CN106383373B - Isopleth, Isosurface construction, method for early warning based on actual measurement with forecast rainfall - Google Patents

Isopleth, Isosurface construction, method for early warning based on actual measurement with forecast rainfall Download PDF

Info

Publication number
CN106383373B
CN106383373B CN201611133797.8A CN201611133797A CN106383373B CN 106383373 B CN106383373 B CN 106383373B CN 201611133797 A CN201611133797 A CN 201611133797A CN 106383373 B CN106383373 B CN 106383373B
Authority
CN
China
Prior art keywords
rainfall
early warning
forecast
warning
hours
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611133797.8A
Other languages
Chinese (zh)
Other versions
CN106383373A (en
Inventor
陈博嘉
张迎春
张火炬
池詹赟
汤辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Four Creation Technology Ltd Co
Original Assignee
Four Creation Technology Ltd Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Four Creation Technology Ltd Co filed Critical Four Creation Technology Ltd Co
Priority to CN201611133797.8A priority Critical patent/CN106383373B/en
Publication of CN106383373A publication Critical patent/CN106383373A/en
Application granted granted Critical
Publication of CN106383373B publication Critical patent/CN106383373B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01WMETEOROLOGY
    • G01W1/00Meteorology
    • G01W1/10Devices for predicting weather conditions

Landscapes

  • Environmental & Geological Engineering (AREA)
  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Atmospheric Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Ecology (AREA)
  • Environmental Sciences (AREA)
  • Alarm Systems (AREA)

Abstract

The present invention provides a kind of isopleth based on actual measurement with forecast rainfall, Isosurface construction, method for early warning, consider that current actual measurement rainfall and following forecast rainfall carry out " forecast rainfall " isopleth simultaneously, the drafting of contour surface, obtain forecast rainfall, survey rainfall, to forecasting rainfall, actual measurement rainfall product data is handled, according to treated, " forecast rainfall " draws precipitation isohyetal line, contour surface, so by treated " forecast rainfall " isopleth, contour surface intuitively understands the region for next needing to pay close attention to, the time of Emergency Preparedness can be shifted to an earlier date significantly.Further, it can be based on the comparison that treated " forecast rainfall " with survey station threshold value of warning, early warning is sent out in advance, so that relevant person in charge is noticed the region for being likely to occur dangerous situation in advance, carry out counter-measure in advance.

Description

Isopleth, Isosurface construction, method for early warning based on actual measurement with forecast rainfall
Technical field
The invention belongs to weather forecast and early warning fields, and in particular to a kind of equivalence based on actual measurement with forecast rainfall Line, Isosurface construction, method for early warning.
Background technology
Existing flood control informationization related system mainly has about the mode that rainfall is shown:1, with the shape of text or table Formula shows rainfall.2, rainfall is shown in the form of rainfall block diagram.3, drop is shown in the form of precipitation isohyetal line, contour surface Rainfall(It is mainly based upon actual measurement rainfall or forecast rainfall is drawn, do not consider actual measurement rainfall and dropped with forecast Rainfall).
Method for early warning based on rainfall mainly has:1, rainfall and threshold value of warning is surveyed to be compared, reach threshold value i.e. into Row early warning.2, it forecasts that rainfall and threshold value of warning are compared, reaches threshold value and carry out early warning.3, consider actual measurement rainfall With forecast rainfall, is compared with early warning value, reach threshold value and carry out early warning.
The third alarm mode referenced patent document:201610132726.X one kind is calculated based on the quantitative rainfall forecast of fusion The mountain torrents early warning platform and method for early warning of method.
The drafting of precipitation isohyetal line, contour surface is carried out based on actual measurement rainfall in current flood control informationization related system It draws, work of flood prevention personnel can only understand current different zones rainfall distribution situation by isopleth, contour surface, for anti- It is relatively short to prepare the emergent time for flood work arrangements.For such situation, also there is part system using forecast rainfall The drafting for carrying out isopleth, contour surface, work of flood prevention personnel can be made to recognize in advance to be influenced caused by the following rainfall is possible, is It copes with possible dangerous situation and has won the time.But work of flood prevention is a dynamic process, thereby increases and it is possible to there is rainfall and be not achieved Threshold value of warning is also not achieved in threshold value of warning, forecast rainfall, but rainfall adds the early warning threshold for forecasting that rainfall has reached the corresponding period The case where value;The problem of considering further that current rainfall forecast technology accuracy rate, considers rainfall and forecast rainfall carries out Early warning practicability higher.The present invention is just to provide one kind and considering rainfall and forecast rainfall, passes through isopleth, contour surface Form show and carry out the method and system of early warning, improved to the leading time of dangerous situation with intuitive way, enable leader It is enough to notice potential danger earlier.
Invention content
The object of the present invention is to provide a kind of based on actual measurement and forecasts the isopleth, Isosurface construction, the pre- police of rainfall Method, considers rainfall and forecast rainfall drawing isoline, contour surface carry out comparison with threshold value of warning and carry out early warning in turn.
To achieve the above object, the present invention uses following technical scheme:A kind of equivalence based on actual measurement with forecast rainfall Line, Isosurface construction, method for early warning, which is characterized in that include the following steps:Step S1:Obtain predictions for future rainfall product data With current actual measurement rainfall product data;Step S2:The predictions for future rainfall and actual measurement rainfall product data that are obtained in step S1 are pressed It is handled according to the rule of setting, data that treated are known as forecasting rainfall, are output to isopleth, Isosurface construction module and pre- Alert determination module;Step S3:The drafting of precipitation isohyetal line, contour surface is carried out to forecast rainfall data;Each period is both provided with Threshold value of warning compares forecast rainfall and the threshold value of warning of corresponding period, when reaching or exceeding early warning, will need into Survey station, area, corresponding rainfall and the corresponding period information of the rainfall of row early warning pass to early warning release module and enter step Rapid S4;Step S4:Carry out early warning publication.
Further, forecast that the computational methods of rainfall include the following steps in step S2:Step S21:Obtain different periods Forecast rainfall and actual measurement rainfall;Step S22:If the period collection of forecast rainfall is combined into A hours following, actual measurement rainfall Period collection be combined into over B hours, early warning period collection is combined into C hours, a ∈ A, b ∈ B, c ∈ C, c ' ∈ C;A, b, c are nature Number;Step S23:If a=c and(a+b)C, then a hours forecast rainfalls are not processed forecast rainfall, early warning directly as c hours When compared with c hours threshold value of warning, meet or exceed threshold value of warning publication warning information;If a=c, a+b=c ' is divided to two kinds of feelings Condition:First, a hours forecast rainfalls are not processed and forecast that rainfall, when early warning were opposed with c hours threshold value of warning directly as c hour Than meeting or exceeding threshold value of warning publication warning information;First, a hours forecast rainfalls add b hours actual measurement rainfalls as c ' Hour forecast rainfall, compares when early warning with c ' hour threshold value of warning, meets or exceeds threshold value of warning publication warning information;Work as a When C, a+b=c, a hours forecast rainfalls add b hour actual measurement rainfalls as c hours and forecast rainfall, when early warning and early warning in c hours Threshold value compares, and meets or exceeds threshold value of warning publication warning information.
Further, the forecast rainfall after the computational methods in step S23 calculate, if a hours future forecast rainfall The sum of rainfall was surveyed with past b hour, then special identifier is carried out in systems, to show and directly make predictions for future rainfall To forecast the difference of rainfall such case.
Further, early warning publication by early warning short message, wireless alarming broadcast, mailbox or is faxed to early warning survey in step S4 It stands or region related personnel sends warning information.
Further, the early warning publication in step S4 automatically generates corresponding early warning content, and then carry out by early warning template The publication of early warning;Early warning template is by system according to presetting automatic running or by being manually arranged.
In an embodiment of the present invention, early warning content carries out early warning publication or through phase by system automatically according to the regular of setting Pass personnel audit is issued after changing when necessary.
The present invention is simple in rule to the processing of rainfall data and it can be readily appreciated that the form by isopleth, contour surface carries out Displaying is vivid, intuitive, in combination with early warning issuing function, work of flood prevention personnel is enable to perceive possible danger in advance, into And prepare counter-measure in advance, it is of great significance on reducing disaster influence.
Description of the drawings
Fig. 1 is the main flow schematic diagram of the present invention.
Specific implementation mode
Explanation is further explained to the present invention in the following with reference to the drawings and specific embodiments.
A kind of isopleth, Isosurface construction, method for early warning based on actual measurement with forecast rainfall comprising following steps: Step S1:Obtain predictions for future rainfall product data and current actual measurement rainfall product data;Step S2:To the future obtained in step S1 Forecast rainfall and actual measurement rainfall product data are handled according to the rule of setting, and data that treated are known as forecasting rainfall, defeated Go out to isopleth, Isosurface construction module and early warning determination module;Step S3:To forecast rainfall data carry out precipitation isohyetal line, The drafting of contour surface;Each period is both provided with threshold value of warning, and forecast rainfall and the threshold value of warning of corresponding period are compared, When reaching or exceeding early warning, survey station, area, corresponding rainfall and the rainfall corresponding period for needing to carry out early warning will be believed Breath passes to early warning release module and enters step S4;Step S4:Carry out early warning publication.
Forecast that the computational methods of rainfall include the following steps in step S2:
Step S21:Obtain the forecast rainfall and actual measurement rainfall of different periods;
Step S22:If it is A hours following to forecast that the period collection of rainfall is combined into, the period collection B of being combined into over of rainfall is surveyed Hour, early warning period collection is combined into C hours, a ∈ A, b ∈ B, c ∈ C, c ' ∈ C;A, b, c are natural number.
Step S23:If a=c and(a+b)C, then a hours forecast rainfalls are not processed forecast rain directly as c hours Amount, when early warning, compare with c hours threshold value of warning, meet or exceed threshold value of warning and issue warning information;If a=c, a+b=c ', point Two kinds of situations, first, a hours forecast rainfalls are not processed directly as c hour forecast rainfall, when early warning and c hours early warning thresholds Value compares, and meets or exceeds threshold value of warning publication warning information, first, a hours forecast rainfalls add b hours actual measurement rainfalls Rainfall is forecast as c ' hours, is compared with c ' hour threshold value of warning when early warning, is met or exceeded threshold value of warning publication early warning letter Breath;As a C, a+b=c, a hours forecast rainfalls add b hour actual measurement rainfalls as c hours and forecast rainfall, when early warning and c Hour threshold value of warning compares, and meets or exceeds threshold value of warning publication warning information.
C after being calculated in step S23(Or c ', following description is using c as being referred to as in this paragragh)Hour forecast Rainfall, if the sum of a hours future forecast rainfall and b hours in the past actual measurement rainfalls, then carry out special identifier in systems, To show the difference with the forecast rainfall such case that directly looks to the future, such as with " c (a) " expression c hours warning levels, leading times A hours, rained c-a=b hours;Or " c (b) " indicate c hours warning levels, rained b hours, leading time c-b=a it is small When;Or " c-a " indicates c hours warning levels, leading time a hours, has rained c-a=b hours;It can also be other mark side Formula, the present invention do not limit;Indicated if being identified using " c " directly by predictions for future rainfall as forecast rainfall.
In specific embodiment:Rain detection with radar is mainly short forecasting, based on this hypothesis obtain following 1 hour, 2 hours, it is 3 small When rainfall forecast data.Rainfall early warning considers 1 hour, 3 hours, 6 hours, 12 hours 4 ranks." forecast rainfall " is:1 hour Forecast data is not processed, and directly as 1 hour " forecast rainfall ", is compared with 1 hour threshold value of warning;Pre- count off in 2 hours It compares, can mark with 3 hours threshold value of warning as 3 hours " forecast rainfall " according to the practical rainfall product data plus past 1 hour It is denoted as " 3(2)" or " 3-2 " etc.;3 hours forecast datas are divided into two kinds of situations:It is small directly as 3 one is not dealing with When " forecast rainfall ", compared with 3 hours threshold value of warning, another kind is, by 3 hours forecast datas plus 3 hours in the past reality Rainfall product data can be labeled as " 6 as 6 hours forecast rainfall(3)" or " 6-3 " etc..
This example does not limit rainfall forecast period, early warning period, is only used as one of embodiment, period root It can be adjusted according to the needs of development or the real work of forecasting technique.
Further, for by forecasting that rainfall is used as forecast rainfall with the sum of actual measurement rainfall in the past in step S4 Situation is identified, either the drafting of isopleth, contour surface, or generate warning information content, and by early warning short message, Wireless alarming broadcast, mailbox are faxed to early warning survey station or region related personnel transmission warning information.
Further, the early warning publication in step S4 automatically generates corresponding early warning content, and then carry out according to early warning template The publication of early warning;Early warning template is by system according to presetting automatic running or by being manually arranged.Early warning template can be in system In preset, preferably, user such as can increase early warning template, delete, change at the operations.
Early warning content is carried out early warning publication automatically according to the rule of setting by system or is repaiied when necessary through related personnel's audit It is issued after changing.
Early warning publication include early warning template-setup, warning information editor, alarm mode select, sending object selection function, Specifically system still can be manually arranged according to presetting automatic running.Early warning release module obtains early warning determination module Judgement needs to send out the information of early warning, and corresponding early warning content is automatically generated according to default early warning template, also can human-edited's early warning Content, and then carry out the publication of early warning.The early warning published method present invention is not limited, and can be rule of the system automatically according to setting Early warning publication is then carried out, can also provide after early warning audit function related personnel audit is changed when necessary and issue, Huo Zhebao Two kinds of mechanism are stayed to be selected for user.In addition, the early warning publication means present invention is not also limited, include optionally it is following a kind of or It is a variety of, can also be except example set forth below:Reach the rainfall contour surface in the region of threshold value of warning with special mode into Row shows, such as flicker, sound, or the survey station of association early warning region is shown on contour surface(Either survey station figure The displaying on map such as mark, title can also be to click prewarning area push early warning survey station information or stackable all surveys Information of standing but the special displaying of the survey station for needing early warning --- such as pass through the modes such as flicker, different colours or sound);By pre- Alert short message, wireless alarming broadcast, mailbox, fax etc. send warning information to early warning survey station or region related personnel.The present invention Publication channel, sending object setting function are provided, automatic publication can be equally preset, is configured when can also issue every time, Also the operations such as publication channel, the newly-increased of sending object, modification, deletion can be carried out.
The above are preferred embodiments of the present invention, all any changes made according to the technical solution of the present invention, and generated function is made When with range without departing from technical solution of the present invention, all belong to the scope of protection of the present invention.

Claims (5)

1. it is a kind of based on actual measurement with forecast rainfall isopleth, Isosurface construction, method for early warning, which is characterized in that including with Lower step:
Step S1:Obtain predictions for future rainfall product data and current actual measurement rainfall product data;
Step S2:To the predictions for future rainfall that is obtained in step S1 and actual measurement rainfall product data according to the rule of setting at Reason, data that treated are known as forecasting rainfall, are output to isopleth, Isosurface construction module and early warning determination module;
Step S3:The drafting of precipitation isohyetal line, contour surface is carried out to forecast rainfall data;Each period is both provided with early warning threshold Value compares forecast rainfall and the threshold value of warning of corresponding period, reaches or when beyond early warning, will be needing progress early warning Survey station, area, corresponding rainfall and the corresponding period information of the rainfall pass to early warning release module and enter step S4;
Step S4:Carry out early warning publication;
Forecast that the computational methods of rainfall include the following steps in step S2:
Step S21:Obtain forecast rainfall, the actual measurement rainfall of different periods;
Step S22:If it is A hours following to forecast that the period collection of rainfall is combined into, the period collection B of being combined into over for surveying rainfall is small When, early warning period collection is combined into C hours, a ∈ A, b ∈ B, c ∈ C, c ' ∈ C;A, b, c are natural number;
Step S23:If a=c and(a+b)C, then a hours forecast rainfalls are not processed forecast rainfall directly as c hours, in advance It is compared with c hours threshold value of warning when alert, meets or exceeds threshold value of warning publication warning information;If a=c, a+b=c ' is divided to two kinds Situation:First, a hours forecast rainfalls are not processed directly as c hour forecast rainfall, when early warning with c hours threshold value of warning works Comparison meets or exceeds threshold value of warning publication warning information;First, a hours forecast rainfalls add actual measurement rainfall conduct in b hours C ' hours forecast rainfall, are compared with c ' hour threshold value of warning when early warning, meet or exceed threshold value of warning publication warning information;When When a C, a+b=c, a hours forecast rainfalls add b hour actual measurement rainfalls as c hour and forecast rainfall, when early warning and c hours in advance Alert threshold value compares, and meets or exceeds threshold value of warning publication warning information.
2. isopleth, Isosurface construction, method for early warning according to claim 1 based on actual measurement with forecast rainfall, It is characterized in that:The forecast rainfall after computational methods calculating in step S23, if a hours future forecast rainfall and b is small in the past When actual measurement the sum of rainfall, then carry out special identifier in systems, using show with directly by predictions for future rainfall as forecasting rain Measure the difference of such case.
3. isopleth, Isosurface construction, method for early warning according to claim 1 based on actual measurement with forecast rainfall, It is characterized in that:Early warning publication by early warning short message, wireless alarming broadcast, mailbox or is faxed to early warning survey station or area in step S4 Domain related personnel sends warning information.
4. isopleth, Isosurface construction, method for early warning according to claim 1 based on actual measurement with forecast rainfall, It is characterized in that:Early warning publication in step S4 automatically generates corresponding early warning content, and then carry out the hair of early warning by early warning template Cloth;Early warning template is by system according to presetting automatic running or by being manually arranged.
5. isopleth, Isosurface construction, method for early warning according to claim 4 based on actual measurement with forecast rainfall, It is characterized in that:Early warning content is carried out early warning publication automatically according to the rule of setting by system or is changed through related personnel's audit laggard Row publication.
CN201611133797.8A 2016-12-10 2016-12-10 Isopleth, Isosurface construction, method for early warning based on actual measurement with forecast rainfall Active CN106383373B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611133797.8A CN106383373B (en) 2016-12-10 2016-12-10 Isopleth, Isosurface construction, method for early warning based on actual measurement with forecast rainfall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611133797.8A CN106383373B (en) 2016-12-10 2016-12-10 Isopleth, Isosurface construction, method for early warning based on actual measurement with forecast rainfall

Publications (2)

Publication Number Publication Date
CN106383373A CN106383373A (en) 2017-02-08
CN106383373B true CN106383373B (en) 2018-10-30

Family

ID=57960048

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611133797.8A Active CN106383373B (en) 2016-12-10 2016-12-10 Isopleth, Isosurface construction, method for early warning based on actual measurement with forecast rainfall

Country Status (1)

Country Link
CN (1) CN106383373B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107608010A (en) * 2017-10-12 2018-01-19 江苏航天大为科技股份有限公司 A kind of urban water affairs rainfall isoplethes drawing method and drawing system
CN109241369B (en) * 2018-08-02 2019-06-21 中国水利水电科学研究院 Rainfall isopleth construction method based on grid stretching method
CN110111538B (en) * 2019-04-30 2021-06-25 中国电建集团北京勘测设计研究院有限公司 Dynamic monitoring, early warning and analyzing system for mountain torrent disasters
CN114093133A (en) * 2021-11-24 2022-02-25 合肥工业大学 Regional geological disaster weather forecast early warning method

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100628859B1 (en) * 1999-06-03 2006-09-27 보슝 메카트로닉 아게 Process and warning device for producing an early warning signal of slick road conditions
JP5083522B2 (en) * 2007-08-16 2012-11-28 日本電気株式会社 Network monitoring method, network monitoring apparatus, line error prevention system, network monitoring apparatus program
JP5247301B2 (en) * 2008-08-21 2013-07-24 中国電力株式会社 Disaster prevention system judgment support system
CN102103787B (en) * 2011-02-27 2013-06-26 中国科学院水利部成都山地灾害与环境研究所 Debris flow early warning method
CN103714661B (en) * 2013-11-14 2016-06-08 浙江省国土资源厅信息中心 The landslide real time early warning method of rainfall threshold adaptive
CN105224801B (en) * 2015-10-08 2017-09-26 中国长江电力股份有限公司 A kind of multiple-factor reservoir reservoir inflow short-period forecast evaluation method
CN105740618B (en) * 2016-01-28 2018-10-26 成都理工大学 Rainfall dividing method for the prediction of ditch bed start type mud-rock flow
CN105608840A (en) * 2016-03-09 2016-05-25 长江水利委员会水文局 Mountain torrents early warning platform based on fused quantitative rainfall forecast algorithm, and early warning method thereof

Also Published As

Publication number Publication date
CN106383373A (en) 2017-02-08

Similar Documents

Publication Publication Date Title
CN106383373B (en) Isopleth, Isosurface construction, method for early warning based on actual measurement with forecast rainfall
US9158035B2 (en) System and method of automated acquisition, correlation and display of power distribution grid operational parameters and weather events
KR100783721B1 (en) Broadcast network system and method for interactive weather advisory
CN104539882A (en) Safe prevention system of smart city
CN105608840A (en) Mountain torrents early warning platform based on fused quantitative rainfall forecast algorithm, and early warning method thereof
KR101445045B1 (en) System and method for emergency alerting using the sameusing integrated management service
US20100245064A1 (en) Method and means for providing safety related messages to drivers
JP2006079483A (en) Traffic information providing apparatus and traffic information providing method
US20160148100A1 (en) Apparatus and method for changing alarm information in accordance with weather
JP5994389B2 (en) Information processing apparatus, information processing method, and information processing program
KR20160099931A (en) Disaster preventing and managing method for the disaster harzard and interest area
CN110555381A (en) Personnel dispersion system and personnel dispersion method
CN107086663A (en) Graphic software platform safety monitoring system and method based on distributing optical fiber sensing
CN113125659A (en) Water quality monitoring platform
CN114999180A (en) Expressway severe weather traffic early warning system and method based on Internet of things
CN106657303A (en) Method of universal early warning service capable of being defined and extended by user
CN104535043A (en) Power line safety distance measurement evaluation method based on smart phone
KR101722989B1 (en) Apparatus and method for managing disaster using floating population of base station
KR102189346B1 (en) Method, apparatus and program for deciding potential hazard area based on digital survey
JP4922511B2 (en) Basin information generation system
CN103500530B (en) Based on the automatic initial proportion chi map making method of road net space distribution
KR102033008B1 (en) Geographic information system for proving blocking energy data and method for providing analysis result using the same
KR20210097407A (en) Application Meteorological Information Solution for Maritime Leisure industry
JP6818639B2 (en) Information provision system and information provision method
JP2023040276A (en) Information processor, information processing method, and program

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 350001 unit 6, 4 building, 245 Xiu Shan Road, Xin Dian Town, Jinan District, Fuzhou, Fujian, 608

Applicant after: Four creation technology limited company

Address before: 350108 Fuzhou, Minhou, Fujian province Minhou Town, Fuzhou science and Technology Road East Fuzhou hi tech Zone "Haixi high tech Industrial Park" business building 9, 10

Applicant before: Fujian Strong Software Co., Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant