- 238000004458 analytical method Methods 0.000 claims abstract description 19
- 238000004088 simulation Methods 0.000 claims abstract description 5
- 238000004519 manufacturing process Methods 0.000 claims abstract description 4
- 230000004044 response Effects 0.000 claims description 12
- 239000000463 material Substances 0.000 claims description 10
- 238000000034 method Methods 0.000 claims description 10
- 238000005065 mining Methods 0.000 claims description 7
- 230000008569 process Effects 0.000 claims description 7
- 238000012545 processing Methods 0.000 claims description 7
- 238000012795 verification Methods 0.000 claims description 7
- 238000011161 development Methods 0.000 claims description 4
- 238000011156 evaluation Methods 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 claims description 3
- 230000013011 mating Effects 0.000 claims description 3
- 238000003860 storage Methods 0.000 claims description 3
- 230000008878 coupling Effects 0.000 claims 1
- 238000010168 coupling process Methods 0.000 claims 1
- 238000005859 coupling reaction Methods 0.000 claims 1
- 238000012550 audit Methods 0.000 abstract 1
- 238000005516 engineering process Methods 0.000 description 5
- 230000005540 biological transmission Effects 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000006227 byproduct Substances 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 230000026676 system process Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/02—Agriculture; Fishing; Forestry; Mining
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Marine Sciences & Fisheries (AREA)
- Mining & Mineral Resources (AREA)
- Agronomy & Crop Science (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Animal Husbandry (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention belongs to the field of coal mine safety management informatization, and in particular relates to a coal mine emergency aid decision making support system. The emergency aid decision making support system comprises an emergency plan management module which is used for digitally abstracting and storing a traditional text-based paper emergency plan, an emergency aid decision making module which is used for managing the emergency plan approved for the record and safety information, digitizing the original plan file managed in the form of paper, and dividing the emergency plan into a number of special projects for management according to the actual production situation in the field of a coal mine, and an accident analysis module. The management content comprises plan revision, audit and preparation. The accident analysis module is used for accident simulation and analysis at the stages of a coal mine accident and decision making, and calling the data of the accident analysis basic database of the coal mine to assess the risk degree and size of the accident, analyze the accident trends and predict possible consequences.
Description
Technical field
The invention belongs to coal mine safety management informatization is and in particular to meet an urgent need in a kind of colliery, and aid decision supports system
System.
Background technology
With the development of Mine digitalization technology, the application of coal mine safety management informationization technology is more and more extensive.Emergent
Management is the most important thing in coal production, and the secure data of emergency preplan and its correlation constitutes the basis of digital management,
Under conditions of computer, network communication hardware technology are more ripe, safety of coal mines is promoted to become with contingency management with information-based
Important component part in Construction of Mine Digitalization.And the main concentration of colliery contingency management informationization technology research domestic at present
In accident scene simulation, range of application is smaller.
Content of the invention
Goal of the invention:The present invention is directed to the problem that above-mentioned prior art exists and makes improvement, that is, the invention discloses a kind of
Meet an urgent need auxiliary decision-making support system in colliery.
Technical scheme:Meet an urgent need auxiliary decision-making support system in a kind of colliery, including:
Emergency preplan management module, digitizes abstract and stores up for passing through traditional text based papery emergency preplan
Deposit;
Emergent aid decision module, for managing emergency preplan and the security information that approved is put on record, by original with papery
Emergency preplan is divided into multiple special next by the prediction scheme file digitization of format management according to the actual condition of production of colliery scene
Management, management content includes revision, examination & verification and the establishment of prediction scheme,
Crash analysis module, for accident simulation and the analysis of coal mining accident and decision phase, calls coal mining accident to divide
The data of analysis basic database, assessment accident risk degree and size, analysis accident development trend simultaneously predicts possible consequence.
Further, described emergency preplan management module includes:
Forecasting edited module, for wizard-like forecasting edited, prediction scheme task/resource establishment, the institutional establishment of text and
The the importing and exporting of prediction scheme text;
Prediction scheme differentiated control module, management scenario in stratified set, according to rights management and examination & verification prediction scheme, and to prediction scheme and attached
Part carries out maintenance and management, and including providing expert to evaluate online, evaluation suggestion is managed collectively;
Prediction scheme interlocking module, calls prediction scheme information in accident emergency respond module, and according to incident response rank and class
Type, Auto-matching emergency preplan launch emergency provision, simultaneously in contingency procedure, using inquiry emergency disposal measure shape and emergent finger
Wave scheme;
Prediction scheme template management module, for carrying out forecasting edited or self-defined prediction scheme template as preset mould to prediction scheme template
Plate is reused, and these preset template carry out importing and exporting, increase, delete, changing, looking into operation.
Further, described emergent aid decision module includes:
Accident emergency respond module, determines prediction scheme rank and starts related prediction scheme, and prediction scheme starts emergency response level after starting
Not, determine the flow process of emergency response;
Emergent aid decision module, according to accident report information during emergency plan for accidents, determines and starts emergency preplan
Classification, emergency response grade, determine site disposal scheme;
Emergency resources management module, for the management of required emergency materials in the emergency management and rescue of colliery, including management goods and materials number
Amount, unit, entry time and storage place;
Post incident processing module, in emergency management and rescue later stage link, analysis on accident cause and accident summary.
Further, emergent aid decision module includes:
Emergency preplan inquiry and starting module, for when there is security incident, transferring emergency preplan according to accident pattern
Corresponding emergency preplan in database, and corresponding emergency preplan is started according to the entry condition of corresponding prediction scheme, and according to prediction scheme
Rank, type and keyword carry out inquiring about, browse, and carry out emergency processing according to the prediction scheme chosen;
Emergency cooperative commands module, for, after starting corresponding emergency preplan, being entered to accident emergency according to prediction scheme instruction
Row interlinked command, generates emergent and decision scheme;
Accident case enquiry module, according to history accident data, inquiring about the case library mating with current accident should to assist
Anxious process.
More further, described emergent and decision scheme includes special prediction scheme, goods and materials detail, personnel's division of labor and processing stream
Journey.
Beneficial effect:A kind of emergent auxiliary decision-making support system in colliery disclosed by the invention has the advantages that:
1 efficient emergency preplan information management.Emergency preplan information not only contains prediction scheme file itself, further comprises coal
Ore deposit main hazard, the distribution of adverse factor, separated time assessment, early warning, type of alarm, emergency materials, organization, dangerous substance peace
Full tables of data etc., completes emergency preplan and its security related information management using digital form, you can in easily mode
Complete forecasting edited, revision, examination & verification, foundation for security information management, the information sharing between each several part can be realized simultaneously, it is to avoid
The drawbacks of paper document manages, solves the FileVersion conflict that e-file transmission causes, information updating asynchronous simultaneously
The problems such as, it is that coal mining accident contingency management provides one kind fast and effectively management means;
2nd, effectively meet an urgent need aid decision.Based on accident report information, actual according to colliery scene, determine that accident emergency is rescued
Help rank, special emergency preplan and site disposal scheme, fast and effectively achieve coal mining accident Emergency decision, it is to avoid pass
The problems such as artificial supervisor of system judges that time-consuming, information transmission speed is slow, can issue emergency management and rescue scheme with quick way, be coal
Valuable time is striven to obtain in the rescue of ore deposit accident emergency.
Brief description
Fig. 1 is the functional schematic of emergency preplan management module;
Fig. 2 is the flow chart applying a kind of colliery disclosed by the invention to meet an urgent need auxiliary decision-making support system process accident.
Specific embodiment:
Below the specific embodiment of the present invention is described in detail.
As illustrated in fig. 1 and 2, the emergent auxiliary decision-making support system in a kind of colliery, including
Emergency preplan management module, digitizes abstract and stores up for passing through traditional text based papery emergency preplan
Deposit;
Emergent aid decision module, for managing emergency preplan and the security information that approved is put on record, by original with papery
The prediction scheme file digitization of format management, emergency preplan file is divided into three parts, and then according to the actual life of colliery scene
Emergency preplan is divided into multiple special projects to manage by product situation, and management content includes revision, examination & verification and the establishment of prediction scheme,
Crash analysis module, for accident simulation and the analysis of coal mining accident and decision phase, calls this coal mining accident
The data of analysis foundation database, assessment accident risk degree and size, analysis accident development trend simultaneously predicts possible consequence.
Further, emergency preplan management module includes:
Forecasting edited module, for wizard-like forecasting edited, prediction scheme task/resource establishment, the institutional establishment of text and
The the importing and exporting of prediction scheme text;
Prediction scheme differentiated control module, management scenario in stratified set, according to rights management and examination & verification prediction scheme, and to prediction scheme and attached
Part carries out maintenance and management, and including providing expert to evaluate online, evaluation suggestion is managed collectively;
Prediction scheme interlocking module, calls prediction scheme information in accident emergency respond module, and according to incident response rank and class
Type, Auto-matching emergency preplan launch emergency provision, simultaneously in contingency procedure, using inquiry emergency disposal measure shape and emergent finger
Wave scheme;
Prediction scheme template management module, for carrying out forecasting edited or self-defined prediction scheme template as preset mould to prediction scheme template
Plate is reused, and these preset template carry out importing and exporting, increase, delete, changing, looking into operation.
Further, emergent aid decision module includes:
Accident emergency respond module, determines prediction scheme rank and starts related prediction scheme, and prediction scheme starts emergency response level after starting
Not, determine the flow process of emergency response;
Emergent aid decision module, according to accident report information during emergency plan for accidents, determines and starts emergency preplan
Classification, emergency response grade, determine site disposal scheme;
Emergency resources management module, for the management of required emergency materials in the emergency management and rescue of colliery, including management goods and materials number
Amount, unit, entry time and storage place;
Post incident processing module, in emergency management and rescue later stage link, analysis on accident cause and accident summary.
Further, emergent aid decision module includes:
Emergency preplan inquiry and starting module, for when there is security incident, transferring emergency preplan according to accident pattern
Corresponding emergency preplan in database, and corresponding emergency preplan is started according to the entry condition of corresponding prediction scheme, and according to prediction scheme
Rank, type and keyword carry out inquiring about, browse, and carry out emergency processing according to the prediction scheme chosen;
Emergency cooperative commands module, for, after starting corresponding emergency preplan, being entered to accident emergency according to prediction scheme instruction
Row interlinked command, generates emergent and decision scheme;
Accident case enquiry module, according to history accident data, inquiring about the case library mating with current accident should to assist
Anxious process.
More further, meet an urgent need and decision scheme includes special prediction scheme, goods and materials detail, personnel's division of labor and handling process.
Above embodiments of the present invention are elaborated.But the present invention is not limited to above-mentioned embodiment,
In the ken that art those of ordinary skill possesses, can also do on the premise of without departing from present inventive concept
Go out various change.
Claims (5)
1. auxiliary decision-making support system is met an urgent need it is characterised in that including in a kind of colliery
Emergency preplan management module, digitizes abstract and stores for passing through traditional text based papery emergency preplan;
Emergent aid decision module, for managing emergency preplan and the security information that approved is put on record, by original in paper form
Emergency preplan is divided into multiple special projects to manage by the prediction scheme file digitization of management according to the actual condition of production of colliery scene
Reason, management content includes revision, examination & verification and the establishment of prediction scheme,
Crash analysis module, for accident simulation and the analysis of coal mining accident and decision phase, calls the crash analysis in colliery
The data of basic database, assessment accident risk degree and size, analysis accident development trend simultaneously predicts possible consequence.
2. auxiliary decision-making support system is met an urgent need it is characterised in that described emergency preplan in a kind of colliery according to claim 1
Management module includes:
Forecasting edited module, for wizard-like forecasting edited, prediction scheme task/resource establishment, the institutional establishment of text and prediction scheme
The the importing and exporting of text;
Prediction scheme differentiated control module, management scenario in stratified set, according to rights management and examination & verification prediction scheme, and enters to prediction scheme and annex
Row maintenance and management, including providing expert to evaluate online, evaluation suggestion is managed collectively;
Prediction scheme interlocking module, calls prediction scheme information in accident emergency respond module, and according to incident response rank and type, from
Dynamic coupling emergency preplan launch emergency provision, simultaneously in contingency procedure, using inquiry emergency disposal measure shape and emergency command side
Case;
Prediction scheme template management module, for carrying out forecasting edited or self-defined prediction scheme template as preset template weight to prediction scheme template
Use again, and these preset template carry out importing and exporting, increase, delete, changing, looking into operation.
3. auxiliary decision-making support system is met an urgent need it is characterised in that described emergent auxiliary in a kind of colliery according to claim 1
Decision-making module includes:
Accident emergency respond module, determines prediction scheme rank and starts related prediction scheme, and prediction scheme starts Emergency response level, really after starting
Determine the flow process of emergency response;
Emergent aid decision module, according to accident report information during emergency plan for accidents, determines the class starting emergency preplan
Not, emergency response grade, determines site disposal scheme;
Emergency resources management module, for the management of required emergency materials in the emergency management and rescue of colliery, including management goods and materials quantity, list
Position, entry time and storage place;
Post incident processing module, in emergency management and rescue later stage link, analysis on accident cause and accident summary.
4. auxiliary decision-making support system is met an urgent need it is characterised in that emergent aid decision in a kind of colliery according to claim 1
Module includes:
Emergency preplan inquiry and starting module, for when there is security incident, transferring emergency preplan data according to accident pattern
Corresponding emergency preplan in storehouse, and corresponding emergency preplan is started according to the entry condition of corresponding prediction scheme, and the level according to prediction scheme
Not, type and keyword carry out inquiring about, browse, and carry out emergency processing according to the prediction scheme chosen;
Emergency cooperative commands module, for, after starting corresponding emergency preplan, being joined to accident emergency according to prediction scheme instruction
Dynamic commander, generates emergent and decision scheme;
Accident case enquiry module, according to history accident data, inquires about the case library mating with current accident to assist emergent place
Reason.
5. auxiliary decision-making support system is met an urgent need it is characterised in that described meet an urgent need and determine in a kind of colliery according to claim 4
Plan scheme includes special prediction scheme, goods and materials detail, personnel's division of labor and handling process.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611022041.6A CN106408432A (en) | 2016-11-16 | 2016-11-16 | Coal mine emergency aid decision making support system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611022041.6A CN106408432A (en) | 2016-11-16 | 2016-11-16 | Coal mine emergency aid decision making support system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106408432A true CN106408432A (en) | 2017-02-15 |
Family
ID=58068750
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611022041.6A Pending CN106408432A (en) | 2016-11-16 | 2016-11-16 | Coal mine emergency aid decision making support system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106408432A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107392459A (en) * | 2017-07-17 | 2017-11-24 | 青岛海信网络科技股份有限公司 | A kind of emergency preplan generation method, apparatus and system |
CN109614530A (en) * | 2018-11-21 | 2019-04-12 | 山东新矿赵官能源有限责任公司 | Safety of Coal Mine Production based on 360doc in-depth interview standardizes data supervision system |
CN111626483A (en) * | 2020-05-09 | 2020-09-04 | 国网上海市电力公司 | Accident processing flow management and optimization system |
CN112435029A (en) * | 2021-01-27 | 2021-03-02 | 支付宝(杭州)信息技术有限公司 | Service processing method and device based on block chain and electronic equipment |
CN112862647A (en) * | 2021-01-29 | 2021-05-28 | 中国船舶重工集团公司第七一四研究所 | Construction method of water emergency rescue aid decision-making system |
CN113780983A (en) * | 2021-08-16 | 2021-12-10 | 创意信息技术股份有限公司 | Emergency plan driving system based on process engine |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103268109A (en) * | 2013-05-24 | 2013-08-28 | 常州大学 | Chemical industrial park risk management information system based on GIS |
-
2016
- 2016-11-16 CN CN201611022041.6A patent/CN106408432A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103268109A (en) * | 2013-05-24 | 2013-08-28 | 常州大学 | Chemical industrial park risk management information system based on GIS |
Non-Patent Citations (2)
Title |
---|
顾敦清: "矿山应急救援行动方案自动生成系统", 《中国优秀硕士学位论文全文数据库 工程科技I辑》 * |
马莉: "本体的煤矿数字化应急预案系统研究", 《西安科技大学学报》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107392459A (en) * | 2017-07-17 | 2017-11-24 | 青岛海信网络科技股份有限公司 | A kind of emergency preplan generation method, apparatus and system |
CN109614530A (en) * | 2018-11-21 | 2019-04-12 | 山东新矿赵官能源有限责任公司 | Safety of Coal Mine Production based on 360doc in-depth interview standardizes data supervision system |
CN111626483A (en) * | 2020-05-09 | 2020-09-04 | 国网上海市电力公司 | Accident processing flow management and optimization system |
CN112435029A (en) * | 2021-01-27 | 2021-03-02 | 支付宝(杭州)信息技术有限公司 | Service processing method and device based on block chain and electronic equipment |
CN112862647A (en) * | 2021-01-29 | 2021-05-28 | 中国船舶重工集团公司第七一四研究所 | Construction method of water emergency rescue aid decision-making system |
CN113780983A (en) * | 2021-08-16 | 2021-12-10 | 创意信息技术股份有限公司 | Emergency plan driving system based on process engine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106408432A (en) | Coal mine emergency aid decision making support system | |
CN108256713A (en) | Nuclear power plant system measure of supervision based on ERDB | |
CN108717604A (en) | A kind of production safety hidden danger closed loop management system | |
CN103942635A (en) | Coal-mine gas safety intelligent patrol system | |
CN108154340A (en) | Prefabricated component informationization management system based on BIM cloud platforms | |
CN111445118A (en) | Task collaborative flow network model construction method and efficiency evaluation method for mine accident emergency rescue digital plan | |
Vorobyov et al. | Bases of the methodology of monitoring the impact of the human factor on the reliability of the railway infrastructure | |
Patriarca et al. | Change management in the ATM system: integrating information in the preliminary system safety assessment | |
WO2019136765A1 (en) | Typical dynamic coal mine disaster early-warning service method based on saas mode | |
CN115619130A (en) | Intelligent comprehensive dispatching management and control platform for coal mine | |
CN107909170A (en) | A kind of passenger-cargo rolling dress harbour of intelligence based on BIM technology | |
Lu et al. | Using cased based reasoning for automated safety risk management in construction industry | |
Gustafson et al. | Impact of technical and operational factors on effectiveness of automatic load-haul-dump machines | |
Sadvandi et al. | Safety and security interdependencies in complex systems and sos: Challenges and perspectives | |
CN116703148B (en) | Cloud computing-based mine enterprise risk portrait method | |
CN103942474A (en) | Method for controlling permission three-dimensional model system in software project management process | |
CN110782378A (en) | Community operation service platform, community management method, community management equipment and storage medium | |
CN116128197A (en) | Intelligent airport management system and method | |
CN106713387A (en) | Million-kilowatt-class nuclear power station emergency data acquisition system | |
CN113706101A (en) | Power grid project management intelligent system architecture and method | |
AlKheder et al. | Scenario-based preference modeling to examine the robustness of airport mega projects initiatives | |
Rajput et al. | Smart city driven by AI and data mining: The need of urbanization | |
CN111091266A (en) | Grade determination method and device of empty management station and storage medium | |
CN103186821A (en) | Troubleshooting and early warning management system for potential safety hazards of engineering project | |
Li et al. | Architecture and Key Technologies for Airline Operational Control System Based on Risk Preprocessing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170215 |