CN106393392A - Method for locating steel chisels used for preparing water passing channels of high-pressure grouting molds - Google Patents

Method for locating steel chisels used for preparing water passing channels of high-pressure grouting molds Download PDF

Info

Publication number
CN106393392A
CN106393392A CN201610821827.8A CN201610821827A CN106393392A CN 106393392 A CN106393392 A CN 106393392A CN 201610821827 A CN201610821827 A CN 201610821827A CN 106393392 A CN106393392 A CN 106393392A
Authority
CN
China
Prior art keywords
gypsum fibrosum
gypsum
water
drill rod
preparing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610821827.8A
Other languages
Chinese (zh)
Other versions
CN106393392B (en
Inventor
林孝发
林孝山
应滔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jomoo Kitchen and Bath Co Ltd
Jomoo Group Co Ltd
Original Assignee
Jomoo Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jomoo Group Co Ltd filed Critical Jomoo Group Co Ltd
Priority to CN201610821827.8A priority Critical patent/CN106393392B/en
Publication of CN106393392A publication Critical patent/CN106393392A/en
Application granted granted Critical
Publication of CN106393392B publication Critical patent/CN106393392B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/26Producing shaped prefabricated articles from the material by slip-casting, i.e. by casting a suspension or dispersion of the material in a liquid-absorbent or porous mould, the liquid being allowed to soak into or pass through the walls of the mould; Moulds therefor ; specially for manufacturing articles starting from a ceramic slip; Moulds therefor
    • B28B1/261Moulds therefor
    • B28B1/262Mould materials; Manufacture of moulds or parts thereof
    • B28B1/264Plaster
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/26Producing shaped prefabricated articles from the material by slip-casting, i.e. by casting a suspension or dispersion of the material in a liquid-absorbent or porous mould, the liquid being allowed to soak into or pass through the walls of the mould; Moulds therefor ; specially for manufacturing articles starting from a ceramic slip; Moulds therefor
    • B28B1/261Moulds therefor
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/14Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing calcium sulfate cements

Abstract

The invention discloses a method for locating steel chisels used for preparing water passing channels of high-pressure grouting molds. The method is characterized in that small gypsum blocks and stop sheets are pasted to a molding surface of a master mold, first gypsum slurry is poured between the small gypsum blocks and the stop sheets to manufacture gypsum gauges, surrounding plates are arranged around the master mold, a pore plate is erected on the surrounding plates, the steel chisels extend into small holes of the pore plate to make contact with the gypsum gauges so as to be located, and then the water passing channels meeting the specification of the high-pressure grouting molds can be produced. According to the method, the steel chisels can be located more accurately, conveniently and quickly.

Description

A kind of to for preparing the method that the drill rod on high-pressure slip-casting die through water road is positioned
Technical field
The present invention relates to ceramic high pressure casting mould applications are and in particular to one kind is to being used for preparing high-pressure slip-casting die through water The method that the drill rod on road is positioned.
Background technology
Ceramic high pressure casting molding, because its automated production level is high, eats slurry speed soon, labor efficiency is high, is increasingly becoming The trend of sanitary ceramics moulding process.Make high-pressure slip-casting shaping mould and there are many methods, one of method is whole employing Porous resin material makes high-pressure slip-casting Working mould.Wherein, water flowing road is set in Working mould, and the top on water flowing road is inhaled to Working mould The distance in slurry face is generally located on 25mm to 30mm.Master mold is mainly placed in cast porous in coaming plate by the processing technology on water flowing road After resin material, then by orifice plate lid, orifice plate is preset drill rod, drill rod inserts in not solidified porous resin material.Treat porous After resin material initial set, extract drill rod thus forming water flowing road (see Fig. 1).We have seen that, drill rod stretches out orifice plate from technique above Length determine water flowing road top to the distance in Working mould midge face.Therefore, drill rod stretch out orifice plate length need fixed in advance Behind position, then with securing member locking, so that satisfactory water flowing road can be formed during operation.And because every piece of orifice plate of large mold needs Intert the water flowing road drill rod of 1200 about, and every drill rod is both needed to calculate corresponding Working mould position and just can draw stretch out The length of orifice plate, so positions to drill rod, generally requires time-consuming three days, and flow process is loaded down with trivial details, easily malfunctions.
Content of the invention
It is an object of the invention to solution the problems of the prior art, provide and a kind of lead to being used for preparing high-pressure slip-casting mould The method that the drill rod in water route is positioned, can more accurately, more easily position to drill rod.
For reaching above-mentioned purpose, the present invention adopts the following technical scheme that:
A kind of to for preparing the method that the drill rod on high-pressure slip-casting die through water road is positioned, including:Step 1:Preparation Gypsum Fibrosum fritter, the little tile height of described Gypsum Fibrosum requires in distance range in water flowing portion top to Working mould midge face, and Gypsum Fibrosum is little Block upper surface scribbles coloring agent;Step 2:Uniform brushing mould release on master mold molding face;Step 3:Every a segment distance, by stone Cream fritter upper table is faceup bonded on molding face in master mold product line until sticking with glue;Step 4:By catch along master mold It is bonded on master mold molding face until forming a circle with glue outside product line, catch height is concordant with Gypsum Fibrosum fritter upper surface; Step 5:First gypsum slurry is injected the region between Gypsum Fibrosum fritter in catch;Step 6:In the pre-hardening stage by the first gypsum slurry Repair and scrape to concordant with Gypsum Fibrosum fritter upper surface;Step 7:Treat that the first gypsum slurry solidification forms Gypsum Fibrosum rule tool, take off catch;Step 8:Set up coaming plate in master mold periphery, coaming plate is placed orifice plate;Step 9:Drill rod is inserted aperture on orifice plate have to contacting Gypsum Fibrosum rule Upper surface, and with locking part locking, until all drill rods all position completing.
Further, described Gypsum Fibrosum tile size is 20mm*20mm*25mm, wherein a height of 25mm.
Further, step 1 includes:Step 1.1:Surrounding volume using aluminium sheet four sides is pouring of 800mm*800mm*25mm Note frame, wherein a height of 25mm;Step 1.2:In aluminium sheet inner surface uniform brushing mould release;Step 1.3:Gypsum Fibrosum and water are pressed following Weight portion reconciles into the second gypsum slurry:1 part of Gypsum Fibrosum, water 0.7-0.9 part;Step 1.4:Second gypsum slurry is filled described Cast frame;Step 1.5:In the pre-hardening stage, the second gypsum slurry is repaiied and scrape to concordant with aluminium sheet upper surface;Step 1.6:Cast frame Interior second gypsum slurry is frozen into plaster block;Step 1.7:Lac and ethanol are reconciled into Lac coloring agent by following weight portion: 1 part of Lac, ethanol 7-9 part;Step 1.8:The Lac preparing coloring agent is applied to plaster block upper surface;Step 1.9:Take off Plaster block upper surface is divided into 40*40 lattice with marking pen by aluminium sheet, and every lattice are square, and the length of side is 20mm*20mm;Step 1.10:Plaster block is cut into Gypsum Fibrosum fritter by frame bar, each Gypsum Fibrosum tile size is 20mm*20mm*25mm, wherein a height of 25mm.
Further, the second described gypsum slurry is in harmonious proportion by following weight portion with water by Gypsum Fibrosum and forms:1 part of Gypsum Fibrosum, water 0.8 part.
Wherein in an embodiment, the first described gypsum slurry is in harmonious proportion by following weight portion with water by Gypsum Fibrosum and forms: 1 part of Gypsum Fibrosum, water 0.8-0.9 part.
Further, the first described gypsum slurry is in harmonious proportion by following weight portion with water by Gypsum Fibrosum and forms:1 part of Gypsum Fibrosum, water 0.85 part.
Wherein in an embodiment, the mould release described in step 2 or step 1.2 is potash soap mould release.
Wherein in an embodiment, the glue described in step 3 or step 4 is 502 glue.
Wherein in an embodiment, described catch is back power piece.
Further, the distance described in step 3 is 30mm.
Technical solutions according to the invention with respect to prior art, the beneficial effect of acquirement are:
1st, by Gypsum Fibrosum rule tool positioning drill rod, make drill rod stretch out orifice plate distance and need not pass through calculating again, considerably reduce The difficulty of drill rod positioning, increased accuracy, improves convenience.
2nd, the coloring of Gypsum Fibrosum fritter surface, makes the first gypsum slurry repairing be easier to take standard when scraping, without because color phase Lead to not together distinguish.
3rd, Gypsum Fibrosum fritter is set to 20mm*20mm*25mm size so that various R angles, turnover in mould, radian all can quilt Out, and reason Gypsum Fibrosum fritter is not excessive leads to drill rod intubating length that deviation occurs for simulation, or because Gypsum Fibrosum fritter is too small leads to Workload increases.
4th, the second gypsum slurry in Gypsum Fibrosum than water ratio be 1:0.8 ratio allotment, can make Gypsum Fibrosum more quick-drying, improve life Produce efficiency.
5th, it is difficult to fade in gypsum surface by Lac coloring, and become apparent from.
6th, pass through for plaster block to press frame bar stripping and slicing, be capable of the Gypsum Fibrosum fritter of a large amount of consistent size of quick Fabrication.
7th, the first gypsum slurry in Gypsum Fibrosum than water ratio be 1:0.85 ratio allotment, can properly increase the first calcium plaster The mobility of material, is easy to more accurately repair and scrapes.
8th, adopt potash soap mould release, can effectively Gypsum Fibrosum fritter and Gypsum Fibrosum rule tool be separated from master mold, also can be effectively Catch is separated from master mold.In step 1.2, plaster block is also easily made to separate with aluminium sheet.
9th, 502 glue are quick-drying, can raise labour productivity, and can effectively fix Gypsum Fibrosum fritter, catch.
10th, adopt back power piece make catch because return power piece soft durometer moderate it is easy to ground can cut into variously-shaped, Radian or the turning that can fit outside master mold product line.
The 11st, the distance of 30mm is set, makes the spacing between Gypsum Fibrosum fritter be 10mm, taken into account accuracy requirement and efficiency will Ask.
Brief description
Accompanying drawing described herein is used for providing invention is further understood, and constitutes the part of the present invention, the present invention Schematic description and description be used for explaining the present invention, do not constitute inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the schematic diagram making porous resin Working mould limbers using the drill rod positioning and orifice plate;
Fig. 2 is to pass through to paste catch and Gypsum Fibrosum fritter and pour into a mould the first gypsum slurry on master mold to make showing of Gypsum Fibrosum rule tool It is intended to;
Fig. 3 is the schematic diagram of the length stretching out orifice plate by Gypsum Fibrosum rule tool positioning drill rod.
Specific embodiment
In order that the technical problem to be solved, technical scheme and beneficial effect are clearer, clear, below tie Close drawings and Examples, the present invention will be described in further detail.It should be appreciated that specific embodiment described herein is only used To explain the present invention, it is not intended to limit the present invention.
As shown in figure 1, when making porous resin Working mould, coaming plate 1 in master mold 2 periphery, pour into a mould porous in coaming plate Resin material 3, and cover orifice plate 5.Drill rod 4 is positioned with orifice plate 5, drill rod 4 is fastened on orifice plate 5 by nut 6.Treat porous tree After the initial set of fat material, orifice plate 5 and drill rod 4 are extracted, the position that drill rod 4 is located forms water flowing road.In the process, drill rod 4 The length stretching out orifice plate 5 determines water flowing road top to the distance in Working mould midge face (i.e. master mold molding face), this distance one As be 25mm.The length that every drill rod 4 of positioning stretches out orifice plate 5 is the task of the present invention.
In embodiments of the invention, surround, initially with aluminium sheet four sides, the cast frame that volume is 800mm*800mm*25mm, Wherein a height of 25mm.Again in aluminium sheet inner surface uniform brushing potash soap mould release.Gypsum Fibrosum and water are made in 1 to 0.8 ratio Two gypsum slurries are simultaneously poured in cast frame.Second gypsum slurry initial set the stage repair scrape to aluminium sheet upper surface flush, thus Obtain, after the second gypsum slurry solidification, the plaster block that volume is 800mm*800mm*25mm.Lac and ethanol are pressed 1 to 8 ratio Lac coloring agent is made in example allotment.Lac coloring agent brushing forms yellow in plaster block upper surface.Use in plaster block upper surface again Marking pen is divided into 40*40 lattice, and every lattice are the square of 20mm*20mm.With a chainsaw plaster block is cut into Gypsum Fibrosum by frame bar Fritter 8.
Uniform brushing potash soap mould release on the molding face of master mold 2.
Again Gypsum Fibrosum fritter 8 is bonded in 502 glue on the molding face in master mold 2 product line until gluing every 30mm distance Full.So-called master mold 2 product line refers to that master mold 2 molding face corresponds to Working mould 3 midge face in product line.
Catch 9 is made up of the returning power piece of 50mm*10mm*25mm, will return power piece and use 502 glue along outside master mold 2 product line It is bonded on master mold 2 molding face until form a circle, the height of catch 9 and Gypsum Fibrosum fritter upper surface flush.
Gypsum Fibrosum and water are made the first gypsum slurry in 1 to 0.85 ratio.
First gypsum slurry is injected the region between Gypsum Fibrosum fritter 8 in catch 9.
In the first gypsum slurry initial set stage, the first gypsum slurry is repaiied and scrape to concordant with Gypsum Fibrosum fritter 8 upper surface.
Treat that the first gypsum slurry solidification forms Gypsum Fibrosum rule tool 7, take off catch 9.
Set up coaming plate 1 in master mold 2 periphery, coaming plate 1 is placed orifice plate 5.
Drill rod 4 is inserted aperture on orifice plate 5 and has 7 upper surfaces to contacting Gypsum Fibrosum rule, and locked with nut 6, until all steel Pricker 4 all positions and completes.
Understand from such scheme, by Gypsum Fibrosum rule tool 7 positioning drill rods 4, making drill rod 4 stretch out the distance of orifice plate 5 need not be again Through calculating, considerably reduce the difficulty of drill rod 4 positioning, increased accuracy, improve convenience.Gypsum Fibrosum fritter 8 surface Coloring, makes the first gypsum slurry repairing be easier to take standard when scraping, without leading to not distinguish because color is identical.Gypsum Fibrosum fritter 8 are set to 20mm*20mm*25mm size so that various R angles, turnover, radian all can be modeled out in mould, and not reason Gypsum Fibrosum fritter 8 is excessive to lead to drill rod intubating length that deviation occurs, or leads to workload to increase because Gypsum Fibrosum fritter 8 is too small.Second Gypsum slurry in Gypsum Fibrosum than water ratio be 1:0.8 ratio allotment, can make Gypsum Fibrosum more quick-drying, improve production efficiency.By worm Deadlocked color is difficult to fade in gypsum surface, and becomes apparent from.First gypsum slurry in Gypsum Fibrosum than water ratio be 1:0.85 ratio Allotment, can properly increase the mobility of the first gypsum slurry, be easy to more accurately repair and scrape.Using potash soap mould release, can be effective Gypsum Fibrosum fritter 8 and Gypsum Fibrosum rule tool 7 are separated from master mold 2 by ground, also effectively can separate catch 9 from master mold 2.In step In 1.2, plaster block is also easily made to separate with aluminium sheet.502 glue are quick-drying, can raise labour productivity, and can effectively fix Gypsum Fibrosum Fritter 8, catch 9.Make catch 9 using returning power piece, because returning, power piece 9 soft durometer is moderate it is easy to ground can cut into various shapes Shape, the radian outside master mold 2 product line of can fitting or turning.The distance of setting 30mm, makes the spacing between Gypsum Fibrosum fritter 8 be 10mm, has taken into account accuracy requirement and efficiency requirements.
Using embodiments of the invention, can more accurately, more easily drill rod 4 be positioned.
Description above describe the preferred embodiments of the present invention, it is to be understood that the present invention is not limited to above-mentioned enforcement Example, and should not regard the exclusion to other embodiment as.By the enlightenment of the present invention, those skilled in the art combine known or existing The change that technology, knowledge are carried out also should be regarded as within the scope of the present invention.

Claims (10)

1. a kind of method that the drill rod for preparing high-pressure slip-casting die through water road is positioned is it is characterised in that include:
Step 1:Prepare Gypsum Fibrosum fritter, the little tile height of described Gypsum Fibrosum requires apart from model in water flowing portion top to Working mould midge face In enclosing, and Gypsum Fibrosum fritter upper surface scribbles coloring agent;
Step 2:Uniform brushing mould release on master mold molding face;
Step 3:Every a segment distance, Gypsum Fibrosum fritter upper table is faceup bonded on molding face in master mold product line with glue Until sticking;
Step 4:Catch is bonded on master mold molding face with glue until forming a circle along outside master mold product line, catch height Concordant with Gypsum Fibrosum fritter upper surface;
Step 5:First gypsum slurry is injected the region between Gypsum Fibrosum fritter in catch;
Step 6:In the pre-hardening stage, the first gypsum slurry is repaiied and scrape to concordant with Gypsum Fibrosum fritter upper surface;
Step 7:Treat that the first gypsum slurry solidification forms Gypsum Fibrosum rule tool, take off catch;
Step 8:Set up coaming plate in master mold periphery, coaming plate is placed orifice plate;
Step 9:Drill rod is inserted aperture on orifice plate and extremely contacts Gypsum Fibrosum rule tool upper surface, and with locking part locking, up to all steel All positioning completes pricker.
2. as claimed in claim 1 a kind of to for preparing the method that the drill rod on high-pressure slip-casting die through water road is positioned, It is characterized in that:Described Gypsum Fibrosum tile size is 20mm*20mm*25mm, wherein a height of 25mm.
3. as claimed in claim 2 a kind of to for preparing the method that the drill rod on high-pressure slip-casting die through water road is positioned, It is characterized in that:
Described step 1 includes:
Step 1.1:Surround the cast frame that volume is 800mm*800mm*25mm, wherein a height of 25mm using aluminium sheet four sides;
Step 1.2:In aluminium sheet inner surface uniform brushing mould release;
Step 1.3:Gypsum Fibrosum and water are reconciled into the second gypsum slurry by following weight portion:1 part of Gypsum Fibrosum, water 0.7-0.9 part;
Step 1.4:Second gypsum slurry is filled described cast frame;
Step 1.5:In the pre-hardening stage, the second gypsum slurry is repaiied and scrape to concordant with aluminium sheet upper surface;
Step 1.6:Cast inframe second gypsum slurry is frozen into plaster block;
Step 1.7:Lac and ethanol are reconciled into Lac coloring agent by following weight portion:1 part of Lac, ethanol 7-9 part;
Step 1.8:The Lac preparing coloring agent is applied to plaster block upper surface;
Step 1.9:Take off aluminium sheet, with marking pen, plaster block upper surface is divided into 40*40 lattice, every lattice are square, the length of side For 20mm*20mm;
Step 1.10:Plaster block is cut into Gypsum Fibrosum fritter by frame bar, each Gypsum Fibrosum tile size is 20mm*20mm*25mm, its In a height of 25mm.
4. as claimed in claim 3 a kind of to for preparing the method that the drill rod on high-pressure slip-casting die through water road is positioned, It is characterized in that:The second described gypsum slurry is in harmonious proportion by following weight portion with water by Gypsum Fibrosum and forms:1 part of Gypsum Fibrosum, 0.8 part of water.
5. as claimed in claim 1 a kind of to for preparing the method that the drill rod on high-pressure slip-casting die through water road is positioned, It is characterized in that:The first described gypsum slurry is in harmonious proportion by following weight portion with water by Gypsum Fibrosum and forms:1 part of Gypsum Fibrosum, water 0.8-0.9 Part.
6. as claimed in claim 5 a kind of to for preparing the method that the drill rod on high-pressure slip-casting die through water road is positioned, It is characterized in that:The first described gypsum slurry is in harmonious proportion by following weight portion with water by Gypsum Fibrosum and forms:1 part of Gypsum Fibrosum, 0.85 part of water.
7. a kind of as any one of claim 1 to 6 is carried out to the drill rod for preparing high-pressure slip-casting die through water road Positioning method it is characterised in that:Mould release described in step 2 or step 1.2 is potash soap mould release.
8. a kind of as any one of claim 1 to 6 is carried out to the drill rod for preparing high-pressure slip-casting die through water road Positioning method it is characterised in that:Glue described in step 3 or step 4 is 502 glue.
9. a kind of as any one of claim 1 to 6 is carried out to the drill rod for preparing high-pressure slip-casting die through water road Positioning method it is characterised in that:Described catch is back power piece.
10. a kind of as described in claim 1 to 6 is to for preparing the side that the drill rod on high-pressure slip-casting die through water road is positioned Method it is characterised in that:Distance described in step 3 is 30mm.
CN201610821827.8A 2016-09-14 2016-09-14 A method of the drill rod being used to prepare high-pressure slip-casting die through water road is positioned Active CN106393392B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610821827.8A CN106393392B (en) 2016-09-14 2016-09-14 A method of the drill rod being used to prepare high-pressure slip-casting die through water road is positioned

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610821827.8A CN106393392B (en) 2016-09-14 2016-09-14 A method of the drill rod being used to prepare high-pressure slip-casting die through water road is positioned

Publications (2)

Publication Number Publication Date
CN106393392A true CN106393392A (en) 2017-02-15
CN106393392B CN106393392B (en) 2019-02-05

Family

ID=58000043

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610821827.8A Active CN106393392B (en) 2016-09-14 2016-09-14 A method of the drill rod being used to prepare high-pressure slip-casting die through water road is positioned

Country Status (1)

Country Link
CN (1) CN106393392B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107336338A (en) * 2017-07-04 2017-11-10 九牧厨卫股份有限公司 A kind of fast draining gypsum molding makees method
CN107336337A (en) * 2017-07-04 2017-11-10 九牧厨卫股份有限公司 A kind of method that pricker rod is positioned on cover mold
CN113443819A (en) * 2021-04-24 2021-09-28 上海琉璃工房琉璃艺术品有限公司 Fire-resistant gypsum mould and manufacturing method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2715070A1 (en) * 1977-04-04 1978-10-12 Dainippon Printing Co Ltd Patterned decorative structural panel prodn. - by slip casting plaster or cement in mould contg. transfer sheet printed with water-soluble ink
CN101568416A (en) * 2006-12-28 2009-10-28 日本碍子株式会社 Process for producing plugged honeycomb structure
CN102555038A (en) * 2012-01-06 2012-07-11 辉煌水暖集团有限公司 Low-pressure quick drainage mold and method for manufacturing same
CN104875273A (en) * 2014-06-09 2015-09-02 九牧厨卫股份有限公司 High-pressure grouting mould slurry sucking method
CN205380767U (en) * 2016-02-25 2016-07-13 湖北楚峰建科集团荆州开元新材有限公司 Grabbing device is right to aerated concrete panel fossil fragments

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2715070A1 (en) * 1977-04-04 1978-10-12 Dainippon Printing Co Ltd Patterned decorative structural panel prodn. - by slip casting plaster or cement in mould contg. transfer sheet printed with water-soluble ink
CN101568416A (en) * 2006-12-28 2009-10-28 日本碍子株式会社 Process for producing plugged honeycomb structure
CN102555038A (en) * 2012-01-06 2012-07-11 辉煌水暖集团有限公司 Low-pressure quick drainage mold and method for manufacturing same
CN104875273A (en) * 2014-06-09 2015-09-02 九牧厨卫股份有限公司 High-pressure grouting mould slurry sucking method
CN205380767U (en) * 2016-02-25 2016-07-13 湖北楚峰建科集团荆州开元新材有限公司 Grabbing device is right to aerated concrete panel fossil fragments

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107336338A (en) * 2017-07-04 2017-11-10 九牧厨卫股份有限公司 A kind of fast draining gypsum molding makees method
CN107336337A (en) * 2017-07-04 2017-11-10 九牧厨卫股份有限公司 A kind of method that pricker rod is positioned on cover mold
CN107336338B (en) * 2017-07-04 2019-08-23 九牧厨卫股份有限公司 The fast draining gypsum molding of one kind makees method
CN107336337B (en) * 2017-07-04 2019-08-23 九牧厨卫股份有限公司 A method of positioning pricker stick on cover mold
CN113443819A (en) * 2021-04-24 2021-09-28 上海琉璃工房琉璃艺术品有限公司 Fire-resistant gypsum mould and manufacturing method thereof

Also Published As

Publication number Publication date
CN106393392B (en) 2019-02-05

Similar Documents

Publication Publication Date Title
CN102248125B (en) Simplified process method of lost wax casting
CN106393392A (en) Method for locating steel chisels used for preparing water passing channels of high-pressure grouting molds
CN204278349U (en) Visual controllable thickness test board timber die
CN106827198A (en) A kind of concrete retarding printing transferring method
CN103950093B (en) The integrated poured block molding equipment that is divided into of gypsum block
CN102699273B (en) Precision casting method for large-scale aluminium alloy impeller
CN104875273A (en) High-pressure grouting mould slurry sucking method
CN203994545U (en) Two sections of movable injection molds
CN104552558A (en) Thin-wall concrete hollow shell forming machine
CN204471552U (en) Thin wall concrete hollow shell forming machine
CN106426775A (en) Wax mould forming method for shell cover of mowing machine
CN203764891U (en) Cold iron casting sand mold
CN103658529B (en) The preparation method of the apperance of V method moulding
CN206544286U (en) A kind of mowing cabinet cover forming die for wax pattern
CN106180557A (en) A kind of blank manufacture method of gear box of tractor
CN105800916A (en) Mold structure for producing glass product
CN106077516A (en) A kind of blank manufacture method of gear box of tractor
CN206009725U (en) V method odd-side molding systems
CN103406488B (en) Graphite powder loam core binder
CN201988686U (en) Sand type casting device
CN217166475U (en) Manufacturing tool for vertical line production of internal sprue of small malleable steel part
CN204076619U (en) A kind of automatic demoulding sole device for molding
CN104002368B (en) Method for making molds convenient to disassemble and assemble in precast concrete element production process
CN220162743U (en) Cement product mould convenient for demoulding
CN216505810U (en) Shaping manufacturing die for thickness controller of precast concrete slab

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant