CN106406283A - Data management method of double controllers of intelligent electric energy meter - Google Patents

Data management method of double controllers of intelligent electric energy meter Download PDF

Info

Publication number
CN106406283A
CN106406283A CN201610939210.6A CN201610939210A CN106406283A CN 106406283 A CN106406283 A CN 106406283A CN 201610939210 A CN201610939210 A CN 201610939210A CN 106406283 A CN106406283 A CN 106406283A
Authority
CN
China
Prior art keywords
controller
data
measurement controller
measurement
read
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610939210.6A
Other languages
Chinese (zh)
Other versions
CN106406283B (en
Inventor
任智仁
周宣
黄杰
韩潇俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wasion Group Co Ltd
Original Assignee
Wasion Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wasion Group Co Ltd filed Critical Wasion Group Co Ltd
Priority to CN201610939210.6A priority Critical patent/CN106406283B/en
Publication of CN106406283A publication Critical patent/CN106406283A/en
Application granted granted Critical
Publication of CN106406283B publication Critical patent/CN106406283B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0259Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
    • G05B23/0275Fault isolation and identification, e.g. classify fault; estimate cause or root of failure
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/24Pc safety
    • G05B2219/24065Real time diagnostics

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

The invention discloses a data management method of double controllers of an intelligent electric energy meter. The method comprises the steps that a management controller is powered on and reset and shakes hands with a metering controller; the management controller reads a pre-stored parameter and carries out parameter configuration on the metering controller; the management controller reads the metering data of the metering controller and judges legality; the management controller reads the operation parameter of the metering controller and judges legality. According to the method, through the steps of power-on set and handshake judgment, parameter configuration and judgment, metering data legality judgment and operation parameter legality judgment, the normal operation of the electric energy meter management controller and the metering controller and the reliability of metering data interaction are realized, and thus the accuracy, reliability and stability of the intelligent electric energy meter metering are ensured.

Description

The data managing method of intelligent electric energy meter dual controller
Technical field
The invention belongs to electrical safety field is and in particular to a kind of data managing method of intelligent electric energy meter dual controller.
Background technology
Development with China's economic technology and the raising of people's living standard, intelligent grid has been widely used for people Production and life among, brought endless facility.With the development of intelligent grid, intelligent electric energy meter also obtains Greatly popularize.Meanwhile, the linked network quantity with electric energy meter sharply increases the increase with household electricity load, and the electricity charge become For a very important great living expense of average family, therefore everybody increasingly improves to the degree of concern of intelligent electric energy meter.
As the meter specially of electricity metering, the accuracy of its metering, stability and reliability are intelligence to intelligent electric energy meter The crucial performance assessment criteria of electric energy meter.At present, the dual controller in intelligent electric energy meter includes measurement controller and Management Controller, meter Amount controller is responsible for electric energy metrical specially, and Management Controller is then responsible for other work(such as data management, the communication of intelligent electric energy meter Energy.Redundancy backup before at present the data managing method of intelligent electric energy meter dual controller also rests on the several years, periodically than reciprocity Outmoded technological phase, has been no longer desirable for the explosive increase developing rapidly data of current intelligent electric energy meter.
Content of the invention
It is an object of the invention to provide a kind of intelligent electric energy meter dual control that ensure that intelligent electric energy meter data reliability The data managing method of device processed.
The data managing method of this intelligent electric energy meter dual controller disclosed by the invention, comprises the steps:
Management Controller electrification reset, and the step shaken hands with measurement controller;
Management Controller reads prestore parameter, and the step carrying out parameter configuration to measurement controller;
The step that Management Controller reads the continuous data of measurement controller and judges legitimacy;
The step that Management Controller reads the operational factor of measurement controller and judges legitimacy.
Described measurement controller electrification reset, and with the step that Management Controller is shaken hands, specifically include following sub-step:
A. Management Controller electrification reset after the completion of initializing, sends reset signal to measurement controller;
B., after Management Controller time delay special time, send handshake communication order to measurement controller again;
C. Management Controller judges whether successfully to shake hands according to return command of shaking hands:
If shaking hands successfully, measurement controller resets and completes;
If it is unsuccessful to shake hands, Management Controller continues to send handshake communication order, and calculates the number of times of handshake communication failure;
D. the handshake communication frequency of failure exceedes the number of times being previously set, Management Controller then repeat step A ~ step C, and records The number of times repeating;
E number of repetition reaches the number of times being previously set, then Management Controller thinks measurement controller fault, and sends warning.
Described Management Controller reads prestore parameter, and the step carrying out parameter configuration to measurement controller, concrete bag Include following sub-step:
A. Management Controller and measurement controller are shaken hands after success, Management Controller according to the register address of measurement controller, Obtain the correct parameter of this depositor from data storage area, parameter is carried out with the framing of tape verifying sum, then is written into meter In corresponding address in amount controller;
B., after the parameter read-in success of measurement controller, Management Controller returns from the corresponding depositor of measurement controller again Read corresponding parameter, and the data of retaking of a year or grade is compared with the correct parameter prestoring:
If the comparing of retaking of a year or grade is errorless, Management Controller carries out parameter configuration to the next depositor of measurement controller;
If the comparing of retaking of a year or grade is wrong, Management Controller repeat step a ~ step b is until the comparing of retaking of a year or grade is errorless.
The step that described Management Controller reads the continuous data of measurement controller and judges legitimacy, specifically include as Lower sub-step:
1)Management Controller is according to sequential pre-determined with measurement controller it would be desirable to the depositing of measurement controller read Device address carries out framing and is written in measurement controller, and then retaking of a year or grade takes the data in this address under measurement controller;
2)The data of this address is carried out shadow latch by measurement controller:Store in the depositor of a fixation, and fall clearly In measurement controller, the data in address is read by this institute;
3)Management Controller again reads off the data in shadow register, and by the data read from shadow register with from The data read in measurement controller is compared:
If the comparing of twi-read is errorless, assert that the data that this is read is valid data;
If the comparing of twi-read is wrong, assert that the data that this is read is invalid data, give up this invalid data, and Carry out following cycle digital independent link.
The step that described Management Controller reads the operational factor of measurement controller and judges legitimacy, specifically include as Lower sub-step:
1.. when the control program of intelligent electric energy meter is normally run, measurement controller carries out real-time school to critical operational parameters Test;
2.. Management Controller periodically reads the check results of measurement controller, and the verification knot by check results and prior setting Fruit is compared:
If compare errorless then it is assumed that measurement controller normal operation;
If comparing wrong, Management Controller repeats to read the check results of measurement controller;
If 3.. the continuous check errors several times of check results to measurement controller for the Management Controller, assert measurement controller Operational factor mistake.
Described measurement controller is verified in real time to critical operational parameters, specially adopts CRC check.
The data managing method of this intelligent electric energy meter dual controller that the present invention provides, is sentenced with shaking hands by electrification reset Disconnected, parameter configuration and the step such as judgement, continuous data validity judgement and operational factor validity judgement are it is achieved that electric energy meter pipe The reliability that reason controller is interacted with normal operation and the continuous data of measurement controller, so that it is guaranteed that intelligent electric energy meter metering Accuracy, reliability and stability.
Brief description
Fig. 1 is the overview flow chart of the inventive method.
Fig. 2 is the Management Controller electrification reset of the present invention the sub-process block diagram shaken hands with measurement controller.
Fig. 3 is that the Management Controller of the present invention reads and prestores parameter and measurement controller is carried out with the sub-process of parameter configuration Block diagram.
Fig. 4 is that the Management Controller of the present invention reads the continuous data of measurement controller and judges the sub-process frame of legitimacy Figure.
Fig. 5 is that the Management Controller of the present invention reads the operational factor of measurement controller and judges the sub-process frame of legitimacy Figure.
Specific embodiment
It is illustrated in figure 1 the overview flow chart of the inventive method:This intelligent electric energy meter dual controller disclosed by the invention Data managing method, including following four steps:
Management Controller electrification reset, and the step shaken hands with measurement controller;
Management Controller reads prestore parameter, and the step carrying out parameter configuration to measurement controller;
The step that Management Controller reads the continuous data of measurement controller and judges legitimacy;
The step that Management Controller reads the operational factor of measurement controller and judges legitimacy.
The sub-process block diagram being illustrated in figure 2 the Management Controller electrification reset of the present invention and shaking hands with measurement controller: Measurement controller electrification reset and with the step that Management Controller is shaken hands, specifically include following sub-step:
A. Management Controller electrification reset after the completion of initializing, sends reset signal to measurement controller;
B., after Management Controller time delay special time, send handshake communication order to measurement controller again;
C. Management Controller judges whether successfully to shake hands according to return command of shaking hands:
If shaking hands successfully, measurement controller resets and completes;
If it is unsuccessful to shake hands, Management Controller continues to send handshake communication order, and calculates the number of times of handshake communication failure;
D. the handshake communication frequency of failure exceedes the number of times being previously set, Management Controller then repeat step A ~ step C, and records The number of times repeating;
E number of repetition reaches the number of times being previously set, then Management Controller thinks measurement controller fault, and sends warning.
The Management Controller being illustrated in figure 3 the present invention reads the parameter carry out parameter configuration to measurement controller of prestoring Sub-process block diagram:Management Controller reads prestore parameter the step that carries out parameter configuration to measurement controller, specifically include as Lower sub-step:
A. Management Controller and measurement controller are shaken hands after success, Management Controller according to the register address of measurement controller, Obtain the correct parameter of this depositor from data storage area, parameter is carried out with the framing of tape verifying sum, then is written into meter In corresponding address in amount controller;
B., after the parameter read-in success of measurement controller, Management Controller returns from the corresponding depositor of measurement controller again Read corresponding parameter, and the data of retaking of a year or grade is compared with the correct parameter prestoring:
If the comparing of retaking of a year or grade is errorless, Management Controller carries out parameter configuration to the next depositor of measurement controller;
If the comparing of retaking of a year or grade is wrong, Management Controller repeat step a ~ step b is until the comparing of retaking of a year or grade is errorless.
The Management Controller being illustrated in figure 4 the present invention reads the continuous data of measurement controller and judges the son of legitimacy FB(flow block):The step that Management Controller reads the continuous data of measurement controller and judges legitimacy, specifically includes following son Step:
1)Management Controller is according to sequential pre-determined with measurement controller it would be desirable to the depositing of measurement controller read Device address carries out framing and is written in measurement controller, and then retaking of a year or grade takes the data in this address under measurement controller;
2)The data of this address is carried out shadow latch by measurement controller:Store in the depositor of a fixation, and fall clearly In measurement controller, the data in address is read by this institute;
3)Management Controller again reads off the data in shadow register, and by the data read from shadow register with from The data read in measurement controller is compared:
If the comparing of twi-read is errorless, assert that the data that this is read is valid data;
If the comparing of twi-read is wrong, assert that the data that this is read is invalid data, give up this invalid data, and Carry out following cycle digital independent link.
The Management Controller being illustrated in figure 5 the present invention reads the operational factor of measurement controller and judges the son of legitimacy FB(flow block):The step that Management Controller reads the operational factor of measurement controller and judges legitimacy, specifically includes following son Step:
1.. when the control program of intelligent electric energy meter is normally run, measurement controller is verified in real time to critical operational parameters (Such as CRC check);
2.. Management Controller periodically reads the check results of measurement controller, and the verification knot by check results and prior setting Fruit is compared:
If compare errorless then it is assumed that measurement controller normal operation;
If comparing wrong, Management Controller repeats to read the check results of measurement controller;
If 3.. the continuous check errors several times of check results to measurement controller for the Management Controller, assert measurement controller Operational factor mistake.

Claims (9)

1. a kind of data managing method of intelligent electric energy meter dual controller, comprises the steps:
Management Controller electrification reset, and the step shaken hands with measurement controller;
Management Controller reads prestore parameter, and the step carrying out parameter configuration to measurement controller;
The step that Management Controller reads the continuous data of measurement controller and judges legitimacy;
The step that Management Controller reads the operational factor of measurement controller and judges legitimacy.
2. the data managing method of intelligent electric energy meter dual controller according to claim 1 is it is characterised in that described meter Amount controller electrification reset, and with the step that Management Controller is shaken hands, specifically include following sub-step:
A. Management Controller electrification reset after the completion of initializing, sends reset signal to measurement controller;
B., after Management Controller time delay special time, send handshake communication order to measurement controller again;
C. Management Controller judges whether successfully to shake hands according to return command of shaking hands:
If shaking hands successfully, measurement controller resets and completes;
If it is unsuccessful to shake hands, Management Controller continues to send handshake communication order, and calculates the number of times of handshake communication failure;
D. the handshake communication frequency of failure exceedes the number of times being previously set, Management Controller then repeat step A ~ step C, and records The number of times repeating;
E number of repetition reaches the number of times being previously set, then Management Controller thinks measurement controller fault, and sends warning.
3. the data managing method of intelligent electric energy meter dual controller according to claim 1 is it is characterised in that described pipe Reason controller reads prestore parameter, and the step carrying out parameter configuration to measurement controller, specifically includes following sub-step:
A. Management Controller and measurement controller are shaken hands after success, Management Controller according to the register address of measurement controller, Obtain the correct parameter of this depositor from data storage area, parameter is carried out with the framing of tape verifying sum, then is written into meter In corresponding address in amount controller;
B., after the parameter read-in success of measurement controller, Management Controller returns from the corresponding depositor of measurement controller again Read corresponding parameter, and the data of retaking of a year or grade is compared with the correct parameter prestoring:
If the comparing of retaking of a year or grade is errorless, Management Controller carries out parameter configuration to the next depositor of measurement controller;
If the comparing of retaking of a year or grade is wrong, Management Controller repeat step a ~ step b is until the comparing of retaking of a year or grade is errorless.
4. the data managing method of intelligent electric energy meter dual controller according to claim 2 is it is characterised in that described pipe Reason controller reads prestore parameter, and the step carrying out parameter configuration to measurement controller, specifically includes following sub-step:
A. Management Controller and measurement controller are shaken hands after success, Management Controller according to the register address of measurement controller, Obtain the correct parameter of this depositor from data storage area, parameter is carried out with the framing of tape verifying sum, then is written into meter In corresponding address in amount controller;
B., after the parameter read-in success of measurement controller, Management Controller returns from the corresponding depositor of measurement controller again Read corresponding parameter, and the data of retaking of a year or grade is compared with the correct parameter prestoring:
If the comparing of retaking of a year or grade is errorless, Management Controller carries out parameter configuration to the next depositor of measurement controller;
If the comparing of retaking of a year or grade is wrong, Management Controller repeat step a ~ step b is until the comparing of retaking of a year or grade is errorless.
5. the data managing method of intelligent electric energy meter dual controller according to claim 1 is it is characterised in that described pipe The step that reason controller reads the continuous data of measurement controller and judges legitimacy, specifically includes following sub-step:
1)Management Controller is according to sequential pre-determined with measurement controller it would be desirable to the depositing of measurement controller read Device address carries out framing and is written in measurement controller, and then retaking of a year or grade takes the data in this address under measurement controller;
2)The data of this address is carried out shadow latch by measurement controller:Store in the depositor of a fixation, and fall clearly In measurement controller, the data in address is read by this institute;
3)Management Controller again reads off the data in shadow register, and by the data read from shadow register with from The data read in measurement controller is compared:
If the comparing of twi-read is errorless, assert that the data that this is read is valid data;
If the comparing of twi-read is wrong, assert that the data that this is read is invalid data, give up this invalid data, and Carry out following cycle digital independent link.
6. the data managing method of intelligent electric energy meter dual controller according to claim 4 is it is characterised in that described pipe The step that reason controller reads the continuous data of measurement controller and judges legitimacy, specifically includes following sub-step:
1)Management Controller is according to sequential pre-determined with measurement controller it would be desirable to the depositing of measurement controller read Device address carries out framing and is written in measurement controller, and then retaking of a year or grade takes the data in this address under measurement controller;
2)The data of this address is carried out shadow latch by measurement controller:Store in the depositor of a fixation, and fall clearly In measurement controller, the data in address is read by this institute;
3)Management Controller again reads off the data in shadow register, and by the data read from shadow register with from The data read in measurement controller is compared:
If the comparing of twi-read is errorless, assert that the data that this is read is valid data;
If the comparing of twi-read is wrong, assert that the data that this is read is invalid data, give up this invalid data, and Carry out following cycle digital independent link.
7. the data managing method of intelligent electric energy meter dual controller according to claim 1 is it is characterised in that described pipe The step that reason controller reads the operational factor of measurement controller and judges legitimacy, specifically includes following sub-step:
1.. when the control program of intelligent electric energy meter is normally run, measurement controller carries out real-time school to critical operational parameters Test;
2.. Management Controller periodically reads the check results of measurement controller, and the verification knot by check results and prior setting Fruit is compared:
If compare errorless then it is assumed that measurement controller normal operation;
If comparing wrong, Management Controller repeats to read the check results of measurement controller;
If 3.. the continuous check errors several times of check results to measurement controller for the Management Controller, assert measurement controller Operational factor mistake.
8. the data managing method of intelligent electric energy meter dual controller according to claim 6 is it is characterised in that described pipe The step that reason controller reads the operational factor of measurement controller and judges legitimacy, specifically includes following sub-step:
1.. when the control program of intelligent electric energy meter is normally run, measurement controller carries out real-time school to critical operational parameters Test;
2.. Management Controller periodically reads the check results of measurement controller, and the verification knot by check results and prior setting Fruit is compared:
If compare errorless then it is assumed that measurement controller normal operation;
If comparing wrong, Management Controller repeats to read the check results of measurement controller;
If 3.. the continuous check errors several times of check results to measurement controller for the Management Controller, assert measurement controller Operational factor mistake.
9. the data managing method of the intelligent electric energy meter dual controller according to claim 7 or 8 is it is characterised in that described Measurement controller is verified in real time to critical operational parameters, specially adopts CRC check.
CN201610939210.6A 2016-10-25 2016-10-25 The data managing method of intelligent electric energy meter dual controller Active CN106406283B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610939210.6A CN106406283B (en) 2016-10-25 2016-10-25 The data managing method of intelligent electric energy meter dual controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610939210.6A CN106406283B (en) 2016-10-25 2016-10-25 The data managing method of intelligent electric energy meter dual controller

Publications (2)

Publication Number Publication Date
CN106406283A true CN106406283A (en) 2017-02-15
CN106406283B CN106406283B (en) 2018-10-09

Family

ID=58012848

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610939210.6A Active CN106406283B (en) 2016-10-25 2016-10-25 The data managing method of intelligent electric energy meter dual controller

Country Status (1)

Country Link
CN (1) CN106406283B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108445436A (en) * 2018-03-01 2018-08-24 宁波迦南智能电气股份有限公司 A kind of electric energy meter that twin-core operating status is mutually examined
CN108898743A (en) * 2018-06-29 2018-11-27 宁波三星智能电气有限公司 The illegal judgement and processing method of a kind of rate and relevant parameter

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050125361A1 (en) * 2003-12-05 2005-06-09 Girsham Gregory A. System and method for accessing read only ANSI tables in an electricity meter
CN101005376A (en) * 2007-01-09 2007-07-25 华为技术有限公司 Device and method for realizing service plate main control plate communication
CN101840345A (en) * 2010-05-06 2010-09-22 深圳市九洲电器有限公司 Configuration parameter-identifying method, system and embedded equipment
CN103326796A (en) * 2013-05-27 2013-09-25 江苏三恒科技股份有限公司 Debugging device and method for mine wireless sensor
CN104914815A (en) * 2015-04-15 2015-09-16 北汽福田汽车股份有限公司 Processor monitoring method, device and system
CN105205034A (en) * 2015-09-25 2015-12-30 中国人民解放军国防科学技术大学 Method for high-reliability parameter configuration based on application specific integrated circuit (ASIC)
CN105738855A (en) * 2014-12-12 2016-07-06 国家电网公司 Intelligent electric meter embedded application-orientated test method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050125361A1 (en) * 2003-12-05 2005-06-09 Girsham Gregory A. System and method for accessing read only ANSI tables in an electricity meter
CN101005376A (en) * 2007-01-09 2007-07-25 华为技术有限公司 Device and method for realizing service plate main control plate communication
CN101840345A (en) * 2010-05-06 2010-09-22 深圳市九洲电器有限公司 Configuration parameter-identifying method, system and embedded equipment
CN103326796A (en) * 2013-05-27 2013-09-25 江苏三恒科技股份有限公司 Debugging device and method for mine wireless sensor
CN105738855A (en) * 2014-12-12 2016-07-06 国家电网公司 Intelligent electric meter embedded application-orientated test method
CN104914815A (en) * 2015-04-15 2015-09-16 北汽福田汽车股份有限公司 Processor monitoring method, device and system
CN105205034A (en) * 2015-09-25 2015-12-30 中国人民解放军国防科学技术大学 Method for high-reliability parameter configuration based on application specific integrated circuit (ASIC)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108445436A (en) * 2018-03-01 2018-08-24 宁波迦南智能电气股份有限公司 A kind of electric energy meter that twin-core operating status is mutually examined
CN108445436B (en) * 2018-03-01 2020-04-10 宁波迦南智能电气股份有限公司 Electric energy meter with double cores for mutual detection of running states
CN108898743A (en) * 2018-06-29 2018-11-27 宁波三星智能电气有限公司 The illegal judgement and processing method of a kind of rate and relevant parameter
CN108898743B (en) * 2018-06-29 2021-08-24 宁波三星智能电气有限公司 Illegal judging and processing method for rate and related parameters

Also Published As

Publication number Publication date
CN106406283B (en) 2018-10-09

Similar Documents

Publication Publication Date Title
CN111262346B (en) Integrated automatic acceptance system and method for transformer substation
Hartman et al. Energy monitoring and control using Internet of Things (IoT) system
CN103176084A (en) Intelligent substation simulation system in panoramic replace mode and integration testing method for intelligent substation simulation system
CN102831756B (en) Mobile terminal positioning electric utility meter reading method and meter reading system
CN102798792B (en) Method and device for verifying connection configuration of transformer substation virtual terminal
CN108809747A (en) A kind of the analogue data test system and its test method of system platform
CN113993000B (en) Transmission method, operation system and transmission equipment for field monitoring data
CN105048632A (en) Smart substation IED configuration information and SCD file consistency detection system and method
CN107819611B (en) Client test method based on IEC61850 multi-server simulation
CN106406283A (en) Data management method of double controllers of intelligent electric energy meter
CN103885026A (en) Electric energy meter calibrating method
CN109302327B (en) Metering automation terminal parameter configuration device and system
CN104993589A (en) Model sharing method between power distribution main station and terminal
CN107566157A (en) Remote diagnosis processing method of the ammeter completely without data fault under a kind of concentrator
CN105847076B (en) Signal testing system, method and device for substation control level equipment of transformer substation
CN105866563A (en) Relay protection algorithm validation system and method thereof
CN106776329A (en) The adjustment method and commissioning device of energy accumulation current converter
CN103888276A (en) WIA network online node firmware remote upgrading method
CN101877715A (en) CDMA-based water conservancy remote monitoring system
CN110868341B (en) Method and device for testing intelligent management unit of in-situ protection
CN105207815A (en) System environment deployment method and deployment system based on server
CN104199743A (en) Power distribution network historical data service interface consistency verifying method
CN107945473A (en) Intelligent home control system and its method based on wireless radio frequency modules
CN103731666B (en) A kind of video linkage simulation device and method
CN103077097B (en) A kind of FLASH data programming method based on verifying under TCP mode

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant