CN106400661A - Rapid construction formwork - Google Patents

Rapid construction formwork Download PDF

Info

Publication number
CN106400661A
CN106400661A CN201610931457.3A CN201610931457A CN106400661A CN 106400661 A CN106400661 A CN 106400661A CN 201610931457 A CN201610931457 A CN 201610931457A CN 106400661 A CN106400661 A CN 106400661A
Authority
CN
China
Prior art keywords
rapid construction
support
panel
template
construction template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610931457.3A
Other languages
Chinese (zh)
Inventor
欧阳子方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610931457.3A priority Critical patent/CN106400661A/en
Publication of CN106400661A publication Critical patent/CN106400661A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/50Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
    • E01C19/502Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes

Abstract

The invention discloses a rapid construction formwork. The rapid construction formwork comprises a panel (1) and a supporting frame (2) fixed to the panel (1). The rapid construction formwork is characterized in that the supporting frame (2) comprises transverse ribs (21) closely attached to the periphery of the panel (1), vertical ribs (22) closely attached to the periphery of the panel (1), and supporting columns (23) fixed to the four corners of the panel (1); the supporting columns (23) are mutually connected and fixed through the transverse ribs (21), the vertical ribs (22), middle transverse supports (24), middle vertical supports (25), bottom transverse supports (26) and bottom vertical supports (27); and the supporting columns (23) are provided with stand column connecting holes (231), the middle transverse supports (24) are provided with middle transverse connecting holes (241), and the bottom transverse supports (26) are provided with bottom transverse connecting holes (261). According to the rapid construction formwork, rapid construction of multiple projects can be achieved, and the rapid construction formwork has the beneficial effects that according to the construction need, the number of formworks is increased and reduced at will, and the formwork is directly moved.

Description

Rapid construction template
Technical field
The invention belongs to construction of the highway field, relate in particular to a kind of rapid construction template.
Background technology
Highway fringing is requisite link in highway construction construction, highway fringing be typically with manual inlaying and Become, not only low construction efficiency of inlaying by hand, construction speed is slow, high labor intensive, and the manual roadbed abutment wall surface ten inlay Divide coarse, uneven, and tend to brokenly under the weight of wheel, dissipate, collapse, collapse, do not reach construction quality really up to the mark, Easily cause great road traffic accident, the security of the lives and property of harm broad masses of the people.
For improving the surface quality of roadbed abutment wall, people inlay into a die cavity frequently with template often in construction, then Casting concrete in die cavity.Although adopt pouring the highway fringing surface quality of formation in this way preferably, due to mould The thinner thickness of plate, is not therefore fixed easily, and is susceptible to run mould in work progress, and the fringing resulting in produces and loses shape, no Can guarantee that linearity and the flatness of fringing, thus affecting the forming quality of concrete.
The Chinese patent of Publication No. CN203487442U, discloses a kind of concrete road surface support shuttering, including channel-section steel Template, the fixed support being connected with closing semicircular ring and fixation steel plate, channel-section steel template is connected with opening annulus, fixed support one End is connected with closing semicircular ring.
This concrete road surface support shuttering, can make the concrete road surface longitudinal seam pouring straight, and the problems such as run mould does not occur, But this template be not easy to install, and need with oblique or with stairstepping roadbed or protect cut construction when, this template can not Use, this template nor the direct template that increases to be to meet the requirement of different construction heights simultaneously, and formwork erection need to carry out big The live built work of amount, elapsed time is longer, leverages construction speed, and also ratio is larger, thus increasing for artificial input simultaneously Add construction cost and reduce efficiency of construction.
In sum, the pavement construction template adopting in prior art, carries out substantial amounts of system when being required for constructing at the scene Frame built works, and this leads to construction speed slower, simultaneously need to putting into substantial amounts of manpower and materials, therefore can not meet low cost, High-quality rapid construction requires.In the above-described techniques, the template of use arbitrarily can not increase or decrease template, works as needs simultaneously Change the height of highway fringing, gradient, or when construction need to build into step-like construction requirement, nor directly pass through increase or Reduce template number, or directly use the front in-migration of template to realize, and be intended in addition process or change the template of other specifications, from And lead to waste of material, delay construction speed, increase construction cost.
Content of the invention
It is an object of the invention to overcoming disadvantages mentioned above and providing a kind of rapid construction of energy, and can arbitrarily increase and decrease template Quantity meets the template of various difference construction requirements with directly template is carried out with front in-migration.
The purpose of the present invention and solve its technical problem underlying and employ the following technical solutions to realize:
A kind of rapid construction template of the present invention, including panel and be fixed on panel bracing frame composition.It is characterized in that:Institute State bracing frame to include being close to the cross rib of panel surrounding, perpendicular rib and be fixed on support column on panel corner, described support column divides Do not erect the perpendicular support in support, bottom horizontal support and bottom and be interconnected and fixed by cross rib, perpendicular rib, middle part horizontal support, middle part.
Above-mentioned device, wherein:Column connecting hole is provided with described support column.
Above-mentioned device, wherein:Described column connecting hole can be strip dowel hole.
Above-mentioned device, wherein:Described panel, cross rib, middle part horizontal support, bottom horizontal support can be square or circular arcs Shape.
Above-mentioned device, wherein:Two wire holes are additionally provided with described panel.
Above-mentioned device, wherein:Middle part lateral connection hole is respectively arranged with described middle part horizontal support and bottom horizontal support The horizontal connecting hole with bottom.
Above-mentioned device, wherein:Described middle part is erected to support to erect with bottom to support and is respectively arranged with the vertical connecting hole in middle part The vertical connecting hole with bottom.
Above-mentioned device, wherein:Mould material is preferably iron and steel for metal, and material shape is triangle(Angle bar class), side Shape.
The present invention compared with prior art has clear advantage and beneficial effect.From above technical scheme, with existing skill Art is compared, and this patent template achieves frame in plate, can adjust in frame, grillage one, and the grillage new technology of endless combinations makes Under, left and right, in front and back, inside and outside define a big framework of iron and steel grillage the most firm, simple to operate in various engineering constructions, pendulum Put quick, flexible adjustment, steadiness is strong, convenient disassembly is suitable in many ways, durable in use it is not necessary to carry out substantial amounts of scene frame processed Built.
In various engineering constructions, construct required height and width and length, can arbitrarily increase completely, engineering is applied The work many higher positions of needs can be how high, and the many width of engineering construction needs just can be how wide, and how long engineering construction just can be how long if needing.
Become oblique in the face of needing to build, or build becomes step-like construction requirement, also can arbitrarily adjust completely.
As oblique in built into, how need tiltedly just can be how oblique;As step-like in built into, need how many ladders with regard to energy How many ladders, need much ladders just much ladders of energy.
As need be constructed into step-like, the upper strata that can move forward touch pull put to complete.
As need are constructed into oblique, bottom template can be turned forward to put to complete.
Constructed using this patent template, substantially accelerated than original speed of application, further increased efficiency of construction, Also substantially increase construction quality.
Brief description
Below in conjunction with the accompanying drawings the specific embodiment of the present invention is described in further detail, wherein:
Fig. 1 is the structural representation of the present invention.
Fig. 2 is another structural representation of the present invention.
Fig. 3 is the first embodiment schematic diagram of the present invention.
Fig. 4 is the second embodiment schematic diagram of the present invention.
Fig. 5 is the third embodiment schematic diagram of the present invention.
Identifier in figure:
1st, panel;2nd, bracing frame;3rd, iron wire;11st, wire hole;21st, cross rib;22nd, erect rib;23rd, support column;24th, middle part horizontal support; 25th, middle part is erected and is supported;26th, bottom horizontal support;27th, bottom is erected and is supported;231st, column connecting hole;232nd, dowel hole;241st, middle part Lateral connection hole;251st, the vertical connecting hole in middle part;261st, the horizontal connecting hole in bottom;271st, the vertical connecting hole in bottom.
Specific embodiment:
Below in conjunction with accompanying drawing and preferred embodiment, to according to rapid construction template specific embodiment proposed by the present invention, structure, Feature and its effect, after describing in detail such as.
Referring to figure-Fig. 2, a kind of rapid construction template of the present invention, including panel 1 and be fixed on the bracing frame 2 on panel 1 Composition it is characterised in that:Support frame as described above 2 includes being close to the cross rib 21 of panel 1 surrounding, erects rib 22 and be fixed on panel 1 four Support column 23 on angle, described support column 23 passes through cross rib 21, perpendicular rib 22, middle part horizontal support 24, middle part perpendicular support 25, bottom respectively Portion's horizontal support 26 and bottom are erected and support 27 to be interconnected and fixed.
Above-mentioned rapid construction template, wherein:It is provided with column connecting hole 231 on described support column 23.
Above-mentioned rapid construction template, wherein:Described column connecting hole 231 can be strip dowel hole 232.
Above-mentioned rapid construction template, wherein:Described panel 1, cross rib 21, middle part horizontal support 24, bottom horizontal support 26 can To be square or circular arc.
Above-mentioned rapid construction template, wherein:Two wire holes 11 are additionally provided with described panel 1.
Above-mentioned rapid construction template, wherein:In being respectively arranged with described middle part horizontal support 24 and bottom horizontal support 26 The horizontal connecting hole in portion lateral connection hole 241 and bottom 261.
Above-mentioned rapid construction template, wherein:Support 25 is erected at described middle part and bottom is erected in being respectively arranged with support 27 The vertical connecting hole of the vertical connecting hole in portion 251 and bottom 271.
Above-mentioned rapid construction template, wherein:Mould material is preferably iron and steel for metal, and material shape is triangle(Angle Iron class), square.
Fig. 3 shows the first embodiment of rapid construction template of the present invention.When being constructed, using as shown in the figure Six pieces of templates symmetrically put two groups of formation along its length successively, and the width requirement constructed as needed adjusts two groups of moulds Then iron wire 3 is passed through and is often fixed relative to two wire holes 11 at panel 1 center of two pieces of templates by the distance between plate, It is connected with the vertical connecting hole of the vertical connecting hole in middle part 251 and bottom 271 that bolt passes through every piece of template, during form removal again Only in template back surface, iron wire 3 need to be cut off and can remove template, convenient and quick construction.
Fig. 4 shows the second embodiment of rapid construction template of the present invention.When running into applying higher than form height During work situation, only this patent template need to be increased along short transverse, iron wire 3 is passed through often panel 1 center relative to two pieces of templates Two wire holes 11 be fixed, then by bolt, the support column 23 of every layer of template is connected.
Fig. 5 shows the third embodiment of rapid construction template of the present invention.When needing up-small and down-big ladder of constructing During shape, only this template need to be increased and to the corresponding distance of medial movement, then iron wire 3 be passed through the often face relative to two pieces of templates Two wire holes 11 at plate 1 center are fixed, then pass through the vertical connecting hole in middle part 251 of every piece of template and bottom to erect with bolt It is connected to connecting hole 271, only in template back surface, iron wire 3 need to be cut off and can remove template during form removal, construction party Just quick.In this embodiment, template adjusts and adopts dowel hole 232, can do arbitrary dimension and adjust, degree of regulation is high, is not subject to The restriction of pitch-row, adjusts very convenient.
The above, be only presently preferred embodiments of the present invention, and not the present invention is made with any pro forma restriction, Ren Hewei Disengaging technical solution of the present invention content, any simple modification above example made according to the technical spirit of the present invention, etc. With change and modification, all still fall within the range of technical solution of the present invention.

Claims (8)

1. a kind of rapid construction template, including panel(1)And it is fixed on panel(1)On bracing frame(2)Composition, its feature exists In:Support frame as described above(2)Including being close to panel(1)The cross rib of surrounding(21), perpendicular rib(22)And it is fixed on panel(1)On corner Support column(23), described support column(23)Pass through cross rib respectively(21), perpendicular rib(22), middle part horizontal support(24), middle part erect Support(25), bottom horizontal support(26)And the perpendicular support in bottom(27)It is interconnected and fixed.
2. as claimed in claim 1 a kind of rapid construction template it is characterised in that:Described support column(23)On be provided with column even Connect hole(231).
3. as claimed in claim 2 a kind of rapid construction template it is characterised in that:Described column connecting hole(231)Can be long Bar shaped dowel hole(232).
4. as claimed in claim 1 a kind of rapid construction template it is characterised in that:Described panel(1), cross rib(21), middle part horizontal Support(24), bottom horizontal support(26)Can be square or circular arc.
5. as claimed in claim 1 a kind of rapid construction template it is characterised in that:Described panel(1)On be additionally provided with two and wear Silk hole(11).
6. as claimed in claim 1 a kind of rapid construction template it is characterised in that:Described middle part horizontal support(24)Prop up with bottom transverse Support(26)On be respectively arranged with middle part lateral connection hole(241)The horizontal connecting hole with bottom(261).
7. as claimed in claim 1 a kind of rapid construction template it is characterised in that:Described middle part is erected and is supported(25)Erect with bottom and prop up Support(27)On be respectively arranged with the vertical connecting hole in middle part(251)The vertical connecting hole with bottom(271).
8. as described in claim 1 to 7 a kind of rapid construction template it is characterised in that:The each bar of template erects the material used by bracing frame Expect to be preferably iron and steel for metal, material shape is triangle(Angle bar class), square.
CN201610931457.3A 2016-10-24 2016-10-24 Rapid construction formwork Pending CN106400661A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610931457.3A CN106400661A (en) 2016-10-24 2016-10-24 Rapid construction formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610931457.3A CN106400661A (en) 2016-10-24 2016-10-24 Rapid construction formwork

Publications (1)

Publication Number Publication Date
CN106400661A true CN106400661A (en) 2017-02-15

Family

ID=58012979

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610931457.3A Pending CN106400661A (en) 2016-10-24 2016-10-24 Rapid construction formwork

Country Status (1)

Country Link
CN (1) CN106400661A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643011A (en) * 2018-06-01 2018-10-12 江北建设有限公司 A kind of vega cement road construction punching block

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202187273U (en) * 2011-06-30 2012-04-11 倪商伟 Metal frame used for water seepage pavement pavage
KR101279379B1 (en) * 2013-03-21 2013-07-15 박해영 Concret pavement public prefab dice
CN203890846U (en) * 2014-05-09 2014-10-22 欧阳子方 Quick highway edging formwork
CN105735625A (en) * 2016-03-12 2016-07-06 中天建设集团有限公司 Side form supporting system for terrace construction

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202187273U (en) * 2011-06-30 2012-04-11 倪商伟 Metal frame used for water seepage pavement pavage
KR101279379B1 (en) * 2013-03-21 2013-07-15 박해영 Concret pavement public prefab dice
CN203890846U (en) * 2014-05-09 2014-10-22 欧阳子方 Quick highway edging formwork
CN105735625A (en) * 2016-03-12 2016-07-06 中天建设集团有限公司 Side form supporting system for terrace construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643011A (en) * 2018-06-01 2018-10-12 江北建设有限公司 A kind of vega cement road construction punching block

Similar Documents

Publication Publication Date Title
CN205805577U (en) A kind of arch wall type open cut tunnel chassis
CN205676844U (en) A kind of for one-piece casting trench furrow bank with the molding sliding formwork of base plate
CN205576728U (en) Folding wedge shape indisputable formula temporary support in top
CN109457951B (en) Formwork system for collecting and dividing shear wall and construction method thereof
CN205370586U (en) Multibreak face reducing tunnel lining platform truck of large -span
CN113235472A (en) Concrete placement platform truck is contained to apron
CN207794608U (en) A kind of adjustable support for shuttering of movement for groove construction column
CN107060322A (en) Concreting die carrier structure
CN209243715U (en) Circular hole pile wall formwork bracing system
CN106400661A (en) Rapid construction formwork
CN214144682U (en) Early structure of tearing open of floor template and building frame template structure
CN205348767U (en) Utilize steel reinforcement cage to make external formwork system of skeleton
CN106401177B (en) A kind of shuttering supporting of cast in place concrete plate
CN209818080U (en) Segmental assembled pipe shed pouring construction structure
CN208305334U (en) A kind of box beam precast pedestal with concrete wedge block
CN104797762B (en) Building and construction method thereof
CN206636582U (en) A kind of shield tunnel construction of central division wall chassis
CN214993219U (en) Concrete placement platform truck is contained to apron
CN215051681U (en) Assembled dado bridgehead foam concrete light embankment
CN214696859U (en) Stair template for construction
CN203890846U (en) Quick highway edging formwork
CN102691409A (en) HR (height regulation) heavy portal frame and temporary reinforced concrete column jointed formwork erecting device and construction method
CN207633804U (en) A kind of middle-size and small-size full assembling activity formula reinforcing steel processing shed
CN207211467U (en) A kind of combined type floor support plate constructing structure for steel building
CN207761668U (en) A kind of supporting construction of novel tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170215