CN106384195B - A kind of substation equipment maintenance and repair method - Google Patents
A kind of substation equipment maintenance and repair method Download PDFInfo
- Publication number
- CN106384195B CN106384195B CN201610815214.3A CN201610815214A CN106384195B CN 106384195 B CN106384195 B CN 106384195B CN 201610815214 A CN201610815214 A CN 201610815214A CN 106384195 B CN106384195 B CN 106384195B
- Authority
- CN
- China
- Prior art keywords
- transformer equipment
- information
- service
- overhauls
- tbo
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012423 maintenance Methods 0.000 title claims abstract description 79
- 238000000034 method Methods 0.000 title claims abstract description 23
- 238000010586 diagram Methods 0.000 claims abstract description 21
- 230000009466 transformation Effects 0.000 claims description 8
- 238000007689 inspection Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Abstract
The invention discloses a kind of substation equipment maintenance and repair method, belong to technical field of power systems.The described method includes:Obtain the operation information of transformer equipment;Problem information is determined according to operation information;Service personnel and service information are determined according to problem information and the transformer equipment pre-established maintenance topological diagram;Service information is sent to service personnel, service personnel is overhauled according to service information to transformer equipment.Present invention comprehensive utilization operation information, problem information, the acquisition of service information, processing and feedback, service personnel and service information are determined according to problem information and the transformer equipment pre-established maintenance topological diagram, service information is sent to service personnel, service personnel is overhauled according to service information to transformer equipment, lift the accuracy of service information.In addition, adjusting the time between overhauls(TBO) of the transformer equipment according to service information, the time between overhauls(TBO) of transformer equipment can be corrected, is allowed to more be bonded the current service requirements of transformer equipment.
Description
Technical field
The present invention relates to technical field of power systems, more particularly to a kind of substation equipment maintenance and repair method.
Background technology
In electric system, overhauled before transformer equipment will break down state, it is ensured that transformer equipment safety
Operation, reduces transformer equipment loss ratio, reduces power off time, extends the transformer equipment time between overhauls(TBO), improves power supply reliability.
At present, transformer equipment repair method is:Overhaul management personnel manually determine maintenance task, and are sent to service personnel
Job order is overhauled, wherein maintenance job order includes the description of maintenance task, such as:Overhaul position, the transformer equipment name of maintenance
Claim, overhaul content etc..After service personnel obtains maintenance job order, overhauled according to the content of maintenance job order.
This method needs manually definite maintenance task, generation maintenance job order, and artificial treatment can reduce maintenance task
Accuracy.
The content of the invention
(1) technical problems to be solved
In order to lift the accuracy of service information, the present invention provides a kind of substation equipment maintenance and repair method, can be believed according to problem
The transformer equipment maintenance topological diagram for ceasing and pre-establishing determines service personnel and service information, and service information is sent to inspection
Personnel are repaiied, service personnel is overhauled according to service information to transformer equipment, lift the accuracy of service information.
(2) technical solution
In order to achieve the above object, the main technical schemes that the present invention uses include:
A kind of substation equipment maintenance and repair method, includes the following steps:
101, obtain the operation information of transformer equipment;
102, problem information is determined according to the operation information;
103, according to described problem information and the transformer equipment pre-established maintenance topological diagram determine service personnel and
Service information, the service information, including:The title of the transformer equipment, the identifying of the transformer equipment, the transformer equipment
Position, with the transformer equipment have service logic relation transformer equipment title, with the transformer equipment have service logic pass
The transformer equipment of system is identified, there is the transformer equipment position of service logic relation with the transformer equipment, had with the transformer equipment
The transformer equipment title of physical logic relation, the transformer equipment mark for having with the transformer equipment physical logic relation, with it is described
Transformer equipment has the transformer equipment position of physical logic relation, described problem information, repair time;
104, the service information is sent to the service personnel, makes the service personnel according to the service information pair
The transformer equipment is overhauled;
105, the time between overhauls(TBO) of the transformer equipment is adjusted according to the service information;
Wherein, the step 102, including following sub-step:
102-1, obtains the normal information of the transformer equipment prestored;
102-2, by the operation information compared with the normal information;
102-3, if (| the operation information-normal information |/the operation information) it is more than 0.16, it is determined that it is described
Operation information is problem information;
The step 105, including following sub-step:
105-1, obtains service information of the transformer equipment in preset time period, and the transformer equipment is current
Time between overhauls(TBO);
105-2, analyzes the service information in the transformer equipment preset time period, is believed according to the maintenance of the transformer equipment
Breath determines candidate's time between overhauls(TBO);
105-3, the new inspection of the transformer equipment is determined according to the relation between candidate's time between overhauls(TBO) and current time between overhauls(TBO)
Repair the cycle;
105-4, the new time between overhauls(TBO) is adjusted to by the current time between overhauls(TBO) of transformer equipment;
The step 105-3, including:
If candidate is shorter than current time between overhauls(TBO) * 1.68 time between overhauls(TBO)s, candidate's time between overhauls(TBO) is determined as the change
The new time between overhauls(TBO) of electric equipment;
If candidate's time between overhauls(TBO) is not shorter than current time between overhauls(TBO) * 1.68, the current time between overhauls(TBO) is determined as described
The new time between overhauls(TBO) of transformer equipment.
Alternatively, before step 103 performs, following steps are further included:
Obtain title, mark, position, service logic, the physical logic of each transformer equipment;
Obtain the maintenance content, maintenance geographic range, effective time of each service personnel;
According to the title of each transformer equipment, mark, position, service logic, physical logic and each service personnel
Content, maintenance geographic range, effective time are overhauled, determines the transformer equipment maintenance topological diagram between each transformer equipment.
Alternatively, the service logic, including:There is the transformer equipment of business relations with transformer equipment.
Alternatively, the physical logic, including:There is the transformer equipment of connection with transformer equipment.
(3) beneficial effect
The beneficial effects of the invention are as follows:Obtain the operation information of transformer equipment;Problem information is determined according to operation information;Root
Service personnel and service information are determined according to problem information and the transformer equipment pre-established maintenance topological diagram;By service information
Send to service personnel, service personnel is overhauled according to service information to transformer equipment, lift the accuracy of service information.
In addition, adjusting the time between overhauls(TBO) of the transformer equipment according to service information, the time between overhauls(TBO) of transformer equipment can be corrected, is allowed to more
It is bonded the current service requirements of transformer equipment.
Brief description of the drawings
Fig. 1 is a kind of substation equipment maintenance and repair method flow diagram that the embodiment of the present invention one provides;
Fig. 2 is a kind of substation equipment maintenance and repair method flow diagram provided by Embodiment 2 of the present invention.
Embodiment
In order to preferably explain the present invention, in order to understand, below in conjunction with the accompanying drawings, by embodiment, to this hair
It is bright to be described in detail.
At present, overhaul management personnel manually determine maintenance task, and send maintenance job order, service personnel to service personnel
After obtaining maintenance job order, overhauled according to the content of maintenance job order.This method needs manually definite maintenance task, generation
Job order is overhauled, and artificial treatment can reduce the accuracy of maintenance task.The present invention provides a kind of substation equipment maintenance and repair method, obtains
The operation information of transformer equipment;Problem information is determined according to operation information;Set according to problem information and the power transformation pre-established
Standby maintenance topological diagram determines service personnel and service information;Service information is sent to service personnel, make service personnel according to
Service information overhauls transformer equipment, lifts the accuracy of service information.
Embodiment one
A kind of substation equipment maintenance and repair method is present embodiments provided, referring to Fig. 1, method flow provided in this embodiment is specifically such as
Under:
101, obtain the operation information of transformer equipment;
102, problem information is determined according to operation information;
Including following sub-step wherein, step 102,:
102-1, obtains the normal information of the transformer equipment prestored;
102-2, by operation information compared with normal information;
102-3, if (| operation information-normal information |/operation information) it is more than 0.16, it is determined that operation information is believed for problem
Breath.
103, service personnel and maintenance are determined according to problem information and the transformer equipment pre-established maintenance topological diagram
Information, service information, including:The title of transformer equipment, the mark of transformer equipment, the position of transformer equipment, have with transformer equipment
The transformer equipment title of service logic relation, the transformer equipment for having service logic relation with transformer equipment identifies and transformer equipment
There is the transformer equipment position of service logic relation, there is the transformer equipment title of physical logic relation with transformer equipment, set with power transformation
Have the transformer equipment mark of physical logic relation, there is the transformer equipment position of physical logic relation, problem to believe with transformer equipment
Breath, repair time;
Alternatively, before step 103 performs, following steps are further included:
Obtain title, mark, position, service logic, the physical logic of each transformer equipment;
Obtain the maintenance content, maintenance geographic range, effective time of each service personnel;
According to the title of each transformer equipment, mark, position, service logic, physical logic and the maintenance of each service personnel
Content, maintenance geographic range, effective time, determine the transformer equipment maintenance topological diagram between each transformer equipment.
Wherein, service logic, including:There is the transformer equipment of business relations with transformer equipment.
Wherein, physical logic, including:There is the transformer equipment of connection with transformer equipment.
104, service information is sent to service personnel, service personnel is examined according to service information to transformer equipment
Repair;
105, the time between overhauls(TBO) of transformer equipment is adjusted according to service information.
Including following sub-step wherein, step 105,:
105-1, obtains service information of the transformer equipment in preset time period, and the current maintenance week of transformer equipment
Phase;
105-2, analyzes the service information in transformer equipment preset time period, determines to wait according to the service information of transformer equipment
Select the time between overhauls(TBO);
105-3, the new maintenance week of transformer equipment is determined according to the relation between candidate's time between overhauls(TBO) and current time between overhauls(TBO)
Phase;
105-4, the new time between overhauls(TBO) is adjusted to by the current time between overhauls(TBO) of transformer equipment;
Step 105-3, including:
If candidate is shorter than current time between overhauls(TBO) * 1.68 time between overhauls(TBO)s, candidate is determined as transformer equipment the time between overhauls(TBO)
The new time between overhauls(TBO);
If candidate's time between overhauls(TBO) is not shorter than current time between overhauls(TBO) * 1.68, the current time between overhauls(TBO) is determined as transformer equipment
The new time between overhauls(TBO).
Method provided in this embodiment, obtains the operation information of transformer equipment;Problem information is determined according to operation information;Root
Service personnel and service information are determined according to problem information and the transformer equipment pre-established maintenance topological diagram;By service information
Send to service personnel, service personnel is overhauled according to service information to transformer equipment, lift the accuracy of service information.
In order to clearly illustrate substation equipment maintenance and repair method that above-described embodiment provides, with reference to the content of above-described embodiment,
By taking following examples two as an example, substation equipment maintenance and repair method is described in detail, sees below embodiment two:
Embodiment two
A kind of substation equipment maintenance and repair method is present embodiments provided, referring to Fig. 2, method flow provided in this embodiment is specifically such as
Under:
201, establish transformer equipment maintenance topological diagram;
This step can be realized by following three step:
Step 1:Obtain title, mark, position, service logic, the physical logic of each transformer equipment;
Wherein, service logic, including:There is the transformer equipment of business relations with transformer equipment.Physical logic, including:With change
Electric equipment has the transformer equipment of connection.
By taking transformer equipment A as an example, if transformer equipment A powers for transformer equipment D, at this time, transformer equipment A and transformer equipment D
Between can not only be directly connected to, can also be indirectly connected with by other equipment, then the service logic of transformer equipment A sets for power transformation
Standby D.
If the electric current input transformer equipment A of transformer equipment B outputs, and the electric current input transformer equipment of transformer equipment A outputs
C, then the physical logic of transformer equipment A is transformer equipment B and transformer equipment C, and transformer equipment B is input logic, transformer equipment C
To export logic.
Step 2:Obtain the maintenance content, maintenance geographic range, effective time of each service personnel;
Step 3:According to the title of each transformer equipment, mark, position, service logic, physical logic and each service personnel
Maintenance content, maintenance geographic range, the effective time, determine between each transformer equipment transformer equipment maintenance topological diagram.
Service logic relation, the physical logic that transformer equipment maintenance topological diagram can reflect between each transformer equipment are closed
Relation between system, transformer equipment and maintenance personal.
202, obtain the operation information of transformer equipment;
Wherein, operation information includes but not limited to:Photo, transformer equipment operation when operating index, transformer equipment operation
When video recording etc..
203, problem information is determined according to operation information;
The specific implementation of this step includes but not limited to:
203-1, obtains the normal information of the transformer equipment prestored;
203-2, by operation information compared with normal information;
203-3, if (| operation information-normal information |/operation information) it is more than 0.16, it is determined that the operation information is to ask
Inscribe information.
For example, the normal information of the transformer equipment prestored is 110 volts of voltage, the transformer equipment obtained in step 202
Operation information be 90 volts of voltage, at this time, | operation information-normal information |/operation information=| 110-90 |/110=0.18,
0.18>0.16, it is determined that the operation information is problem information.
204, service personnel and maintenance are determined according to problem information and the transformer equipment pre-established maintenance topological diagram
Information;
The transformer equipment maintenance topological diagram established by step 201 include the title of each transformer equipment, mark, position,
The maintenance content of service logic, physical logic and each service personnel, maintenance geographic range, effective time, it can reflect
The relation between service logic relation, physical logic relation, transformer equipment and maintenance personal between each transformer equipment.Therefore,
The title of transformer equipment, transformer equipment can be determined according to problem information and the transformer equipment pre-established maintenance topological diagram
Mark, the position of transformer equipment, the transformer equipment title for having with transformer equipment service logic relation, with transformer equipment have business to patrol
The transformer equipment mark and transformer equipment for the relation of collecting have the transformer equipment position of service logic relation, have physics with transformer equipment
The transformer equipment title of logical relation, the transformer equipment for having physical logic relation with transformer equipment identify, have thing with transformer equipment
The transformer equipment position of reason logical relation, service personnel, repair time.
Therefore, the service information in the present embodiment, including:The title of transformer equipment, the mark of transformer equipment, transformer equipment
Position, have with transformer equipment the transformer equipment title of service logic relation, have the power transformation of service logic relation with transformer equipment
Device identification and transformer equipment have the transformer equipment position of service logic relation, have the change of physical logic relation with transformer equipment
Electric equipment title, the transformer equipment for having physical logic relation with transformer equipment identify, have physical logic relation with transformer equipment
Transformer equipment position, problem information, repair time.
205, service information is sent to service personnel, service personnel is examined according to service information to transformer equipment
Repair;
206, the time between overhauls(TBO) of transformer equipment is adjusted according to service information.
Since transformer equipment has the normal time between overhauls(TBO) in itself, and above-mentioned steps 202 to step 205 is according to transformer equipment
The maintenance task that current operating condition determines, it is unrelated with the time between overhauls(TBO) of transformer equipment in itself, but step in practical applications
202 determine that the cycle of maintenance task has an impact the time between overhauls(TBO) of transformer equipment in itself to step 205.For example, as power transformation is set
Standby use, its time between overhauls(TBO) can be shorter and shorter, and when shortens, and how much foreshorten to can be true to step 205 according to step 202
The cycle that regular inspection repaiies task determines.Therefore, service information is sent to service personnel in execution step 205, can also performed
Step 206 adjusts the time between overhauls(TBO) of transformer equipment according to service information.
The specific implementation of the time between overhauls(TBO) of transformer equipment is adjusted according to service information, is included but not limited to:
206-1, obtains service information of the transformer equipment in preset time period, and the current maintenance week of transformer equipment
Phase;
206-2, analyzes the service information in transformer equipment preset time period, determines to wait according to the service information of transformer equipment
Select the time between overhauls(TBO);
206-3, the new maintenance week of transformer equipment is determined according to the relation between candidate's time between overhauls(TBO) and current time between overhauls(TBO)
Phase;
206-4, the new time between overhauls(TBO) is adjusted to by the current time between overhauls(TBO) of transformer equipment.
Specifically, in step 206-3:If candidate is shorter than current time between overhauls(TBO) * 1.68 time between overhauls(TBO)s, candidate is overhauled into week
Phase is determined as the new time between overhauls(TBO) of transformer equipment;If candidate's time between overhauls(TBO) is not shorter than current time between overhauls(TBO) * 1.68, will currently examine
Repair the new time between overhauls(TBO) that the cycle is determined as transformer equipment.
Execution by the time between overhauls(TBO) step that transformer equipment is adjusted according to service information, can working as according to transformer equipment
Preceding service condition dynamic adjusts the time between overhauls(TBO) of the transformer equipment, the time between overhauls(TBO) of transformer equipment is more in line with transformer equipment and works as
Preceding operating status, and then ensure transformer equipment safe operation.
Method provided in this embodiment, obtains the operation information of transformer equipment;Problem information is determined according to operation information;Root
Service personnel and service information are determined according to problem information and the transformer equipment pre-established maintenance topological diagram;By service information
Send to service personnel, service personnel is overhauled according to service information to transformer equipment, lift the accuracy of service information.
In addition, adjusting the time between overhauls(TBO) of the transformer equipment according to service information, the time between overhauls(TBO) of transformer equipment can be corrected, is allowed to more
It is bonded the current service requirements of transformer equipment.
Claims (3)
- A kind of 1. substation equipment maintenance and repair method, it is characterised in that the method, includes the following steps:101, obtain the operation information of transformer equipment;102, problem information is determined according to the operation information;103, service personnel and maintenance are determined according to described problem information and the transformer equipment pre-established maintenance topological diagram Information, the service information, including:The title of the transformer equipment, the identifying of the transformer equipment, the position of the transformer equipment Put, there is the transformer equipment title of service logic relation with the transformer equipment, have service logic relation with the transformer equipment Transformer equipment mark and the transformer equipment have the transformer equipment position of service logic relation, have physics with the transformer equipment The transformer equipment title of logical relation, have the transformer equipment mark of physical logic relation and the power transformation with the transformer equipment Equipment has the transformer equipment position of physical logic relation, described problem information, repair time;104, the service information is sent to the service personnel, makes the service personnel according to the service information to described Transformer equipment is overhauled;105, the time between overhauls(TBO) of the transformer equipment is adjusted according to the service information;Wherein, the step 102, including following sub-step:102-1, obtains the normal information of the transformer equipment prestored;102-2, by the operation information compared with the normal information;102-3, if (| the operation information-normal information |/the operation information) it is more than 0.16, it is determined that the operation Information is problem information;Before the step 103 performs, following steps are further included:Obtain title, mark, position, service logic, the physical logic of each transformer equipment;Obtain the maintenance content, maintenance geographic range, effective time of each service personnel;According to the title of each transformer equipment, mark, position, service logic, physical logic and the maintenance of each service personnel Content, maintenance geographic range, effective time, determine the transformer equipment maintenance topological diagram between each transformer equipment;The step 105, including following sub-step:105-1, obtains service information of the transformer equipment in preset time period, and the current maintenance of the transformer equipment Cycle;105-2, analyzes the service information in the transformer equipment preset time period, true according to the service information of the transformer equipment Determine candidate's time between overhauls(TBO);105-3, the new maintenance week of the transformer equipment is determined according to the relation between candidate's time between overhauls(TBO) and current time between overhauls(TBO) Phase;105-4, the new time between overhauls(TBO) is adjusted to by the current time between overhauls(TBO) of transformer equipment;The step 105-3, including:If candidate is shorter than current time between overhauls(TBO) * 1.68 time between overhauls(TBO)s, candidate's time between overhauls(TBO) is determined as the power transformation and is set The standby new time between overhauls(TBO);If candidate's time between overhauls(TBO) is not shorter than current time between overhauls(TBO) * 1.68, the current time between overhauls(TBO) is determined as the power transformation The new time between overhauls(TBO) of equipment.
- 2. step according to claim 1, it is characterised in that the service logic, including:There is business connection with transformer equipment The transformer equipment of system.
- 3. step according to claim 1, it is characterised in that the physical logic, including:There is circuit company with transformer equipment The transformer equipment connect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610815214.3A CN106384195B (en) | 2016-09-09 | 2016-09-09 | A kind of substation equipment maintenance and repair method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610815214.3A CN106384195B (en) | 2016-09-09 | 2016-09-09 | A kind of substation equipment maintenance and repair method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106384195A CN106384195A (en) | 2017-02-08 |
CN106384195B true CN106384195B (en) | 2018-04-13 |
Family
ID=57935548
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610815214.3A Active CN106384195B (en) | 2016-09-09 | 2016-09-09 | A kind of substation equipment maintenance and repair method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106384195B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106408215A (en) * | 2016-10-28 | 2017-02-15 | 宁波天派智能科技有限公司 | Substation equipment running condition detection method and device |
CN107979182A (en) * | 2017-12-29 | 2018-05-01 | 武汉神宇电气有限公司 | High-low pressure complete set of distribution long-distance maintenance method and system |
CN110942163A (en) * | 2019-12-23 | 2020-03-31 | 国网湖北省电力公司咸宁供电公司 | Intelligent maintenance method and system based on big data |
CN112085410A (en) * | 2020-09-18 | 2020-12-15 | 广东电网有限责任公司 | Maintenance task arrangement method, device, equipment and storage medium |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104867061A (en) * | 2015-06-04 | 2015-08-26 | 国网上海市电力公司 | State repair management system for relay protection device |
CN105809257A (en) * | 2016-03-09 | 2016-07-27 | 国家电网公司 | Power communication network-based triggering type condition-based maintenance method |
-
2016
- 2016-09-09 CN CN201610815214.3A patent/CN106384195B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104867061A (en) * | 2015-06-04 | 2015-08-26 | 国网上海市电力公司 | State repair management system for relay protection device |
CN105809257A (en) * | 2016-03-09 | 2016-07-27 | 国家电网公司 | Power communication network-based triggering type condition-based maintenance method |
Also Published As
Publication number | Publication date |
---|---|
CN106384195A (en) | 2017-02-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106384195B (en) | A kind of substation equipment maintenance and repair method | |
CN106532935B (en) | For carrying out the method and its system of secondary system of intelligent substation fault diagnosis | |
CN204391903U (en) | A kind of line loss monitoring system | |
CN110376483A (en) | A kind of direct current island detection method based on specific frequency busbar voltage positive feedback | |
CN203554074U (en) | Distributed power generation grid-connected dual-power supply interface apparatus | |
CN204515032U (en) | A kind of proving installation of energy feedback unit | |
CN103606924A (en) | Dynamic voltage compensation apparatus and method | |
CN103441505B (en) | Based on electric energy quality serial connection compensation method and the device of wind-powered electricity generation | |
CN206077059U (en) | A kind of terminal lightning protection HVDC no-break power unit | |
CN202837421U (en) | DSP and CPLD-based wind-power electrical-network electric-energy parameter detection apparatus | |
Yu et al. | Maintenance plan based on RCM | |
CN109298255A (en) | A kind of subway energy feedback current transformer power examination test system and method | |
CN107291202A (en) | Regulation and control method, device and the computer-readable recording medium of power supply | |
CN204362075U (en) | A kind of power loss detection means | |
CN104298421B (en) | Power distribution network safety control method based on rapid simulation analysis technology | |
CN206180697U (en) | N+1 computer case power supply monitoring devices | |
CN105429141B (en) | Substation bus bar is turned the control method and system of paired running by point row | |
CN107766947A (en) | A kind of determination method and apparatus of substation equipment maintenance mode | |
CN209472440U (en) | A kind of intelligent checking system of more equipment networks | |
CN207681693U (en) | Arc welder zero load decision circuitry | |
CN205720608U (en) | Energy efficiency test system based on Information Technology Equipment dual power supply | |
CN206820473U (en) | Integration power-supply system for precision station | |
CN206002871U (en) | A kind of electric system operation and safety monitoring analogue system | |
CN104821608B (en) | Micro-capacitance sensor frequency, active and time ternary establishment of coordinate system method | |
CN206594244U (en) | A kind of short-circuit test system for gas turbine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |