CN106393644A - Production technology of PVC-C sleeve for protecting buried type high-voltage power cable - Google Patents

Production technology of PVC-C sleeve for protecting buried type high-voltage power cable Download PDF

Info

Publication number
CN106393644A
CN106393644A CN201610799139.6A CN201610799139A CN106393644A CN 106393644 A CN106393644 A CN 106393644A CN 201610799139 A CN201610799139 A CN 201610799139A CN 106393644 A CN106393644 A CN 106393644A
Authority
CN
China
Prior art keywords
cooling
water
machine
temperature
speed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610799139.6A
Other languages
Chinese (zh)
Inventor
韩彪
牛兵
陶锴
陈林才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU LINRY NEW MSTAR TECHNOLOGY Ltd
Original Assignee
JIANGSU LINRY NEW MSTAR TECHNOLOGY Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU LINRY NEW MSTAR TECHNOLOGY Ltd filed Critical JIANGSU LINRY NEW MSTAR TECHNOLOGY Ltd
Priority to CN201610799139.6A priority Critical patent/CN106393644A/en
Publication of CN106393644A publication Critical patent/CN106393644A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C48/00Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
    • B29C48/25Component parts, details or accessories; Auxiliary operations
    • B29C48/285Feeding the extrusion material to the extruder
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29BPREPARATION OR PRETREATMENT OF THE MATERIAL TO BE SHAPED; MAKING GRANULES OR PREFORMS; RECOVERY OF PLASTICS OR OTHER CONSTITUENTS OF WASTE MATERIAL CONTAINING PLASTICS
    • B29B7/00Mixing; Kneading
    • B29B7/02Mixing; Kneading non-continuous, with mechanical mixing or kneading devices, i.e. batch type
    • B29B7/22Component parts, details or accessories; Auxiliary operations
    • B29B7/28Component parts, details or accessories; Auxiliary operations for measuring, controlling or regulating, e.g. viscosity control
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29BPREPARATION OR PRETREATMENT OF THE MATERIAL TO BE SHAPED; MAKING GRANULES OR PREFORMS; RECOVERY OF PLASTICS OR OTHER CONSTITUENTS OF WASTE MATERIAL CONTAINING PLASTICS
    • B29B7/00Mixing; Kneading
    • B29B7/80Component parts, details or accessories; Auxiliary operations
    • B29B7/82Heating or cooling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C48/00Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
    • B29C48/03Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor characterised by the shape of the extruded material at extrusion
    • B29C48/09Articles with cross-sections having partially or fully enclosed cavities, e.g. pipes or channels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C48/00Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
    • B29C48/25Component parts, details or accessories; Auxiliary operations
    • B29C48/88Thermal treatment of the stream of extruded material, e.g. cooling
    • B29C48/911Cooling
    • B29C48/9115Cooling of hollow articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C48/00Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
    • B29C48/25Component parts, details or accessories; Auxiliary operations
    • B29C48/92Measuring, controlling or regulating
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C2948/00Indexing scheme relating to extrusion moulding
    • B29C2948/92Measuring, controlling or regulating
    • B29C2948/92504Controlled parameter
    • B29C2948/9258Velocity
    • B29C2948/926Flow or feed rate
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29KINDEXING SCHEME ASSOCIATED WITH SUBCLASSES B29B, B29C OR B29D, RELATING TO MOULDING MATERIALS OR TO MATERIALS FOR MOULDS, REINFORCEMENTS, FILLERS OR PREFORMED PARTS, e.g. INSERTS
    • B29K2027/00Use of polyvinylhalogenides or derivatives thereof as moulding material
    • B29K2027/06PVC, i.e. polyvinylchloride
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29LINDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES
    • B29L2023/00Tubular articles
    • B29L2023/22Tubes or pipes, i.e. rigid

Abstract

The invention discloses a production technology of a PVC-C sleeve for protecting a buried type high-voltage power cable. According to the production technology of the PVC-C sleeve for protecting the buried type high-voltage power cable, inspection of raw and auxiliary materials, material mixing, high-speed kneading, cooling, stirring, feeding, plasticizing, extrusion, cooling, vacuum shaping, traction and cutting are involved. The production technology of the PVC-C sleeve for protecting the buried type high-voltage power cable comprises the following steps of S1, inspecting the raw and auxiliary materials, wherein main raw materials and auxiliary products which are supplied to the factory are inspected by a quality inspection department, the main raw materials and the auxiliary material products which do not pass the inspection are disposed, and the main raw materials and the auxiliary material products which pass the inspection are used for material preparation; and S2, conducting material preparation, wherein ingredients are weighed and prepared according to a formula card, a weighing instrument needs to be cleaned and calibrated before weighing, agglomerated materials, materials affected with damp and materials containing impurities are removed before weighing, problems are solved in time if being found, and the materials need to be independently weighed in sequence according to the formula card. The production technology of the PVC-C sleeve for protecting the buried type high-voltage power cable has the advantages of being simple in process and low in cost and solves the problem that the quality of products produced through ordinary PVC-C sleeve production technologies is poor.

Description

PVC-C process for producing casing is used in a kind of buried high voltage power cable protection
Technical field
The present invention relates to PVC-C sleeve pipe production technical field, specially a kind of buried high voltage power cable protection use PVC-C process for producing casing.
Background technology
At present, China's high voltage power cable power transmission line enters into buried, buried high voltage power cable comb from built on stilts Industry also adopts cement asbestos pipe more at large.Therefore adopt high intensity, corrosion-resistant, pollution-free and construction and installation easily new Electrical cable protection sleeve has become the common requirements of electricity channel industry.Japan in the early 1990s the phase just a large amount of using a kind of with CPVC is the type ground-buried power cable protection pipe of base material, and this product has that heat resistance is good, the spy such as intensity is high, long service life Point.Using this protection pipe. in construction, the outside of tubing all need not be reinforced with other materials, and directly uses sand and soil backfill Can construct paragraph by paragraph, save artificial it is not required that closing a road to traffic to construction site, easy construction, quick.At present, existing PVC-C process for producing casing process for the protection of buried high voltage power cable is loaded down with trivial details, relatively costly, the product produced Quality is poor.
Content of the invention
It is an object of the invention to provide PVC-C process for producing casing is used in a kind of buried high voltage power cable protection, tool Standby process is simple, lower-cost advantage, solves the product quality that general PVC-C process for producing casing produces poor Problem.
For achieving the above object, the present invention provides following technical scheme:A kind of buried high voltage power cable protection is used PVC-C process for producing casing, including the inspection of raw and auxiliary material, dispensing, at a high speed kneading, cooling and stirring, feed, plasticizing, extrusion, cold But Vacuum shaping, traction and cutting, comprise the following steps:
S1, the inspection of raw and auxiliary material:First the main material entering factory and adjuvant are tested by quality inspection section, will through inspection not Qualified main material and adjuvant product treatment are fallen, and by through checking qualified main material and adjuvant product to carry out dispensing.
S2, dispensing:Dispensing is carried out weighing by prescription-filling card and prepares, should clear up to weighing utensil before weighing, verification, clearly Except caking, make moist and the material containing impurity, timely process of pinpointing the problems, material weighing individually should be claimed successively by prescription-filling card order Amount, each independent material is mixed with filler with lubricant, reinforcing agent, pigment by stabilizer after weighing puts into Plastic Drum or plastics In bag, accurate for further ensuring that batch weighing, the material after formula is carried out multiple title, control accuracy is prescription-filling card quantity In the range of 0.05kg.
S3, at a high speed kneading:By prescription-filling card quantity, resin is poured into bin stock car, before downtree fat, should be by outside package resin bag Impurity etc. removes, and then low speed opens machine, by conveying worm, resin is all added in high-speed kneader, and then Add stabilizer and lubricant to open machine at high speeds operating, to material temperature show 90 ± 5 DEG C when, addition reinforcing agent, pigment and filling Agent, when material temperature shows 115 ± 5 DEG C, opens machine Dump gate, material is discharged in cooling and stirring machine.
S4, cooling and stirring:Before high-speed kneader discharging, open cooling and stirring machine, material is under cooling and stirring built-in temperature It is down to less than 40 ± 10 DEG C, material is discharged into the bin stock car under cooling and stirring machine, can lower the temperature rapidly for guarantee material, cooling and stirring Machine intake pressure is transferred to more than 0.4Mpa, and the material after cooled stirring is in loose shape, uniform color, no yellowing phenomenon.
S5, feed:By auger conveyor, the in-car material of bin stock is delivered to the position of each extruder material.
S6, plasticizing and extrusion:
(1) heat up:Each machine barrel and die head temperature are warming up to 140 DEG C, are incubated 1 hour, then are warming up to by technological requirement and set Definite value.
(2) screw rod:Because screw rod programming rate is very fast, therefore the barrel heating-up time can be later than during operation, first step during intensification First temperature is adjusted to 60 DEG C, and is at least incubated 20 minutes, second step every 10 is heated for one-level with 10 DEG C respectively, until heating To technological requirement temperature.
(3) power-on operation:After each section of temperature has uniformly reached technique productions temperature, and after being incubated at least 30 minutes, open Beginning entrance feeds intake production, starts main frame, so that main-machine screw operate under the slow-speed of revolution (5 revs/min about), and feed of then opening an account is electric Machine, material is noticed that screw speed is matched with charging rate, feeding amount can not be excessive from slow to being added in screw rod, Can not be not enough, after die head discharging, ramp up screw rod with charging rate to processing parameter, when charging rate is turned with screw rod After speed coupling is proper, synchronize speed governing, after extruded product is normal, starts main frame vacuum pump, material is proceeded by with aerofluxuss, just After often producing, start to observe the change of temperature and screw speed, moment of torsion, melt pressure parameter etc. on extruder, and every two hours Make one-time process record.
(4) shut down:Normal produce terminate after, close vacuum exhaust pump, close charging motor, reduce screw speed to 5 turns/ About point, each machine barrel and die head temperature are down to 140 DEG C, close screw rod heating system.Feed way is slowly from addition by hand Cleaning material, and the charging rate cleaning material can not be too fast, in order to avoid material screw rod over loading from vacuum port overflow, treats that die head squeezes After going out cleaning material, stop charging, stop screw rod and rotate, close each section of temperature, cut off host power supply.
S7, cooling vacuum sizing:
(1) preparation:It is more than 0.4Mpa in pressure of supply water, water temperature, when 10-25 DEG C, is produced, for ensureing start When vacuum pump energy normal work, first the moisturizing ball valve of each vacuum pump is opened before start;Check shaping box so as to sufficiently sealed, For ensureing cool water shower normal work, check the spray unimpeded situation of faucet, load onto shaping cover in qualitative case, make shaping cover With die head extrusion direction in line.
(2) operate:Initial shaping can be started after extruded material ideal, can start after reaching drawing length after electric power length of tube Traction, first start cooling water pump, then open vacuum pump, make power pipe vac sorb and cooling water effect under with shaping cover In being in close contact simultaneously cooling and shaping, start to observe the water level of water tank in running, water level height is right by two tunnel water outlets Valve control, by water lev el control in vacuum pump exhaust port with next segment distance, in running water tank vacuum be 0.02Mpa with On, and make power pipe keep enough circularity.
(3) shut down:Cut off the water supply during shutdown, power supply, left a certain amount of water in water tank, so as next time drive, if A few days to be shut down, then should drain in vacuum pump remain water, and in water supplement port inject saponification liquor, with antirust lead to restart when rotor Kill.
S8, traction:
(1) preparation:Check whether each crawler belt is parallel, such as find not parallel, should adjust in time, check upper two crawler belts Whether steadily long fall, if undesirable, checks whether gas circuit is normal, whether gas leakage on joint, must be with cutting above lower crawler belt The work top of machine forms same plane, also will adjust Work bench of cutting machine height if necessary.
(2) operate:After material to be extruded is normal, drawn with copper core electric wire, extrusion electric power tubing is drawn to traction machine On, power pipe should ensure that balance moves ahead between each crawler belt, changes power pipe by adjusting hauling speed and die head set screw Wall thickness, to critical field, adjusts traction pressure, makes power pipe non-slip, do not flatten so as to reach regulation dacron overall dimensions.
S9, cutting:
(1) preparation:Carry out no-load running, check whether each action of cutting machine is normal.
(2) operate:After normal production, fixed length cutting is carried out to power pipe, otch should be vertical and smooth.
Compared with prior art, beneficial effects of the present invention are as follows:This invention produces to PVC-C sleeve pipe and includes raw and auxiliary material Inspection, dispensing, the at a high speed step such as kneading, cooling and stirring, feed, plasticizing, extrusion, cooling vacuum sizing, traction and cutting, have Standby process is simple, lower-cost advantage, solves the product quality that general PVC-C process for producing casing produces poor Problem.
Brief description
Fig. 1 is technological process of production schematic diagram of the present invention.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation description is it is clear that described embodiment is only a part of embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of not making creative work Embodiment, broadly falls into the scope of protection of the invention.
Refer to Fig. 1, a kind of buried high voltage power cable protection uses PVC-C process for producing casing, including raw and auxiliary material Inspection, dispensing, at a high speed kneading, cooling and stirring, feed, plasticizing, extrusion, cooling vacuum sizing, traction and cut, including below Step:
S1, the inspection of raw and auxiliary material:First the main material entering factory and adjuvant are tested by quality inspection section, will through inspection not Qualified main material and adjuvant product treatment are fallen, and by through checking qualified main material and adjuvant product to carry out dispensing.
S2, dispensing:Dispensing is carried out weighing by prescription-filling card and prepares, should clear up to weighing utensil before weighing, verification, clearly Except caking, make moist and the material containing impurity, timely process of pinpointing the problems, material weighing individually should be claimed successively by prescription-filling card order Amount, each independent material is mixed with filler with lubricant, reinforcing agent, pigment by stabilizer after weighing puts into Plastic Drum or plastics In bag, accurate for further ensuring that batch weighing, the material after formula is carried out multiple title, control accuracy is prescription-filling card quantity In the range of 0.05kg.
S3, at a high speed kneading:By prescription-filling card quantity, resin is poured into bin stock car, before downtree fat, should be by outside package resin bag Impurity etc. removes, and then low speed opens machine, by conveying worm, resin is all added in high-speed kneader, and then Add stabilizer and lubricant to open machine at high speeds operating, to material temperature show 90 ± 5 DEG C when, addition reinforcing agent, pigment and filling Agent, when material temperature shows 115 ± 5 DEG C, opens machine Dump gate, material is discharged in cooling and stirring machine.
S4, cooling and stirring:Before high-speed kneader discharging, open cooling and stirring machine, material is under cooling and stirring built-in temperature It is down to less than 40 ± 10 DEG C, material is discharged into the bin stock car under cooling and stirring machine, can lower the temperature rapidly for guarantee material, cooling and stirring Machine intake pressure is transferred to more than 0.4Mpa, and the material after cooled stirring is in loose shape, uniform color, no yellowing phenomenon.
S5, feed:By auger conveyor, the in-car material of bin stock is delivered to the position of each extruder material.
S6, plasticizing and extrusion:
Plasticizing:Molding materials are added to extruder barrel by extruder hopper, the gyratory compaction of barrel zone temperature and screw rod And under immixture, material has powdery or granular solids, it is transformed into the uniformly continuous melt process with certain fluidity.
Extrusion:Thermoplastic resin and various help mix homogeneously after, in extruder barrel be subject to mechanical shear cutting knife, frictional heat Effect with exterior-heat is allowed to plastify melting, then under screw rod push forward, fused materials pass through filter plate or adapter enters not Congener mould, and make the forming method of the various products of continuous length
(1) heat up:Each machine barrel and die head temperature are warming up to 140 DEG C, are incubated 1 hour, then are warming up to by technological requirement and set Definite value.
(2) screw rod:Because screw rod programming rate is very fast, therefore the barrel heating-up time can be later than during operation, first step during intensification First temperature is adjusted to 60 DEG C, and is at least incubated 20 minutes, second step every 10 is heated for one-level with 10 DEG C respectively, until heating To technological requirement temperature.
(3) power-on operation:After each section of temperature has uniformly reached technique productions temperature, and after being incubated at least 30 minutes, open Beginning entrance feeds intake production, starts main frame, so that main-machine screw operate under the slow-speed of revolution (5 revs/min about), and feed of then opening an account is electric Machine, material is noticed that screw speed is matched with charging rate, feeding amount can not be excessive from slow to being added in screw rod, Can not be not enough, after die head discharging, ramp up screw rod with charging rate to processing parameter, when charging rate is turned with screw rod After speed coupling is proper, synchronize speed governing, after extruded product is normal, starts main frame vacuum pump, material is proceeded by with aerofluxuss, just After often producing, start to observe the change of temperature and screw speed, moment of torsion, melt pressure parameter etc. on extruder, and every two hours Make one-time process record.
(4) shut down:Normal produce terminate after, close vacuum exhaust pump, close charging motor, reduce screw speed to 5 turns/ About point, each machine barrel and die head temperature are down to 140 DEG C, close screw rod heating system.Feed way is slowly from addition by hand Cleaning material, and the charging rate cleaning material can not be too fast, in order to avoid material screw rod over loading from vacuum port overflow, treats that die head squeezes After going out cleaning material, stop charging, stop screw rod and rotate, close each section of temperature, cut off host power supply.
S7, cooling vacuum sizing:
(1) preparation:It is more than 0.4Mpa in pressure of supply water, water temperature, when 10-25 DEG C, is produced, for ensureing start When vacuum pump energy normal work, first the moisturizing ball valve of each vacuum pump is opened before start;Check shaping box so as to sufficiently sealed, For ensureing cool water shower normal work, check the spray unimpeded situation of faucet, load onto shaping cover in qualitative case, make shaping cover With die head extrusion direction in line.
(2) operate:Initial shaping can be started after extruded material ideal, can start after reaching drawing length after electric power length of tube Traction, first start cooling water pump, then open vacuum pump, make power pipe vac sorb and cooling water effect under with shaping cover In being in close contact simultaneously cooling and shaping, start to observe the water level of water tank in running, water level height is right by two tunnel water outlets Valve control, by water lev el control in vacuum pump exhaust port with next segment distance, in running water tank vacuum be 0.02Mpa with On, and make power pipe keep enough circularity.
(3) shut down:Cut off the water supply during shutdown, power supply, left a certain amount of water in water tank, so as next time drive, if A few days to be shut down, then should drain in vacuum pump remain water, and in water supplement port inject saponification liquor, with antirust lead to restart when rotor Kill.
S8, traction:
(1) preparation:Check whether each crawler belt is parallel, such as find not parallel, should adjust in time, check upper two crawler belts Whether steadily long fall, if undesirable, checks whether gas circuit is normal, whether gas leakage on joint, must be with cutting above lower crawler belt The work top of machine forms same plane, also will adjust Work bench of cutting machine height if necessary.
(2) operate:After material to be extruded is normal, drawn with copper core electric wire, extrusion electric power tubing is drawn to traction machine On, power pipe should ensure that balance moves ahead between each crawler belt, changes power pipe by adjusting hauling speed and die head set screw Wall thickness, to critical field, adjusts traction pressure, makes power pipe non-slip, do not flatten so as to reach regulation dacron overall dimensions.
S9, cutting:
(1) preparation:Carry out no-load running, check whether each action of cutting machine is normal.
(2) operate:After normal production, fixed length cutting is carried out to power pipe, otch should be vertical and smooth.
Warehouse-in:Finished product is made, then again after quality testing, qualified finished product starts to put in storage, no after carrying out quality testing Qualified disposes.
This invention PVC-C sleeve pipe is produced includes the inspection of raw and auxiliary material, dispensing, high speed kneading, cooling and stirring, feed, The steps such as plasticizing, extrusion, cooling vacuum sizing, traction and cutting, it is simple to possess process, and lower-cost advantage solves one As the poor problem of the product quality produced of PVC-C process for producing casing.
During production:Forbid to disclose material in barrel air vent metal bar, in order to avoid damaging barrel with screw rod it should use flexible plastic Pipe carries out disclosing material, adds the powder in hopper must clean no free from admixture, metal sundries can not be had to be mixed into, in order to protect screw rod not It is damaged, must running check and the adsorbate excluded on magnetic frame in loading hopper, the internal calorstat of running check machine and cooling The oil level of fuel tank, and supplement high temperature oil in time, according to equipment periodic service condition, the attachment in screw rod and barrel must be cleared up in time Thing, to ensure quality of item, when the material only at merging core is in melt and dissolved state, non-dismountable pressure transducer, if main frame Moment of torsion or melt pressure are reported to the police, and constantly should reduce feeding quantity and screw speed, and check reason, take measures to solve in time.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, permissible Understand and can carry out multiple changes, modification, replacement to these embodiments without departing from the principles and spirit of the present invention And modification, the scope of the present invention be defined by the appended.

Claims (1)

1. PVC-C process for producing casing is used in a kind of buried high voltage power cable protection, including the inspection of raw and auxiliary material, dispensing, At a high speed kneading, cooling and stirring, feed, plasticizing, extrusion, cooling vacuum sizing, traction and cut it is characterised in that:Including following Step:
S1, the inspection of raw and auxiliary material:First the main material entering factory and adjuvant are tested by quality inspection section, will be through disqualified upon inspection Main material and adjuvant product treatment fall, and by through checking qualified main material and adjuvant product to carry out dispensing.
S2, dispensing:Dispensing is carried out weighing by prescription-filling card and prepares, should clear up to weighing utensil before weighing, verification, remove knot Block, make moist and the material containing impurity, pinpoint the problems timely process, material weighing individually should be weighed successively by prescription-filling card order, Each independent material is mixed with filler with lubricant, reinforcing agent, pigment by stabilizer after weighing puts into Plastic Drum or plastic bag Interior, accurate for further ensuring that batch weighing, the material after formula is carried out multiple title, control accuracy is prescription-filling card quantity In the range of 0.05kg.
S3, at a high speed kneading:By prescription-filling card quantity, resin is poured into bin stock car, before downtree fat, should be by the impurity outside package resin bag Etc. removing, then low speed opens machine, by conveying worm, resin is all added in high-speed kneader, and then adds Machine at high speeds operating opened by stabilizer and lubricant, to material temperature show 90 ± 5 DEG C when, addition reinforcing agent, pigment and filler, when When material temperature shows 115 ± 5 DEG C, open machine Dump gate, material is discharged in cooling and stirring machine.
S4, cooling and stirring:Before high-speed kneader discharging, open cooling and stirring machine, material drops in cooling and stirring built-in temperature Less than 40 ± 10 DEG C, material is discharged into the bin stock car under cooling and stirring machine, can lower the temperature rapidly for guarantee material, cooling and stirring machine enters Water pressure is transferred to more than 0.4Mpa, and the material after cooled stirring is in loose shape, uniform color, no yellowing phenomenon.
S5, feed:By auger conveyor, the in-car material of bin stock is delivered to the position of each extruder material.
S6, plasticizing and extrusion:
(1) heat up:Each machine barrel and die head temperature are warming up to 140 DEG C, are incubated 1 hour, then are warming up to setting value by technological requirement.
(2) screw rod:Because screw rod programming rate is very fast, therefore the barrel heating-up time can be later than during operation, during intensification, the first step first will Temperature is adjusted to 60 DEG C, and is at least incubated 20 minutes, and second step every 10 is heated with 10 DEG C for one-level, respectively until being heated to work Skill requires temperature.
(3) power-on operation:After each section of temperature has uniformly reached technique productions temperature, and after being incubated at least 30 minutes, start into Enter the production that feeds intake, start main frame, so that main-machine screw is operated under the slow-speed of revolution (5 revs/min about), feed motor of then opening an account, will Material notices that screw speed is matched with charging rate, feeding amount can not be excessive from slow to being added in screw rod, nor not Foot, after die head discharging, ramps up screw rod with charging rate to processing parameter, when charging rate is mated with screw speed After proper, synchronize speed governing, after extruded product is normal, starts main frame vacuum pump, aerofluxuss are proceeded by material, normal production Afterwards, start to observe the change of temperature and screw speed, moment of torsion, melt pressure parameter etc. on extruder, and every two hours make once Technique record.
(4) shut down:After normal production terminates, close vacuum exhaust pump, close charging motor, reduce screw speed to 5 revs/min of left sides The right side, each machine barrel and die head temperature are down to 140 DEG C, close screw rod heating system.Feed way is slowly from addition cleaning by hand Material, and the charging rate cleaning material can not be too fast, in order to avoid material screw rod over loading from vacuum port overflow, treats that die head extrusion is clear After washing material, stop charging, stop screw rod and rotate, close each section of temperature, cut off host power supply.
S7, cooling vacuum sizing:
(1) preparation:It is more than 0.4Mpa in pressure of supply water, water temperature, when 10-25 DEG C, is produced, true during start for ensureing The moisturizing ball valve of each vacuum pump is first opened before start by empty pump energy normal work;Check shaping box so as to sufficiently sealed, for protecting Card cool water shower normal work, checks the spray unimpeded situation of faucet, loads onto shaping cover, make shaping cover and mould in qualitative case Head extrusion direction is in line.
(2) operate:Initial shaping can be started after extruded material ideal, can start after reaching drawing length to lead after electric power length of tube Draw, first start cooling water pump, then open vacuum pump, make power pipe vac sorb and cooling water effect under with shaping cover be in It is in close contact and cooling and shaping, start to observe the water level of water tank in running, water level height is by two tunnel water outlets to valve Control, by water lev el control in vacuum pump exhaust port with next segment distance, in running, water tank vacuum is more than 0.02Mpa, And make power pipe keep enough circularity.
(3) shut down:Cut off the water supply during shutdown, power supply, left a certain amount of water in water tank, so as next time drive, if will stop The machine a few days, then should drain in vacuum pump remain water, and in water supplement port inject saponification liquor, with antirust lead to restart when rotor sting Extremely.
S8, traction:
(1) preparation:Check whether each crawler belt is parallel, such as find not parallel, should adjust in time, check upper two crawler belt length fall Whether steadily, if undesirable, check whether gas circuit is normal, whether gas leakage on joint, must be with cutting machine above lower crawler belt Work top forms same plane, also will adjust Work bench of cutting machine height if necessary.
(2) operate:After material to be extruded is normal, drawn with copper core electric wire, extrusion electric power tubing is drawn on traction machine, electricity Solenoid should ensure that balance moves ahead between each crawler belt, changes electric power thickness of pipe wall extremely by adjusting hauling speed and die head set screw Critical field, adjusts traction pressure, makes power pipe non-slip, do not flatten so as to reach regulation dacron overall dimensions.
S9, cutting:
(1) preparation:Carry out no-load running, check whether each action of cutting machine is normal.
(2) operate:After normal production, fixed length cutting is carried out to power pipe, otch should be vertical and smooth.
CN201610799139.6A 2016-08-31 2016-08-31 Production technology of PVC-C sleeve for protecting buried type high-voltage power cable Pending CN106393644A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610799139.6A CN106393644A (en) 2016-08-31 2016-08-31 Production technology of PVC-C sleeve for protecting buried type high-voltage power cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610799139.6A CN106393644A (en) 2016-08-31 2016-08-31 Production technology of PVC-C sleeve for protecting buried type high-voltage power cable

Publications (1)

Publication Number Publication Date
CN106393644A true CN106393644A (en) 2017-02-15

Family

ID=58000639

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610799139.6A Pending CN106393644A (en) 2016-08-31 2016-08-31 Production technology of PVC-C sleeve for protecting buried type high-voltage power cable

Country Status (1)

Country Link
CN (1) CN106393644A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111941889A (en) * 2020-07-23 2020-11-17 浙江振飞塑业有限公司 Manufacturing method of high-strength aging-resistant cable protection pipe
CN112895383A (en) * 2021-02-05 2021-06-04 河北鹏博通信设备有限公司 Grating pipe processing technology
CN114621585A (en) * 2020-12-11 2022-06-14 湖南登科材料科技有限公司 Low-cost PA66 halogen-free flame-retardant plastic and preparation method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101344194A (en) * 2008-08-18 2009-01-14 江苏常盛管业有限公司 Production technology of modified polyvinyl chloride pipes
CN103937135A (en) * 2014-04-29 2014-07-23 富阳科威钢业有限公司 Outdoor compound enhanced ethylene chloride HFCM pipe and preparation method thereof
CN105014902A (en) * 2015-07-06 2015-11-04 江苏圣通环境工程有限公司 Production method for chlorinated polyvinyl chloride pipe materials
CN105385059A (en) * 2015-11-04 2016-03-09 安徽瑞丰管业有限公司 Polyvinyl chloride tubular product and preparation method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101344194A (en) * 2008-08-18 2009-01-14 江苏常盛管业有限公司 Production technology of modified polyvinyl chloride pipes
CN103937135A (en) * 2014-04-29 2014-07-23 富阳科威钢业有限公司 Outdoor compound enhanced ethylene chloride HFCM pipe and preparation method thereof
CN105014902A (en) * 2015-07-06 2015-11-04 江苏圣通环境工程有限公司 Production method for chlorinated polyvinyl chloride pipe materials
CN105385059A (en) * 2015-11-04 2016-03-09 安徽瑞丰管业有限公司 Polyvinyl chloride tubular product and preparation method thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘西文: "《塑料挤出工[中、高级]培训教程》", 31 January 2013, 印刷工业出版社 *
周殿明: "《塑料成型技术》", 31 October 2014, 机械工业出版社 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111941889A (en) * 2020-07-23 2020-11-17 浙江振飞塑业有限公司 Manufacturing method of high-strength aging-resistant cable protection pipe
CN114621585A (en) * 2020-12-11 2022-06-14 湖南登科材料科技有限公司 Low-cost PA66 halogen-free flame-retardant plastic and preparation method thereof
CN112895383A (en) * 2021-02-05 2021-06-04 河北鹏博通信设备有限公司 Grating pipe processing technology

Similar Documents

Publication Publication Date Title
US5626420A (en) Apparatus for the continuous mixing of rubber
CN106938528A (en) A kind of double screw extruder that there is premix to roughly grind function
CN108349112B (en) Method for producing an elastomeric compound
CN106393644A (en) Production technology of PVC-C sleeve for protecting buried type high-voltage power cable
CN204712411U (en) A kind of anticlogging screw extruder
CN108867249B (en) Multifunctional continuous asphalt mixture production equipment and production method thereof
CN105235175A (en) Efficient screw extruder
CN104924559A (en) Production method and device for PVC profile materials
CN205033546U (en) Portable plastics extruder
CN115841892B (en) High-temperature-resistant silica gel cable and production process thereof
CN111633858A (en) Rubber waterstop low-temperature one-step rubber mixing production line
CN108582557A (en) A kind of polyethylene double-wall corrugated pipe production line and its production method
CN108858869B (en) A equipment for producing high dispersion type fluorine-containing polymer master batch
CN104046036B (en) A kind of automatic manufacturing method of transparent room temperature vulcanized sili cone rubber and device
KR20150142661A (en) Body weight and the manufacturing device using the synthetic resin and the weight body
CN208148444U (en) A kind of plastic working system
CN102626962B (en) Rubber continuous mixing system device
CN210651427U (en) Electromagnetic heating type plastic granulator convenient for mixing materials
CN214831668U (en) High-precision batching device of green energy-saving factory asphalt mixing plant
CN208167448U (en) A kind of intermittent plantmix's cold asphalt rehabilitation equipment
CN106881787A (en) Full-automatic dispensing additive color powder machine and its adapted toner
CN113601782A (en) Process and device for preparing plastic barrel from recycled plastic
CN207073050U (en) A kind of movable-type intelligent colored asphalt production equipment
CN208449248U (en) Dry granulating machine mixing feeding system
CN208730202U (en) A kind of full-automatic injecting molding apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170215