CN106408234A CN201610814740.8A CN201610814740A CN106408234A CN 106408234 A CN106408234 A CN 106408234A CN 201610814740 A CN201610814740 A CN 201610814740A CN 106408234 A CN106408234 A CN 106408234A
Authority
CN
China
Prior art keywords
vehicle
power material
information
demand
goods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610814740.8A
Other languages
Chinese (zh)
Inventor
衷新平
李安民
李琼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jining Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jining Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jining Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610814740.8A priority Critical patent/CN106408234A/en
Publication of CN106408234A publication Critical patent/CN106408234A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/083Shipping
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Health & Medical Sciences (AREA)
  • Theoretical Computer Science (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Traffic Control Systems (AREA)

Abstract

The invention discloses a power material dispensing method and belongs to the technical field of power systems. The method includes the steps of obtaining demand information of power materials, determining the material storage place information matching with the power material names, models and quantities according to the power material storage place information obtained in advance, determining candidate paths between the matched material storage places and demanding positions, determining the dispensing vehicle information according to the matched material storage place information, determining the dispensing path and dispensing vehicles according to the power material arriving time, demanding priority, demand generation time, the candidate paths, dispensing vehicle information and current time and current road condition information, and the dispensing vehicles dispensing the power materials along the dispensing path. The dispensing path and dispensing vehicles are determined according to the power material demanding information, matched material storage place information, the candidate paths, the dispensing vehicle information and current time and current road condition information to ensure optimal dispensing path and dispensing vehicles.

Description

A kind of Power Material allocator
Technical field
The present invention relates to technical field of power systems, particularly to a kind of Power Material allocator.
Background technology
With the continuous improvement of living standard, the use of the electrical equipment such as intelligent terminal, air-conditioning, electric light, TV gradually increases Many, the use of electrical equipment is premised on supply of electric power, and then electric power becomes one of energy that people mainly use daily.In order to Avoid unnecessary power-off and shorten power-off time as far as possible, power breakdown hidden danger occurs, or, the early warning such as power breakdown When, need the Power Materials such as part, equipment, material quickly to reach early warning scene, and allocator is for Power Material in early warning Timely supply play Main Function.
At present, early warning personnel determine the acquisition position of Power Material as needed, notify to obtain the related custodian in position The concrete Power Material of member's needs, the quantity needing, time of needs etc., custodial staff's foundation notifies to get corresponding electric power thing After money, determine distribution vehicle, allow distribution vehicle that Power Material is delivered to early warning personnel.
In said method, early warning personnel determine during the acquisition position of Power Material and preferably to determine foundation, Ke Nengzao Become to obtain position not optimal location, extend the distribution time of Power Material.
Content of the invention
(1) technical problem to be solved
In order to improve the optimality of distribution route and distribution vehicle, the invention provides a kind of Power Material distribution side Method, can according to the demand information of Power Material, coupling goods and materials storage information, alternative route, distribution vehicle information and Current time, current traffic information determine distribution route and distribution vehicle it is ensured that the optimum of distribution route and distribution vehicle Property.
(2) technical scheme
In order to achieve the above object, the main technical schemes that the present invention adopts include:
A kind of Power Material allocator, comprises the following steps:
101, obtain the demand information of Power Material, described demand information includes:Power Material title, Power Material type Number, Power Material quantity, Power Material reach time, demand classes, demand belonging positions, demand generation time;
102, according to the Power Material storage information obtaining in advance, determine and required Power Material title, electric power Goods and materials model, the goods and materials storage information of Power Material quantity Matching;
103, determine the alternative route between the goods and materials storage of described coupling and described demand belonging positions;
104, distribution vehicle information is determined according to the goods and materials storage information of coupling;
105, time, demand classes, demand generation time, alternative route, dispensing vehicle are reached according to described Power Material Information and current time, current traffic information determine distribution route and distribution vehicle;
106, by described distribution vehicle along the described distribution route described Power Material of dispensing.
Wherein, step 102, including following sub-step:
Step 102-1, according to the Power Material storage information obtaining in advance, determines the goods and materials storage of coupling, described The goods and materials storage of coupling is stored with described Power Material title, the Power Material of Power Material model, and the thing of described coupling The described Power Material title of money storage storage, the quantity of the Power Material of Power Material model are no less than required electric power Goods and materials quantity;
Step 102-2, determines the information of the goods and materials storage of described coupling.
Wherein, step 105, including following sub-step:
105-1, obtains in way information of vehicles, described in way information of vehicles, including:In the mark of way vehicle, in way vehicle Destination, the current location in way vehicle, way car transit time require;
105-2, according to described way information of vehicles, Power Material reach the time, demand classes, demand generation time, Alternative route, distribution vehicle information and current time, current traffic information determine distribution route and distribution vehicle, described join Vehicle is sent to be in way vehicle, or, described distribution vehicle is the vehicle in distribution vehicle information;
Wherein, step 105-2, including:
105-2-1, according to described way information of vehicles, Power Material reach the time, demand generation time, current time, Distribution vehicle information, current traffic information, demand classes determine the vehicle meeting described Power Material time demand, described full The vehicle of the described Power Material time demand of foot includes the vehicle in way vehicle and/or distribution vehicle information;
105-2-2, according to the vehicle, current time, current traffic information and the time that meet described Power Material time demand Routing line, calculates the transport duration that each vehicle meeting described Power Material time demand is directed to each alternative route;
105-2-3, the vehicle in the distribution vehicle information meeting described Power Material time demand is directed to each candidate road The transport duration of line is adjusted to its that calculate and is directed to the transport duration+0.36 hour of each alternative route;
105-2-4, will meet the transport duration being directed to each alternative route in way vehicle of described Power Material time demand It is adjusted to its that calculate and be directed to the transport duration+1.39 hours of each alternative route;
105-2-5, after adjustment, the vehicle respectively meeting described Power Material time demand is directed to the fortune of each alternative route The shortest transport duration is determined in defeated duration, will be true for corresponding for the shortest transport duration vehicle meeting described Power Material time demand It is set to distribution vehicle, the shortest transport corresponding alternative route of duration is defined as distribution route.
Alternatively, before step 102 execution, also comprise the steps:
A, obtains each goods and materials storage stored power goods and materials title, Power Material model, Power Material quantity, is formed Power Material storage information.
Alternatively, after described A execution, also comprise the steps:
B, updates described Power Material storage information.
Alternatively, the information of the goods and materials storage of described coupling, including:The mark of goods and materials storage of described coupling, institute State the position of goods and materials storage of coupling, the currently available vehicle of goods and materials storage of described coupling.
Alternatively, step 103, including:
Whole routes of described demand belonging positions will be reached from the goods and materials storage of described coupling as alternative route.
Alternatively, step 104, including:
Distribution vehicle information is selected from the currently available vehicle of goods and materials storage of described coupling according to described demand information.
Alternatively, after step 105 execution, also comprise the steps:
C, described distribution vehicle is stored as in way vehicle.
(3) beneficial effect
The invention has the beneficial effects as follows:According to the demand information of Power Material, the goods and materials storage information of coupling, Hou Xuanlu Line, distribution vehicle information and current time, current traffic information determines distribution route and distribution vehicle it is ensured that distribution route And the optimality of distribution vehicle.
Brief description
Fig. 1 is a kind of Power Material allocator flow chart that the embodiment of the present invention one provides;
Fig. 2 is a kind of Power Material allocator flow chart that the embodiment of the present invention two provides.
Specific embodiment
In order to preferably explain the present invention, in order to understand, below in conjunction with the accompanying drawings, by specific embodiment, to this Bright it is described in detail.
At present, early warning personnel determine the acquisition position of Power Material as needed, notify to obtain the related custodian in position The concrete Power Material of member's needs, the quantity needing, time of needs etc., custodial staff's foundation notifies to get corresponding electric power thing After money, determine distribution vehicle, allow distribution vehicle that Power Material is delivered to early warning personnel, and in said method, early warning personnel determine Preferably do not determine foundation during the acquisition position of Power Material, be likely to result in acquisition position not optimal location, extend electricity The distribution time of power goods and materials.For this reason, the invention provides a kind of Power Material allocator, according to the demand letter of Power Material Breath, the goods and materials storage information of coupling, alternative route, distribution vehicle information and current time, current traffic information determine joins Send route and distribution vehicle it is ensured that the optimality of distribution route and distribution vehicle.
Embodiment one
Present embodiments provide a kind of Power Material allocator, referring to Fig. 1, the method flow that the present embodiment provides is concrete As follows:
101, obtain the demand information of Power Material, demand information includes:Power Material title, Power Material model, electricity Power goods and materials quantity, Power Material reach time, demand classes, demand belonging positions, demand generation time;
102, according to the Power Material storage information obtaining in advance, determine and required Power Material title, electric power Goods and materials model, the goods and materials storage information of Power Material quantity Matching;
Alternatively, before step 102 execution, also include:
Obtain each goods and materials storage stored power goods and materials title, Power Material model, Power Material quantity, form electricity Power goods and materials storage information.
Alternatively, after forming Power Material storage information, also include:
Update Power Material storage information.
Alternatively, step 102, including following sub-step:
Step 102-1, according to the Power Material storage information obtaining in advance, determines the goods and materials storage of coupling, coupling Goods and materials storage be stored with Power Material title, the Power Material of Power Material model, and the goods and materials storage storage mated Power Material title, the Power Material of Power Material model quantity be no less than required Power Material quantity;
Step 102-2, determines the information of the goods and materials storage of coupling.
Alternatively, the information of the goods and materials storage of coupling, including:The mark of goods and materials storage of coupling, the goods and materials of coupling The position of storage, the currently available vehicle of goods and materials storage of coupling.
103, determine the alternative route between the goods and materials storage of coupling and demand belonging positions;
Alternatively, step 103, including:
Whole routes of demand belonging positions will be reached from the goods and materials storage of coupling as alternative route.
104, distribution vehicle information is determined according to the goods and materials storage information of coupling;
Alternatively, step 104, including:
Information selects distribution vehicle information from the currently available vehicle of goods and materials storage of coupling according to demand.
105, time, demand classes, demand generation time, alternative route, distribution vehicle letter are reached according to Power Material Breath and current time, current traffic information determine distribution route and distribution vehicle;
Wherein, step 105, including following sub-step:
105-1, obtains in way information of vehicles, in way information of vehicles, including:Mark in way vehicle, the mesh in way vehicle Ground, the current location in way vehicle, way car transit time require;
105-2, reaches time, demand classes, demand generation time, candidate according in way information of vehicles, Power Material Route, distribution vehicle information and current time, current traffic information determine distribution route and distribution vehicle, and distribution vehicle is In way vehicle, or, distribution vehicle is the vehicle in distribution vehicle information;
Alternatively, step 105-2, including:
105-2-1, reaches time, demand generation time, current time, dispensing according in way information of vehicles, Power Material Information of vehicles, current traffic information, demand classes determine the vehicle meeting Power Material time demand, when meeting Power Material Between the vehicle of demand include the vehicle in way vehicle and/or distribution vehicle information;
105-2-2, according to the vehicle, current time, current traffic information and the candidate road that meet Power Material time demand Line, calculates the transport duration that each vehicle meeting Power Material time demand is directed to each alternative route;
105-2-3, the vehicle in the distribution vehicle information meeting Power Material time demand is directed to each alternative route Transport duration is adjusted to its that calculate and is directed to the transport duration+0.36 hour of each alternative route;
105-2-4, will meet the transport duration adjustment being directed to each alternative route in way vehicle of Power Material time demand It is directed to the transport duration+1.39 hours of each alternative route for its calculating;
105-2-5, from adjustment after, respectively meet Power Material time demand vehicle be directed to each alternative route transport when Determine the shortest transport duration in length, the shortest transport corresponding vehicle meeting Power Material time demand of duration is defined as providing and delivering Vehicle, the shortest transport corresponding alternative route of duration is defined as distribution route.
Alternatively, after step 105 execution, also comprise the steps:
Distribution vehicle is stored as in way vehicle.
106, by distribution vehicle along distribution route dispensing Power Material.
The method that the present embodiment provides, according to the demand information of Power Material, the goods and materials storage information of coupling, Hou Xuanlu Line, distribution vehicle information and current time, current traffic information determines distribution route and distribution vehicle it is ensured that distribution route And the optimality of distribution vehicle.
In order to clearly illustrate the Power Material allocator that above-described embodiment provides, in conjunction with above-described embodiment Hold, taking following examples two as a example, Power Material allocator is described in detail, sees below embodiment two:
Embodiment two
Present embodiments provide a kind of Power Material allocator, referring to Fig. 2, the method flow that the present embodiment provides is concrete As follows:
201, obtain Power Material storage information;
Obtain each goods and materials storage stored power goods and materials title, Power Material model, Power Material quantity, form electricity Power goods and materials storage information.
Wherein, acquisition modes can send stored power goods and materials title, Power Material type for receiving goods and materials storage Number, Power Material quantity or each goods and materials storage stored power goods and materials title, electric power are obtained by management platform Goods and materials model, Power Material quantity.
After forming Power Material storage information, in order to ensure the accuracy of Power Material storage information, also can Update Power Material storage information.
Concrete update mode can periodically obtain each goods and materials storage stored power goods and materials name for regularly updating Title, Power Material model, Power Material quantity or interim update, that is, when there being Power Material title, or Power Material Model, or when Power Material quantity changes, obtain the Power Material title changing or Power Material model or electric power Goods and materials quantity.
It should be noted that this step is not only performed once, when goods and materials storage changes, or Power Material name When title, Power Material model etc. change, all can perform this step, to ensure the accuracy of Power Material storage information, The present embodiment is not defined to the concrete reason re-executing this step.
202, obtain the demand information of Power Material;
Wherein, demand information includes:Power Material title, Power Material model, Power Material quantity, Power Material reach Time, demand classes, demand belonging positions, demand generation time;
203, according to the Power Material storage information obtaining in advance, determine and required Power Material title, electric power Goods and materials model, the goods and materials storage information of Power Material quantity Matching;
The implementation of this step includes but is not limited to:
202-1, according to the Power Material storage information obtaining in advance, determines the goods and materials storage of coupling;
202-2 determines the information of the goods and materials storage of coupling.
Wherein, the goods and materials storage of coupling is stored with Power Material title, the Power Material of Power Material model, and mates Goods and materials storage storage Power Material title, the Power Material of Power Material model quantity be no less than required electric power Goods and materials quantity;
In addition, the information of the goods and materials storage of coupling, including:The mark of goods and materials storage of coupling, the goods and materials of coupling are deposited The position on storage ground, the currently available vehicle of goods and materials storage of coupling.
204, determine the alternative route between the goods and materials storage of coupling and demand belonging positions;
According to urban planning, construction department promulgate map, or, map supply business provide map, can from The goods and materials storage joined reaches whole routes of demand belonging positions all as alternative route.
205, distribution vehicle information is determined according to the goods and materials storage information of coupling;
Information selects distribution vehicle information from the currently available vehicle of goods and materials storage of coupling according to demand.
For example:According to the Power Material title in power information, Power Material model it may be determined that this Power Material volume Larger, then select to load the distribution vehicle information of this volume from the currently available vehicle of goods and materials storage of coupling.
206, time, demand classes, demand generation time, alternative route, distribution vehicle letter are reached according to Power Material Breath and current time, current traffic information determine distribution route and distribution vehicle;
This step can have 2 kinds of implementations:
First kind of way:Vehicle delivery Power Material by goods and materials storage.
For this kind of mode, need to select a distribution vehicle in the distribution vehicle information determining from step 205, from time A distribution route is selected in routing line.
For example, the demand that time interval demand generation time is relatively near, demand classes are higher is reached for Power Material, to joining Send the time to have higher requirements, select from alternative route in way time shorter route as distribution route, further according to current when Between, current traffic information, distribution vehicle information (for example, the requirement to road for the vehicle) determine each alternative route in the way time and Available vehicle.Comprehensive information above, determines final distribution route and distribution vehicle.
The second way:By the vehicle of goods and materials storage, or, in way vehicle delivery Power Material.
The premise of this kind of mode is:The operation information of each distribution vehicle all would know that.For example, can by vehicle management system To obtain each vehicles identifications, the current location of vehicle, destination locations, E.T.A, information of vehicles, cargo information Deng.
In the second way, according to Power Material reach the time, demand classes, demand generation time, alternative route, Distribution vehicle information and current time, current traffic information determine that the implementation of distribution route and distribution vehicle is permissible For:
206-1, obtains in way information of vehicles;
Wherein, in way information of vehicles, including:In the mark of the way vehicle, destination in way vehicle, current in way vehicle Position, way car transit time require.
206-2, reaches time, demand classes, demand generation time, candidate according in way information of vehicles, Power Material Route, distribution vehicle information and current time, current traffic information determine distribution route and distribution vehicle.
Wherein, distribution vehicle is in way vehicle, or, distribution vehicle is the vehicle in distribution vehicle information;
For example, the demand that time interval demand generation time is relatively near, demand classes are higher is reached for Power Material, to joining Send the time to have higher requirements, select from alternative route in way time shorter route as distribution route, further according to current when Between, current traffic information, distribution vehicle information (for example, the requirement to road for the vehicle) determine each alternative route in the way time and Available vehicle, then, according to way information of vehicles, current time, current traffic information, determine each alternative route in the way time With can be used on way vehicle.Comprehensive information above, determines final distribution route and distribution vehicle.
Wherein, distribution vehicle is not limited to the vehicle in way vehicle or distribution vehicle information, according to practical situation from The distribution vehicle of optimum is determined, that is, distribution vehicle is in way vehicle in vehicle in way vehicle or distribution vehicle information, or, Distribution vehicle is the vehicle in distribution vehicle information.
By second method, reasonably can reach dispensing effect using in way vehicle, reduce the waste of vehicle resources.
In the method providing for clearer explanation the present embodiment, the implementation of step 206-2, now provides a kind of step The rapid possible implementation of 206-2.
206-2-1, reaches time, demand generation time, current time, dispensing according in way information of vehicles, Power Material Information of vehicles, current traffic information, demand classes determine the vehicle meeting Power Material time demand, when meeting Power Material Between the vehicle of demand include the vehicle in way vehicle and/or distribution vehicle information;
206-2-2, according to the vehicle, current time, current traffic information and the candidate road that meet Power Material time demand Line, calculates the transport duration that each vehicle meeting Power Material time demand is directed to each alternative route;
Due to meeting the vehicle of Power Material time demand when transporting Power Material, the time that can produce indefinite content disappears Consumption, for example, oiling, Power Material are put time-consuming etc., therefore, in step 206- in the vehicle meeting Power Material time demand 2-2 calculates after each vehicle meeting Power Material time demand is directed to the transport duration of each alternative route, can execution step 206-2-3, step 206-2-4, are adjusted to the duration that this calculates, so that the transport duration after adjustment more meets actual feelings Condition.
206-2-3, the vehicle in the distribution vehicle information meeting Power Material time demand is directed to each alternative route Transport duration is adjusted to its that calculate and is directed to the transport duration+0.36 hour of each alternative route;
206-2-4, will meet the transport duration adjustment being directed to each alternative route in way vehicle of Power Material time demand It is directed to the transport duration+1.39 hours of each alternative route for its calculating;
206-2-5, from adjustment after, respectively meet Power Material time demand vehicle be directed to each alternative route transport when Determine the shortest transport duration in length, the shortest transport corresponding vehicle meeting Power Material time demand of duration is defined as providing and delivering Vehicle, the shortest transport corresponding alternative route of duration is defined as distribution route.
It is managed in way vehicle for convenience, conveniently utilizes in way vehicle, reduce the wasting of resources, in execution After step 206-2 determines distribution route and distribution vehicle, also distribution vehicle can be stored as in way vehicle.
207, by distribution vehicle along distribution route dispensing Power Material.
It should be noted that:
1) the present embodiment is not defined to the execution sequence of step 201, as long as executing before step 203.
2) the present embodiment is not defined to the execution sequence of step 204 and step 205.
The Power Material allocator being provided by the present embodiment, when determining distribution route and distribution vehicle, is comprehensively examined Consider time factor, Power Material factor itself, distribution vehicle factor, road conditions factor, important sexual factor etc. so that the dispensing of determination Route and distribution vehicle more tally with the actual situation, and more have feasibility it is ensured that the optimality of distribution route and distribution vehicle.
The Power Material allocator that the present embodiment provides, stores according to the demand information of Power Material, the goods and materials of coupling Ground information, alternative route, distribution vehicle information and current time, current traffic information determine distribution route and dispensing vehicle It is ensured that the optimality of distribution route and distribution vehicle.

Claims (7)

1. a kind of Power Material allocator, it is characterised in that methods described, comprises the steps:
101, obtain the demand information of Power Material, described demand information includes:Power Material title, Power Material model, electricity Power goods and materials quantity, Power Material reach time, demand classes, demand belonging positions, demand generation time;
102, according to the Power Material storage information obtaining in advance, determine and required Power Material title, Power Material Model, the goods and materials storage information of Power Material quantity Matching;
103, determine the alternative route between the goods and materials storage of described coupling and described demand belonging positions;
104, distribution vehicle information is determined according to the goods and materials storage information of coupling;
105, time, demand classes, demand generation time, alternative route, distribution vehicle letter are reached according to described Power Material Breath and current time, current traffic information determine distribution route and distribution vehicle;
106, by described distribution vehicle along the described distribution route described Power Material of dispensing;
Wherein, step 102, including following sub-step:
Step 102-1, according to the Power Material storage information obtaining in advance, determines the goods and materials storage of coupling, described coupling Be stored with described Power Material title, the Power Material of Power Material model, and goods and materials of described coupling of goods and materials storage deposit The described Power Material title of storage ground storage, the quantity of the Power Material of Power Material model are no less than required Power Material Quantity;
Step 102-2, determines the information of the goods and materials storage of described coupling;
Wherein, step 105, including following sub-step:
105-1, obtains in way information of vehicles, described in way information of vehicles, including:Mark in way vehicle, the mesh in way vehicle Ground, the current location in way vehicle, way car transit time require;
105-2, reaches time, demand classes, demand generation time, candidate according to described in way information of vehicles, Power Material Route, distribution vehicle information and current time, current traffic information determine distribution route and distribution vehicle, described dispensing vehicle It is in way vehicle, or, described distribution vehicle is the vehicle in distribution vehicle information;
Wherein, step 105-2, including:
105-2-1, reaches time, demand generation time, current time, dispensing according to described in way information of vehicles, Power Material Information of vehicles, current traffic information, demand classes determine and meet the vehicle of described Power Material time demand, described meet institute The vehicle stating Power Material time demand includes the vehicle in way vehicle and/or distribution vehicle information;
105-2-2, according to the vehicle, current time, current traffic information and the candidate road that meet described Power Material time demand Line, calculates the transport duration that each vehicle meeting described Power Material time demand is directed to each alternative route;
105-2-3, the vehicle in the distribution vehicle information meeting described Power Material time demand is directed to each alternative route Transport duration is adjusted to its that calculate and is directed to the transport duration+0.36 hour of each alternative route;
105-2-4, will meet the transport duration adjustment being directed to each alternative route in way vehicle of described Power Material time demand It is directed to the transport duration+1.39 hours of each alternative route for its calculating;
105-2-5, from adjustment after, respectively meet described Power Material time demand vehicle be directed to each alternative route transport when Determine the shortest transport duration in length, the shortest transport corresponding vehicle meeting described Power Material time demand of duration is defined as Distribution vehicle, the shortest transport corresponding alternative route of duration is defined as distribution route.
2. method according to claim 1 is it is characterised in that before step 102 execution, also comprise the steps:
A, obtains each goods and materials storage stored power goods and materials title, Power Material model, Power Material quantity, forms electric power Goods and materials storage information.
3. method according to claim 2 is it is characterised in that after described A execution, also comprise the steps:
B, updates described Power Material storage information.
4. method according to claim 1 is it is characterised in that the information of the goods and materials storage of described coupling, including:Described The mark of goods and materials storage of coupling, the position of goods and materials storage of described coupling, the goods and materials storage of described coupling currently may be used Use vehicle.
5. method according to claim 1 is it is characterised in that step 103, including:
Whole routes of described demand belonging positions will be reached from the goods and materials storage of described coupling as alternative route.
6. method according to claim 1 is it is characterised in that step 104, including:
Distribution vehicle information is selected from the currently available vehicle of goods and materials storage of described coupling according to described demand information.
7. the method according to claim 1-6 is it is characterised in that after step 105 execution, also comprise the steps:
C, described distribution vehicle is stored as in way vehicle.
CN201610814740.8A 2016-09-09 2016-09-09 Power material dispensing method Pending CN106408234A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610814740.8A CN106408234A (en) 2016-09-09 2016-09-09 Power material dispensing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610814740.8A CN106408234A (en) 2016-09-09 2016-09-09 Power material dispensing method

Publications (1)

Publication Number Publication Date
CN106408234A true CN106408234A (en) 2017-02-15

Family

ID=57999008

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610814740.8A Pending CN106408234A (en) 2016-09-09 2016-09-09 Power material dispensing method

Country Status (1)

Country Link
CN (1) CN106408234A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109472530A (en) * 2018-10-31 2019-03-15 国网河北省电力有限公司电力科学研究院 Goods delivery task creating method and terminal device
CN109993396A (en) * 2018-01-03 2019-07-09 航天信息股份有限公司 Grain dispatching method and device
CN110235075A (en) * 2017-04-28 2019-09-13 深圳市元征科技股份有限公司 A kind of automatic running method and device of factory's article-holding cart
CN111123870A (en) * 2019-12-23 2020-05-08 广东利元亨智能装备股份有限公司 System control method and device and electronic equipment
CN111582719A (en) * 2020-05-08 2020-08-25 闯志超 Method and system for dispatching planning of power grid materials
CN111967684A (en) * 2020-08-27 2020-11-20 北京合众伟奇科技有限公司 Metering asset active distribution method based on big data analysis
CN113342869A (en) * 2021-08-06 2021-09-03 北京国电通网络技术有限公司 Visualization path display method and device, electronic equipment and computer readable medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102081786A (en) * 2011-01-30 2011-06-01 北京东方车云信息技术有限公司 Vehicle scheduling method and system
CN105913212A (en) * 2016-05-20 2016-08-31 广东电网有限责任公司中山供电局 Method and system for power material distribution management

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102081786A (en) * 2011-01-30 2011-06-01 北京东方车云信息技术有限公司 Vehicle scheduling method and system
CN105913212A (en) * 2016-05-20 2016-08-31 广东电网有限责任公司中山供电局 Method and system for power material distribution management

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110235075A (en) * 2017-04-28 2019-09-13 深圳市元征科技股份有限公司 A kind of automatic running method and device of factory's article-holding cart
CN109993396A (en) * 2018-01-03 2019-07-09 航天信息股份有限公司 Grain dispatching method and device
CN109472530A (en) * 2018-10-31 2019-03-15 国网河北省电力有限公司电力科学研究院 Goods delivery task creating method and terminal device
CN111123870A (en) * 2019-12-23 2020-05-08 广东利元亨智能装备股份有限公司 System control method and device and electronic equipment
CN111123870B (en) * 2019-12-23 2023-06-30 广东利元亨智能装备股份有限公司 System control method and device and electronic equipment
CN111582719A (en) * 2020-05-08 2020-08-25 闯志超 Method and system for dispatching planning of power grid materials
CN111967684A (en) * 2020-08-27 2020-11-20 北京合众伟奇科技有限公司 Metering asset active distribution method based on big data analysis
CN111967684B (en) * 2020-08-27 2024-02-02 北京合众伟奇科技股份有限公司 Metering asset active distribution method based on big data analysis
CN113342869A (en) * 2021-08-06 2021-09-03 北京国电通网络技术有限公司 Visualization path display method and device, electronic equipment and computer readable medium

Similar Documents

Publication Publication Date Title
CN106408234A (en) Power material dispensing method
Zhao et al. An integrated framework for electric vehicle rebalancing and staff relocation in one-way carsharing systems: Model formulation and Lagrangian relaxation-based solution approach
CN107323300B (en) A kind of-electric car reservation charging method of vehicle conjunctive model of being stood based on road-
US9689692B2 (en) Charging facility information providing system and electrically driven vehicle
EP2608146B1 (en) Management device, method of management, computer program, management system, and management method
CN105529788B (en) Unmanned plane method for charging batteries, system and unmanned plane
CN105071508B (en) Electric vehicle intelligent charging method and system
US20140143002A1 (en) Charge/discharge scheduling-operation system and a method thereof
CN105243836A (en) Carpooling method and device
CN109034465A (en) Consider the charging station bi-level optimization method that charging station addressing is coupled with trip route
CN106042963B (en) The cooperative optimization method and system of electrified transportation network and electric system
WO2013118113A2 (en) Method and system for optimization of deployment of battery service stations for electric vehicles
CN106326471A (en) Route recommendation method and device
CN107392336A (en) Distributed electric automobile charging dispatching method based on reservation in intelligent transportation
CN105279955A (en) Carpooling method and device
CN107633701A (en) A kind of parking space intelligent match control method
GU et al. Monitoring dispatch information system of trucks and shovels in an open pit based on GIS/GPS/GPRS
JP2023535828A (en) Routing method, device, equipment and medium
WO2018120829A1 (en) Charging facility scheduling system and method
CN111915150B (en) Electric bus system planning method
CN105761365B (en) Platform of internet of things applied to emergency power supply and intelligent transportation field
CN109612488A (en) Mixing trip mode path planning system and method based on big data micro services
CN110375757A (en) Intelligently auxiliary roadway line gauge draws method to new-energy automobile based on big data
CN103700272A (en) Convenient traffic information real-time transceiving system
US20160193931A1 (en) Power supply system and discharge device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170215

RJ01 Rejection of invention patent application after publication