CN106392492B - Steel ball production and processing method - Google Patents

Steel ball production and processing method Download PDF

Info

Publication number
CN106392492B
CN106392492B CN201611035230.7A CN201611035230A CN106392492B CN 106392492 B CN106392492 B CN 106392492B CN 201611035230 A CN201611035230 A CN 201611035230A CN 106392492 B CN106392492 B CN 106392492B
Authority
CN
China
Prior art keywords
steel ball
temperature
prefabricated steel
subjected
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611035230.7A
Other languages
Chinese (zh)
Other versions
CN106392492A (en
Inventor
张晶磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANSHUN HONGYI SPECIAL STEEL BALL MANUFACTURING Co Ltd
Original Assignee
ANSHUN HONGYI SPECIAL STEEL BALL MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANSHUN HONGYI SPECIAL STEEL BALL MANUFACTURING Co Ltd filed Critical ANSHUN HONGYI SPECIAL STEEL BALL MANUFACTURING Co Ltd
Priority to CN201611035230.7A priority Critical patent/CN106392492B/en
Publication of CN106392492A publication Critical patent/CN106392492A/en
Application granted granted Critical
Publication of CN106392492B publication Critical patent/CN106392492B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Abstract

The invention discloses a kind of steel ball production and processing methods, suitable finished wire rod raw material is first chosen, steel ball finished product is obtained after having carried out wire rod aligning, shearing, passivation, annealing, quenching, for the first time tempering, grinding, second of tempering and the processing step of cleaning successively.The cylinder blank obtained after shearing through cleaning mill Passivation Treatment, is allowed and is eliminated the defects of the overlap generated after shearing, avoided and the defects of owe punching occur in subsequent cold-heading by the present invention.In addition compared with existing heat treatment process, the hardness and strength performance of steel ball is all significantly increased, and meets the quality requirement of steel ball.

Description

Steel ball production and processing method
Technical field
The present invention relates to a kind of metal processing sectors, and in particular to a kind of steel ball production and processing method.
Background technology
Steel ball is important base parts and components, and especially accurate industrial ball plays huge work in the national economic development With.Under some specific conditions, it is often necessary to the steel ball of special substance, to complete the required function of reaching under varying environment. Some special substance steel balls are widely used in national economy every field in fact, including 9Cr18,3Cr13 stainless steel, copper, Aluminium, titanium alloy steel and agate, glass, Ceramic Balls etc..Their popularization and application have not only pushed the development of steel ball production industry, And also promote the technology development and scientific and technological progress of relevant industries.In current existing steel ball production and processing method, obtain Steel ball surface quality difference and geometric accuracy it is not high, and the hardness and strength of bearing steel ball qualification are not achieved.
Invention content
In view of the above shortcomings of the prior art, the technical problems to be solved by the invention are:How to provide a kind of steel ball into Type quality is high, and surface accuracy is high, so as to get steel ball there is the steel ball production and processing method of high rigidity and high intensity.
In order to solve the above-mentioned technical problem, present invention employs following technical solutions:
A kind of steel ball production and processing method, it is characterised in that:Include the following steps:
1)Choose finished product wire feedstock:C mass contents are that 0.15~0.20%, Si mass contents are 0.03~0.10%, Mn It is 0.015~0.030%, S mass contents is 0.017~0.035% that mass content, which is 0.30~0.90%, P mass contents,;
2)Finished wire rod is subjected to straightening processing by straightener, finished wire rod is then cut into cylinder blank, is connect It and cylinder blank is put into cleaning mill, the corner on cylinder blank is passivated processing, cold-heading is carried out to it later Obtain prefabricated steel ball;
3)Prefabricated steel ball is subjected to spheroidizing processing:Prefabricated steel ball is heated to according to the heating speed of 12 DEG C/min 400~450 DEG C, and 0.5~1h is kept the temperature, 850~900 then are heated to prefabricated steel ball according still further to the heating speed of 8 DEG C/min DEG C, and 3~4h is kept the temperature, it comes out of the stove after being then furnace-cooled to 500 DEG C, then be air-cooled to room temperature;
4)Prefabricated steel ball is subjected to quenching treatment again:Prefabricated steel ball is heated to 800~850 DEG C, and keep the temperature 1h, is reheated To 970~1020 DEG C, and 2h is kept the temperature, prefabricated steel ball is put into 40~60 DEG C of quenching-in water later to pre-manufactured steel spherical surface temperature To after 300~350 DEG C, place into 30~50 DEG C of machine oil to taking out after pre-manufactured steel spherical surface temperature to oil temperature;
5)Prefabricated steel ball is subjected to temper again:Prefabricated steel ball is tempered, temperature is 150~200 DEG C, is returned Fiery medium is oil, and tempering time is 2~3h;
6)Prefabricated steel ball is put into grinder, and add in lapping liquid carry out first time grinding, lapping liquid include oil and Granularity is less than or equal to 0.1 μm of diamond dust, takes out prefabricated steel ball later and is reentered into grinder, and add in metalworking coolant It carries out second to grind, finally obtains fine grinding steel ball;
7)Fine grinding steel ball is subjected to double tempering processing:Temperature is 150~200 DEG C, and temper medium is air, tempering Time is 6~7h;
8)Fine grinding steel ball is cleaned, obtains finished product.
In conclusion the beneficial effects of the present invention are:The present invention is by the cylinder blank obtained after shearing through cleaning mill Passivation Treatment allows and is eliminated the defects of the overlap generated after shearing, avoids and the defects of owe punching occur in subsequent cold-heading. In addition compared with existing heat treatment process, the hardness and strength performance of steel ball is all significantly increased, and meets the quality of steel ball It is required that.
Specific embodiment
The present invention is described in further detail below.
Embodiment 1
Steel ball production and processing method in present embodiment, includes the following steps:
1)Choose finished product wire feedstock:C mass contents are that 0.15%, Si mass contents are that 0.03%, Mn mass contents are 0.30%, P mass content are that 0.015%, S mass contents are 0.017%;
2)Finished wire rod is subjected to straightening processing by straightener, finished wire rod is then cut into cylinder blank, is connect It and cylinder blank is put into cleaning mill, the corner on cylinder blank is passivated processing, cold-heading is carried out to it later Obtain prefabricated steel ball;
3)Prefabricated steel ball is subjected to spheroidizing processing:Prefabricated steel ball is heated to according to the heating speed of 12 DEG C/min 400 DEG C, and 0.5h is kept the temperature, then 850 DEG C are heated to prefabricated steel ball, and keep the temperature 3h according still further to the heating speed of 8 DEG C/min, connect It and comes out of the stove, then be air-cooled to room temperature after being furnace-cooled to 500 DEG C;
4)Prefabricated steel ball is subjected to quenching treatment again:Prefabricated steel ball is heated to 800 DEG C, and keep the temperature 1h, is again heated to 970 DEG C, and 2h is kept the temperature, prefabricated steel ball is put into 40 DEG C of quenching-in water later to pre-manufactured steel spherical surface temperature to after 300 DEG C, then put Enter in 30 DEG C of machine oil to taking out after pre-manufactured steel spherical surface temperature to oil temperature;
5)Prefabricated steel ball is subjected to temper again:Prefabricated steel ball is tempered, temperature is 150 DEG C, and tempering is situated between Matter is oily, tempering time 2h;
6)Prefabricated steel ball is put into grinder, and add in lapping liquid carry out first time grinding, lapping liquid include oil and Granularity is less than or equal to 0.1 μm of diamond dust, takes out prefabricated steel ball later and is reentered into grinder, and add in metalworking coolant It carries out second to grind, finally obtains fine grinding steel ball;
7)Fine grinding steel ball is subjected to double tempering processing:Temperature is 150 DEG C, and temper medium is air, tempering time For 6h;
8)Fine grinding steel ball is cleaned, obtains finished product.
Embodiment 2
Steel ball production and processing method in present embodiment, includes the following steps:
1)Choose finished product wire feedstock:C mass contents are that 0.20%, Si mass contents are that 0.10%, Mn mass contents are 0.90%, P mass content are that 0.030%, S mass contents are 0.035%;
2)Finished wire rod is subjected to straightening processing by straightener, finished wire rod is then cut into cylinder blank, is connect It and cylinder blank is put into cleaning mill, the corner on cylinder blank is passivated processing, cold-heading is carried out to it later Obtain prefabricated steel ball;
3)Prefabricated steel ball is subjected to spheroidizing processing:Prefabricated steel ball is heated to according to the heating speed of 12 DEG C/min 450 DEG C, and 1h is kept the temperature, then 900 DEG C are heated to prefabricated steel ball, and keep the temperature 4h according still further to the heating speed of 8 DEG C/min, then It comes out of the stove after being furnace-cooled to 500 DEG C, then is air-cooled to room temperature;
4)Prefabricated steel ball is subjected to quenching treatment again:Prefabricated steel ball is heated to 850 DEG C, and keep the temperature 1h, is again heated to 1020 DEG C, and keep the temperature 2h, prefabricated steel ball is put into 60 DEG C of quenching-in water later to pre-manufactured steel spherical surface temperature to after 350 DEG C, It places into 50 DEG C of machine oil to taking out after pre-manufactured steel spherical surface temperature to oil temperature;
5)Prefabricated steel ball is subjected to temper again:Prefabricated steel ball is tempered, temperature is 200 DEG C, and tempering is situated between Matter is oily, tempering time 3h;
6)Prefabricated steel ball is put into grinder, and add in lapping liquid carry out first time grinding, lapping liquid include oil and Granularity is less than or equal to 0.1 μm of diamond dust, takes out prefabricated steel ball later and is reentered into grinder, and add in metalworking coolant It carries out second to grind, finally obtains fine grinding steel ball;
7)Fine grinding steel ball is subjected to double tempering processing:Temperature is 200 DEG C, and temper medium is air, tempering time For h;
8)Fine grinding steel ball is cleaned, obtains finished product.
Finally illustrate, the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, although passing through ginseng According to the preferred embodiment of the present invention, invention has been described, it should be appreciated by those of ordinary skill in the art that can Various changes are made to it in the form and details, the present invention that is limited without departing from the appended claims Spirit and scope.

Claims (1)

1. a kind of steel ball production and processing method, it is characterised in that:Include the following steps:
1)Choose finished product wire feedstock:C mass contents are that 0.15~0.20%, Si mass contents are 0.03~0.10%, Mn mass It is 0.015~0.030%, S mass contents is 0.017~0.035% that content, which is 0.30~0.90%, P mass contents,;
2)Finished wire rod is subjected to straightening processing by straightener, finished wire rod is then cut into cylinder blank, then will Cylinder blank is put into cleaning mill, and the corner on cylinder blank is passivated processing, and carrying out cold-heading to it later obtains Prefabricated steel ball;
3)Prefabricated steel ball is subjected to spheroidizing processing:400 are heated to prefabricated steel ball according to the heating speed of 12 DEG C/min~ 450 DEG C, and 0.5~1h is kept the temperature, then 850~900 DEG C are heated to prefabricated steel ball according still further to the heating speed of 8 DEG C/min, and 3~4h is kept the temperature, is come out of the stove after being then furnace-cooled to 500 DEG C, then be air-cooled to room temperature;
4)Prefabricated steel ball is subjected to quenching treatment again:Prefabricated steel ball is heated to 800~850 DEG C, and keep the temperature 1h, is again heated to 970~1020 DEG C, and keep the temperature 2h, prefabricated steel ball is put into 40~60 DEG C of quenching-in water later to pre-manufactured steel spherical surface temperature extremely After 300~350 DEG C, place into 30~50 DEG C of machine oil to taking out after pre-manufactured steel spherical surface temperature to oil temperature;
5)Prefabricated steel ball is subjected to temper again:Prefabricated steel ball is tempered, temperature is 150~200 DEG C, and tempering is situated between Matter is oil, and tempering time is 2~3h;
6)Prefabricated steel ball is put into grinder, and adds in lapping liquid and carries out first time grinding, lapping liquid includes oil and granularity Diamond dust less than or equal to 0.1 μm takes out prefabricated steel ball and is reentered into grinder later, and adds in metalworking coolant progress Second of grinding, finally obtains fine grinding steel ball;
7)Fine grinding steel ball is subjected to double tempering processing:Temperature is 150~200 DEG C, and temper medium is air, tempering time For 6~7h;
8)Fine grinding steel ball is cleaned, obtains finished product.
CN201611035230.7A 2016-11-23 2016-11-23 Steel ball production and processing method Active CN106392492B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611035230.7A CN106392492B (en) 2016-11-23 2016-11-23 Steel ball production and processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611035230.7A CN106392492B (en) 2016-11-23 2016-11-23 Steel ball production and processing method

Publications (2)

Publication Number Publication Date
CN106392492A CN106392492A (en) 2017-02-15
CN106392492B true CN106392492B (en) 2018-06-15

Family

ID=58081788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611035230.7A Active CN106392492B (en) 2016-11-23 2016-11-23 Steel ball production and processing method

Country Status (1)

Country Link
CN (1) CN106392492B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107186447A (en) * 2017-07-15 2017-09-22 芜湖市宇恒特种钢球有限公司 A kind of processing method of bearing steel ball
CN109082518B (en) * 2018-09-19 2019-12-06 铜陵市明诚铸造有限责任公司 Annealing cooling device for hot rolling steel ball
CN110303304B (en) * 2019-07-23 2022-03-15 重庆申耀机械工业有限责任公司 Processing technique of roller
CN110977346A (en) * 2019-12-10 2020-04-10 苏州工业园区科海机电工程有限公司 Steel product processing technology
CN112059542A (en) * 2020-08-19 2020-12-11 云南昆钢耐磨材料科技股份有限公司 Production process of high-carbon microalloyed steel ball

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0783232A (en) * 1993-09-20 1995-03-28 Nippon Seiko Kk Manufacture of ball for ball bearing
EP1270142A2 (en) * 2001-06-28 2003-01-02 Koyo Seiko Co., Ltd. Manufacturing method of steel ball for rolling bearing
CN101185955A (en) * 2007-12-21 2008-05-28 江南大学 Steel ball cold heading technique and steel ball cold header
CN101186005A (en) * 2007-11-30 2008-05-28 洛阳轴研科技股份有限公司 Processing technique of 9Cr18 stainless steel capable of being improved to G3 level
CN101724742A (en) * 2008-10-22 2010-06-09 洛阳轴研科技股份有限公司 Heat treatment process of notch ductile steel bearing balls
CN102252024A (en) * 2011-02-14 2011-11-23 江苏力星通用钢球股份有限公司 Steel ball special for third-age hub bearing for luxury cars
CN103008994A (en) * 2012-12-12 2013-04-03 山东东阿钢球集团有限公司 Production method for dedicated steel ball for bearing of high-speed high-precision numerical control machine tool
CN104259790A (en) * 2014-10-04 2015-01-07 芜湖市宇恒特种钢球有限公司 Method for machining high-precision steel ball

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0783232A (en) * 1993-09-20 1995-03-28 Nippon Seiko Kk Manufacture of ball for ball bearing
EP1270142A2 (en) * 2001-06-28 2003-01-02 Koyo Seiko Co., Ltd. Manufacturing method of steel ball for rolling bearing
CN101186005A (en) * 2007-11-30 2008-05-28 洛阳轴研科技股份有限公司 Processing technique of 9Cr18 stainless steel capable of being improved to G3 level
CN101185955A (en) * 2007-12-21 2008-05-28 江南大学 Steel ball cold heading technique and steel ball cold header
CN101724742A (en) * 2008-10-22 2010-06-09 洛阳轴研科技股份有限公司 Heat treatment process of notch ductile steel bearing balls
CN102252024A (en) * 2011-02-14 2011-11-23 江苏力星通用钢球股份有限公司 Steel ball special for third-age hub bearing for luxury cars
CN103008994A (en) * 2012-12-12 2013-04-03 山东东阿钢球集团有限公司 Production method for dedicated steel ball for bearing of high-speed high-precision numerical control machine tool
CN104259790A (en) * 2014-10-04 2015-01-07 芜湖市宇恒特种钢球有限公司 Method for machining high-precision steel ball

Also Published As

Publication number Publication date
CN106392492A (en) 2017-02-15

Similar Documents

Publication Publication Date Title
CN106392492B (en) Steel ball production and processing method
CN105583588B (en) A kind of processing method for taper roll bearing Internal and external cycle
CN104878317A (en) Hot-rolling production method for low-nickel austenitic stainless steel coils
CN104388859A (en) Method for simultaneously improving strength and plasticity of copper aluminum alloy
CN105088085A (en) High-performance cold mill intermediate roll and preparation method thereof
CN106467931A (en) A kind of method of manufacturing technology of lifting bearer ring performance
CN102766803A (en) Free forging processing process of alloyed tool steel 5CrNiMo for footstep shaft
CN102528382A (en) Manufacture method of cold-rolled roller
CN105063500A (en) Cold roller for rolling stainless steel plates, and preparation method of cold roller
CN112251664A (en) Ultra-fine grain alloy steel forging and manufacturing method thereof
CN109290371B (en) Cold rolling manufacturing method of copper-aluminum composite plate strip
CN104690494A (en) Forging process of piston rod
CN105215626A (en) Be applicable to chromium bearing steel cold-drawn material and the manufacture method thereof of miniature bearing lasso cutting members
CN105714027A (en) Heat treatment process for hardening and tempering of 45 steel
CN101992395A (en) Machining-shaping process of bearing ring
CN107984173A (en) A kind of processing method of bearing ring
CN110904324A (en) Heat treatment process for planetary gear
CN103192244A (en) Machining technology for titanium alloys and method for producing titanium rods and titanium wires through machining technology
CN110153199A (en) A kind of controlled rolling method of large scale rod bar
CN115555806A (en) Wire rod preparation method capable of improving stainless steel rivet yield
CN105983822A (en) Machining process of tapered roller
CN106735265A (en) Method for processing steel ball
CN105986080A (en) Heat treatment technology of 38CrMnAl steel
CN112846017A (en) Forging process for preventing 11Cr17 from forging cracking
CN106048146A (en) Thermal treatment method of high-performance rotor forging

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant